Attach_13_FA_Requirements.pdf

PDF 114 KB Posted

Attached to
F-16 Test Station Power Supply (6130-01-373-0561WF)
Solicitation number
FA8212-25-R-0003
Issued by

About this file

This is a First Article Requirements form (AFMC IMT 260) dated December 16, 2024, specifying testing requirements for an F-16 Test Station Power Supply (NSN 6130013730561WF). The form requires one First Article unit that will be part of the production quantity, with government testing required per drawing 2215058-001. The First Article must be manufactured at the facilities where production will occur and will undergo functional testing on higher assembly.

Key details include: delivery within 150 calendar days from contract date to Hill AFB, UT; 30-day advance notification required before shipment; government approval/disapproval within 90 days of receipt; estimated testing cost of $2,500. Approved articles will be forwarded to USAF Supply, while disapproved articles will be retained by 809 MXSS/MXDEB. The requirements allow for possible waivers if vendors have supplied similar items to DoD/Air Force within the past 36 months. The form includes special instructions for material certification, dimensional tolerances documentation, and process verification requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

16 DEC 2024(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

12436 / 2215058-001

4. NSN

6130013730561WF

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM Item

AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A.

X

CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

Part must meet requirements of drawing 2215058-001 Part will be functionally tested on higher assembly to help ensure proper construction.

B. The detailed technical requirements for First Article approval tests are contained in

Part must meet requirements of drawing 2215058-001 Part will be functionally tested on higher assembly to help ensure proper construction.

(Cite Spec and Para number)

C. TEST PLAN REQUIRED

(3) Number of days for government approval / disapproval days.

(1) DD Form 1423 ELIN

(2) Delivery due calendar days from date of contract.

D. Contractor's notification to ACO and

(Requesting Activity) of test time and location due days prior to start of testing.

E. X TEST REPORT REQUIRED

(3) Forwarded to

809 MXSS/MXDEB

Concurrent w/First Article Asset

(4) Government written notice of approval / disapproval due

(2) Due

(1) DD Form 1423 ELIN days after receipt of contractor's report.90

Required calendar days from date contract.

AFMC IMT 260, 20230316, V-5,

Version 4Generated by PRPS using Jasper Reports on 08 Jan 2025

PREVIOUS EDITION IS OBSOLETE

Prescribed by: AFMCI23-110

F. FIRST ARTICLE DELIVERY

(1) Due within 150 calendar days from date contract.

(2) Notify 30 calendar days prior to shipment.

(3) Delivered to government at

DODACC:FB2029 OO-ALC 809 MXSS/MXDEB

BLDG 849 ATTN: NON-ACCOUNTABLE BAY

HILL AFB, UT 84056-5713

MARK FOR: F/A I & TEST DO NOT POST

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 90 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$2,500.0000

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to

USAF Supply

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles will be returned to the contractor

X will be retained by 809 MXSS/MXDEB pending disposition instructions from the contractor.

X On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, X DoD, Air Force.

b. X Offerors currently in production of the same or similar article for a Government, X DoD, Air Force contract and who have received First Article approval under the existing contract.

c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, X DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 36 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. X See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

AFMC IMT 260, 20230316, V-5,

Version 4Generated by PRPS using Jasper Reports on 08 Jan 2025

12. REMARKS

Meredith, Jaime MNAME: 17 DEC 2024DATE:

1. The lead engineer has performed a secondary review of this item and found that a first article test is required for purchase requests less than $25,000.

2. If the vendor has never produced this item or hasn't produced it for an extended period of time, then, in view of the critical nature of the part, a "First Article" is required.

3. Vendor may be allowed only one attempt to receive full or conditional approval. At the discretion of the Government, failure to receive approval of "First Article" inspection will result in termination of the contract or a request for resubmitted. It may result in subsequent removal of the vendor as an approved source.

4. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.

5. Materials utilized in the manufacture of "First Article" items shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements.

6. Material processing, including finish requirements (plating, heat treatment, welding, inspecting, anodize, painting, etc.) utilized in the manufacture of "First Article" items shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.

Blanco, Curtis JNAME: 10 APR 2020DATE:

Deliver First Article to ...

(Mark for 1st Article test, Do Not Post) 809 MXSS/MXDEB (First Article Test - Bldg 849) Attention Non-Accountable (Dear John) Bay Hill AFB, UT 84056-5713

Offerors who have supplied this part previously to the Air Force (within 36 Months), and manufacture this part using the same production facility do not need to provide a first article. If supplier feels there is a legitimate reason to waive first article requirement supplier should contact government engineer for possible waiver.

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING

(Name, Organization, Phone)

Jaime Meredith

416th SCMS/GUEAA

801-586-5743

586-5743

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

First Article Testing Lab

809 MXSS/MXDEB

x x

AFMC IMT 260, 20230316, V-5,

Version 4Generated by PRPS using Jasper Reports on 08 Jan 2025

File details come from the government source that posted it. Updated .