This is a Statement of Work (SOW) for the removal and upgrade of the Travis Air Force Base Deployment and Reception Surveillance and Audio-Visual System, dated September 16, 2026.

The contractor shall replace 18 existing Hangzhou Hikvision Digital Technology Co cameras (which do not comply with Section 889 of the John S. McCain National Defense Authorization Act of 2019) with 18 new IP-based PTZ surveillance cameras selected from the approved Non-Nuclear Configuration Management Database (CMD) Equipment Approval List. Additionally, the contractor shall install 2 new IP-based PTZ cameras in the 900 Cargo Deployment Function (CDF) area, requiring new CAT 6A cabling with runs estimated at no more than 295 feet per camera. The contractor shall remove and replace outdated Crestron and Crown amplifier equipment with an Air Force-approved audio-visual solution while reusing existing speakers and six operational monitors (three 75-inch Samsung monitors, one 65-inch Samsung monitor, one 42-inch Sony monitor, and one 55-inch Samsung monitor in separate buildings). The system must manage and display 20 camera feeds and data from 11 unclassified Windows 11 Enterprise Version 23H2 computers in the Deployment Control Center (DCC), plus support SIPR display capability on four monitors for classified operation up to SECRET. Remote viewing of camera feeds shall be enabled for authorized users at five specified buildings (Crisis Action Team, Alternate CAT, 60 AMW/XP Office, Passenger Deployment Function, and 60 Security Forces) using browser-based access over the installation fiber backbone without wireless or internet connectivity.

The new NVR must store 30 days of video at 30 frames per second using compressed video files, and the UPS must power the system for at least one hour during power outages. All new cameras and Video Management Systems must be selected from the CMD Equipment Approval List provided in Attachment 3. The contractor shall use existing PoE switches and patch panels; the Government will install and configure a Cisco 9300 switch in the DCC equipment rack. Work shall be performed at multiple locations on Travis Air Force Base (Buildings P1, P3, 31, 900 area, and Building 243) between 0800-1600 Monday through Friday, excluding federal holidays. The contractor must begin work within 60 days of contract award and complete all work within 60 days of starting performance. Deliverables include a continuity book and user training for 10 personnel within 30 days after installation. All contractor employees must comply with installation entry requirements including identity proofing and vetting via National Crime Information Center (NCIC) and California Law Enforcement Telecommunication System (CLETS) checks, unless they possess current favorable government security clearances verifiable through the Joint Personnel Adjudication System (JPAS). The contractor shall provide a contract manager available Monday through Friday, 0800-1600, with full authority to act on all contract matters relating to daily operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

Deployment and Reception Surveillance & Audio-Visual System

16 Sep 2026

1.0 DESCRIPTION: The 60th Logistics Readiness Squadron requires removal and upgrade of the Travis AFB Deployment and Reception Surveillance and Presentation System. The contractor shall provide all personnel, equipment, materials, tools, supervision, and services necessary to complete the work described in this Statement of Work (SOW), except for items expressly identified as Government-furnished. All work shall be performed in accordance with this SOW and applicable standards.

1.1 BACKGROUND: The existing camera system is operational but currently turned off because the installed cameras do not comply with Section 889 of the John S. McCain National Defense Authorization Act (NDAA) of 2019 and the prohibition on covered telecommunications equipment or services defined at 48 C.F.R. 52.204-25(a).

The existing camera infrastructure includes category cable (CAT). The existing system also include network PoE switches supporting 18 cameras. The 18 cameras have their own power supply. Existing audio-visual control equipment in the Deployment Control Center (DCC) includes Crestron, Crown, Diamond Security, and Pelco equipment. The audio-visual system is partially operational. All buildings, cameras, and audio-visual equipment are currently on the same network.

1.2 INCUMBENT: There is no incumbent. This is a new requirement.

1.3 OBJECTIVES: The objective is to upgrade the current surveillance and presentation system with the following:

1.3.1 Replace Cameras: The contractor shall remove eighteen (18) existing cameras and install eighteen (18) new IP-based PTZ surveillance cameras selected from the approved Non-Nuclear Configuration Management Database (CMD) Equipment Approval List in Attachment 3. The contractor shall use existing cabling where compatible with the new cameras.

1.3.2 Add Cameras: The contractor shall install two (2) new IP-based PTZ surveillance cameras selected from the approved Non-Nuclear CMD Equipment Approval List in the 900 Cargo Deployment Function (CDF) area. New cabling will be required. The estimated cable length to the PoE network switch is no more than 295 feet per camera.

