About this file

This document contains an attachment of specialized experience examples for an engineering firm. The attachment includes templates for seven project examples requiring information on project details, design disciplines involved, and relevant design project types.

The templates seek information on each project's title and location, years of design and estimated construction completion, the firm's project role as prime or subcontractor, construction cost, the engineering firm or joint venture name, whether it involved new construction or repair, applicable professional services of design-bid-build, design-build, or engineering studies, design disciplines of civil, architectural, structural, electrical, fire protection, mechanical or geotechnical engineering involved, and relevant design project types of roadway/parking, pavements, airfields, water treatment and distribution systems, sewage collection and treatment systems, or drainage systems, erosion control, and slope stabilization.

The related federal contract opportunity is for market research services for architect-engineer services for military construction civil projects and other civil projects at various locations for the Naval Facilities Engineering Systems Command Hawaii Areas.

View the file

Other files

File Type Posted
Attach_(3)_Key_Personnel.pdf PDF
Attach_(1)_OfferorInfo.pdf PDF
N62478CON33FY2401.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT (2)

SPECIALIZED EXPERIENCE

(a) SPECIALIZED EXPERIENCE

EXAMPLE PROJECT KEY

NUMBER:

TITLE AND LOCATION (CITY & STATE) DESIGN COMPLETED (YR)

(NOT INCLUDING PCAS)

EST. CONSTRUCTION

COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)

DESIGN BID

BUILD D-B RFP

ENGINEERING

STUDIES

DESIGN

BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL ARCHITECT STRUCTURAL ELECTRICAL

FIRE

PROTECTION MECHANICAL GEOTECHNICAL

RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):

ROADWAY/PARKING PAVEMENTS AIRFIELDS

WATER TREATMENT AND

DISTRIBUTION SYSTEMS

SEWAGE COLLECTION AND

TREATMENT SYSTEMS

DRAINAGE SYSTEMS, EROSION

CONTROL, SLOPE

STABILIZATION

NUMBER:

TITLE AND LOCATION (CITY & STATE) DESIGN COMPLETED (YR)

(NOT INCLUDING PCAS)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT CONSTRUCTION COST (NOT AE DESIGN FEE):

ENGINEERING

STUDIES

DRAINAGE SYSTEMS, EROSION

NUMBER:

TITLE AND LOCATION (CITY & STATE) DESIGN COMPLETED (YR)

(NOT INCLUDING PCAS)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT CONSTRUCTION COST (NOT AE DESIGN FEE):

ENGINEERING

STUDIES

DRAINAGE SYSTEMS, EROSION

NUMBER:

TITLE AND LOCATION (CITY & STATE) DESIGN COMPLETED (YR)

(NOT INCLUDING PCAS)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT CONSTRUCTION COST (NOT AE DESIGN FEE):

ENGINEERING

STUDIES

DRAINAGE SYSTEMS, EROSION

NUMBER:

TITLE AND LOCATION (CITY & STATE) DESIGN COMPLETED (YR)

(NOT INCLUDING PCAS)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT CONSTRUCTION COST (NOT AE DESIGN FEE):

ENGINEERING

STUDIES

DRAINAGE SYSTEMS, EROSION

NUMBER:

TITLE AND LOCATION (CITY & STATE) DESIGN COMPLETED (YR)

(NOT INCLUDING PCAS)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT CONSTRUCTION COST (NOT AE DESIGN FEE):

ENGINEERING

STUDIES

DRAINAGE SYSTEMS, EROSION

NUMBER:

TITLE AND LOCATION (CITY & STATE) DESIGN COMPLETED (YR)

(NOT INCLUDING PCAS)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT CONSTRUCTION COST (NOT AE DESIGN FEE):

ENGINEERING

STUDIES

DRAINAGE SYSTEMS, EROSION

File details come from the government source that posted it. Updated .