ATTACH 2 - Drawings.pdf
PDF 30 MB Posted
- Solicitation number
- FA670320B0003
About this file
This federal contract opportunity solicitation seeks bids for a project to repair spalls, cracks, and joints on taxiways and ramps and install mooring points at Dobbins Air Reserve Base in Georgia. Specifically, the project will perform selected slab replacement and crack repairs on the C-130 ramp and Taxiways Delta and Golf. It will also replace joints and slabs with cracks on runways and taxiways. The project scope includes repairing airfield shoulders with slurry seal, repairing cracks on runway overruns and shoulders, and painting chevron markings. The solicitation was issued by the Department of the Air Force Reserve Command. Bids are due by the date listed in the solicitation number FA670320B0003. The selected contractor will be required to complete the repairs and installations by the scheduled award date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIRPORT ELEVATION = 1068.5 FT
LATITUDE: 33°54'52"N
LONGITUDE: 84°30'51"W
COBB COUNTY
PROJECT
LOCATION
VICINITY MAPLOCATION MAP
N.T.S.N.T.S.
ISSUE DATE: FEBRUARY 7, 2020
SOLICITATION NO.:
CONTRACT NO.:
PROJECT
LOCATION
H
W
AIR FORCE RESERVE
COMMAND
DOBBINS AIR RESERVE BASE, GEORGIA
REPAIR SPALLS, CRACKS & JOINTS ON C-130 RAMP & TAXIWAY
DELTA/GOLF, LOX PAD, INSTALL MOORING POINTS FOR C-130
PARKING SPOTS AND REPAIR OVERRUNS & SHOULDERS
PROJECT NO. FGWB13 - 0024
FINAL DESIGN SUBMITTAL
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C T
N
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A I R
F
R
E
S
E R
V
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
J A
N U
A R
Y
M
S G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
A D
U N
T
I N
C
N
L O
E
S
U I T
E
T A
M P
A
F
L
B E
N H
A M
S
K E
L
M
P A
N Y
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
B
S
E
G
E O
R G
P
A
P A
L L
S
C
R A
C K
J
I N
T
S
E A
C
M
X
I W
A Y
D E
L T
A G
O L
F
L
X
D
I N
S T
A L
L
M
O O
R I N
G
P
O I N
P A
R K
I N
G
S
P O
P
A
E
R R
U N
O
U L
D E
R S
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
OF1 73
GI001
T I T
E
E T
M J R
D M
R
D P
S
Attachment 2 FA670320B0003
2169des
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
J A
N U
A R
Y
T
H
M
S G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
L
O
E
S
U I T
E
T A
M P
A
F
L
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
P
A
A
L L S
C
R A
C K
I N
T
S
E A
C
R
A M
X
I W
A Y
D E
L T
A G
O L F
L O
X
P
A D
I N
S T
A L L
M
O O
R I N
G
P
O I N
P A
R K
I N
G
S
P O
P
A
E
R R
U N
O
U L D
E R
S
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
OF2 73
GI002
S H
E E
T
I N
D E
X
M J R
D M
R
D E
S
Sheet List Table
SHEET NO. SHEET TITLE
GI001 TITLE SHEET
GI002 SHEET INDEX
GI003 LEGEND AND ABBREVIATIONS
GC111 PROJECT LAYOUT PLAN
GC141 CONSTRUCTION OPERATIONS & PHASING PLAN - OVERALL
GC142 CONSTRUCTION OPERATIONS & PHASING PLAN - C-130 RAMP
GC143 CONSTRUCTION OPERATIONS & PHASING PLAN - C-130 RAMP
GC144 CONSTRUCTION OPERATIONS & PHASING PLAN - OVERFLOW RAMP
GC145 CONSTRUCTION OPERATIONS & PHASING PLAN - TAXIWAY D
GC146 CONSTRUCTION OPERATIONS & PHASING PLAN - TAXIWAY G
GC151 CONSTRUCTION OPERATIONS & PHASING NOTES
GC152 CONSTRUCTION OPERATIONS & PHASING NOTES
GC501 EROSION CONTROL DETAILS
CS001 EXISTING PAVEMENT IDENTIFICATION PLAN
CS002 EXISTING PAVEMENT IDENTIFICATION PLAN
CS003 EXISTING PAVEMENT IDENTIFICATION PLAN
CS101 EXISTING SITE PLAN- C-130 RAMP
CS102 EXISTING SITE PLAN- C-130 RAMP
CS103 EXISTING SITE PLAN- C-130 RAMP
CS104 EXISTING SITE PLAN- C-130 RAMP
CS105 EXISTING SITE PLAN- C-130 RAMP
CS106 EXISTING SITE PLAN- C-130 RAMP
CS107 EXISTING SITE PLAN- C-130 RAMP
CS108 EXISTING SITE PLAN- C-130 RAMP
CS111 EXISTING SITE PLAN- OVERFLOW RAMP
CS112 EXISTING SITE PLAN- OVERFLOW RAMP
CS113 EXISTING SITE PLAN- OVERFLOW RAMP
CS114 EXISTING SITE PLAN- OVERFLOW RAMP
CS121 EXISTING SITE PLAN- TAXIWAY D
CS122 EXISTING SITE PLAN- TAXIWAY D
CS123 EXISTING SITE PLAN- TAXIWAY D
CS124 EXISTING SITE PLAN- TAXIWAY D
CS125 EXISTING SITE PLAN- TAXIWAY D
CS126 EXISTING SITE PLAN- TAXIWAY D
CS131 EXISTING SITE PLAN- TAXIWAY G
CS132 EXISTING SITE PLAN- TAXIWAY G
CS133 EXISTING SITE PLAN- TAXIWAY G
CS141 EXISTING SITE PLAN- EAST OVERRUN
CS151 EXISTING SITE PLAN- WEST OVERRUN
CS161 EXISTING SITE PLAN- LOX PAD
CP101 PAVEMENT REPAIR PLAN- C-130 RAMP
CP102 PAVEMENT REPAIR PLAN- C-130 RAMP
CP103 PAVEMENT REPAIR PLAN- C-130 RAMP
CP104 PAVEMENT REPAIR PLAN- C-130 RAMP
CP105 PAVEMENT REPAIR PLAN- C-130 RAMP
CP106 PAVEMENT REPAIR PLAN- C-130 RAMP
CP107 PAVEMENT REPAIR PLAN- C-130 RAMP
CP108 PAVEMENT REPAIR PLAN- C-130 RAMP
CP111 PAVEMENT REPAIR PLAN- OVERFLOW RAMP
CP112 PAVEMENT REPAIR PLAN- OVERFLOW RAMP
CP113 PAVEMENT REPAIR PLAN- OVERFLOW RAMP
CP114 PAVEMENT REPAIR PLAN- OVERFLOW RAMP
CP121 PAVEMENT REPAIR PLAN- TAXIWAY D
CP122 PAVEMENT REPAIR PLAN- TAXIWAY D
CP123 PAVEMENT REPAIR PLAN- TAXIWAY D
CP124 PAVEMENT REPAIR PLAN- TAXIWAY D
CP125 PAVEMENT REPAIR PLAN- TAXIWAY D
CP126 PAVEMENT REPAIR PLAN- TAXIWAY D
CP131 PAVEMENT REPAIR PLAN- TAXIWAY G
CP132 PAVEMENT REPAIR PLAN- TAXIWAY G
CP133 PAVEMENT REPAIR PLAN- TAXIWAY G
CP141 PAVEMENT REPAIR PLAN- EAST OVERRUN
CP151 PAVEMENT REPAIR PLAN- WEST OVERRUN
CP161 PAVEMENT REPAIR PLAN- LOX PAD
CP301 TYPICAL SECTIONS & PAVEMENT REPAIR DETAILS
CP501 PAVEMENT REPAIR DETAILS
CP502 JOINTING DETAILS
CP503 JOINTING DETAILS
CS175 MARKING PLAN- EAST OVERRUN
CS176 MARKING PLAN- WEST OVERRUN
CS501 MARKING DETAILS
CI181 MOORING POINT LAYOUT
CI502 TIEDOWN DETAILS
TAXIWAY EDGE LIGHT
SURVEY CONTROL POINT
CHAIN LINK FENCE
ELECTRIC LINE
PROJECT LIMITS
STORM DRAIN PIPE
LOW PROFILE BARRICADES
EXISTING PROPOSED
AB
AGGREGATE BASE
AC
ASPHALT CONCRETE
ALT
ALTERNATE
AOA AIR OPERATIONS AREA
APCH APPROACH
APPROX APPROXIMATE
ARFF AIR RESCUE AND FIRE FIGHTING
ATCT AIR TRAFFIC CONTROL TOWER
ATO AIR TRAFFIC ORGANIZATION
AWG AMERICAN WIRE GAUGE
BC BEGINNING OF CURVE
BLDG BUILDING
BM BENCHMARK
BOT BOTTOM
BVC BEGINNING OF VERTICAL CURVE
C-C CENTER TO CENTER
C CURVE
CB CATCH BASIN
CIPCP CAST-IN-PLACE CONCRETE PIPE
CJ CONSTRUCTION JOINT
CFS CUBIC FEET PER SECOND
CL, C/L
CENTERLINE
CLF CHAIN-LINK FENCE
CLR CLEAR
CMP CORRUGATED METAL PIPE
CONC CONCRETE
CONT CONTINUOUS
CRGO CARGO
CP CONTROL POINT
DB DIRECT BURIAL
DEG DEGREE
DI DROP INLET
DIA DIAMETER
DIM DIMENSION
DIP DUCTILE IRON PIPE
DP DEPTH
(E)
EXISTING
E
ELECTRICAL LINE, EASTING
EC END OF CURVE
EG EXISTING GRADE
ELEV ELEVATION
EOP EDGE OF PAVEMENT
EVC END OF VERTICAL CURVE