1.3.3 Upgrade Audio-Visual system: The contractor shall remove and replace outdated Crestron and Crown amplifier equipment with an Air Force-approved audio-visual solution. The current speakers will be reused.

No microphones are allowed in the DCC. The 11 workstations audio will be routed through the new audio system to be heard through existing speakers. The audio-visual equipment and software shall manage and display camera feeds and computer data on the six (6) existing operational monitors identified in this SOW. No monitors will be replaced or added.

The six display endpoints include:

• Three (3) Samsung UN75MU6300 75-inch monitors in the DCC

• One (1) Samsung Series 6 65-inch monitor in the DCC

• One (1) Sony FWD-42PX2 42-inch monitor in the DCC

• One (1) Samsung UN55MU6071 monitor in the Passenger Deployment Function (PDF), Building P1

1.3.4 The Audio-Visual system will manage and display twenty (20) camera feeds.

1.3.4.1 The Audio-Visual will manage and display data from eleven (11) unclassified Windows 11 Enterprise, Version 23H2, computers, located inside the DCC.

1.3.4.2 The Audio-Visual will display data from one (1) Secret Internet Protocol Router (SIPR) computer (workstation) on any three (3) Samsung 75” and one (1) 42” monitors located inside the DCC.

1.4 Remote Access: The contractor shall enable secure remote viewing of camera feeds for authorized users from workstations at the following locations using browser-based access and IP addressing assigned by 60

CS:

• Crisis Action Team (CAT), Building 31

• Alternate CAT, Building 977

• 60 AMW/XP Office, Building 52

• Passenger Deployment Function (PDF), Building P1

• 60 SFS, one designated workstation configured for remote access

The IP address shall direct remote users to the NVR located in the DCC. Remote users shall access the system through their workstation browsers, such as Microsoft Edge or Google Chrome, using assigned NVR accounts. The DCC staff shall be able to control which cameras each remote user is authorized to view. The standalone system uses the installation fiber backbone to connect authorized remote viewing areas. Access will not be provided wireless or thru the internet.

1.5 SCOPE OF WORK:

1.5.1 Camera Removal: The contractor shall remove 18 cameras located at Buildings P1, P3, 977, the Pole Barn, and the associated 900 area on Travis AFB. The contractor shall provide any required lift or scaffolding. Existing cabling shall be used for replacement cameras where compatible.

1.5.2 System Design: After award, the contractor shall develop a design and installation plan for a 20-camera surveillance system covering Buildings P1, P3, 977, and the associated 900 area, including the Pole Barn.

Proposed camera locations are identified in Technical Exhibit 1 .

1.5.3 Installation Qualifications: The contractor shall ensure the proposed system is installed by manufacturer-certified technicians for the system being provided.

1.5.4 Engineering, Furnishing, Installation, and Testing: The contractor shall engineer, furnish, install, and test the new system in accordance with industry standards and original equipment manufacturer (OEM) specifications.

1.5.5 Camera Capabilities: All cameras shall provide day/night and low-light capabilities. Thermal capability is not required.

1.5.6 Recording Functions: The contractor shall configure all cameras for continuing recording.

Motion-Activated cameras are not required.

1.5.7 User Access to Recordings: The contractor shall configure the system so that authorized DCC personnel and Security Forces personnel can access, view, and download recordings.

1.5.8 New Cabling for Added Cameras: The contractor shall install new CAT 6A cabling and any additional support infrastructure, including power outlets if required, for the two new cameras in the 900 area.

1.5.9 Furnished Equipment and Reuse of Existing Assets: The contractor shall provide all new cameras, software licenses, server equipment, and any other parts required for a complete and functional system. The contractor shall reuse existing cables and licenses where feasible and compatible with the new system. Outdoor cameras shall be suitable for local environmental conditions.

1.5.10 Camera Field of View: The contractor will configure the field of view for each camera.

1.5.11 Switches and Supporting Equipment: The contractor shall utilize existing PoE switches and patch panels.

The contractor shall provide any additional equipment required for system operation, including UPS units, NVRs, cables, and related components, as needed. The Cisco C3850 switch currently located in the DCC will be replaced or upgraded by 60 CS. The Government will install and configure a Cisco 9300 switch in the current DCC equipment rack for the new camera system. The contractor will configure their equipment for Cisco 9300 switches.

1.5.12 NVR and Performance: The new NVR must be able to store 30 days of video at 30 frames per second using compressed video files. The UPS must be able to power the system for at least one hour during a power outage.

1.5.13 Cable and Conduit Requirements: The contractor will use CAT 6A cable to connect the cameras to the switches to ensure the best signal quality. For outdoor cables, the contractor will install EMT conduit (metal tubing) to protect the cables, and paint the conduit to match the buildings

1.5.14 Post-Award Design Submittal: The contractor's post-award design plan should include a PDF drawing showing the layout of the buildings, conduit runs, rack elevations/locations, control monitor locations, switches, NVRs, UPS and individual camera locations, along with the manufacturer and model number of each piece of equipment.

1.5.15 SIPR Display Capability: The contractor shall install the necessary equipment to display SIPR data on four

(4) monitors in the DCC. The contractor must ensure the installed equipment is compliant for classified operation up to SECRET. The 60th Logistics Readiness Squadron (60 LRS) will verify personnel clearances, and the 60 CS will verify that the equipment meets Air Force compliance before being approved for purchase.

1.5.16 Training: Upon completion of installation, the contractor shall provide training for DCC personnel, 60 LRS ITEC personnel, and 60 CS personnel so they can operate the system without contractor assistance.

1.5.17 Warranty: The camera system must come with a one-year warranty. The contractor must be able to provide or arrange for service and repairs of the equipment during the warranty period.

1.5.18 Standalone System Requirement: The camera system shall be a standalone system that allows viewing of all cameras through one NVR. No specific brand is required for cameras, equipment, monitors, or software; however, all cameras shall be selected from the Non-Nuclear CMD Equipment Approval List in Attachment 3.

1.6 PERIOD OF PERFORMANCE: The contractor shall begin work within 60 days of the contract award and complete all work within 60 days after the start of performance, unless the Contracting Officer approves an extension. The contractor must follow safety regulations (NFPA 70) during the project.

1.7 GENERAL INFORMATION

1.7.1 Recognized Holidays: The contractor will not perform any services on the following Holidays, or the accompanying Air Mobility Command Goal/Family Days:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day

1.7.2 Hours of Operation: The contractor is responsible for conducting business between the hours of [0800-1600] Monday through Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Military exercises, inclement conditions caused by Mother Earth, civil unrest resulting in base closure, etc. are considered inherent government delays. The Contractor will be notified as soon as possible if any delays are anticipated. The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.7.3 Place of Performance: The work under this contract will be performed at the following locations: Buildings P1 (DCC, PDF), P3 (APT), 31 (CAT), the 900 area (CDF), and Building 243 (60th Communications Squadron - 60

CS)

1.7.4 Security Requirements: Contractor personnel performing work under this contract shall not employ any personnel presenting potential threats to the health, safety, security, general well-being, or operational mission of the installation and its population during the execution of the project. Compliance with AFI 91-202, The U.S. Air force Mishap Prevention Program, is mandatory for the Contractor.

The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.7.5 Special Qualifications: The contractor shall be qualified to perform work involving the specified camera and presentation systems.

1.7.6 Standard Product Requirements: The contractor will provide new cameras and the Video Management System (VMS) from the CMD list.

1.7.7 Alternative Product Qualifications: For equipment (other than cameras and the video management system that must be purchased from the CMD List) may be accepted with fewer than two years of field-service history, provided that certified documentation demonstrates at least 6,000 hours of satisfactory field operation. Manufacturer factory and laboratory testing hours shall not count toward the 6,000-hour requirement

1.7.8 Material and Equipment Manufacturing Date: Products manufactured more than 1 year prior to date of delivery to site shall not be used, unless specified otherwise. All cables used for telecommunications outlets shall be four pairs, solid copper conductor, green CAT 6A standard, UL tested and certified. Each cable shall be dedicated to one device or outlet only.

1.7.9 Delivery and Storage: The contractor shall protect telecommunications cabling and equipment from weather, moisture, temperature extremes, dirt, dust, and other contaminants during delivery and storage.

1.7.10 Environmental Requirements: Connecting hardware shall be rated for operation under ambient conditions of 32 to 140 Degrees Fahrenheit and in the range of 0 to 95 percent relative humidity, noncondensing.

1.7.11 Safety: The contractor shall comply with applicable safety requirements during performance.

1.7.12 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer (CO), Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will appraise the contractor of how the government views the contractor's performance and the contractor will appraise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.7.13 Government POCs after award: Primary, Nathaniel O. Middleton, 707-424-3557; Secondary, (S)MSgt Diego Veliz, 707-816-4137.

