Summary of HVAC Renovation Specifications for Dobbins Air Reserve Base Building 510
This document comprises mechanical and electrical specifications for HVAC system renovation work at a historic building located at Dobbins Air Reserve Base. The project involves demolition of existing HVAC equipment and installation of relocated fan coil units, with emphasis on minimizing impact to historic building fabric. Key demolition tasks include disconnection and removal of FC-2 fan coil unit, CU-2 condenser unit, associated refrigerant linesets, electrical feeders, combustion air ducts, and condensate drain piping. FC-1 fan coil unit and related components are to be disconnected, stored, and relocated to a new position within the facility. All exterior penetrations must be flashed, counterflashed, and sealed to maintain watertight conditions. The project must comply with UFC standards, 2024 International Building Code, NFPA 70 (2023 Edition), and Dobbins Air Reserve Base facility standards.
Installation requirements specify G60 galvanized sheet metal ductwork with internal 1-inch fiberglass wrap insulation meeting ASTM E84 flame spread index of 25 and smoke development index of 50. All ductwork must be constructed to SMACNA standards with 2-inch W.G. static pressure classification and Class A seals. Flexible neoprene-glass fabric connections minimum six inches in length are required for all mechanical equipment connections. Refrigerant piping must be Type-L or ASTM B280 copper tubing with brazed joints, pressure-tested at 445 PSIG minimum with nitrogen, and vacuum-tested at 27 inches for one hour. The contractor must perform comprehensive HVAC duct cleaning per NADCA standards with a certified supervisor, provide 12-month equipment warranties, and complete testing and balancing services through a licensed TAB contractor with minimum five years experience. New MERV-13 disposable pleated filters must be installed prior to testing and replaced afterward. Control setpoints include cooling at 78°F and heating at 68°F, with coordinated reprogramming of the JACE building management system. All electrical work requires new conduit installations, grounding per NFPA 70, and updated panelboard identification of active and spare circuits.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
T
GENERAL NOTES - DEMOLITION:
1. PRIOR TO PROJECT COMPLETION, CLEAN
EXISTING DUCTWORK AND DIFFUSERS AND
SEAL LEAKS IN DUCTWORK FOR REUSE IN
HVAC SYSTEMS INCLUDED WITHIN THE SCOPE
OF THE PROJECT. SEE DUCT CLEANING
SPECIFICATIONS.
2. STORE ALL EQUIPMENT AND DIFFUSERS THAT
ARE TO BE REUSED TO PROTECT THEM FROM
DAMAGE AND DEBRIS DURING CONSTRUCTION.
COORDINATE STORAGE LOCATION WITH C.O.
PRIOR TO COMMENCING WORK.
3. ONCE DEMOLITION IS COMPLETE, PATCH
HOLES AND DAMAGED AREAS OF
CONSTRUCTION (E.G., DRYWALL) CAUSED BY
CONSTRUCTION. FINISH AND PAINT TO MATCH
SURROUNDING SURFACES.
S2 110 S2 110
S2 110S2 110
S2 95
S2 120
S1 40
S2 95
S1 35
S2 85
S2 85
L2 145
R3
R1
R1
R3
R2
R2
S2 65
OPEN OFFICE
RECEPTION
AREA
SUPPLIES /
STORAGE
OPEN OFFICE
CORRIDOR
OFFICE
RESTROOM
CONFERENCE
ROOM
S2 95
S2 95
12"x12"
12"x12"
"x
"x
16"x16"
12"x12"
"x
10"ø
"x
B E
L O
W
F C
-1 (R
E L O
C A
T E
D
B E
L O
W
S2 65
S2 85
FC-1
D1D2
D3
D4
D5
D5
D6
D7
D8
D9
D10
D11
D12
D13 D13
D13
D13
D13
D13
D13
D13
D13
D13
D13
D13
D13
D13
D13D13
D13
D13
D13
D13
VENTILATION CALCULATIONS
NOTE: AIRFLOWS SHOWN ARE CALCULATED VALUES. FOR FINAL AIR BALANCE, SEE AIRFLOWS INDICATED ON HVAC NEW WORK PLAN.
APPLICATION OF THE DRAWINGS:
1. DRAWINGS ARE DIAGRAMMATIC AND ARE NOT
REPRESENTATIVE OF ALL POTENTIAL
CONDITIONS. COORDINATE WITH ALL
DISCIPLINES TO ENSURE PROPER
INSTALLATION OF ALL SYSTEMS AND
EQUIPMENT.
2. CONFLICTS: THE PROVISION, SPECIFICATION
OR DRAWING IN THE CONTRACT DOCUMENTS
WHICH PROVIDES FOR THE HIGHER QUALITY
OR QUANTITY SHALL TAKE PRECEDENCE OVER
A CONFLICTING OR INCONSISTENT PROVISION,
SPECIFICATION OR DRAWING IN THE
CONTRACT DOCUMENTS. WHERE SUCH A
CONFLICT IS IDENTIFIED, THE CONTRACTOR
SHALL SUBMIT A REQUEST FOR INFORMATION
(RFI).
3. REFER TO ARCHITECTURAL REFLECTED
CEILING PLAN(S) FOR EXACT LOCATION OF ALL
CEILING-MOUNTED EQUIPMENT AND AIR
DISTRIBUTION DEVICES.
Croft & Associates
3400 Blue Springs Road, Suite 200 Kennesaw, GA 30144
770.529.7714 (p)
770.529.7716 (f) www.croftae.com
CONSTRUCTION DOCS.
C
IV
IL
E
N G
IN
E
E R
IN
G th
A
IR
L
IF
T W
IN
G
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E
G E
O R
G
IA
P R
O
JE
C T
L O
C A
T
IO
N
D R
A W
IN
G
C O
N T
A C
T
PROJECT No.
PROJ. OFFICER
DESIGNED
CHECKED
DATE
DRAWING OF
P R
O
JE
C T
C O
N T
A C
T
R O
B E
R T
E R
N S
T
D S
N
-3 ro b e rt
.e rn st .5 u s.
a f.
m il
R O
C K
H O
U S
E R
E N
O V
A T
IO
N
B U
IL
D
IN
G
F
G W
B
-0
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E
G E
O R
G
IA
J. MORGAN
C o p yr ig h t b y C ro ft
A ss o ci a te s, I n c.
A ll ri g h ts r e se rv e d
T h is d o cu m e n t is p ro p e rt y o f
C ro ft
A ss o ci a te s, I n c.
It is t o b e u s e d o n ly f o r th e s p e ci fic p ro je ct r e fe rr e d t o o r id e n tif ie d h e re in a n d is n o t to b e u se d o n o th e r p ro je ct s in w h o le o r in p a rt e xc e p t b y th e e xp re ss w ri tt e n a g re e m e n t o f
C ro ft
A ss o ci a te s, I n c
2025/08/26
/2
/2
:0
:3
P
M A u to d e s k D o c s /2
-1
D o b b in s A
R B
B ld g
/2
-1
D o b b in s A
R B
B ld g
M
.r v t
M-101
H V
A C
U P
D A
T E
P L
A N
2018-173
M. JOHNSON
V. MAZZEI
MASTER KEY: HVAC DEMOLITION SHEET NOTES
SEE INDIVIDUAL SHEETS FOR APPLICATION
TAG # TAG DESCRIPTION
D1 DISCONNECT EXISTING FC-1 AND ALL ASSOCIATED SENSORS, CONDENSATE
PUMP, PIPING, U.V. LAMP ASSEMBLY, AND SENSORS AND STORE FOR REUSE IN
NEW WORK PHASE. DISCONNECT ELECTRICAL FEEDERS AND CONDUIT. REMOVE
WIRING AND CONDUIT BACK TO ATTIC ENTRY POINT AND INSTALL A JUNCTION BOX
FOR SPLICING OF CIRCUIT CONTINUATION TO ACCOMMODATE UNIT IN NEWLY
INDICATED LOCATION. REMOVE FC-1 DISCONNECT SWITCH AND STORE FOR
REUSE IN THE NEW LOCATION.
D2 DISCONNECT EXISTING FC-1 REFRIGERANT LINESETS AND REROUTE TO NEW FC-1
LOCATION AS INDICATED ON NEW WORK PLAN.
D3 DISCONNECT EXISTING FC-1 THERMOSTAT AND STORE FOR REUSE IN NEW WORK
PHASE.
D4 DEMOLISH CONDENSATE DRAIN PIPING UP TO POINT INDICATED. REMAINING
DRAIN PIPING TO OUTSIDE TO REMAIN FOR REUSE IN NEW WORK PHASE. PLUG
UNUSED PIPE INLET AT WYE FITTING.
D5 DEMOLISH EXISTING DIFFUSER AND PATCH, SEAL, AND RE-INSULATE DUCTWORK.
PATCH CEILING AND PAINT TO MATCH.
D6 DEMOLISH EXISTING FAN COIL UNIT FC-2 AND ASSOCIATED CONDENSATE PUMP,
SENSORS, UV LAMP ASSEMBLY, AND EQUIPMENT, AND RETURN TO THE
GOVERNMENT. DEMOLISH ASSOCIATED ELECTRICAL FEEDERS BACK TO
ELECTRICAL PANEL AND ABANDON CONDUIT IN PLACE. TURN CIRCUIT BREAKERS
TO "OFF" POSITION AND UPDATE PANEL SCHEDULE TO INDICATE THESE
POSITIONS AS "SPARE". DEMOLISH ASSOCIATED CONTROL WIRING AND
THERMOSTAT, AND RETURN THERMOSTAT TO GOVERNMENT.
D7 DEMOLISH EXISTING COMBUSTION AIR DUCT. CAP VERTICAL OPENING ABOVE
ROOF AND ABANDON IN PLACE.
D8 LABEL DEMOLISHED FC-2 CIRCUITS AS "UNUSED" IN ELECTRICAL PANEL.
D9 DEMOLISH EXISTING CONDENSER UNIT CU-2 AND ASSOCIATED REFRIGERANT
LINESETS, WIRING, AND CONDUIT. RETURN CONDENSER UNIT TO THE
GOVERNMENT.
D10 DEMOLISH EXISTING COMBUSTION AIR DUCT TO ELBOW. REMAINING
PENETRATION TO REMAIN FOR REUSE IN NEW WORK PHASE.
D11 DEMOLISH CONDENSATE DRAIN LINE TO POINT INDICATED. REMAINDER OF
CONDENSATE DRAIN PIPE TO REMAIN FOR REUSE IN NEW WORK PHASE.
D12 DEMOLISH OUTSIDE AIR DUCT AS SHOWN. BLANK OFF LOUVER WITH INSULATED
PANEL.
D13 EXISTING AIR TERMINAL TO REMAIN IN PLACE.
MASTER KEY: HVAC NEW WORK SHEET NOTES
SEE INDIVIDUAL SHEETS FOR APPLICATION
TAG # TAG DESCRIPTION
1 BALANCE FAN COIL UNIT FOR AIRFLOW QUANTITIES SHOWN ON THE PLAN.
2 INSTALL DIFFUSER QUADRANT BLANK TO PREVENT RETURN AIR SHORT CIRCUIT
3 REINSTALL FAN COIL UNIT, FLEXIBLE DUCT CONNECTIONS, DUCT-MOUNTED U.V.
LAMP ASSEMBLY, AND SENSORS. RE-CONNECT UNIT TO JACE IN ATTIC. CLEAN ALL
DUCTWORK, FAN COIL, AND DIFFUSERS IN THE FACILITY. SEE HVAC DUCT
CLEANING SPECIFICATIONS, SHEET M-102.
4 REINSTALL FAN COIL UNIT AUX DRAIN PAN, CONDENSATE PUMP, AND CONNECT
NEW CONDENSATE DRAIN PIPING TO EXISTING CONDENSATE DRAIN ROUTED
OUTSIDE AS SHOWN.
5 REROUTE REFRIGERANT LINESETS TO NEW FAN COIL UNIT LOCATION AS
INDICATED
6 REINSTALL FC-1 THERMOSTAT AT 42" A.F.F.
7 INSTALL NEW POLYPROPYLENE EXHAUST-RATED PIPING TO CONNECT TO
EXISTING COMBUSTION AIR AND EXHAUST THROUGH ROOF.
8 INSULATE ALL NEW DUCTWORK (EXCEPT DUCTWORK INDICATED TO RECIEVE
LINING). PROVIDE 2-INCH OVERLAP OF NEW INSULATION OVER EXISTING.
9 INSTALL NEW ELECTRIC FEEDER FROM ATTIC ENTRY JUNCTION BOX (SEE DEMO
NOTE "D1") TO NEW FC-1 LOCATION. MATCH EXISTING (PRIOR TO
RECONFIGURATION) FC-1 CONDUIT AND WIRING FEEDER. REINSTALL EXISTING
FC-1 DISCONNECT AT NEW UNIT LOCATION AND BREAK FEEDER THROUGH SWITCH
PRIOR TO TERMINATING AT UNIT.
A.F.F. ABOVE FINISHED FLOOR
BAS BUILDING AUTOMATION SYSTEM
CD CONDENSATE DRAIN
C.O. CONTRACTING OFFICER
EF EXHAUST FAN
FC FAN COIL
H.M.I. HUMAN-MACHINE INTERFACE
HP HEAT PUMP
L LOUVER
OSA OUTSIDE AIR
REF REFRIGERANT
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
TYP. TYPICAL
LIMIT OF SCOPE
RETURN AIR DIFFUSER
SUPPLY AIR DIFFUSER
FLEXIBLE DUCTWORK
MANUAL VOLUME DAMPER
DUCT TAKEOFF WITH INTEGRATED
BALANCING DAMPER
HVAC SYMBOL LEGEND
T THERMOSTAT
1 SHEET NOTE TAG
XX ###
AIR DEVICE TAG
DEVICE TYPE MARK
AIRFLOW (CFM)
DIFFUSER BLANK
CONDENSATE PIPING
REFRIGERANT PIPING
ABBREVIATIONS
10 FT50
1/4" = 1'-0"
M-101
HVAC NEW WORK PLAN
10 FT50
1/4" = 1'-0"
M-101
HVAC DEMOLITION PLAN
PLAN
NORTH
HISTORIC BUILDING PROJECT:
THE PROJECT FACILITY IS A REGISTERED HISTORIC BUILDING.
PERFORM ALL WORK TO MINIMIZE IMPACT TO THE HISTORIC
FABRIC OF THE BUILDING, INCLUDING FLOORING, WOOD
CEILINGS, AND OTHER BUILDING ELEMENTS AS DIRECTED BY
THE HISTORICAL PRESERVATION AUTHORITY AND THE
CONTRACTING OFFICER. DO NOT MAKE HOLES OR ALTER
ELEMENTS IDENTIFIED AS BELONGING TO THE HISTORIC
FABRIC WITHOUT CONSULTING THE ABOVE REFERENCED
AUTHORITIES.
REV. DATE/BY DESCRIPTION
0 2025/08/26 HVAC UPDATE CD'S
VincentMazzei Vincent GA Stamp - Simple
GENERAL:
1. APPLICABLE CODES AND REGULATIONS:
1.1. UNIFIED FACILITIES CRITERIA (UFC) (https://www.wbdg.org/dod/ufc)
1.2. 2024 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC) AND ALL
REFERENCED CODES INCLUDED THEREIN (E.G., IPC, IMC, IFC, NFPA,
IECC, ETC.)
1.3. NFPA 70 - NATIONAL ELECTRICAL CODE, 2023 EDITION
1.4. DOBBINS AIR RESERVE BASE FACILITY STANDARD.
1.5. ALL CURRENT AMENDMENTS TO CODES LISTED.
2. FIELD-VERIFY EXISTING CONDITIONS, AND DUCTWORK / EQUIPMENT SIZES,
LOCATIONS, ROUTING, ETC. PRIOR TO BEGINNING WORK OR PURCHASING
ANY MATERIALS, AND REPORT ANY DEVIATIONS TO THE CONTRACTING
OFFICER.
3. THE CONTRACT DOCUMENTS ARE DIAGRAMMATIC IN NATURE AND NOT EVERY
DETAIL OR EXACT LOCATION OF EQUIPMENT AND / OR CONDUIT IS SHOWN.
VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO ORDERING ANY
MATERIAL OR PERFORMING ANY WORK. NOTIFY THE CONTRACTING OFFICER
OF ANY CONDITIONS OR DIMENSIONS WHICH WOULD AFFECT
PERFORMANCE OF WORK IN ACCORDANCE WITH THE CONTRACT DRAWINGS
AND / OR SPECIFICATIONS.
4. OBTAIN ALL PERMITS, INSPECTIONS, AND APPROVALS AS REQUIRED BY THE
CONTRACTING OFFICER, AND DELIVER CERTIFICATES OF APPROVAL TO THE
DESIGN PROFESSIONAL. ASSUME AND PAY ALL FEES AND COSTS OF ANY
NATURE WHATSOEVER INCIDENTAL TO THESE PERMITS.
5. COORDINATE EXACT PHASING OF ALL WORK WITH CONTRACTING OFFICER.
6. COORDINATE ALL AIR DEVICES, WALL OPENINGS, AND ROOF OPENINGS WITH
IN-FIELD CONDITIONS.
7. SUPPORT ALL EQUIPMENT FROM THE BUILDING STRUCTURE USING SPRING
ISOLATORS TO PROVIDE A VIBRATION-FREE INSTALLATION.
8. ALL EQUIPMENT SHALL BE TESTED AND BALANCED USING METHODS
APPROVED BY NEBB AND / OR AABC. TESTING AND BALANCE (TAB)
SERVICES SHALL BE PERFORMED BY A LICENSED TAB CONTRACTOR
HAVING AT LEAST 5 YEARS OF EXPERIENCE.
9. ALL EXTERIOR PENETRATIONS SHALL BE FLASHED, COUNTERFLASHED, AND
SEALED TO MAKE WATERTIGHT, OR INSTALLED PER MANUFACTURER'S
RECOMMENDATIONS FOR A WATERTIGHT INSTALLATION.
10. HVAC DUCT CLEANING SPECIFICATIONS:
10.1. CLEANING CONTRACTOR QUALIFICATIONS: COMPANY SPECIALIZING IN
THE CLEANING AND RESTORATION OF HVAC SYSTEMS AND EMPLOYING
FOR THIS PROJECT A SUPERVISOR CERTIFIED AS AN AIR SYSTEMS
CLEANING SPECIALIST BY NADCA (NATIONAL AIR DUCT CLEANERS
ASSOCIATION).
10.2. BIOLOGICAL GROWTH HAS BEEN OBSERVED ON SURFACES WITHIN THE
BUILDING. CLEAN ALL INTERIOR SURFACES OF THE HEATING, AIR-
CONDITIONING AND VENTILATION SYSTEM FROM THE POINTS WHERE
THE AIR ENTERS THE SYSTEM TO THE POINTS WHERE THE AIR IS
DISCHARGED FROM THE SYSTEM, INCLUDING THE INSIDE OF AIR
DISTRIBUTION EQUIPMENT, COILS, AND CONDENSATE DRAIN PANS.
10.3. PERFORM CLEANING, INSPECTION, AND REMEDIATION IN ACCORDANCE
WITH THE RECOMMENDATIONS OF NADCA "ASSESSMENT, CLEANING
AND RESTORATION OF HVAC SYSTEMS" (ACR) AND AS SPECIFIED
BELOW.
10.4. WHERE NADCA ACR USES THE TERMS "RECOMMENDED", "HIGHLY
RECOMMENDED", OR "IDEALLY" IN REGARD TO A CERTAIN PROCEDURE
OR ACTIVITY, DO THAT UNLESS IT IS CLEARLY INAPPLICABLE TO THE
PROJECT.
10.5. PERFORM CLEANING AFTER NEW DUCTWORK HAS BEEN INSTALLED,
BUT BEFORE TESTING AND BALANCING PROCEDURES HAVE BEEN
PERFORMED.
10.6. OBTAIN CONTRACTING OFFICER'S APPROVAL OF PROPOSED
TEMPORARY LOCATIONS FOR LARGE EQUIPMENT.
10.7. DESIGNATE A DECONTAMINATION AREA AND OBTAIN CONTRACTING
OFFICER'S APPROVAL.
10.8. COLLECT DEBRIS REMOVED DURING CLEANING; ENSURE THAT DEBRIS
IS NOT DISPERSED OUTSIDE THE HVAC SYSTEM DURING THE CLEANING
PROCESS.
10.9. RESEAL NEW OPENINGS MADE TO ACCESS AND CLEAN DUCTWORK IN
ACCORDANCE WITH NADCA STANDARD 05.
10.10 SUBMIT A FIELD QUALITY CONTROL REPORT TO THE CONTRACTING
OFFICER. INCLUDE EVIDENCE OF SATISFACTORY CLEANING USING
TESTING AND OBSERVATION METHODS OUTLINED BY NADCA ACR,
INCLUDING NADCA SURFACE COMPARISON TESTING METHOD.
10.11. CONTRACTING OFFICER RESERVES THE RIGHT TO VERIFY
CLEANLINESS USING NADCA ACR SURFACE COMPARISON TESTING OR
NADCA VACUUM TEST. WHEN DIRECTED, RE-CLEAN COMPONENTS
UNTIL THEY PASS. CONTRACTOR SHALL BEAR THE COSTS OF
RETESTING DUE TO INADEQUATE CLEANING.
10.12. DOUBLE-BAG WASTE AND DEBRIS IN 6 MIL, 0.006 INCH THICK
POLYETHYLENE PLASTIC BAGS.
10.13. DISPOSE OF DEBRIS OFF-SITE IN ACCORDANCE WITH APPLICABLE
FEDERAL, STATE AND LOCAL REQUIREMENTS.
11. WARRANTIES:
PROVIDE A 12-MONTH (1 YEAR) WARRANTY FOR ALL SYSTEMS AND
EQUIPMENT. WARRANTY PERIOD SHALL BEGIN UPON ACCEPTANCE OF
SYSTEMS BY OWNER.
DUCTWORK:
1. ALL DUCTWORK SHALL BE CONSTRUCTED OF G60 GALVANIZED SHEET METAL
UNLESS INDICATED OTHERWISE.
2. MOUNT ALL DUCTWORK AS CLOSE AS POSSIBLE TO THE UNDERSIDE OF THE
BUILDING STRUCTURE. ALL DUCTWORK SUPPORTS SHALL BE MOUNTED TO
THE BUILDING STRUCTURE.
3. DUCTWORK DIMENSIONS SHOWN ON DRAWINGS ARE INTERNAL AIRFLOW
DIMENSIONS. DUCTWORK OUTER DIMENSIONS SHALL BE INCREASED TO
ACCOMMODATE INTERIOR LINING AS REQUIRED.
4. ALL DUCTWORK AND SHEET METAL SHALL BE FABRICATED AND INSTALLED IN
ACCORDANCE WITH THE MOST RECENT SMACNA STANDARD GUIDELINES.
ADDITIONALLY, THE FOLLOWING REQUIREMENTS APPLY:
4.1. GENERAL DUCTWORK REQUIREMENTS:
4.1.1. PRESSURE CLASSIFICATIONS: 2" W.G. STATIC PRESSURE, CLASS A
SEALS.
4.1.2. CONSTRUCT LOW PRESSURE RECTANGULAR DUCTWORK FROM
LOCK FORMING QUALITY GALVANIZED STEEL SHEETS.
4.1.3. CONSTRUCTION METHODS, METAL GAUGES, AND STIFFENING
SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF SMACNA
DUCT CONSTRUCTION STANDARDS.
4.1.4. LOW PRESSURE ROUND DUCTWORK UP TO AND INCLUDING 12"
DIAMETER SHALL BE LONGITUDINAL LOCK SEAM CONSTRUCTION.
ROUND DUCTS LARGER THAN 12" SHALL BE SPIRAL LOCK SEAM
CONSTRUCTION.
5.1. DUCTWORK ACCESSORIES:
5.1.1. LINERS:
5.1.1.1. ALL DUCTWORK INDICATED ON DRAWINGS AS HAVING
INTERNAL LINING SHALL USE 1” THICK LINER UNLESS OTHERWISE
INDICATED.
5.1.1.2. ALL LINERS SHALL BE INSTALLED PER MANUFACTURER'S
RECOMMENDATIONS. SEAL ALL EDGES, SEAMS, TEARS, OR
OTHER POTENTIAL LEAKS COMPLETELY AS DIRECTED BY
MANUFACTURER.
5.1.1.3. ALL INTERNAL DUCTWORK LINING SHALL MEET THE
FOLLOWING REQUIREMENTS, UNLESS OTHERWISE NOTED ON
THE DRAWINGS:
5.7.1.3.A. FIRE HAZARD CLASSIFICATION:
5.7.1.3.A.A. UL 723, ASTM E84, NFPA 255, CAN/ULC-S102
5.7.1.3.A.B. MAX FLAME SPREAD INDEX: 25, MAX SMOKE
DEVELOPED INDEX: 50, AND CLASSIFIED AS “LIMITED
COMBUSTIBLE” UNDER NFPA 259 (<3,500 BTU / LB)
MECHANICAL SPECIFICATIONS:
5.7.1.3.B. MEETS OR EXCEEDS ASTM G22 BACTERIA GROWTH
REQUIREMENTS FOR NO GROWTH, AND PASSES BOTH ASTM
C1338 AND ASTM G21 FUNGI RESISTANCE REQUIREMENTS
FOR NO GROWTH.
5.7.1.3.C. WATER REPELLENCY RATING: INDA IST 80.6-92 ≥ 4.
5.1.2. FITTINGS:
5.1.2.1. ELBOWS, TEES, AND WYES:
5.1.2.1.A. ALL ELBOWS, TEES, AND WYES SHALL BE RADIUS-TYPE
FITTINGS, WITH MINIMUM 1.5 x DIA RADIUS, UNLESS
OTHERWISE INDICATED ON DRAWINGS. IF DUCT VELOCITY IS
GREATER THAN 1,500 FT / MIN, TURN RADIUS MUST BE EQUAL
TO 2.0 x DIA OR GREATER.
5.1.2.1.B. EXCEPTION: WHERE DUCTWORK CONFIGURATION OR
ROUTING REQUIREMENTS PRECLUDE THE USE OF A 1.5 x DIA.
TURNING RADIUS, INSTALL TURNING VANES TO PREVENT
EXCESSIVE PRESSURE DROP THROUGH THE FITTING.
5.1.2.2. TURNING VANES:
5.1.2.2.A. DUCT VELOCITY LESS THAN 1500 FT/MIN: TURNING
VANES SHALL BE SINGLE-WIDTH TYPE, AND SHALL BE
FABRICATED, SPACED, AND INSTALLED PER SMACNA
STANDARDS.
5.1.2.3. TAKEOFFS:
5.1.2.3.A. TAKEOFFS TO DIFFUSERS SHALL BE THE SAME SIZE AS
THE DIFFUSER NECK / OPENING UNLESS NOTED OTHERWISE
ON HVAC DRAWINGS.
5.1.2.3.B. RECTANGULAR OR OVAL DUCTWORK: USE BEVELED
TAKEOFF WITH A MINIMUM 45 DEGREE BEVEL. DO NOT USE
SCOOPS OR AIR DAMS.
5.1.2.3.C. ROUND DUCTWORK: USE CONICAL OR CONICAL
BELLMOUTH “SPIN-IN” TYPE TAKEOFF SUCH AS CROWN CO
3210-DS, 3210-BDS, OR EQUAL, OR USE A WYE LATERAL
TAKEOFF. DO NOT USE “DOVETAIL” TYPE TAKEOFF FITTINGS.
5.1.2.4. DAMPERS:
5.1.2.4.A. ALL BALANCING DAMPERS SHALL BE LOCKING-TYPE
CONSTRUCTED OF GALVANIZED STEEL (MINIMUM 20-GA.
THICKNESS), AND SHALL BE RATED FOR A MINIMUM OF 1.0 IN
WG PRESSURE, 2000 FPM VELOCITY, AND 180°F (82°C).
TESTING AND RATINGS SHALL BE IN ACCORDANCE WITH
AMCA STANDARD 500-D.
5.1.2.5. EQUIPMENT CONNECTIONS:
5.1.2.5.A. PROVIDE MINIMUM 6” FLEXIBLE NEOPRENE-GLASS
FABRIC CONNECTIONS FOR ALL DUCTWORK CONNECTIONS
TO MECHANICAL EQUIPMENT. NEOPRENE MATERIAL MUST BE
UL-LISTED, AND SHALL MEET NFPA-701 / CAN/ULC S109-03
REQUIREMENTS.
5.1.2.5.B. PROVIDE 1” THICK INTERIOR ACOUSTICAL DUCT LINER
FOR AT LEAST 10'-0” DOWNSTREAM OF SUPPLY CONNECTION
AND 10'-0” UPSTREAM OF RETURN CONNECTION OF ALL AIR
HANDLING EQUIPMENT UNLESS NOTED OTHERWISE.
5.1.3. FLEXIBLE DUCTWORK:
5.1.3.1. MAX FLEX DUCTWORK RUN: 6'-0” TO DIFFUSER CONNECTION.
5.1.3.2. WHERE FLEXIBLE DUCTWORK IS CONNECTED TO CEILING
DIFFUSERS, PROVIDE A UL-LISTED PLENUM-RATED DUCT
SUPPORT TO FORM DUCT ELBOW (SUCH AS TITUS FLEXRIGHT OR
EQUIVALENT), INSTALLED PER MANUFACTURER'S INSTRUCTIONS.
ALTERNATIVELY, PROVIDE AN EXTERNALLY-INSULATED,
INDEPENDENTLY-SUPPORTED SHEET METAL ELBOW, OR
INSULATED FLEXIBLE METAL DUCT CONSISTING OF FLEXIBLE
METAL CORE OF CORRUGATED ALUMINUM WITH EXTERNAL
INSULATION. DUCT CONNECTION / ELBOW BEND: MINIMUM ONE
DUCT DIAMETER CENTERLINE RADIUS.
5.1.3.3. DO NOT SUBSTITUTE FLEX DUCTWORK FOR FLEXIBLE
NEOPRENE-GLASS FABRIC FOR VIBRATION ISOLATION AT
MECHANICAL EQUIPMENT.
5.2. DUCT HANGERS AND SUPPORTS:
5.2.1. DUCT HANGERS AND SUPPORTS SHALL BE IN ACCORDANCE WITH
THE HANGERS AND SUPPORTS OF THE REFERENCED SMACNA DUCT
CONSTRUCTION STANDARDS.
5.3. DUCTWORK INSULATION:
5.3.1. FIBERGLASS WRAP INSULATION WITH FACTORY APPLIED VAPOR
BARRIER: INSULATE ALL SUPPLY, RETURN, AND OUTSIDE AIR
DUCTWORK WITH 1.5" THICK WRAP INSULATION, HAVING A THERMAL
CONDUCTIVITY OF 0.27 AT 75°F MEAN TEMPERATURE.
5.4. PIPING INSULATION:
5.4.1. FOAMED PIPE INSULATION WITH MINIMUM 4.5 PCF, AND THERMAL
CONDUCTIVITY OF 0.28 AT 75°F MEAN TEMPERATURE.
5.4.1.1. REFRIGERANT PIPING: 3/4" THICK.
CONTROLS:
1. INSTALL ALL NEW CONTROL WIRING.
2. COORDINATE WITH CONTRACTING OFFICER TO REPROGRAM JACE AND UNIT
CONTROLS TO MATCH PREVIOUS SETPOINTS AND SETBACKS. SETPOINTS
AND SETBACKS LISTED BELOW ARE PROVIDED IF NO SETPOINTS OR
SETBACKS ARE AVAILABLE.
2.1. COOLING SETPOINT: 78 DEGREES F
2.2. COOLING SETBACK: 80 DEGREES F
2.3. HEATING SETPOINT: 68 DEGREES F
2.4. HEATING SETBACK: 55 DEGREES F
3. CONNECT DAMPER CONTROL FOR EXISTING OUTSIDE AIR LOUVER DAMPER
PREVIOUSLY SERVING FC-2 TO RELOCATED FC-1 CONTROLS SO THAT
DAMPER OPENS ON FAN START AND CLOSES ON FAN STOP.
FIRE PROTECTION NOTES:
1. ALL DUCTWORK INSULATION, PIPING INSULATION, AND WIRING SHALL BE
PLENUM-RATED (FLAME INDEX OF 25 OR BETTER, AND A SMOKE INDEX OF 50
OR BETTER, PER ASTM-E84 STANDARDS).
PIPING:
1. GENERAL PIPING NOTES:
1.1. CODES AND STANDARDS: PLASTIC PIPE, FITTINGS, AND COMPONENTS
SHALL CONFORM TO NSF 14 / ANSI 14.
2. COMBUSTION EXHAUST PIPING: USE ONLY MATERIALS, PIPING, AND
ACCESSORIES LISTED AND LABELED TO UL-1738. STANDARD SCH. 40 PVC
AND DWV PVC PIPING ARE NOT LISTED TO UL-1738, AND ARE
DISALLOWED.
3. REFRIGERANT PIPING:
3.1. ALL REFRIGERANT PIPING SHALL BE INSTALLED ACCORDING TO
MANUFACTURER'S RECOMMENDATIONS.
3.2. REFRIGERANT PIPING SHALL BE TYPE-L OR ASTM B280 COPPER TUBING
WITH BRAZED JOINTS. FITTINGS SHALL BE ASME B16.22 WROUGHT
COPPER. REFRIGERANT PIPING SYSTEMS SHALL BE FLOODED WITH
NITROGEN WHEN BRAZING.
3.3. PROVIDE ADDITIONAL REFRIGERANT CHARGE AS NEEDED FOR
RELOCATED HVAC FAN COIL UNIT SYSTEM TO MEET MANUFACTURER'S
REQUIREMENTS AND RECOMMENDATIONS FOR OPTIMAL UNIT
OPERATION.
3.4. REFRIGERANT PIPING MUST BE INSTALLED TIGHT TO STRUCTURE.
3.5. INSTALL VALVES WITH STEMS UPRIGHT OR HORIZONTAL, NOT INVERTED.
3.6. TEST REFRIGERANT PIPING ACCORDING TO MANUFACTURER'S
SPECIFIED TESTING PROCEDURES. AT MINIMUM, TEST UNIT AT A
PRESSURE OF 445 PSIG BY INTRODUCING NITROGEN THROUGHOUT THE
REFRIGERANT CIRCUIT. USE ELECTRONIC PRESSURE GAUGES CAPABLE
OF MEASURING PRESSURE TO A TENTH OF A POUND, AND TEST FOR AT
LEAST ONE HOUR. BUBBLE TEST JOINTS WITH SOAP LATHER, CLEAN
JOINTS OF SOAP AND LEAK-TEST WITH AN ELECTRONIC TYPE LEAK
DETECTOR. PUMP OUT THE SYSTEM, PLACE THE ENTIRE CIRCUIT UNDER
27 INCHES OF VACUUM AND ALLOW TO STAND SEALED OFF FOR A
PERIOD OF ONE HOUR WITHOUT ANY LOSS OF VACUUM.
4. CONDENSATE DRAIN LOCATED ABOVE CEILING AND MECHANICAL ROOMS:
4.1. COPPER TYPE L, HARD DRAWN.
4.2. JOINTS: SOCKET BRAZED.
5. PIPE HANGERS AND SUPPORTS FOR INSULATED PIPING:
5.1. UPPER ATTACHMENT, NEW CONCRETE CONSTRUCTION: USE
ADJUSTABLE INSERTS SIMILAR TO ANVIL FIGURE 282.
5.2. UPPER ATTACHMENT, EXISTING CONCRETE CONSTRUCTION: USE
EXPANSION CASE ANCHOR SIMILAR TO ANVIL FIGURE 117.
5.3. UPPER ATTACHMENT IN STEEL CONSTRUCTION: USE ADJUSTABLE
BEAM CLAMPS AND TIE RODS.
5.4. INTERMEDIATE ATTACHMENT: USE STEEL RODS SIZED PROPERLY FOR
THE PIPE SIZE.
5.5. SPACE PIPE HANGERS AS FOLLOWS:
PIPE SIZE (STEEL): SPACING:
1-1/4" AND SMALLER 7 FT
1-1/2” 9 FT
2” TO 2-1/2” 10 FT
PIPE SIZE (COPPER): SPACING:
UP TO ¾” 5 FT
1” TO 1-1/4” 6 FT
1-1/2” TO 2” 7 FT
PIPE SIZE (PVC): SPACING:
UP TO 2” 5 FT
2” TO 6” 8 FT
EQUIPMENT NOTES:
1. PROVIDE VIBRATION ISOLATION FOR RELOCATED FC-1 AS FOLLOWS:
1.1. PROVIDE COMBINATION NEOPRENE AND SPRING (TYPE H)
VIBRATION HANGERS. SPRING SHALL PERMIT A 15-DEGREE ANGULAR
MISALIGNMENT FROM VERTICAL WITHOUT RUBBING ON HANGER
BOX, OR MAKING ANY OTHER METAL-TO-METAL CONTACT.
2. RELOCATE EXISTING LOCAL DISCONNECT SWITCHES INSTALLED ADJACENT
TO THE EQUIPMENT SERVED FOR ALL RELOCATED EQUIPMENT.
3. PROVIDE NEW MERV-13 DISPOSABLE PLEATED FILTERS IN FC-1 PRIOR TO
TEST AND BALANCE. AT CONCLUSION OF TEST AND BALANCE, REMOVE AND
DISPOSE OF THE FILTERS, AND PROVIDE NEW REPLACEMENT MERV-13
DISPOSABLE PLEATED FILTERS IN FC-1.
4. INSTALL ALL EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS.
WHERE MANUFACTURER'S RECOMMENDATIONS DEVIATE FROM THE
DRAWINGS, NOTIFY THE CONTRACTING OFFICER IN WRITING.
ELECTRICAL:
1. GENERAL
A. TORQUE ALL ELECTRICAL DEVICE CONNECTIONS TO THE TORQUE
VALUES RECOMMENDED BY THE DEVICE MANUFACTURER. IF THESE
VALUES ARE NOT LISTED, TIGHTEN TO VALUES RECOMMENDED BY UL
STANDARD 486A-B.
2. WIRING:
A. INSTALL ALL WIRING IN CONDUITS.
B. RATED CIRCUIT VOLTAGES: ALL POWER WIRE AND CABLE MUST HAVE
MINIMUM RATED CIRCUIT VOLTAGES IN ACCORDANCE WITH NEMA WC
70, ANSI/NEMA WC 71/ICEA S-96-659, OR NEMA WC 74/ICEA S-93-639 AS
APPLICABLE. POWER WIRE AND CABLE FOR CIRCUIT VOLTAGES RATED
0-600 VOLTS MUST BE RATED NOT LESS THAN 600 VOLTS. CONTROL
WIRE AND CABLE MUST HAVE MINIMUM RATED CIRCUIT VOLTAGES IN
ACCORDANCE WITH NEMA WC 57, BUT MUST BE RATED 600 VOLTS IF
ROUTED IN RACEWAY WITH OTHER CONDUCTORS THAT ARE RATED 600
VOLTS.
C. MATERIAL FOR CONDUCTORS: COPPER, UNLESS NOTED OTHERWISE.
CONDUCTORS MUST CONFORM TO ALL THE APPLICABLE
REQUIREMENTS OF NEMA WC 57, NEMA WC 70, ANSI/NEMA WC 71/ICEA
S-96-659, OR NEMA WC 74/ICEA S-93-639 AS APPLICABLE. COPPER
CONDUCTORS MUST BE ANNEALED COPPER MATERIAL AND THEY MAY
BE BARE, OR TIN- OR LEAD-ALLOY-COATED, IF REQUIRED BY THE TYPE
OF INSULATION USED. INTERMIXING OF COPPER AND ALUMINUM
CONDUCTORS IN THE SAME RACEWAY IS NOT PERMITTED.
D. SIZE / TYPE / STRANDING / COLOR CODING: TO MATCH EXISTING
FEEDERS FOR ALL RELOCATED EQUIPMENT. STRANDED COPPER MAY BE
USED FOR ALL WIRING #8 AWG AND LARGER.
3. CONDUIT
A. ELECTRICAL METALLIC TUBING (EMT): GALVANIZED STEEL CONFORMING
TO ASA C80.3, (FS) WW-C563 AND ULF 797.
B. CONDUIT FITTINGS: CADMIUM-PLATED STEEL OR HOT-DIPPED
GALVANIZED MALLEABLE IRON; COMPRESSION OR SET SCREW TYPE.
C. PROVIDE PULL ROPE IN EMPTY CONDUITS ABANDONED IN PLACE.
4. BOXES
A. GALVANIZED SHEET METAL OR CAST CONSTRUCTION AND SIZED IN
ACCORDANCE WITH NFPA 70 AND BEARING UL LABEL.
B. PROVIDE NEW PULL BOXES, JUNCTION BOXES, AND DEVICE BOXES AS
OUTLINED BY CODE TO RELOCATE THE EQUIPMENT INDICATED.
C. MAINTAIN THE INTEGRITY OF ALL EXISTING CIRCUITS IN SERVICE THAT
MAY BE AFFECTED BY THIS WORK. IDENTIFY ALL SOURCES OF POWER
AND DE-ENERGIZE REQUIRED CIRCUITS PRIOR TO BEGINNING WORK.
D. PROVIDE INDIVIDUAL STRUCTURAL SUPPORTS FOR DISCONNECT
SWITCHES.
5. GROUNDING
A. GROUND ALL ELECTRICAL EQUIPMENT, WIRING, CONDUITS, AND
BUILDING ELEMENTS PER THE REQUIREMENTS OF NFPA 70.
6. IDENTIFICATION
A. IDENTIFY ALL MAJOR JUNCTION BOXES AND CIRCUIT WIRING AT EACH
TERMINATION.
B. PROVIDE UPDATED TYPEWRITTEN PANELBOARD CIRCUIT DIRECTORY IN
PANELBOARD DOOR IDENTIFYING ALL ACTIVE CIRCUITS AND SPARES.
ACTIVE CIRCUITS DESIGNATE EQUIPMENT SERVED.
VERTICAL
RETURN
DUCT
VERTICAL
SUPPLY
DUCT
MVD MVD
45° CLINCH COLLAR (TYP.)
MVD
MVD
DIFFUSER RUNOUT
FLEXIBLE DUCTWORK
MANUAL VOLUME
DAMPER (TYP.)
90° ELBOW WITH TURNING
VANES IN SUPPLY DUCTWORK
MVDMVD
NOTE:
NOT ALL BALANCING DAMPERS ARE SHOWN ON FLOOR PLANS. PROVIDE
BALANCING DAMPERS AT POINTS ON SUPPLY, RETURN, AND EXHAUST
SYSTEMS WHERE BRANCHES ARE TAKEN FROM LARGER DUCTS AS
REQUIRED FOR AIR BALANCING. SEE SPECIFICATIONS SECTION 233300.
RETURN OR
EXHAUST
SUPPLY
LEGEND
M A
X
EQUIPMENT
° M A
X
AIRFLOW AIRFLOW
APPLIES TO PLAN OR SIDE
VIEW OF DUCT TRANSITION
EQUIPMENT IN DUCT
NOTE: MAXIMUM ANGLES SHOWN APPLY, UNLESS SPECIFICALLY NOTED OTHERWISE ON PLANS,
M
A X
UPSTREAM
TRANSITION
DOWNSTREAM
TRANSITION
NO EQUIPMENT IN DUCT
AIRAIR
A
IR
MD
AUXILIARY DRAIN PAN. PROVIDE MOISTURE
SENSOR TO DEACTIVATE FAN COIL UNIT
WHEN MOISTURE IS DETECTED IN DRAIN PAN.
ISOLATOR (TYP.)
SPRING VIBRATION
STRUCTURE ABOVE
HANGER RODS TO
FROM STRUCTURE
SUPPORT AUX. DRAIN PAN
NEW OR REUSED
FLEXIBLE NEOPRENE
GLASS CONNX. (TYP)SLOPE NEW CONDENSATE DRAIN
AT 1/8" PER FOOT TO RECONNECT
TO EXISTING OUTLET.
(FOUR POINT) NEW OR REUSED GALV.
(FOUR POINT)
RELOCATED
CONDENSATE PUMP
AND AUX. DRAIN PAN
CONNECT NEW RETURN AIR
DUCT TO EXISTING RETURN
DUCTS. SEE DRAWINGS.
EXISTING OUTSIDE AIR
DUCT WITH ACTUATED
DAMPER. RECONNECT
TO FC-1 SO DAMPER
OPENS ON FAN START
AND CLOSES ON FAN
STOP
E X
IS
T
IN
G
O
U T
S
ID
E A
IR
FC-1 (RELOCATED)
CONNECT NEW SUPPLY AIR
DUCT TO EXISTING SUPPLY
DUCTS. SEE DRAWINGS.
1" THICK DUCT LINER
SHEET METAL DUCT
TOP AND BOTTOM
SECTIONS OF LINER SHALL
OVERLAP THE SIDES
12" C .C. M
AX TYP.
2"
NO MORE THAN 2"
FROM EDGE OF LINER
2"
ALL ENDS OF LINER TO BE COATED
W/ ADHESIVE (MIRACLE PF 96)
ENDS OF LINER SHALL BE BUTTED
FIRMLY TOGETHER.
DUCT LINER
LINER TO BE ADHERED TO
DUCT W/ 100% ADHESIVE
(MIRACLE PF 96)
INSULATED SHEET METAL DUCT
(ROUND OR RECTANGULAR, AS
SHOWN ON DRAWINGS)
NOTE:
USE #10x3/4" SELF-TAPPING
CADMIUM-PLATED SHEET
METAL SCREWS. TIGHTEN ALL
STRAPS AGAINST DUCT AND
SUPPORT MEMBERS. (TYP.)
LOCKING BALANCE DAMPER
RIGID DUCT
AFFIX FLEX DUCT TO METAL DUCT WITH
NYLON DRAW TIE. TAPE FLEX DUCT
VAPOR BARRIER TO METAL DUCT (2
WRAPS MINIMUM). TAPE INSULATION
VAPOR BARRIER TO FLEX DUCT VAPOR
BARRIER (2 WRAPS MINIMUM).
HANGER
STRAPS
TO DIFFUSER NECK
WRAP ALL RIGID DUCT W/ FOIL-FACED
FIBERGLASS DUCT WRAP AS INDICATED
IN INSULATION SPECIFICATIONS ON THIS
SHEET.
FASTEN RIGID DUCT TO TAKEOFF
FITTING WITH SHEET METAL SCREWS
Croft & Associates
3400 Blue Springs Road, Suite 200 Kennesaw, GA 30144
770.529.7714 (p)
770.529.7716 (f) www.croftae.com
CONSTRUCTION DOCS.
C
IV
IL
E
N G
IN
E
E R
IN
G th
A
IR
L
IF
T W
IN
G
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E
G E
O R
G
IA
P R
O
JE
C T
L O
C A
T
IO
N
D R
A W
IN
G
C O
N T
A C
T
PROJECT No.
PROJ. OFFICER
DESIGNED
CHECKED
DATE
DRAWING OF
P R
O
JE
C T
C O
N T
A C
T
R O
B E
R T
E R
N S
T
D S
N
-3 ro b e rt
.e rn st .5 u s.
a f.
m il
R O
C K
H O
U S
E R
E N
O V
A T
IO
N
B U
IL
D
IN
G
F
G W
B
-0
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E
G E
O R
G
IA
J. MORGAN
C o p yr ig h t b y C ro ft
A ss o ci a te s, I n c.
A ll ri g h ts r e se rv e d
T h is d o cu m e n t is p ro p e rt y o f
C ro ft
A ss o ci a te s, I n c.
It is t o b e u s e d o n ly f o r th e s p e ci fic p ro je ct r e fe rr e d t o o r id e n tif ie d h e re in a n d is n o t to b e u se d o n o th e r p ro je ct s in w h o le o r in p a rt e xc e p t b y th e e xp re ss w ri tt e n a g re e m e n t o f
C ro ft
A ss o ci a te s, I n c
2025/08/26
/2
/2
:0
:3
P
M A u to d e s k D o c s /2
-1
D o b b in s A
R B
B ld g
/2
-1
D o b b in s A
R B
B ld g
M
.r v t
M-102
H V
A C
S P
E C
IF
IC
A T
IO
N
S A
N D
D E
T A
IL
S
2018-173
M. JOHNSON
V. MAZZEI
NOT TO SCALE
M-102
INTERIOR DUCTWORK DETAIL
NOT TO SCALE
M-102
DUCT TRANSITION DETAIL
NOT TO SCALE
M-102
HORIZ. FAN COIL UNIT DETAIL
NOT TO SCALE
M-102
DUCT LINER DETAIL
NOT TO SCALE
M-102
FLEX DUCT CONNECTION DETAIL
REV. DATE/BY DESCRIPTION
0 2025/08/26 HVAC UPDATE CD'S
VincentMazzei Vincent GA Stamp - Simple
| Sheets |
| M-101 - HVAC UPDATE PLAN |
| M-102 - HVAC SPECIFICATIONS AND DETAILS |