FAA FEDERAL AVIATION ADMINISTRATION
FBO FIXED BASE OPERATOR
FF FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FL FLOW LINE
FNC FENCE
FOD FOREIGN OBJECT DEBRIS
FPS FEET PER SECOND
FT FEET
G NATURAL GAS LINE
GAL GALLON
GALV GALVANIZED
GB GRADE BREAK
GND GROUND
GPM GALLONS PER MINUTE
GS GROUND SHOT
H HEIGHT
HDPE HIGH DENSITY POLYETHYLENE
HIRL HIGH INTENSITY RUNWAY LIGHT
HITHL HIGH INTENSITY THRESHOLD LIGHT
HORIZ HORIZONTAL
HMA HOT MIX ASPHALT
HWY HIGHWAY
IE INVERT ELEVATION
IN INCHES
IP IN-PAVEMENT
L
LENGTH, LEFT, LINE, LIGHT
LAT LATITUDE
LBS POUNDS
LED, (L)
LIGHT EMITTING DIODE
LF LINEAL FEET
LOC LOCALIZER
LONG LONGITUDE
LWL LOW WATER LEVEL
MH MANHOLE
MAX MAXIMUM
MG MILLED GRADE
MID MIDPOINT
MIN MINIMUM
MALS MEDIUM APPROACH LIGHTING SYSTEM
MIRL MEDIUM INTENSITY RUNWAY LIGHT
MITL MEDIUM INTENSITY TAXIWAY LIGHT
MPH MILES PER HOUR
MUTCD MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
(N)
NEW
N NORTHING
NAVAIDS NAVIGATION AIDS
NIC NOT IN CONTRACT
NO. OR # NUMBER
NOTAM NOTICE TO AIRMAN
NTS NOT TO SCALE
OFF, O/S
OFFSET
OC ON CENTER
OH OVERHEAD
PAPI PRECISION APPROACH PATH INDICATOR
PB PULL BOX
PC POINT OF CURVATURE
PCC PORTLAND CEMENT CONCRETE
PCF POUNDS PER CUBIC FOOT
PFC POROUS FRICTION COURSE
PERF PERFORATED
PI POINT OF INTERSECTION
POB POINT OF BEGINNING
POC POINT OF CURVE
POE POINT OF ENDING
PSI POUNDS PER SQUARE INCH
PSF POUNDS PER SQUARE FOOT
PT
POINT, POINT OF TANGENCY
PVC POINT OF VERTICAL CURVE
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENCY
QTY QUANTITY
R
RIGHT, RADIUS
R&R REMOVE AND REPLACE
RAIL RUNWAY ALIGNMENT INDICATOR LIGHT
RC RELATIVE COMPACTION
REL RELOCATE EXISTING
REIL RUNWAY END IDENTIFIER LIGHT
RCP REINFORCED CONCRETE PIPE
REQ REQUIRED
RGL RUNWAY GUARD LIGHT
RPR RESIDENT PROJECT REPRESENTATIVE
ROW RIGHT OF WAY
RTR REMOTE TRANSMITTER/RECEIVER
RWA RESTRICTED WORK AREA
RWAPP RUNWAY APPROACH LIGHT
RWY RUNWAY
S
SANITARY LINE, SALVAGED
SF SQUARE FOOT
SG STRAIGHT GRADE
SH SHOULDER
SIDA SECURITY IDENTIFICATION DISPLAY AREA
SMGS
SURFACE MOVEMENT GUIDANCE AND
CONTROL SYSTEM
SPCD SAFETY PLAN COMPLIANCE DOCUMENT
SS STAINLESS STEEL
SD STORM DRAIN
STA STATION
STD STANDARD
STL STEEL
SY SQUARE YARDS
T TELEPHONE LINE
TC TOP OF CURB
TG TOP OF GRATE
T/L TAXILANE
TOE TOE OF BANK
TOP TOP OF BANK
TDZ TOUCHDOWN ZONE
TWY TAXIWAY
TYP TYPICAL
UD
UNDERDRAIN
OFA OBJECT FREE AREA
UG UNDERGROUND
UON UNLESS OTHERWISE NOTED
USA UNITED STATES OF AMERICA
V VELOCITY
V VOLT
VC VERTICAL CURVE
VERT VERTICAL
VG VALLEY GUTTER
VIF VERIFY IN FIELD
VASI VISUAL APPROACH SLOPE INDICATOR
W
WIDTH, WEST, WATER LINE
W/
WITH
W/O WITHOUT
WSE WATER SURFACE ELEVATION
WSP WELDED STEEL PIPE
WV WATER VALVE
WWM WELDED WIRE MESH
EXISTING SUBGRADE (SECTION VIEW)
GROUND, PROPOSED (SECTION VIEW)
PCC SLAB REPLACEMENT (PLAN VIEW)
ASPHALT PATCHING
STAGING AREA
BM#1
x
E
XXXXXXXXXXXXXXX
SD
NATURAL GAS LINE
G
SANITARY SEWER LINE
SS
WATER LINE
W W
SEWER CLEAN OUT
CATCH BASIN
STORM DRAIN MANHOLE
HAUL ROUTE
ASPHALT SEALCOATING
(PLAN VIEW)
NEW PCC PAVEMENT
(SECTION VIEW)
CRUSHED STONE CONSTRUCTION EXIT
FIRE HYDRANT AND VALVE
SEWER CLEAN OUT
CATCH BASIN
STORM DRAIN MANHOLE
SANITARY SEWER
MANHOLE
INLET PROTECTION
(EROSION CONTROL MEASURE)
EXISTING 6.5" PCC PAVEMENT
EXISTING 7.5" PCC PAVEMENT
EXISTING 8.5" PCC PAVEMENT
EXISTING 11" PCC PAVEMENT
EXISTING 11.25" PCC PAVEMENT
EXISTING 16.25" PCC PAVEMENT
EXISTING 2" ASPHALT PAVEMENT
LINES
PATTERNS
GENERAL ABBREVIATIONS
EXISTING 14.5" PCC PAVEMENT
B
F
H
J
D
THICKENED EDGE ISOLATION
JOINT
DOWELED CONTRACTION JOINT
NON-DOWELED CONTRACTION
JOINT
ASPHALT/CONCRETE EDGE JOINT
DOWELED CONSTRUCTION JOINT
SF
SILT FENCE
ALIGNMENT
TEMPORARY MARKING REMOVAL
DARB DOBBINS AIR RESERVE BASE
CO CONTRACTING OFFICER
COR CONTRACTING OFFICER REPRESENTATIVE
C DOWELED JOINT AT EXIST. CONC.
NEW ASPHALT PAVEMENT
(SECTION VIEW)
NEW AGGREGATE BASE COURSE
LAYER (SECTION VIEW)
NEW UNBOUND CRUSHED
STONE (SECTION VIEW)
WIRE REINFORCEMENT
SUBGRADE COMPACTED TO 95% TO ASTM D1557
MAX DENSITY (SECTION VIEW)
FR FLUSHING RISER
W
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
J A
N U
A R
Y
T
H
M
S G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
L
O
E
S
U I T
E
T A
M P
A
F
L
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
P
A
A
L L S
C
R A
C K
I N
T
S
E A
C
R
A M
X
I W
A Y
D E
L T
A G
O L F
L O
X
P
A D
I N
S T
A L L
M
O O
R I N
G
P
O I N
P A
R K
I N
G
S
P O
P
A
E
R R
U N
O
U L D
E R
S
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
OF3 73
GI003
L E
G E
B
R E
V I A
T I O
N S
M J R
D M
R
D E
S
EXISTING 11.5" PCC PAVEMENT
EXISTING 16.5" PCC PAVEMENT
EXISTING 22" PCC PAVEMENT
EXISTING 24" PCC PAVEMENT
EXISTING 7.75" PCC PAVEMENT
EXISTING 20.25" PCC PAVEMENT
EXISTING 20.75" PCC PAVEMENT
TRENCH DRAIN
Attachment 2 FA670320B0003
AutoCAD SHX Text
CO
AutoCAD SHX Text
CB
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text
CO
AutoCAD SHX Text
CB
AutoCAD SHX Text D
AutoCAD SHX Text
RUNWAY 11/29
A
X
I
W
A
Y
A
T
A
X
I
W
A
Y
B
T
A
X
I
W
Y
KEY MAP
NOT TO SCALE
C-130 RAMP
OVERFLOW RAMP
TAXIWAY D
LEGEND
TAXIWAY G
WEST OVERRUN
EAST OVERRUN
PROJECT
LOCATIONS
4 73
GC111
P R
O J E
Y
O U
T
P
L A
N
M J R
D M
R
D P
S
EAST OVERRUN
ASPHALT CRACK SEALING &
SEALCOAT
REMARKING OF OVERRUN
CHEVRONS
WEST OVERRUN
ASPHALT CRACK SEALING &
SEALCOAT
REMARKING OF OVERRUN
CHEVRONS
TAXIWAY G
SLAB REPLACEMENT
JOINT RESEALING
CRACK & SPALL REPAIR
CONCRETE PAVEMENT RECONSTRUCTION
C-130 RAMP
SLAB REPLACEMENT
JOINT RESEALING
CRACK & SPALL REPAIR
ASPHALT SHOULDER CRACK SEALING & SEALCOAT
TRENCH DRAIN REPAIR
OVERFLOW RAMP
SLAB REPLACEMENT
JOINT RESEALING
CRACK & SPALL REPAIR
ASPHALT SHOULDER CRACK
SEALING & SEALCOAT
TAXIWAY D
SLAB REPLACEMENT
JOINT RESEALING
CRACK & SPALL REPAIR
ASPHALT SHOULDER CRACK
SEALING & SEALCOAT
LOX PAD
RECONSTRUCT CONCRETE PAD
00 500 1000
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
J A
N U
A R
Y
T
H
M
S G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
L
O
E
S
U I T
E
T A
M P
A
F
L
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
P
A
A
L L S
C
R A
C K
I N
T
S
E A
C
R
A M
X
I W
A Y
D E
L T
A G
O L F
L O
X
P
A D
I N
S T
A L L
M
O O
R I N
G
P
O I N
P A
R K
I N
G
S
P O
P
A
E
R R
U N
O
U L D
E R
S
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
OF
L A
N T
A
R
D
S
E
A T
L A
N
T
IC
A V
E S
E
RUNWAY 11/29
TAXIWAY D
T
A
X
I
W
A
Y
A
T
A
X
I
W
A
Y
B
DOBBINS ARB NEW COMMERCIAL GATE
CONTRACTOR ACCESS POINT.
SEE CONTRACTOR ACCESS NOTES A AND B, SHEET
GC151 FOR CONTRACTOR STAFFING REQUIREMENTS.
(E) AIRFIELD ACCESS GATE
SEE CONTRACTOR ACCESS
NOTES A AND B, SHEET
GC151 FOR CONTRACTOR
STAFFING REQUIREMENTS.
CONTRACTOR
ACCESS AND
HAUL ROUTE
DOBBINS ARB
MAIN ENTRANCE
GATE
VISITOR'S CENTER
& BADGING OFFICE
INDUSTRIAL DRIVE
C
O
R C
O
K
ATLANTIC AVE SE
C
M
P
T
A
X
I
W
E
F U
E L I N
G
R
D
WORK AREA 7 LOX
PAD- SEE SHEET
CP161 FOR WORK
REQUIREMENTS
CONTRACTOR
LAYDOWN AREA
(SEE SHEETS GC142 -
GC146 FOR INDIVIDUAL
STAGING AREAS)
TAXIWAY
G
0 100' 200'
KEY MAP
NOT TO SCALE
WORK AREA 1
C-130 RAMP (SEE
SHEETS GC142&143)
WORK AREA 2
OVERFLOW RAMP
(SEE SHEET GC144)
WORK AREA 3
TAXIWAY D (SEE
SHEET GC145)
LEGEND- PROJECT WORK AREAS
WORK AREA 4
TAXIWAY G (SEE
SHEET GC146)
WORK AREA 5 WEST
OVERRUN (SEE
SHEET CP151)
WORK AREA 6 EAST
OVERRUN (SEE
SHEET CP141)
CONTRACTOR STAGING
AREA
HAUL ROUTE
LEGEND
5 73
GC141
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
N S
P
H A
S I N
G
P
L A
N
O
V E
R A
L L
M J R
D M
R
D P
S
PROJECT
LOCATIONS
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
J A
N U
A R
Y
T
H
M
S G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
L
O
E
S
U I T
E
T A
M P
A
F
L
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
P
A
A
L L S
C
R A
C K
I N
T
S
E A
C
R
A M
X
I W
A Y
D E
L T
A G
O L F
L O
X
P
A D
I N
S T
A L L
M
O O
R I N
G
P
O I N
P A
R K
I N
G
S
P O
P
A
E
R R
U N
O
U L D
E R
S
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
ARFF STATION
(UNDER
CONSTRUCTION)
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXXXXXXXX
XXXXXXXXXXXXXXXX
EXISTING TRENCH DRAIN
OVERFLOW RAMP
TAXIWAY D
SEE NOTE 1
KEY MAP
NOT TO SCALE
PROJECT
LOCATION
GC142
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
A
S I N
G
P
L A
N
C
M
P
M J R
D M
R
D P
S
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
J A
N U
A R
Y
T
H
M
S G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
L
O
E
S
U I T
E
T A
M P
A
F
L
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
P
A
A
L L S
C
R A
C K
I N
T
S
E A
C
R
A M
X
I W
A Y
D E
L T
A G
O L F
L O
X
P
A D
I N
S T
A L L
M
O O
R I N
G
P
O I N
P A
R K
I N
G
S
P O
P
A
E
R R
U N
O
U L D
E R
S
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
OF
0 100' 200'
XXXXXX
LOW PROFILE BARRICADE
LEGEND
WORK AREA 1A - C130 RAMP
NOTES
1. CONTRACTOR SHALL ALWAYS PROVIDE CLEAR ACCESS ROUTE TO AND FROM THE
ARFF STATION DURING THIS PHASE.
2. CONTRACTOR MAY TEMPORARILY BE REQUIRED TO REMOVE AND REPLACE
BARRICADES TO ALLOW PARKED AIRCRAFT EAST OF THE PHASE LIMITS TO EXIT THE
C-130 RAMP.
3. EXACT LIMITS OF PHASES 1A AND 1B MAY BE ADJUSTED IN FIELD PENDING PLANNED
OPERATIONS AND PROPOSED CONSTRUCTION SCHEDULE.
4. CONTRACTOR SHALL ESTABLISH A STAGING AREA FOR THIS WORK AREA WITHIN THE
LIMITS OF THE WORK AREA. NO EQUIPMENT SHALL BE STORED OUTSIDE THESE LIMITS
WITHOUT APPROVAL OF THE CONTRACTING OFFICER.
ARFF STATION
(UNDER
CONSTRUCTION)
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXX
X X
X X
XXXXXXXXXXXXXX
OVERFLOW RAMP
SEE NOTE 1
TAXIWAY D
0 100' 200'
KEY MAP
NOT TO SCALE
PROJECT
LOCATION
7 73
GC143
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
A
S I N
G
P
L A
N
C
M
P
M J R
D M
R
D P
S
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
J A
N U
A R
Y
T
H
M
S G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
L
O
E
S
U I T
E
T A
M P
A
F
L
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
P
A
A
L L S
C
R A
C K
I N
T
S
E A
C
R
A M
X
I W
A Y
D E
L T
A G
O L F
L O
X
P
A D
I N
S T
A L L
M
O O
R I N
G
P
O I N
P A
R K
I N
G
S
P O
P
A
E
R R
U N
O
U L D
E R
S
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
OF
XXXXXX
LOW PROFILE BARRICADE
LEGEND
WORK AREA 1B - C130 RAMP
NOTES
1. CONTRACTOR MAY BE REQUIRED TO REMOVE AND REPLACE BARRICADES TO ALLOW
VEHICLES AND AIRCRAFT TO ACCESS BUILDING 838 AND OTHER FACILITIES WHILE
WORK IS OCCURRING IN THIS WORK AREA. CONTRACTORS PAVING PLAN TO BE
COORDINATED AND APPROVED BY DARB PRIOR TO THIS WORK BEGINNING.
2. CONTRACTOR MAY TEMPORARILY BE REQUIRED TO REMOVE AND REPLACE
BARRICADES TO ALLOW PARKED AIRCRAFT WEST OF THE PHASE LIMITS TO PARK IN
EXISTING PARKING POSITIONS OUTSIDE THE WORK AREA.
3. EXACT LIMITS OF PHASES 1A AND 1B MAY BE ADJUSTED IN FIELD PENDING PLANNED
OPERATIONS AND PROPOSED CONSTRUCTION SCHEDULE.
4. CONTRACTOR SHALL ESTABLISH A STAGING AREA FOR THIS WORK AREA WITHIN THE
LIMITS OF THE WORK AREA. NO EQUIPMENT SHALL BE STORED OUTSIDE THESE LIMITS
ARFF STATION
(UNDER
CONSTRUCTION)
XXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
OVERFLOW RAMP
TAXIWAY D
0 100' 200'
KEY MAP
NOT TO SCALE
PROJECT
LOCATION
8 73
GC144
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
A
S I N
G
P
L A
N
O V
E R
F L
M
P
M J R
D M
R
D P
S
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
J A
N U
A R
Y
T
H
M
S G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
L
O
E
S
U I T
E
T A
M P
A
F
L
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
P
A
A
L L S
C
R A
C K
I N
T
S
E A
C
R
A M
X
I W
A Y
D E
L T
A G
O L F
L O
X
P
A D
I N
S T
A L L
M
O O
R I N
G
P
O I N
P A
R K
I N
G
S
P O
P
A
E
R R
U N
O
U L D
E R
S
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
OF
XXXXXX
LOW PROFILE BARRICADE
LEGEND
WORK AREA 2 - OVERFLOW RAMP
NOTES
1. WORK SHALL STAY CLEAR OF TAXIWAY D WHICH WILL REMAIN OPEN DURING THIS
PHASE OF WORK.
2. CONTRACTOR MAY TEMPORARILY BE REQUIRED TO REMOVE AND REPLACE
BARRICADES TO ALLOW VEHICLES TO ENTER AND EXIT THE WORK AREA.
3. EXACT LIMITS OF PHASE MAY BE ADJUSTED IN FIELD PENDING PLANNED OPERATIONS
AND PROPOSED CONSTRUCTION SCHEDULE.
4. CONTRACTOR SHALL ESTABLISH A STAGING AREA FOR THIS WORK AREA WITHIN THE
LIMITS OF THE WORK AREA. NO EQUIPMENT SHALL BE STORED OUTSIDE THESE LIMITS
XXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXXXX
SEE NOTE 1
TAXIWAY D
OVERFLOW RAMP
C-130 RAMP
RUNWAY 11/29
0 100' 200'
KEY MAP
NOT TO SCALE
PROJECT
LOCATION
9 73
GC145
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
A
S I N
G
P
L A
N
T A
X I W
J R
D M
R
D P
S
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
J A
N U
A R
Y
T
H
M
S G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
L
O
E
S
U I T
E
T A
M P
A
F
L
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
P
A
A
L L S
C
R A
C K
I N
T
S
E A
C
R
A M
X
I W
A Y
D E
L T
A G
O L F
L O
X
P
A D
I N
S T
A L L
M
O O
R I N
G
P
O I N
P A
R K
I N
G
S
P O
P
A
E
R R
U N
O
U L D
E R
S
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
OF
XXXXXX
LOW PROFILE BARRICADE
LEGEND
WORK AREA 3 - TAXIWAY D
NOTES
1. ALL WORK OUTSIDE THE BARRICADE LIMITS ADJACENT TO RUNWAY 11-29 MUST BE
COMPLETED AT NIGHT OR COORDINATED WITH THE CONTRACTING OFFICER AS A
RUNWAY CLOSURE WILL BE REQUIRED. SEE NOTES SHEET GC 151 AND 152 FOR
ADDITIONAL INFORMATION..
2. CONTRACTOR MAY TEMPORARILY BE REQUIRED TO REMOVE AND REPLACE
BARRICADES TO ALLOW VEHICLES TO ENTER AND EXIT THE WORK AREA.
3. EXACT LIMITS OF PHASE MAY BE ADJUSTED IN FIELD PENDING PLANNED OPERATIONS
AND PROPOSED CONSTRUCTION SCHEDULE.
4. CONTRACTOR SHALL ESTABLISH A STAGING AREA FOR THIS WORK AREA WITHIN THE
LIMITS OF THE WORK AREA. NO EQUIPMENT SHALL BE STORED OUTSIDE THESE LIMITS
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
KEY MAP
NOT TO SCALE
PROJECT
LOCATION
0 50' 100'
10 73
GC146
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
A
S I N
G
P
L A
N
T A
X I W
G
J R
D M
R
D P
S
TAXIWAY G
RUNWAY 11/29
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
J A
N U
A R
Y
T
H
M
S G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
L
O
E
S
U I T
E
T A
M P
A
F
L
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
P
A
A
L L S
C
R A
C K
I N
T
S
E A
C
R
A M
X
I W
A Y
D E
L T
A G
O L F
L O
X
P
A D
I N
S T
A L L
M
O O
R I N
G
P
O I N
P A
R K
I N
G
S
P O
P
A
E
R R
U N
O
U L D
E R
S
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
OF
XXXXXX
LOW PROFILE BARRICADE
LEGEND
WORK AREA 4 - TAXIWAY G
1. ALL WORK OUTSIDE THE BARRICADE LIMITS ADJACENT TO RUNWAY 11-29 MUST BE
COMPLETED AT NIGHT OR COORDINATED WITH THE CONTRACTING OFFICER AS A
RUNWAY CLOSURE WILL BE REQUIRED. SEE NOTES SHEET GC 151 AND 152 FOR
ADDITIONAL INFORMATION.
2. CONTRACTOR MAY TEMPORARILY BE REQUIRED TO REMOVE AND REPLACE
BARRICADES TO ALLOW VEHICLES AND/OR AIRCRAFT TO ENTER AND EXIT THE WORK
AREA FOR HANGAR AND FACILITY ACCESS.
3. EXACT LIMITS OF PHASE MAY BE ADJUSTED IN FIELD PENDING PLANNED OPERATIONS
AND PROPOSED CONSTRUCTION SCHEDULE.
4. CONTRACTOR SHALL ESTABLISH A STAGING AREA FOR THIS WORK AREA WITHIN THE
LIMITS OF THE WORK AREA. NO EQUIPMENT SHALL BE STORED OUTSIDE THESE LIMITS
WITHOUT APPROVAL OF THE CONTRACTING OFFICER.
NOTES
SEE NOTE 1
TAXIWAY A
CONSTRUCTION PHASING/ SCHEDULING
THE PROJECT IS DIVIDED INTO MULTIPLE PHASES. THESE PHASES ARE AS FOLLOWS:
PHASE 0 (60 CALENDAR DAYS) - THIS PHASE WILL START AFTER THE AWARD TO THE CONTRACTOR IS
GIVEN. THIS PHASE WILL CONSIST OF A TIME PERIOD FOR THE CONTRACTOR TO CONDUCT ALL
NECESSARY REQUIREMENTS IN THE RFP PRIOR TO CONSTRUCTION.
THIS PHASE IS PRIMARILY INTENDED FOR THE CONTRACTOR TO SUBMIT AND GET APPROVAL ON ALL
REQUIRED PRE-CONSTRUCTION SUBMITTALS, PERFORM REQUIRED TESTS ON PROPOSED MATERIALS TO
BE USED IN THE PROJECT, PERFORM REQUIRED MIX DESIGNS & ACHIEVE APPROVAL OF MIX DESIGNS, ISSUE SUBCONTRACTS AND PURCHASE ORDERS, SUBMIT REQUIRED PERMITS FOR APPROVAL, PLACEMENT OF STAGING AREA, CONSTRUCTION OF HAUL ROUTES WITHIN THE BASE PROPERTY, AND
PRODUCTION AND STOCKPILING OF MATERIALS FOR THE PROJECT. INTENT OF THIS PHASE IS TO HAVE
ALL REQUIRED APPROVALS AND REPRESENTATIVE MATERIALS IN PLACE PRIOR TO BEGINNING
DEMOLITION OF ANY CONCRETE SLABS OR MAKING ANY PAVEMENT REPAIRS.
A SUBMITTAL REGISTER HAS BEEN PROVIDED OUTLINING ALL REQUIRED SUBMITTALS DURING THIS
PHASE. ALL SUBMITTALS DEFINED AS “PRECONSTRUCTION SUBMITTALS”, “CERTIFICATES”, “PRODUCT
DATA”, “MANUFACTURER'S FIELD REPORTS”, “TEST REPORTS”, “SHOP DRAWINGS”, OR “MANUFACTURER'S
INSTRUCTIONS” IN THE SUBMITTAL DESCRIPTION COLUMN OF THE SUBMITTAL LOG MUST BE SUBMITTED
AND APPROVED PRIOR TO THE COMPLETION OF THIS PHASE.
UPON COMPLETION OF MOBILIZATION, THE CONTRACTOR SHALL RECEIVE A SEPARATE NOTICE TO
PROCEED FOR THE ACTUAL CONSTRUCTION ASSOCIATED WITHIN THE PROJECT. CONSTRUCTION IS
ANTICIPATED TO OCCUR DURING THE BASE FIVE-DAY WORK WEEK OF MONDAY THROUGH FRIDAY FROM
0600 TO 1700, WITH SOME PORTIONS OF THE CONSTRUCTION OCCURRING AT NIGHT DUE TO WEATHER
LIMITATIONS OF CONCRETE PAVING AND SAW CUTTING OF NEW CONCRETE NEEDING TO OCCUR WITHIN
SPECIFIC TIME PERIODS IN RELATION TO THE CONCRETE BEING PLACED.
THE PROJECT HAS BEEN DIVIDED INTO MULTIPLE WORK AREAS AS DEFINED ON SHEET GC141. EACH OF
THESE WORK AREAS WILL HAVE A TIME ASSOCIATED FOR COMPLETION OF WORK. THESE WORK AREAS
ARE AS FOLLOWS.
· WORK AREA 1 - C-130 RAMP (75 CALENDAR DAYS)
WORK SHALL CONSIST OF THE RESEALING OF CONCRETE JOINTS, SPALL REPAIR, CRACK REPAIR, ISOLATED SLAB REPLACEMENT, REMARKING OF MARKINGS THAT ARE DESTROYED DURING
CONSTRUCTION, MOORING POINT REPLACEMENT, AND TRENCH DRAIN REPAIR WITHIN THE WORK AREA.
THE SEALING OF ASPHALT CRACKS AND THE SEALCOATING OF ASPHALT TAXIWAY SHOULDERS IN THIS
WORK AREA ARE ALSO INCLUDED. WORK IN THIS AREA SHALL BE DIVIDED INTO TWO (2) SUBPHASES SO
THAT THE C-130 RAMP CAN REMAIN OPERATIONAL DURING CONSTRUCTION.
· WORK AREA 2 - OVERFLOW APRON (21 CALENDAR DAYS)
WORK SHALL CONSIST OF THE RESEALING OF CONCRETE JOINTS, SPALL REPAIR, CRACK REPAIR, ISOLATED SLAB REPLACEMENT, REMARKING OF MARKINGS THAT ARE DESTROYED DURING
CONSTRUCTION, AND MOORING POINT REPLACEMENT, WITHIN THE WORK AREA. THE SEALING OF
ASPHALT CRACKS AND THE SEALCOATING OF ASPHALT TAXIWAY SHOULDERS IN THIS WORK AREA ARE
ALSO INCLUDED.
· WORK AREA 3 - TAXIWAY D (21 CALENDAR DAYS)
WORK SHALL CONSIST OF THE RESEALING OF CONCRETE JOINTS, SPALL REPAIR, CRACK REPAIR, ISOLATED SLAB REPLACEMENT, REMARKING OF MARKINGS THAT ARE DESTROYED DURING
CONSTRUCTION WITHIN THE WORK AREA. THE SEALING OF ASPHALT CRACKS AND THE SEALCOATING OF
ASPHALT TAXIWAY SHOULDERS IN THIS WORK AREA ARE ALSO INCLUDED. A PORTION OF THIS WORK WILL
BE REQUIRED TO BE COMPLETED WITH A RUNWAY CLOSURE.
· WORK AREA 4 - TAXIWAY G (28 CALENDAR DAYS)
WORK SHALL CONSIST OF THE RESEALING OF CONCRETE JOINTS, SPALL REPAIR, CRACK REPAIR, REMARKING OF MARKINGS THAT ARE DESTROYED DURING CONSTRUCTION, AND RECONSTRUCTION OF
CONCRETE PAVEMENT ADJACENT TO RUNWAY 11-29 IN THIS WORK AREA. A PORTION OF THIS WORK
WILL BE REQUIRED TO BE COMPLETED WITH A RUNWAY CLOSURE.
· WORK AREA 5 - WEST OVERRUN (14 CALENDAR DAYS)
WORK SHALL CONSIST OF THE SEALING OF ASPHALT CRACK AND SEALCOATING OF THE EAST OVERRUN
OF RUNWAY 11/29. WORK SHALL ALSO INCLUDE THE REMOVAL AND REMARKING OF THE RUNWAY
OVERRUN CHEVRON STRIPES. WORK DURING THIS PHASE WILL BE CAREFULLY COORDINATED WITH
OPERATIONS AS RUNWAY CLOSURES WILL BE REQUIRED TO COMPLETE THIS WORK AND WORK MAY BE
REQUIRED TO BE COMPLETED AT NIGHT.
· WORK AREA 6 - EAST OVERRUN (14 CALENDAR DAYS)
WORK SHALL CONSIST OF THE SEALING OF ASPHALT CRACK AND SEALCOATING OF THE WEST OVERRUN
OF RUNWAY 11/29. WORK SHALL ALSO INCLUDE THE REMOVAL AND REMARKING OF THE RUNWAY
OVERRUN CHEVRON STRIPES. WORK DURING THIS PHASE WILL BE CAREFULLY COORDINATED WITH
OPERATIONS AS RUNWAY CLOSURES WILL BE REQUIRED TO COMPLETE THIS WORK AND WORK MAY BE
REQUIRED TO BE COMPLETED AT NIGHT.
· WORK AREA 7 - LOX PAD (14 CALENDAR DAYS)
WORK IN THIS AREA SHALL INCLUDE THE RECONSTRUCTION OF THE CONCRETE LOX PAD WITH A
CONTINUOUSLY REINFORCED CONCRETE PAD.
GENERAL CONSIDERATIONS:
COORDINATE THE FOLLOWING AS REQUIRED:
A. CONTRACTORS ARE REQUIRED TO ATTEND WEEKLY COORDINATION MEETINGS AT WHICH OPERATIONAL
SAFETY WILL BE A STANDING AGENDA ITEM DURING EVERY PROGRESS MEETING.
B. ALL CONTRACTOR PERSONNEL SHALL COMPLETE THE BASES BACKGROUND CHECK, BADGING AND
DRIVERS TRAINING REQUIREMENTS PRIOR TO BEING ALLOWED ACCESS TO THE PROJECT.
C. THE CONTRACTOR SHALL NOT INTERFERE WITH THE NORMAL OPERATIONS OF THE BASE FACILITIES THAT
ARE DESIGNATED UNDER THIS CONTRACT TO REMAIN OPEN TO AIR TRAFFIC, AND SHALL IMPLEMENT ALL
SPECIFIED AND OTHER APPROPRIATE MEASURES TO ENSURE THE SAFETY OF ALL USERS OF THE BASE.
PROJECT PHASING
SEE SHEET GC141 THROUGH GC148 "CONSTRUCTION OPERATIONS & PHASING PLAN" FOR ADDITIONAL
INFORMATION.
AREAS AND OPERATIONS AFFECTED BY CONSTRUCTION ACTIVITY:
A. RUNWAYS SHALL REMAIN IN USE BY AIRCRAFT THROUGHOUT THE ENTIRE PROJECT. WHEN ANY AREA IS
REQUIRED TO BE CLOSED TO AIRCRAFT AND BASE VEHICLE TRAFFIC, IT SHALL BE BARRICADED AND
MARKED, WITH ANY NAVAIDS AFFECTED BY THE CLOSURE ADDRESSED PER THE REQUIREMENTS STATED
ON THIS SHEET AND THE SPECIFICATIONS.
B. TAXIWAY CLOSURES:
CLOSURE OF TAXIWAYS D AND G WILL BE REQUIRED FOR THIS PROJECT AND COMPLETED IN SEPARATE
PHASES. (WORK AREAS 3 & 4)
C. RUNWAY CLOSURES:
A RUNWAY CLOSURES WILL WILL BE REQUIRED WHEN WORK IS BEING COMPLETED IN THE
RUNWAY OVERRUNS AND A PORTION OF THE WORK ON TAXIWAYS D AND G (WORK AREA 3
THRU 6).
D. APRON PAVEMENT CLOSURES:
CLOSURE OF THE C-130 RAMP AND OVERFLOW APRON WILL BE REQUIRED FOR THIS
PROJECT. THESE CLOSURES WILL TAKE PLACE AT SEPARATE TIMES AND THE C-130 RAMP WILL
BE CLOSED IN TWO PHASES.
E. FLIGHT LINE ROAD CLOSURES:
THE EAST END OF FLIGHT LINE ROAD WILL BE CLOSED WHILE WORK IS TAKING PLACE ON THE
C-130 RAMP.
NAVAIDS:
A. IF THIS PROJECT AFFECTS RUNWAY NAVAIDS, COORDINATION WITH THE CONTRACTING OFFICERS
REPRESENTATIVE (COR) WILL BEGIN AT THE PRECONSTRUCTION MEETING. A LIST OF RESPONSIBLE
PARTY REPRESENTATIVES, INCLUDING PROCEDURES FOR CONTACT AFTER-HOURS, SHOULD BE
OBTAINED PRIOR TO CONSTRUCTION. NAVAIDS ARE NOT ANTICIPATED TO BE AFFECTED BY THIS
PROJECT.
B. BEFORE COMMENCING CONSTRUCTION ACTIVITY, PARKING VEHICLES OR STORING CONSTRUCTION
EQUIPMENT AND MATERIALS NEAR A NAVAID, COORDINATE WITH THE APPROPRIATE OFFICE TO
EVALUATE THE EFFECT OF CONSTRUCTION ACTIVITY AND THE REQUIRED DISTANCE AND DIRECTION
FROM THE NAVAID.
C. INTERFERENCE FROM CONSTRUCTION EQUIPMENT AND ACTIVITIES MAY REQUIRE NAVAID SHUTDOWN OR
ADJUSTMENT OF INSTRUMENT APPROACH MINIMUMS FOR LOW VISIBILITY OPERATIONS. THIS REQUIRES
THAT A NOTAM BE FILED. ALL NOTAM'S TO BE FILED BY THE BASE. THIS IS NOT ANTICIPATED TO OCCUR
FOR THIS PROJECT.
CONTRACTOR ACCESS:
A. THE CONTRACTOR SHALL USE THE DOBBINS ARB COMMERCIAL GATE 2 (OFF ATLANTIC AVENUE SE) TO
GAIN ACCESS ONTO BASE PROPERTY. NORMAL GATE HOURS ARE 0600 TO 1400. FOR ACCESS TO THE
SITE OUTSIDE OF 0600-1400 DOBBINS WILL PROVIDE GATE STAFFING IF NOTIFIED 7 DAYS IN ADVANCE.
SHOULD THE CONTRACTOR WISH TO HAVE MORE EFFICIENT HAULING OPERATIONS (DURING ANY HOUR), TWO OR MORE DARB APPROVED CONTRACTOR PROVIDED PERSONNEL WILL BE REQUIRED TO
SUPPLEMENT BASE STAFF IN CONTRACTOR DELIVERY INSPECTIONS.
B. GATE GUARD IS REQUIRED AT THE AIRFIELD ACCESS GATE WHEN REQUIRED TO REMAIN OPEN. ALL
GATES MUST BE LOCKED WHEN NOT IN USE OR NOT MANNED BY THE GATE GUARD. CONTRACTOR MUST
TAKE CARE TO MAINTAIN A HIGH LEVEL OF SAFETY AND SECURITY DURING CONSTRUCTION.
PROCEDURES SHOULD BE IN PLACE TO ENSURE THAT ONLY AUTHORIZED PERSONS AND VEHICLES HAVE
ACCESS TO THE AIRFIELD OR PROJECT LIMITS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PROPER OPERATION AND PRESERVATION OF AIRFIELD ACCESS GATES SHOWN ON SHEET GC141.
C. THE CONTRACTOR STAGING AREA WILL BE LOCATED SOUTHEAST OF RUNWAY 11/29 ON TAXIWAY A , AS
SHOWN ON SHEET GC141. THE HAUL ROUTE WILL UTILIZE REFUELING ROAD AS SHOWN ON SHEET GC141, TO GAIN ACCESS TO THE AIRFIELD. THE CONTRACTOR MUST HAVE AN AUTHORIZED, TRAINED
REPRESENTATIVE TO ALLOW CONSTRUCTION VEHICLES TO CROSS THE RUNWAY. WORK AREA SPECIFIC
STAGING AREAS CAN ALSO BE UTILIZED IN ADDITION / IN LIEU OF THIS SHOWN STAGING AREA. STAGING
AREAS WILL NOT BE PERMITTED IN OTHER AREAS OF OPEN AIRFIELD WITHOUT PRIOR APPROVAL FROM
THE CONTRACTING OFFICER.
D. FOR THE PURPOSES OF THIS CONTRACT, ALL FENCING/GATES SHALL BE CONSIDERED PART OF
CONTRACTOR HAUL ROUTES. AS SUCH, ANY DAMAGE TO FENCING/GATES AS A RESULT OF
CONSTRUCTION TRAFFIC SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. IF ANY CONSTRUCTION
GATE IS FOUND OPEN AND UNATTENDED BY THE BASE STAFF, THE CONTRACTOR WILL BE REPRIMANDED
PER OCCURRENCE BY THE GOVERNMENT. SEE "SECURITY AND OPERATIONS ENFORCEMENT" FOR
ADDITIONAL INFO.
E. KEY CONTRACTOR PERSONNEL MAY BE EXPECTED TO TRAVEL ON OR NEAR ACTIVE AOA'S. THESE
INDIVIDUALS MUST COMPLY WITH THE RULES AND REGULATIONS BY PARTICIPATING IN AIRFIELD DRIVER'S
TRAINING PROCEDURES PROVIDED BY THE BASE. THERE IS NO GOVERNMENT FEE FOR THIS TRAINING, BUT THE CONTRACTOR IS REQUIRED TO ATTEND THIS TRAINING AND THEIR COST FOR ATTENDING THIS
TRAINING AND THEIR COST FOR THIS TIME SHALL BE INCLUDED IN THEIR BID.
F. STOCKPILED MATERIALS AND EQUIPMENT STORAGE/PARKING ARE NOT PERMITTED WITHIN 200 FEET OF
AN OPERATIONAL RUNWAY OR TAXIWAY EDGE. IF THE CONTRACTOR WISHES TO STOCKPILE MATERIALS
OR EQUIPMENT ADJACENT TO THIS AREA, HE MUST FIRST COORDINATE WITH THE CONTRACTING
OFFICER AND AIRFIELD MANAGER TO ENSURE THAT:
1) MATERIALS AND EQUIPMENT WILL BE ALLOWED AND BASE ENVIRONMENTAL GUIDELINES ARE MET FOR
REMOVED MATERIAL PROPOSED FOR STOCKPILING.
2) APPROPRIATE LIGHTING AND BARRICADES ARE IN PLACE.
3) THE STOCKPILED MATERIALS DO NOT CREATE A WILDLIFE ATTRACTANT OR FOREIGN OBJECT DEBRIS
(FOD) HAZARD.
4) EXCAVATION AND RESULTANT STOCKPILES ADJACENT TO OTHER SURFACES MUST BE APPROPRIATELY
MARKED W/ BARRICADES, AS DIRECTED BY THE COR.
G. THE CONTRACTORS' EQUIPMENT IS STRICTLY LIMITED TO THE CONSTRUCTION AREAS DURING
CONSTRUCTION AND TO THE CONTRACTOR STORAGE AREA DURING NON-CONSTRUCTION PERIODS,
EXCEPT AS PROVIDED ON THE PLANS, IN THE CONTRACT PROVISIONS, OR AS MAY BE AUTHORIZED BY
THE COR IN WRITING. CONTRACTOR PARKING SHALL BE LIMITED TO THE STAGING AREA, EXCEPT AS
ALLOWED BY THE COR.
H. HAUL ROUTES AND ACCESS TO THE CONSTRUCTION SITE(S) WILL BE AS SHOWN ON SHEET GC141 AND
DISCUSSED AT THE PRE-BID MEETING. THE CONTRACTOR IS RESPONSIBLE FOR RESTORING ALL HAUL
ROADS, PLANT SITES, STAGING AND STORAGE AREAS TO ORIGINAL CONDITION AND TO THE
SATISFACTION OF THE CONTRACTING OFFICER. THIS WILL INCLUDE BUT NOT BE LIMITED TO GRADING
(FILLING IF NECESSARY) AND PLACING NEW SOD ON ALL TURF AREAS USED BY THE CONTRACTOR. ANY
PAVEMENT AREAS USED BY THE CONTRACTOR AS A HAUL ROUTE WHICH ARE DAMAGED WILL BE
REPAVED AS APPROVED BY THE CONTRACTING OFFICER AT THE CONTRACTOR'S EXPENSE. THE
CONTRACTOR SHALL INSPECT ALL HAUL ROUTES PRIOR TO START OF CONSTRUCTION. THE
CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ANY DOCUMENTATION OF EXISTING HAUL ROUTES, EITHER WITH PICTURES OR VIDEO. COSTS ASSOCIATED WITH DOCUMENTING EXISTING HAUL ROUTE
CONDITIONS, OR RECONSTRUCTING OR RESTORING HAUL ROUTES AND STORAGE AREAS, WILL BE
CONSIDERED INCIDENTAL TO THE PROJECT.
CONSTRUCTION EQUIPMENT:
A. ALL CONSTRUCTION EQUIPMENT MUST BE MARKED WITH A 3 FEET BY 3 FEET ORANGE AND WHITE
CHECKERED FLAG AND/OR AMBER BEACON. FOR NIGHT CONSTRUCTION, ALL EQUIPMENT MUST BE
EQUIPPED WITH AN AMBER BEACON. ALL CONSTRUCTION VEHICLES MUST BE CLEARLY MARKED WITH
THE COMPANY NAME/LOGO AT ALL TIMES.
WILDLIFE MANAGEMENT:
A. CONTRACTORS MUST CAREFULLY CONTROL AND CONTINUOUSLY REMOVE WASTE OR LOOSE MATERIALS
THAT CAN CREATE WILDLIFE HAZARDS OR ATTRACTANTS. THESE INCLUDE TRASH, STANDING WATER, TALL GRASS, SCATTERED SEEDS, POORLY MAINTAINED FENCING, AND DISRUPTION OF EXISTING HABITAT.
HAZARDOUS MATERIALS (HAZMAT) MANAGEMENT:
A. ANY TYPE OF FUELING SUPPORT FACILITY OR DEVICE USED TO REFUEL CONSTRUCTION EQUIPMENT IS
SUBJECT TO LOCAL FIRE INSPECTION. LOCAL FIRE CODES AND SAFETY STANDARDS SHALL BE MET PRIOR
TO COMMENCEMENT OF WORK.
B. CONTRACTORS OPERATING CONSTRUCTION VEHICLES AND EQUIPMENT ON THE BASE MUST BE
PREPARED TO EXPEDITIOUSLY CONTAIN AND CLEAN UP SPILLS RESULTING FROM FUEL OR HYDRAULIC
FLUID LEAKS.
C. TRANSPORT AND HANDLING OF OTHER HAZARDOUS MATERIALS ALSO REQUIRE SPECIAL PROCEDURES
(SEE SPECIFICATION SECTION 01 74 19, CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT).
NOTIFICATION OF CONSTRUCTION ACTIVITIES:
A. THE CONTRACTOR SHALL PREPARE AND SUBMIT TO THE COR THE REQUIRED AIRFIELD CONSTRUCTION
WAIVER DURING PHASE 0. THIS AIRFIELD CONSTRUCTION WAIVER SHALL BE APPROVED PRIOR TO THE
CONTRACTOR COMMENCING ANY CONSTRUCTION ACTIVITIES.
B. THE CONTRACTOR SHALL INCLUDE IN THE CONSTRUCTION OPERATIONS PLAN A PROCEDURE FOR
IMMEDIATE NOTIFICATION OF THE COR OF ANY ADVERSE CONDITIONS AFFECTING SAFETY ON THE
AIRFIELD. THE CONTRACTOR SHALL OBTAIN CONTACT INFORMATION FOR ALL INVOLVED PARTIES AND
PROCEDURES FOR CONTACTING THEM 24 HOURS A DAY, 7 DAYS A WEEK.
C. IF APPLICABLE, A LIST OF AIRFIELD OPERATIONS PERSONNEL AND FIRE DEPARTMENT EMERGENCY
PERSONNEL WILL BE DISTRIBUTED.
D. THE BASE OPERATIONS OFFICE SHALL ISSUE ALL NOTAMS RELEVANT TO THE CONSTRUCTION PROGRESS
AND ANY OTHER REQUIRED NOTAMS OR CONTACT NUMBERS.
E. THE CONTRACTOR SHALL PREPARE AND SUBMIT CONTACT INFORMATION FOR LOCAL MEDICAL, FIRE
FIGHTING, AND POLICE RESPONSE IN CASE OF EMERGENCIES DURING CONSTRUCTION TO ALL
EMPLOYEES.
F. THE CONTRACTOR MAY BE REQUIRED TO COORDINATE WITH BASE AIRCRAFT RESCUE AND FIRE FIGHTING
(ARFF) PERSONNEL EVEN FOR NON-EMERGENCIES.
G. THE CONTRACTOR SHALL SUBMIT TO THE CONTRACTING OFFICER 60 DAYS PRIOR TO THE START OF
WORK, AN APPROVED FAA FORM 7460-1 "NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION." BE
ADVISED, FAA APPROVAL OF THE FORM MAY TAKE UP TO 45 DAYS.
H. THE CONTRACTOR SHALL COORDINATE WITH THE COR ANY SAFETY ORIENTED ASPECT CHANGES TO THE
CONSTRUCTION PLAN ONCE IT IS ISSUED.
INSPECTION REQUIREMENTS:
A. AIRFIELD SAFETY SELF-INSPECTIONS SHOULD BE CONDUCTED BY THE CONTRACTOR AT LEAST DAILY, BUT MORE FREQUENTLY IF NECESSARY.
B. A PRE-FINAL AND FINAL INSPECTION MEETING WILL ALSO BE HELD FOR THIS PROJECT.
UNDERGROUND UTILITIES:
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING BASE UTILITIES, AND
ELECTRICAL CIRCUITS, WHETHER OWNED BY THE BASE OR OTHER AGENCIES OPERATING AT THE
AIRFIELD. LOCATIONS OF EXISTING UTILITIES SHOWN IN THE PLANS ARE BASED ON AVAILABLE
SURVEY AND AS-BUILT DATA AND ARE APPROXIMATE ONLY.
B. WORKING IN CONJUNCTION WITH THE COR, THE CONTRACTOR SHALL COORDINATE THE LOCATION OF
ANY CROSSING OF UNDERGROUND ELECTRICAL CIRCUITS PRIOR TO THE START OF ANY CONSTRUCTION
ACTIVITIES. THE CONTRACTOR SHALL PROVIDE TONING EQUIPMENT CAPABLE OF DETECTING A 60 Hz
SIGNAL FOR LOCATING CABLES IN THE CONSTRUCTION AREA.
CONTINUED ON NEXT SHEET
11 73
GC151
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
A
S I N
G
N
O T
E S
M J R
D M
R
D P
S
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
J A
N U
A R
Y
T
H
M
S G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
L
O
E
S
U I T
E
T A
M P
A
F
L
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
P
A
A
L L S
C
R A
C K
I N
T
S
E A
C
R
A M
X
I W
A Y
D E
L T
A G
O L F
L O
X
P
A D
I N
S T
A L L
M
O O
R I N
G
P
O I N
P A
R K
I N
G
S
P O
P
A
E
R R
U N
O
U L D
E R
S
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
C. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING UNDERGROUND UTILITIES
THROUGHOUT CONSTRUCTION. THE CONTRACTOR SHALL HAVE QUALIFIED PERSONNEL ONSITE IF
ANY EXISTING UNDERGROUND UTILITY IS DAMAGED DURING CONSTRUCTION OPERATIONS. THE ROLE
OF THESE PERSONNEL IS NOT LIMITED TO OVERSEEING THE PROTECTION OF UNDERGROUND
UTILITIES AND MAY HAVE ADDITIONAL RESPONSIBILITIES ON THE PROJECT. DAMAGED UTILITIES SHALL
BE IMMEDIATELY CORRECTED AND APPROVED BY THE COR AT NO ADDITIONAL COST TO THE
GOVERNMENT.
D. PRIOR TO THE START OF CONSTRUCTION ANY ELECTRICAL CIRCUITS TO BE CROSSED SHALL BE
TESTED FOR RESISTANCE TO GROUND BY THE CONTRACTOR UNDER SUPERVISION OF THE COR AND
THE READINGS RECORDED. FOLLOWING CONSTRUCTION, THE CONTRACTOR, UNDER THE
SUPERVISION OF THE COR, SHALL CHECK ALL CIRCUITS CROSSED DURING THE PROJECT. ANY
CIRCUITS SHOWING A DECREASE IN RESISTANCE TO GROUND SHALL BE CORRECTED BY THE
CONTRACTOR TO THE RECORDED PRE-CONSTRUCTION LEVELS OR AT LEAST 50 MEGOHMS. NO
ADDITIONAL COMPENSATION WILL BE MADE FOR ANY CORRECTIVE ELECTRICAL WORK DUE TO
CONTRACTOR'S OPERATIONS.
FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT:
A. THE CONTRACTOR SHALL DEVELOP, IMPLEMENT, AND MONITOR A FOD PREVENTION PLAN. A PERSON
SHALL BE DESIGNATED BY THE CONTRACTOR TO CONTINUOUSLY MONITOR THE PAVEMENTS FOR FOD, INCLUDING THE HAUL ROUTES AND ROADWAYS. THIS PERSON SHALL HAVE THE CAPABILITY TO
ASSIGN PERSONNEL AND EQUIPMENT TO REMOVE DEBRIS OR REPAIR HAUL ROUTES AND ROADWAYS
WHEN REQUIRED IN A TIMELY MANNER. THIS PERSON SHALL BE IN SUPERVISORY ROLE BUT THIS ROLE
IS NOT LIMITED TO OVERSEEING THE FOD PREVENTION PLAN AND MAY HAVE ADDITIONAL
RESPONSIBILITIES ON THE PROJECT.
B. DEBRIS SHALL NOT BE DEPOSITED ON ANY PORTION OF AN OPERATIONAL RUNWAY, TAXIWAY OR
APRON. SHOULD ANY DEBRIS BE ACCIDENTALLY DEPOSITED ON ACTIVE OPERATIONAL AREAS, IT
SHALL BE REMOVED IMMEDIATELY. THE CONTRACTORS SWEEPER SHALL HAVE VACUUMING
CAPABILITIES AND BE ASSIGNED TO THE PROJECT AND BE ON-SITE AT ALL TIMES.
C. PRIOR TO OPENING AIRCRAFT MOVEMENT AREAS CLOSED FOR THIS PROJECT, THE CONTRACTOR IS
RESPONSIBLE FOR ENSURING THAT THE SITE, INCLUDING ADJACENT PAVEMENTS AND HAUL ROUTES, IS CLEAR OF ANY FOREIGN OBJECT DEBRIS (FOD) AND IS ACCEPTABLE TO THE COR.
D. THE CONTRACTOR SHALL CONDUCT DAILY INSPECTIONS OF THE WORK AND ADJACENT AREAS FOR
SAFETY AND CLEANLINESS. THE AIRFIELD OPERATIONS AND COR MAY ALSO PERFORM DAILY
INSPECTIONS OF THIS PROJECT SITE.
E. CONTRACTOR SHALL USE ALL MEANS NECESSARY TO MINIMIZE DUST DURING CONSTRUCTION
OPERATIONS. IF THE COR REQUESTS DUST CONTROL IT SHALL BE APPLIED IMMEDIATELY.
SECURITY AND OPERATIONS ENFORCEMENT:
A. THIS PROJECT INVOLVES WORK NEAR ACTIVE AIRCRAFT OPERATIONAL AREAS INCLUDING RUNWAY, TAXIWAY, OR RESTRICTED AREA LOCATIONS ON THE APRON. INCURSIONS OCCURRING DURING THE
PROJECT, AS DETERMINED BY THE JUDGEMENT OF THE CONTRACTING OFFICER, MAY BE SUBJECT TO
A VIOLATION. A RUNWAY INCURSION IS "ANY OCCURRENCE AT AN AERODROME INVOLVING THE
INCORRECT PRESENCE OF AN AIRCRAFT, VEHICLE OR PERSON ON THE PROTECTED AREA OF A
SURFACE DESIGNATED FOR THE LANDING AND TAKE OFF OF AIRCRAFT."
B. VIOLATIONS TO BOTH THE AIRFIELD AND BASE OPERATIONS, SECURITY, OR THESE RULES AND
REGULATIONS, DEPENDING UPON THE SEVERITY OF THE VIOLATION, MAY RESULT IN ONE OR MORE OF
THE FOLLOWING:
1) A VERBAL AND/OR WRITTEN WARNING
2) REVOCATION OF VEHICLE ACCESS PERMIT
3) THE CONTRACT WORK BEING STOPPED UNTIL CORRECTIVE MEASURES ARE TAKEN TO
PRECLUDE A RECURRENCE OF THE VIOLATIONS. (NO TIME EXTENSION WILL BE ISSUED DUE TO A
VIOLATION.)
4) REMOVAL FROM THE PROJECT
C. THE CONTRACTOR IS RESPONSIBLE FOR ALL VIOLATIONS OF AIRFIELD AND SECURITY REGULATIONS.
D. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING CLEAR ROUTES OF ACCESS TO
ACTIVE AIRPORT OPERATIONS AREAS FOR FIRE FIGHTING AND RESCUE EQUIPMENT AND PERSONNEL.
CONSTRUCTION OCCURS IN AREAS THAT ARE IN PROXIMITY TO EMERGENCY SERVICES' ACCESS TO
THE AIRFIELD. AT NO TIME MAY VEHICLES, EQUIPMENT, OR PERSONNEL BE LEFT PARKED, IDLED, STAGED, OR STATIONARY IN THESE AREAS.
RUNWAY & TAXIWAY MARKING, LIGHTING, SIGNS, AND VISUAL NAVAIDS:
A. AIRFIELD MARKINGS, LIGHTING, SIGNS, AND VISUAL NAVAIDS MUST BE CLEARLY VISIBLE TO PILOTS, NOT MISLEADING, CONFUSING OR DECEPTIVE. ALL MUST BE SECURED IN PLACE TO PREVENT
MOVEMENT BY PROP WASH, JET BLAST, WING VORTICES OR OTHER WIND CURRENTS, BUT FRANGIBLE
AND CONSTRUCTED OF MATERIALS THAT WOULD MINIMIZE DAMAGE TO AN AIRCRAFT IN THE EVENT OF
INADVERTENT CONTACT.
B. THE FOLLOWING ARE APPLICABLE STANDARDS FOR ANY TEMPORARY OR PERMANENT INSTALLATIONS
OF THESE RESPECTIVE ITEMS:
PAVEMENT MARKINGS: UFC 3-260-04
AIRFIELD LIGHTING: UFC 3-535-01
C. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING MARKINGS, SIGNS, AND VISUAL NAVAIDS.
IF EXISTING MARKINGS, SIGNS, OR VISUAL NAVAIDS ARE DAMAGED BY CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL IMMEDIATELY CORRECT AS APPROVED BY THE COR AT THE CONTRACTOR'S
EXPENSE.
D. RUNWAY 11-29 WILL REQUIRE A CLOSURE FOR THE WORK TAKING PLACE IN THE OVERRUNS AND THE
WORK ON TAXIWAYS D AND G NEAR THE EDGE OF RUNWAY. TAXIWAY B AND D WILL ALSO REQUIRE
CLOSURES FOR THIS PROJECT.
E. NAVAIDS AND AIRFIELD LIGHTING ARE NOT ANTICIPATED TO BE AFFECTED BY THIS PROJECT.
MARKING AND SIGNS FOR ACCESS ROUTES:
A. PAVEMENT MARKINGS AND SIGNS INTENDED FOR CONSTRUCTION PERSONNEL SHALL CONFORM TO
UFC 3-260-04, AND WITH THE MUTCD AND/OR STATE HIGHWAY SPECIFICATIONS AS PRACTICAL.
B. ACCESS ROUTES USED BY CONTRACTOR MUST BE CLEARLY MARKED TO PREVENT INADVERTENT
ENTRY TO AREAS OPEN TO AIRFIELD OPERATIONS. CONSTRUCTION SIGNS SHALL BE INSTALLED PER
THE MINIMUM REQUIREMENTS OF THE SPECIFICATIONS AND REMOVED AT THE COMPLETION OF THE
PROJECT.
C. CONTRACTOR SHALL PROVIDE "25 MPH SPEED LIMIT" SIGNS AND "HAUL ROUTE" SIGNS WHEN HAULING
ON THE AIRFIELD OR BASE ROADWAYS AND TAXIWAYS. OTHER SPEED LIMITS THAT MUST BE
OBSERVED ARE, 10 MPH ON ANY AIRCRAFT APRON AND 5 MPH WITHIN 50 FEET OF ANY AIRCRAFT.
HAZARD MARKING AND LIGHTING:
A. IF ANY AIRCRAFT MOVEMENT AREA MUST BE CLOSED, THE CONTRACTOR SHALL FURNISH AND PLACE
PORTABLE BARRICADES ACROSS APRONS TO KEEP CONSTRUCTION VEHICLES FROM ENTERING
ACTIVE OPERATION AREAS AND TO KEEP AIRCRAFT FROM TAXIING INTO CONSTRUCTION AREAS.
BARRICADES SHALL BE HIGHLY-REFLECTIVE, MARKED WITH DIAGONAL, ALTERNATING ORANGE AND
WHITE STRIPES AND SUPPLEMENTED WITH EITHER FLASHING OR STEADY-BURNING LIGHTS DURING
HOURS OF RESTRICTED VISIBILITY OR DARKNESS. LIGHTS SHALL BE BARRICADE TYPE TYPICAL FOR
CONSTRUCTION ZONES AND RED IN COLOR, MEETING ALL STATE HIGHWAY REQUIREMENTS.
BARRICADES LOCATED WITHIN AIRCRAFT MOVEMENT AREAS (RUNWAYS, TAXIWAYS, APRONS) SHALL
BE LOW LEVEL AVIATION BARRICADES (NO HIGHER THAN 18") SPECIFICALLY MANUFACTURED AND
DESIGNED FOR SUCH PURPOSE. THEY SHALL BE ALTERNATING ORANGE AND WHITE IN COLOR 10"
HIGH AND 96" LONG, MADE OF UV-RESISTANT POLYETHYLENE. FLASHERS MUST BE MIN. 5 CANDELAS
EFFECTIVE INTENSITY AND FLASH AT A RATE OF 50 TO 160 FLASHES PER MINUTE.
ENOUGH BARRICADES MUST BE PROVIDED TO SAFELY DELINEATE ALL CONSTRUCTION BOUNDARIES.
BARRICADES SHALL BE PLACED CLOSELY ENOUGH TO PREVENT TRAFFIC FROM ENTERING THE
CONSTRUCTION AREA. POSSIBLE GAPS ARE TO BE PLACED WITHIN THE BARRICADES FOR
GOVERNMENT USE. LOCATIONS OF GAPS TO BE COORDINATED WITH BASE OPERATIONS AND THE
CONTRACTING OFFICER. SEE DETAIL FOR SEPARATION BETWEEN BARRICADES. BARRICADES SHALL
BE FILLED WITH WATER TO PREVENT MOVEMENT BY JET BLAST.
BARRICADES LOCATED OUTSIDE OF AIRCRAFT MOVEMENT AREAS SHALL BE CONCRETE BARRICADES
LOCATED ALONG THE ADJOINING PROJECT LIMIT.
B. HAZARDS SUCH AS OPEN MANHOLES, AREAS UNDER REPAIR, STOCKPILE AND WASTE AREAS SHALL
ALSO BE MARKED WITH BARRICADES.
C. THE CONTRACTOR MUST ALSO PROVIDE AN EMERGENCY CONTACT AVAILABLE 24 HOURS FOR
MAINTENANCE OF CONSTRUCTION LIGHTING AND BARRICADING, OR ANY OTHER ISSUES THAT
INTERFERE WITH THE OPERATIONS AT THE AIRFIELD.
D. CONTRACTOR SHALL, ON A DAILY BASIS, COORDINATE WITH THE COR AND AIRFIELD MAINTENANCE
SUPERINTENDENT TO ENSURE ALL REQUIRED AIRFIELD LIGHTING IS FUNCTIONAL, LIGHTED
BARRICADES ARE OPERATIONAL, AND TO REVIEW NOTAM'S.
E. USE HIGHLY REFLECTIVE BARRICADES WITH LIGHTS TO CLOSE ANY AIRFIELD PAVEMENT AREAS.
LIGHTS MUST ONLY BE BATTERY POWERED AND NOT SOLAR POWERED.
F. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MOVEMENT OF BARRICADES BETWEEN PHASES, OR AS OTHERWISE CRITICAL TO AIRFIELD OPERATIONS. ALL BARRICADE LIGHTS MUST BE CHECKED
NIGHTLY, AND REPLACED BY THE CONTRACTOR IF NOT FUNCTIONING.
PROTECTION OF RUNWAY AND TAXIWAY SAFETY AREAS:
A. CONSTRUCTION ACTIVITY ADJACENT TO ACTIVE RUNWAYS, TAXIWAYS, AND APRONS SHALL BE
COORDINATED WITH AIRFIELD OPERATIONS THROUGH THE COR. CONSTRUCTION ACTIVITY IN THESE
AREAS WILL BE AUTHORIZED AFTER:
1) NOTICES TO AIRMEN (NOTAM'S) HAVE BEEN ISSUED,
2) BARRICADING AND LIGHTING PROVISIONS HAVE BEEN IMPLEMENTED BY THE CONTRACTOR, AND
3) IT HAS BEEN DETERMINED THAT THE HEIGHT OF EQUIPMENT AND MATERIALS IS BEYOND THE
REACH, OR SAFELY BELOW, AIRCRAFT USING ADJACENT OPERATION AREAS. THE COR WILL
SUPPLY INFORMATION FOR RUNWAY APPROACHES AND OTHER AREAS IF REQUIRED.
B. OPEN TRENCHES AND EXCAVATIONS WITHIN THE CONSTRUCTION AREA(S) MUST BE PROMINENTLY
BARRICADED. NO CONSTRUCTION MAY OCCUR WITHIN 200' OF AN EXISTING RUNWAY, TAXIWAY, OR
TAXILANE EDGE WHILE THE RUNWAY/TAXIWAY/TAXILANE IS OPEN TO AIRCRAFT OPERATIONS. OPEN
TRENCHES OR EXCAVATIONS ARE NOT PERMITTED WITHIN THE 200' OF AN OPEN
RUNWAY/TAXIWAY/TAXILANE. IF THE RUNWAY/TAXIWAY/TAXILANE MUST BE OPENED BEFORE
EXCAVATIONS ARE BACKFILLED, THE EXCAVATIONS MUST BE COVERED IN SUCH A WAY AS TO ALLOW
THE HEAVIEST AIRCRAFT OPERATING ON THE RUNWAY/TAXIWAY/TAXILANE TO CROSS THE COVERING
WITHOUT DAMAGE TO THE AIRCRAFT.
C. THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING ALL WORK AREAS WITHIN 200' OF ANY
ACTIVE RUNWAY, TAXIWAY, OR TAXILANE EDGE DURING ALL NON-WORKING HOURS OR WHEN ANY
RUNWAY OR TAXIWAY IS OPERATIONAL, THE FOLLOWING:
1) THE AREA SHALL HAVE NO GRADES STEEPER THAN A 10:1 SLOPE IN ANY DIRECTION.
2) PROVIDE EVENLY GRADED TRANSITIONS OFF ALL EXISTING PAVEMENT EDGES USING BASE
COURSE MATERIAL AT SAME GRADE AS REMAINING PAVEMENT AND SLOPED AT A 10:1 MAXIMUM
GRADE.
3) AT NO LOCATION WILL A DROP IN GRADE BE GREATER THAN 2 INCHES WITHOUT BEING GRADED
TO THE REQUIREMENTS ABOVE PROVIDED.
D. RUNWAY APPROACH/DEPARTURE AREAS AND CLEARWAYS MUST BE PROTECTED. DURING TIMES
WHEN THE RUNWAY IS OPEN TO AIRCRAFT TRAFFIC, NO VEHICLES, MATERIALS OR EQUIPMENT WILL
BE ALLOWED WITHIN 200' OF ANY ACTIVE RUNWAY, TAXIWAY OR APRON EDGE.
CONTROL TOWER COMMUNICATION:
A. ACTIVE AIRCRAFT OPERATION AREAS: OPERATIONS AT DOBBINS AIR RESERVE BASE ARE
CONTROLLED BY THE CONTROL TOWER. WHEN A RUNWAY OR TAXIWAY IS OPEN TO AIR TRAFFIC, THE
CONTRACTOR MUST OBTAIN CLEARANCE FROM THE TOWER BEFORE ANY PERSONNEL OR EQUIPMENT
PROCEEDS ONTO OR ACROSS THE AREA. A RADIO-EQUIPPED TRAFFIC GUARD SHALL BE USED TO
CONTROL VEHICULAR TRAFFIC CROSSING ACTIVE AREAS DURING HAULING OPERATIONS. THE
TRAFFIC GUARD SHALL BE CHECKED OUT AND APPROVED BY AIRFIELD OPERATIONS PERSONNEL
PRIOR TO USING RADIOS.
B. THE CONTRACTOR SHALL SUPPLY REQUIRED AIRPORT RADIOS. THE PRIME CONTRACTOR
SUPERINTENDENT, GATE GUARD, AND TWO OTHER PRIME CONTRACTOR DESIGNATED WORKERS
SHALL HAVE A RADIO POWERED ON AND MONITOR THE RADIO AT ALL TIMES. THESE RADIOS SHALL BE
EXCLUSIVELY USED TO ALLOW COMMUNICATION BETWEEN THE TOWER AND THE DESIGNATED
CONTRACTOR REPRESENTATIVES. ALL PERSONS THAT WILL POSSESS A RADIO SHALL BE TRAINED BY
THE BASE PRIOR TO THE START OF CONSTRUCTION.
CONTINUED FROM PREVIOUS SHEET
C. THE CONTRACTOR MAY BE ALLOWED TO USE TWO-WAY RADIOS FOR COMMUNICATION BETWEEN
CONTRACTORS AS LONG AS THE FREQUENCY HAS BEEN APPROVED BY THE DARB SPECTRUM
FREQUENCY MANAGER (SFM) THROUGH THE COR. THE CONTRACTORS SHALL NOT USE ANY RADIOS, COMMUNICATION DEVICES, AND FREQUENCIES NOT APPROVED BY THE SFM.
OTHER CONSTRUCTION NOTES:
A. ALL SAFETY AND SECURITY ITEMS REQUIRED ON SHEETS GC141 THROUGH GC148, THIS SHEET, AND
WITHIN THE CONTRACT DOCUMENTS TO BE INCLUDED AND CONSIDERED INCIDENTAL TO THE PROJECT.
B. SEE SHEETS GC141 THROUGH GC148 FOR RESTRICTIONS ON WORK PERTAINING TO CONSTRUCTION
WITHIN OR EFFECTING APRON PAVEMENTS.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY AND ALL PERMITS REQUIRED FOR THIS
PROJECT. ALL COSTS ASSOCIATED WITH PERMITS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT.
THE FOLLOWING ARE PROHIBITED ON THE AIRFIELD:
D. WELDING/BLASTING OPERATIONS
OPEN-FLAME WELDING OR TORCH CUTTING OPERATIONS ARE PROHIBITED UNLESS ADEQUATE FIRE AND
SAFETY PRECAUTIONS ARE PROVIDED AS APPROVED BY THE FIRE CHIEF AND THE COR. USE OF
ELECTRICAL BLASTING CAPS IS PROHIBITED ON OR WITHIN 1,000 FEET OF THE BASE PROPERTY. FLARE
POTS ARE PROHIBITED WITHIN THE AIR OPERATIONS AREA (AOA).
E. BURNING AND BLASTING IS NOT ALLOWED ON BASE PROPERTY.
EFFECT ON AIRCRAFT / AIRPORT OPERATIONS
A. ALL CONSTRUCTION ACCESS WILL BE AT LOCATIONS SHOWN ON SHEETS GC141 THROUGH GC147.
B. LOW PROFILE BARRICADES WITH RED, FLASHING LIGHTS WILL MARK AREAS UNDER CONSTRUCTION.
C. NO EQUIPMENT OR PERSONNEL SHALL OPERATE OUTSIDE THE LIMITS OF CONSTRUCTION SHOWN ON
SHEETS GC141 THROUGH GC147 AS STATED WITHIN THIS SHEET.
CONSTRUCTION OPERATIONS NOTES:
1. CONTRACTOR SHALL SUBMIT SCHEDULE OF OPERATIONS FOR THE COMPLETE PROJECT PRIOR TO
START OF CONSTRUCTION.
2. ALL CONTRACTOR PERSONNEL SHALL COMPLETE THE AIRPORT AND BASE AIRFIELD DRIVERS TRAINING
COURSE PRIOR TO BEING ABLE TO ACCESS THE SITE. THIS SHALL BE COORDINATED THROUGH
AIRFIELD MANAGEMENT A MINIMUM OF THREE DAYS PRIOR TO THE REQUESTED DATE.
3. ALL CONTRACTOR VEHICLES ON THE AIRFIELD MUST HAVE AN AIRFIELD PASS ISSUED FOR AND
DISPLAYED ON EACH VEHICLE'S DASHBOARD.
4. THE CONTRACTOR SHALL HAVE A PERSON DESIGNATED AS SITE SUPERINTENDENT ON-CALL 24 HOURS
A DAY FOR EMERGENCY MAINTENANCE OF AIRPORT HAZARD LIGHTING AND BARRICADES.
5. BARRICADES SHALL BE WEIGHTED BY WATER, SAND BAGS, OR OTHER MEANS TO KEEP BARRICADES
STATIONARY FROM WINDS AND JET BLAST.
6. BARRICADES TO BE CHECKED EVERY DAY FOR WATER LEVEL AND THAT LIGHTS WORK PROPERLY.
CONTRACTOR TO IMMEDIATELY FIX ALL PROBLEMS WHEN FOUND.
7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING BARRICADES AND ALL SIGNAGE
REQUI…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .