Attach 2 List of NIST Closed Loops.pdf

PDF 91 KB Posted

Attached to
NIST Boulder Closed Loop Chemical Treatment
Solicitation number
NB1940002301741
Issued by

About this file

The attached document is a list of three closed loops at the National Institute of Standards and Technology campus in Boulder, Colorado. The loops include conductivity, pH, nitrite, glycol percentage, and iron levels.

The related federal contract opportunity is a pre-solicitation for chemical treatment of the NIST Boulder closed loops. The solicitation number is NB1940002301741 and is being issued by the Department of Commerce National Institute of Standards and Technology. Services required include ongoing chemical treatment of the three closed loops specified in the attached list to control conductivity, pH, nitrite, glycol percentage, and iron levels. The pre-solicitation provides advance notice of the forthcoming solicitation for these chemical treatment services.

View the file

Other files

File Type Posted
SOW Closed Loop Chemicals revised.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Loop Name Conductivity pH Existing Nitrite Glycol Percentage Iron

1 B1 W6 Glycol Energy Recovery 180 5.47 0 19 3.3

B1 Spine/Front of Building 1 Heating Hot Water

655 9.9 300 23 1.26

3 B1 2058 Process Water 6531 11.4 <2500 N/A 0.07 4 B1 W3/W5 Heating Hot Water 251 9.3 100 0 0.10 5 B1 W3 Process Water 215 7.5 100 N/A 0.30 6 B1 W3 Glycol Energy Recovery 1130 10.5 600 15 0.65 7 B1 Annex F Glycol Chilled Water 2100 10.2 700 40 0 8 B1 W6 Heating Hot Water 122 8.7 50 0 0.17 9 B81 Heating Hot Water 560 9.9 150 N/A 0.03

10 B81 Heat Recovery Loop 2715 9.9 2300 56 0 11 B81 Heat Pump Loop 1062 9.9 <2500 <63 0.83 12 B81 Low Temp Chilled Water 3810 9.47 1600 35 0 13 B81 Glycol Heating Hot Water 1770 9.3 1100 42 0 14 B81 Secondary Chilled Water 582 8.5 250 N/A 0.10 15 B81 Low Temp Heating Water 584 9.0 200 N/A 0 16 B2 Glycol Boiler 12 1585 8..8 350 25 0 17 B2 Glycol Energy Recovery 2200 9.4 450 34 0.66 18 B2 Glycol Reheat 1495 9.1 250 13 0.08 19 B2 Glycol Preheat 1790 10.1 550 38 0.07 20 B3 Glycol Heating Hot Water 4010 8.9 2200 18 0.04 21 B21 Glycol Heating Hot Water 615 10.4 200 44 0.66 22 B22 Glycol Heating Hot Water 2580 9.4 500 37 0 23 B23 Glycol Heating Hot Water 1707 8.4 550 43 0.24 24 B24 Heating Hot Water 136 9.3 50 N/A 0.55 25 B25 Heat Hot Water 2329 10.0 1800 N/A 0.01 26 B42 Heating Hot Water 146 9.0 50 N/A 3.3

Loop Name Conductivity pH Silica Inhibitor Glycol Percentage Iron

27 B81 Process Chilled Water Loop as of Feb 22 249 10.35 85 N/A 0.24

NIST CLOSED LOOPS INFORMATION

Testing Results from March 2023

Testing Results from February 2023

Wing 5 New Construction (Information based on construction drawings, construction complete May 2023)

Loop Name Conductivity pH Silica Inhibitor Glycol Percentage Iron

28 Wing 5 Decoupled Chilled Water Loop Unknown Unknown 60-100 ppm N/A New piping installed in 2023

29 Wing 5 Process Chilled Water Loop Unknown Unknown 60-100 ppm N/A New piping installed in 2023

30 Wing 5 Snow Melt Loop Unknown Unknown 60-100 ppm 30 New piping installed in 2023

31 Wing 5 energy Recovery Loop Unknown Unknown 60-100 ppm 30 New piping installed in 2023

32 Wing 5 Preheat Coil Loops Unknown Unknown 60-100 ppm N/A New piping installed in 2023

Loop Name Conductivity pH Silica Inhibitor Glycol Percentage Iron

33 Building 2 Snow Melt Loop Unknown Unknown 0 No detectable percentage when tested

Unknown

Existing Building Loops that have not been fully tested

Table 1