1.7.14 Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract.

The contract manager or alternate shall be available between 0800 - 1600, Monday through Friday, except Federal holidays or when the government facility is closed for administrative reasons.

1.7.15 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Travis Air Force Base is designated as a closed base. In order to promote security and safety, all employees desiring access must adhere to installation entry requirements, to include identity proofing and vetting. This includes a National Crime Information Center (NCIC) and California Law Enforcement Telecommunication System (CLETS) check. Identity proofing and vetting is not required for employees if they have a current favorable government security clearance, which can be verified through the Joint Personnel Adjudication System (JPAS).

1.7.15.1 Credentials: The contractor will ensure all employees possess proper credentials allowing them to work in the United States and ensure illegal aliens are not employed and/or transported onto the installation.

Identification required for identity proofing follows:

United States Passport Permanent Registration Card/Alien Registration Receipt Card (Form I-1551) Foreign Passport with a temporary (I-1551) stamp or temporary (I-1551) printed notation on a machine-readable immigrant visa.

Employment authorization document that contains a photograph (Form I-766) Current/valid Driver’s License Identification card issued by Federal, State or local Government U.S. Coast Guard Merchant Mariner Legacy Card U.S. Coast Guard New Merchant Mariner Credential

Additional supplemental sources of identity proofing which may be requested during increased Force Protection Conditions (FPCONS) or Random Antiterrorism Measures (RAMs) include, but are not limited to:

School identification card with photograph U.S. Military or draft record Native American Tribal Document U.S. Social Security Card issued by the Social Security Administration (SSA) Certification of Birth Abroad issued by the Department of State (Form FS-545 or Form DS-1350) Original or certified copy of a birth certificate issued by a state, county, municipal authority or outlying possession of the United States bearing an official seal U.S. Citizen ID Card (Form I-197) ID Card for use of Resident Citizen in the United States (Form I-179) Unexpired employment authorization document issued by the Department of Homeland Security (DHS) which includes, a) Form I-94 identifying the holder as an asylee, or b) other documentation issued by DHS or the former Immigration and Naturalization Service that identifies the holder as an asylee, lawful permanent resident, refugee or other status authorized to work in the United States incident to status Foreign Military or Government Identification Credentials Foreign passport with a current arrival-departure record (Form I-94) bearing the same name as the passport and containing an endorsement of the alien’s nonimmigrant status, if that status authorizes the alien to work for the employer. In the case of a non-immigrant alien authorized to work for a specific employer incident to status, a foreign passport with Form I-94 or Form I-94A bearing the same name as the passport and containing an endorsement of the alien’s nonimmigrant status, as long as the endorsement has not yet expired and the proposed employment is not in conflict with any restrictions or limitations identified on the form.

1.7.16 Data Rights: The Government has unlimited rights to all documents/material produced under this contract.

All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.7.17 PHASE IN /PHASE OUT PERIOD: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the 30-day phase in/ phase out periods. During the phase in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.

2.0 GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

2.1 Services: N/A

2.1.1 Facilities: The Government will furnish facilities and utilities to the Contractor such as light, heat, ventilation, electric current, and outlets for use by installation personnel. Facilities and utilities will be provided as specified in the Site Survey Report. Facilities will be readied prior to arrival of Contractor personnel and be provided at no cost to the Contractor. The Contractor shall provide required temporary utilities, which are not readily available in the work area. The Contractor shall coordinate, through the on-site point of contact any requirement before temporary disconnection of a utility. The Contractor shall submit a request in writing to the on-site point of contact 14 days in advance of the necessity of utility disconnection.

2.1.2 Utilities: The Government will provide utilities in the facility for the contractor’s use in the performance of tasks outlined in this SOW. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

2.1.3 Equipment: The Contractor shall utilize existing PoE switches and UPS; however, the contractor shall supply all or any other equipment and peripherals needed to make this project functional

2.1.4 Materials: The Government will provide Operating Rating Procedures and Policies as required.

2.1.5 Storage: The Government will provide storage space for parts ordered and the contractor equipment.

3.0 APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

3.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures

ATTACHMENT LISTING

4.0 Attachment List:

4.1. Attachment 1/Technical Exhibit 1 – Overview of Work to Preform.

4.2. Attachment 2/Technical Exhibit 2 – Deliverables Schedule

4.3. Attachment 3/Non-Nuclear Configuration Management Database (CMD) Equipment Approval List

ATTACHMENT 1

TECHNICAL EXHIBIT 1

Existing System

Manufactures such as Pelco and Motorola representatives evaluated the Deployment and Reception Surveillance/Presentation System, Thursday, Nov 11, 2021. Their overall analysis of the system is a refresh is overdue. The critical components of the system are past the manufacture lifecycle requirements. As of March 2022, some components are no longer supported by the manufacturer.

The Deployment and Reception Surveillance/Presentation System consists of cameras, NIPR and SIPR workstations, display monitors, and Audio-Visual equipment:

a. 1 monitor (75”) and Audio-Visual presentation equipment in the DCC Conference Room, bldg. P1 (will not be replaced)

b. 2 projectors and 1 monitor in the Personnel Deployment Function (PDF) in-brief section, bldg. P1

c. (will not be replaced)

d. 1 projector, 2 monitors, and Audio-Visual presentation equipment in the PDF Classify Briefing Room, bldg. P1(will not be replaced)

e. 18 Hangzhou Hikvision Digital Technology Co cameras (will be replaced)

Number of Cameras

Building Locations

Interior/Exterior, Placement

Photo

2 P1 Exterior, Pole

7 P1 Interior pole, wall

5 P3 (Pax Terminal)

Interior, ceiling

2 900 (CDF) Exterior, Pole

2 900 (CDF) Exterior, Pole

f. DCC Current Audio-Visual System (Will be upgraded/replaced)

1. DCC Equipment Rack

Equipment Brand Switch Cisco C3850-NM-210G (Note there are switches also located in buildings P1, P3, and 900 area. The switches are connected via installation network fiber infrastructure.)

Monitor Tote Vision Audio Amp Crown CD 2000 NVR/Server Diamond Security, DSS-T479017 NVR Pelco Digital Sentry DS5rv2 Control Processor Crestron Pro 2 Volume/EQ Control Module Crestron Volume C2n-VEQ4 H.264 Streaming Receiver Crestron DM-RMC-100-STR UPS Vertiv Liebert PS15-800/110/1500

RT120

DCC Workstations:

9 Encoder/decoder (under workstations)

Crestron DM-TXRX-100-STR

Control Panel:

Controller Crestron TSW-10-60-TTK-B-5

The initial installation was in May 2003. A refresh was accomplished Sep 2012

Overview of Work to Perform

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

1.1 Overview of camera placement and connections:

1.1.1 Building P1 (DCC and PDF Interior): Replace 7 Cameras

R eception Station

1.1.2 Building P1 (Exterior): Replace 2 Cameras

1.1.3 Building P3 (APT): Replace 5 Cameras

1 Camera Main Hall, 1 Camera Gate 4, 1 Camera Gate 5, 2 Cameras Baggage Pick Up

Baggage Pick Up Area

3 2 1

Bu s

D ro p O ff at

In bo un d Lo un ge eception Station

R eception Station

R eception Station

R eception Station

SE

AT

IN

G

A

EA

1.1.4 900 Area (CDF): Replace 4 and Add 2 Cameras

Existing Camera (1 for 1 Swap) Added Camera (900 Ramp/Rolling)

Chalk

BLDG 977

NEW MMHS

900 RAMP

ATTACHMENT 2

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To Continuity Book Within 30 days after installation 2 Hard and soft copy 60 LRS/LGRD

User Training Within 30 days after installation

10 personnel In person or virtual training

60 LRS/LGRD and

60 AMW/XP

ATTACHMENT 3/CMD (NON-NUCLEAR) EQUIPMENT LIST, 23 MAR 2026

APPROVED FOR NEW PROCUREMENTS, INSTALLS AND UPGRADES

COMMAND, CONTROL AND DISPLAY EQUIPMENT (CCDE)

(Integrated Intrusion Detection (IDS) and Access Control (ACS))

Prometheus Security Group (PSG) Global

• LINX Predator Elite (LPE) Annunciator Version 8.1 (Windows 10)

– LINX SNMP version p90100.2.58

– LINX Predator Enrollment System Version 4.1.220

– LINX Predator Badging Enrollment Application Version 8.1.2100P

– LINX Versatile Interface Panel (VIP) Version 8.116

– LINX Versatile Interface Panel (VIP-16i) Version 1.09

– WSD-E Card Reader version 3.1110

– LINX Touch Zone Controller (PSG ordering code: 15-20000-001 for controller itself, 15-20000-007 for install kit)

– iDentyTech IDT Jade Biometric Physical Access Control: o IDT Jade Palm Scanner Model 100120135-PRO, v15.06.000-112 (PSG ordering code: 15-18010-000) o IDT Jade Palm Enrollment Scanner (USB) Model 100230910-PRO, v15.06.000-112 (PSG ordering code: 15- 18010-001) o IDT Jade Palm Scanner Reader Installation Kit (PSG ordering code: 15-18010-002) o HID SE RPK40 o HID Proximity ProxPro card reader

LenelS2

• OnGuard Version 8.1 module on (must be used with Milestone XProtect 22.2av to provide the required graphic/mapping display)

– Tested with Seneca/Dell R540 Server and Seneca/Dell R330 Server

– Windows 10 Enterprise 20H2 (OnGuard and Milestone Client)

– Windows Server 2019 Standard (OnGuard and Milestone Servers)

– SQL Server 2019 Standard

– Zebra ZXP Series 7 Card Printer

– Videology 24C708AF Photo ID Camera

– Morpho MSO-300 Fingerprint Enrollment Reader

– HID Omnikey 5422 Personal Identity Verifier (PIV) / Common Access Card (CAC) Enrollment Reader

– HID Omnikey 3121 PIV/CAC Enrollment Reader

– RFIDeas HID iCLASS Enrollment Reader

– Intelligent System Controllers: o LenelS2 LNL-X4420 v1.303 o LenelS2 LNL-X2220 v1.303 o LenelS2 LNL-X2210 v1.303

– Reader and Input Modules:

o LenelS2 LNL-1320-S3 Reader Module (tested with LNL-X4420 & using RS-485) v3.21.12 o LenelS2 LNL-1200-S3 Alarm Module (tested with LNL-X2220 using RS-485) v3.21.12 o LenelS2 LNL-1100-S3 Alarm Modules (tested with its respective LNL-X2210 using RS-485) v3.21.12

– Card and Biometric Readers:

o HID pivCLASS RK40 Card Reader o HID pivCLASS RKCL40 Card Reader o Morpho Sigma LitePlus Biometric and Card Reader o Veridt Stealth 900W2026 proximity (Prox) (RFID) Card Reader o Veridt Stealth 900W2036 tested with the LNL-X2220 Prox (RFID) and chip card reader o LNL-CK arm/disarm reader, tested with the LNL-X2220 o Morpho Access Sigma SMA-293645512 Biometric (fingerprint) and Card Reader

Honeywell Vindicator

• Vindicator Command and Control Platform Version 10 (tested with VICADS 4.3.5 and V100)

– Vindicator 10 Annunciator Workstation (Win 10 LTSC):

o Windows 10 LTSC version 21H2 (OS Build 19044)

– Vindicator Security Server (VSS) o Windows Server 2019 version 1809 (OS Build 17763.4377)

– Windows Structured Query Language (SQL) Database Management VSS o SQL Server 2019 version 1809 (OS Build 17763.4377)

– Vindicator System Terminal o Windows 10 LTSC version 21H2 (OS Build 19044)

– Vindicator Command and Control 2 (VCC2) 1.3.0.2 SP4

– V3 Network Security (IDS & ACS) Firmware 4.3.2 SP VR22

– V5 Network Security (IDS & ACS) Firmware 4.5.2 SP VR22

– AES-1500 Network Field Device Firmware 4.3.2 SP VR22

– Security Archive Workstation 2 (SAW2) 1.4.3.0 SP6

– Vindicator Badge Manager 3 2.0.27.0 SP4

– Vindicator Site Commander with or without SAW2 1.3.0.7 SP2

– Vindicator Area Commander 1.1.0.7

– Vindicator Premise Controller 4.3.2 VR22

– Vindicator PC Smart Pak (PCSP) 6.0.0.1

Note: No new orders of the V5 panel (V5 IDS & ACS hardware) are being taken by the OEM as production is discontinued.

VIDEO MANAGEMENT SYSTEMS (VMS)

Milestone

• Milestone XProtect 22.2av tested with LenelS2 OnGuard v8.1

– XProtect Server 2022 R2 (22.2av), XProtect Smart Client 2022 R2 (22.2av)

– Windows 10 Enterprise 20H2 (OnGuard and Milestone Client)

– