Attach_12_CDRL_CPP.pdf
PDF 579 KB Posted
- Solicitation number
- FA8212-25-R-0003
About this file
This is a Contract Data Requirements List (CDRL) form DD 1423-1 for a Counterfeit Prevention Plan (CPP) associated with an F-16 Test Station Power Supply contract (FD2020-25-00387). The document specifies that the contractor must submit a Letter of Transmittal and CPP via email within 30 calendar days after contract award, with government comments to be provided within 14 days. The contractor must resubmit the CPP within 7 days of receiving comments.
The CDRL includes specific distribution requirements, marking the document as "Distribution D" (authorized only for DoD and U.S. DoD contractors - Critical Technology) and requires export control warnings on all technical documents. The requiring office is listed as 416 SCMS/GUEAB at Hill AFB, UT. The document is dated December 18, 2024, and requires one draft copy to be submitted. There is no estimated total price listed (shown as $0.00).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .