Attach-2-Concrete Spec.pdf
PDF 98 KB Posted
- Attached to
- PIEDMONT NWR REPLACE POND2A FISHING
- Solicitation number
- 140F0220R0038
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach-1-SOW.pdf | ||
| Attach-3-Miscellaneous and Fabrications.pdf | ||
| Attach-8-Drawings-4.pdf | ||
| Attach-6-Drawing-2.pdf | ||
| Attach-9-Drawing-5.pdf | ||
| Attach-4-Rough Carpentry.pdf | ||
| Attach-5-Drawings-1.pdf | ||
| Sol_140F0220R0038.pdf | ||
| Attach-7-Drawing-3.pdf | ||
| Attach-10-Past Performance and Clauses.pdf | ||
| Attach-11-DBA Min. Wage Rates.pdf | ||
| Attach-12-Price SheetPrice Sheet.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS Page 1 of 11 Piedmont NWR
DIVISION 03 SECTION 03 30 04
CONCRETE CONCRETE FOR MINOR STRUCTURES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced.
The publications are referred to within the text by the basic designation only.
ACI INTERNATIONAL (ACI)
ACI 308R (2001) Guide to Curing Concrete
ACI 318/318R (2005; Errata 2005) Building Code Requirements for Structural Concrete and Commentary
ACI 347 (2004) Guide to Formwork for Concrete
ASTM INTERNATIONAL (ASTM)
ASTM A 185/A 185M (2007) Standard Specification for Steel Welded Wire Reinforcement, Plain, for Concrete
ASTM A 615/A 615M (2007) Standard Specification for Deformed and
Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM C 143/C 143M (2005a) Standard Test Method for Slump of
Hydraulic-Cement Concrete
ASTM C 150 (2007) Standard Specification for Portland Cement
ASTM C 171 (2003) Standard Specification for Sheet Materials for Curing Concrete
ASTM C 172 (2007) Standard Practice for Sampling Freshly
Mixed Concrete
ASTM C 260 (2006) Standard Specification for Air-Entraining Admixtures for Concrete
TECHNICAL SPECIFICATIONS Page 2 of 11 Piedmont NWR
DIVISION 03 SECTION 03 30 04
ASTM C 309 (2007) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete
ASTM C 33 (2003) Standard Specification for Concrete
Aggregates
ASTM C 618 (2005) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in
ASTM C 685/C 685M (2007) Concrete Made by Volumetric Batching and
Continuous Mixing
ASTM C 94/C 94M (2007) Standard Specification for Ready-Mixed
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 400 (1963) Requirements for Water for Use in Mixing or
Curing Concrete
1.2 SUBMITTALS
The following shall be submitted to the Contracting Officer for approval:
Product Data
Air-Entraining Admixture Curing Materials Reinforcing Steel
Manufacturer's literature is available from suppliers which demonstrates compliance with applicable specifications for the above materials.
Batching and Mixing Equipment
Batching and mixing equipment will be accepted on the basis of manufacturer's data which demonstrates compliance with the applicable specifications.
Conveying and Placing Concrete
TECHNICAL SPECIFICATIONS Page 3 of 11 Piedmont NWR
DIVISION 03 SECTION 03 30 04
The methods and equipment for transporting, handling, depositing, and consolidating the concrete shall be submitted prior to the first concrete placement.
Formwork
Formwork design shall be submitted prior to the first concrete placement.
Test Reports
Aggregates will be accepted on the basis of certificates of compliance and test reports that show the material(s) meets the quality and grading requirements of the specifications under which it is furnished.
Concrete Mixture Proportions
Ten days prior to placement of concrete, the contractor shall submit the mixture proportions that will produce concrete of the quality required.
Applicable test reports shall be submitted to verify that the concrete mixture proportions selected will produce concrete of the quality specified.
Certificates
Cementitious Materials
Cementitious material will be accepted on the basis of a manufacturer's certificate of compliance, accompanied by mill test reports that the material(s) meet the requirements of the specification under which it is furnished.
Aggregates will be accepted on the basis of certificates of compliance and tests reports that show the material(s) meet the quality and grading requirements of the specifications under which it is furnished.
1.3 DESIGN AND PERFORMANCE REQUIREMENTS
1.3.1 Strength
TECHNICAL SPECIFICATIONS Page 4 of 11 Piedmont NWR
DIVISION 03 SECTION 03 30 04
Acceptance test results will be the average strengths of two specimens tested at 28 days (90 days if pozzolan is used). The strength of the concrete will be considered satisfactory so long as the average of three consecutive acceptance test results equal or exceed the specified compressive strength, f'c, and no individual acceptance test result falls below f'c by more than 500 psi.
1.3.2 Construction Tolerances
A Class "C" finish shall apply to all surfaces except those specified to receive a Class "D" finish. A Class "D" finish shall apply to all surfaces which will be permanently concealed after construction. The surface requirements for the classes of finish required shall be as specified in ACI 347.
1.3.3 Concrete Mixture Proportions
Concrete mixture proportions shall be the responsibility of the Contractor. Mixture proportions shall include the dry weights of cementitious material(s); the nominal maximum size of the coarse aggregate; the specific gravities, absorptions, and saturated surface-dry weights of fine and coarse aggregates; the quantities, types, and names of admixtures; and quantity of water per cubic yard of concrete. All materials included in the mixture proportions shall be of the same type and from the same source as will be used on the project. Specified compressive strength f'c shall be 3,000 psi at 28 days (90 days if pozzolan is used). The maximum nominal size coarse aggregate shall be 3/4 inch, in accordance with ACI 318/318R. The air content shall be between 4.5 and 7.5 percent. The slump shall be between 2 and 5 inches. The maximum water cement ratio shall be 0.50.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Cementitious Materials
Cementitious materials shall conform to the appropriate specifications listed:
2.1.1.1 Portland Cement
ASTM C 150, Type II.
2.1.1.2 Pozzolan
Pozzolan shall conform to ASTM C 618, Class C or F, including requirements of Tables 1A and 2A.
TECHNICAL SPECIFICATIONS Page 5 of 11 Piedmont NWR
DIVISION 03 SECTION 03 30 04
2.1.2 Aggregates
Fine and coarse aggregates shall meet the quality and grading requirements of ASTM C 33 Class Designations 4M or better.
2.1.3 Admixtures
Admixtures to be used, when required or approved, shall comply with the appropriate specification listed. Chemical admixtures that have been in storage at the project site for longer than 6 months or that have been subjected to freezing shall be retested at the expense of the contractor at the request of the Contracting Officer and shall be rejected if test results are not satisfactory.
2.1.3.1 Air-Entraining Admixture
Air-entraining admixture shall meet the requirements of ASTM C 260.
2.1.4 Water
Water for mixing and curing shall be fresh, clean, potable, and free from injurious amounts of oil, acid, salt, or alkali, except that unpotable water may be used if it meets the requirements of COE CRD-C 400.
2.1.5 Reinforcing Steel
Reinforcing steel bar shall conform to the requirements of ASTM A 615/A 615M, Grade 60. Welded steel wire fabric shall conform to the requirements of ASTM A 185/A 185M. Details of reinforcement not shown shall be in accordance with ACI 318/318R, Chapters 7 and 12.
2.1.6 Formwork
The design and engineering of the formwork as well as its construction, shall be the responsibility of the Contractor.
2.1.7 Form Coatings
Forms for exposed surfaces shall be coated with a nonstaining form oil, which shall be applied shortly before concrete is placed.
2.1.8 Curing Materials
TECHNICAL SPECIFICATIONS Page 6 of 11 Piedmont NWR
DIVISION 03 SECTION 03 30 04
Curing materials shall conform to the following requirements.
2.1.8.1 Impervious Sheet Materials
Impervious sheet materials, ASTM C 171, type optional, except polyethylene film, if used, shall be white opaque.
2.1.8.2 Membrane-Forming Curing Compound
ASTM C 309, Type 1-D or 2, Class A.
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 General
Construction joints shall be prepared to expose coarse aggregate, and the surface shall be clean, damp, and free of laitance. Ramps and walkways, as necessary, shall be constructed to allow safe and expeditious access for concrete and workmen.
Snow, ice, standing or flowing water, loose particles, debris, and foreign matter shall have been removed. Earth foundations shall be satisfactorily compacted. Spare vibrators shall be available. The entire preparation shall be accepted by the Government prior to placing.
3.1.2 Embedded Items
Reinforcement shall be secured in place; joints, anchors, and other embedded items shall have been positioned. Internal ties shall be arranged so that when the forms are removed the metal part of the tie will be not less than 2 inches from concrete surfaces permanently exposed to view or exposed to water on the finished structures.
Embedded items shall be free of oil and other foreign matters such as loose coatings or rust, paint, and scale. The embedding of wood in concrete will be permitted only when specifically authorized or directed. All equipment needed to place, consolidate, protect, and cure the concrete shall be at the placement site and in good operating condition.
3.1.3 Formwork Installation
Forms shall be properly aligned, adequately supported, and mortar-tight. The form surfaces shall be smooth and free from irregularities, dents, sags, or holes when used for permanently exposed faces. All exposed joints and edges shall be chamfered, unless otherwise indicated.
TECHNICAL SPECIFICATIONS Page 7 of 11 Piedmont NWR
DIVISION 03 SECTION 03 30 04
3.1.4 Production of Concrete
3.1.4.1 Ready-Mixed Concrete
Ready-mixed concrete shall conform to ASTM C 94/C 94M except as otherwise specified.
3.1.4.2 Concrete Made by Volumetric Batching and Continuous Mixing
Concrete made by volumetric batching and continuous mixing shall conform to ASTM C 685/C 685M.
3.1.4.3 Batching and Mixing Equipment
The contractor shall have the option of using an on-site batching and mixing facility.
The facility shall provide sufficient batching and mixing equipment capacity to prevent cold joints. The method of measuring materials, batching operation, and mixer shall be submitted for review.
3.2 CONVEYING AND PLACING CONCRETE
Conveying and placing concrete shall conform to the following requirements.
3.2.1 General
Concrete placement shall not be permitted when weather conditions prevent proper placement and consolidation without approval. When concrete is mixed and/or transported by a truck mixer, the concrete shall be delivered to the site of the work and discharge shall be completed within 1-1/2 hours or 45 minutes when the placing temperature is 85 degrees F or greater unless a retarding admixture is used.
Concrete shall be conveyed from the mixer to the forms as rapidly as practicable by methods which prevent segregation or loss of ingredients. Concrete shall be in place and consolidated within 15 minutes after discharge from the mixer. Concrete shall be deposited as close as possible to its final position in the forms and be so regulated that it may be effectively consolidated in horizontal layers 18 inches or less in thickness with a minimum of lateral movement. The placement shall be carried on at such a rate that the formation of cold joints will be prevented.
3.2.2 Consolidation
Each layer of concrete shall be consolidated by rodding, spading, or internal vibrating equipment. Internal vibration shall be systematically accomplished by inserting the
TECHNICAL SPECIFICATIONS Page 8 of 11 Piedmont NWR
DIVISION 03 SECTION 03 30 04
vibrator through the fresh concrete in the layer below at a uniform spacing over the entire area of placement. The distance between insertions shall be approximately 1.5 times the radius of action of the vibrator and overlay the adjacent, just-vibrated area by a few inches. The vibrator shall penetrate rapidly to the bottom of the layer and at least 6 inches into the layer below, if such a layer exists. It shall be held stationary until the concrete is consolidated and then withdrawn slowly at the rate of about 3 inches per second.
3.2.3 Cold-Weather Requirements
No concrete placement shall be made when the ambient temperature is below 35 degrees F or if the ambient temperature is below 40 degrees F and falling. Suitable covering and other means as approved shall be provided for maintaining the concrete at a temperature of at least 50 degrees F for not less than 72 hours after placing and at a temperature above freezing for the remainder of the curing period. Salt, chemicals, or other foreign materials shall not be mixed with the concrete to prevent freezing. Any concrete damaged by freezing shall be removed and replaced at the expense of the contractor.
3.2.4 Hot-Weather Requirements
When the rate of evaporation of surface moisture, as determined by use of Figure 1 of ACI 308R, is expected to exceed 0.2 psf per hour, provisions for windbreaks, shading, fog spraying, or covering with a light-colored material shall be made in advance of placement, and such protective measures shall be taken as quickly as finishing operations will allow.
3.3 FORM REMOVAL
Forms shall not be removed before the expiration of 24 hours after concrete placement except where otherwise specifically authorized. Supporting forms and shoring shall not be removed until the concrete has cured for at least 5 days. When conditions on the work are such as to justify the requirement, forms will be required to remain in place for longer periods.
3.4 FINISHING
3.4.1 General
No finishing or repair will be done when either the concrete or the ambient temperature is below 50 degrees F.
TECHNICAL SPECIFICATIONS Page 9 of 11 Piedmont NWR
DIVISION 03 SECTION 03 30 04
3.4.2 Finishing Formed Surfaces
All fins and loose materials shall be removed, and surface defects including tie holes shall be filled. All honeycomb areas and other defects shall be repaired. All unsound concrete shall be removed from areas to be repaired. Surface defects greater than 1/2 inch in diameter and holes left by removal of tie rods in all surfaces not to receive additional concrete shall be reamed or chipped and filled with dry-pack mortar. The prepared area shall be brush-coated with an approved epoxy resin or latex bonding compound or with a neat cement grout after dampening and filled with mortar or concrete. The cement used in mortar or concrete for repairs to all surfaces permanently exposed to view shall be a blend of portland cement and white cement so that the final color when cured will be the same as adjacent concrete.
3.4.3 Finishing Unformed Surfaces
All unformed surfaces that are not to be covered by additional concrete or backfill shall be float finished. Exterior surfaces shall be sloped for drainage unless otherwise shown. Joints shall be carefully made with a jointing tool. Unformed surfaces shall be finished to a tolerance of 3/8 inch for a float finish as determined by a 10 foot straightedge placed on surfaces shown on the plans to be level or having a constant slope. Finishing shall not be performed while there is excess moisture or bleeding water on the surface. No water or cement shall be added to the surface during finishing.
3.4.3.1 Float Finish
Surfaces to be float finished shall be screeded and darbied or bullfloated to eliminate the ridges and to fill in the voids left by the screed. In addition, the darby or bullfloat shall fill all surface voids and only slightly embed the coarse aggregate below the surface of the fresh concrete. When the water sheen disappears and the concrete will support a person's weight without deep imprint, floating should be completed.
Floating should embed large aggregates just beneath the surface, remove slight imperfections, humps, and voids to produce a plane surface, compact the concrete, and consolidate mortar at the surface.
3.5 CURING AND PROTECTION
Beginning immediately after placement and continuing for at least 7 days, all concrete shall be cured and protected from premature drying, extremes in temperature, rapid temperature change, freezing, mechanical damage, and exposure to rain or flowing water. All materials and equipment needed for adequate curing and protection shall be available and at the site of the placement prior to the start of concrete placement.
TECHNICAL SPECIFICATIONS Page 10 of 11 Piedmont NWR
DIVISION 03 SECTION 03 30 04
Preservation of moisture for concrete surfaces not in contact with forms shall be accomplished by one of the following methods:
a. Continuous sprinkling or ponding.
b. Application of absorptive mats or fabrics kept continuously wet.
c. Application of sand kept continuously wet.
d. Application of impervious sheet material conforming to ASTM C 171.
e. Application of membrane-forming curing compound conforming to ASTM C 309, Type 1-D, on surfaces permanently exposed to view and Type 2 on other surfaces shall be accomplished in accordance with manufacturer's instructions.
The preservation of moisture for concrete surfaces placed against wooden forms shall be accomplished by keeping the forms continuously wet for 7 days. If forms are removed prior to end of the required curing period, other curing methods shall be used for the balance of the curing period. During the period of protection removal, the temperature of the air in contact with the concrete shall not be allowed to drop more than 25 degrees F within a 24 hour period.
3.6 TESTS AND INSPECTIONS
3.6.1 General
The individuals who sample and test concrete as required in this specification shall have demonstrated a knowledge and ability to perform the necessary test procedures.
3.6.2 Inspection Details and Frequency of Testing
3.6.2.1 Preparations for Placing
Forms and embedded items shall be inspected in sufficient time prior to each concrete placement by the Contractor to certify that it is ready to receive concrete.
3.6.2.2 Slump
Slump shall be checked once during each shift that concrete is produced. Samples shall be obtained in accordance with ASTM C 172 and tested in accordance with
ASTM C 143/C 143M.
TECHNICAL SPECIFICATIONS Page 11 of 11 Piedmont NWR
DIVISION 03 SECTION 03 30 04
3.6.2.3 Consolidation and Protection
The Contractor shall ensure that the concrete is properly consolidated, finished, protected, and cured.
3.6.3 Reports
The results of all tests and inspections conducted at the project site shall be reported informally at the end of each shift and in writing weekly.
End of Section
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DESIGN AND PERFORMANCE REQUIREMENTS |
| 1.3.1 Strength |
| 1.3.2 Construction Tolerances |
| 1.3.3 Concrete Mixture Proportions |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 Cementitious Materials |
| 2.1.1.1 Portland Cement |
| 2.1.1.2 Pozzolan |
| 2.1.2 Aggregates |
| 2.1.3 Admixtures |
| 2.1.3.1 Air-Entraining Admixture |
| 2.1.4 Water |
| 2.1.5 Reinforcing Steel |
| 2.1.6 Formwork |
| 2.1.7 Form Coatings |
| 2.1.8 Curing Materials |
| 2.1.8.1 Impervious Sheet Materials |
| 2.1.8.2 Membrane-Forming Curing Compound |
| PART 3 EXECUTION |
| 3.1 PREPARATION |
| 3.1.1 General |
| 3.1.2 Embedded Items |
| 3.1.3 Formwork Installation |
| 3.1.4 Production of Concrete |
| 3.1.4.1 Ready-Mixed Concrete |
| 3.1.4.2 Concrete Made by Volumetric Batching and Continuous Mixing |
| 3.1.4.3 Batching and Mixing Equipment |
| 3.2 CONVEYING AND PLACING CONCRETE |
| 3.2.1 General |
| 3.2.2 Consolidation |
| 3.2.3 Cold-Weather Requirements |
| 3.2.4 Hot-Weather Requirements |
| 3.3 FORM REMOVAL |
| 3.4 FINISHING |
| 3.4.1 General |
| 3.4.2 Finishing Formed Surfaces |
| 3.4.3 Finishing Unformed Surfaces |
| 3.4.3.1 Float Finish |
| 3.5 CURING AND PROTECTION |
| 3.6 TESTS AND INSPECTIONS |
| 3.6.1 General |
| 3.6.2 Inspection Details and Frequency of Testing |
| 3.6.2.1 Preparations for Placing |
| 3.6.2.2 Slump |
| 3.6.2.3 Consolidation and Protection |
3.6.3 Reports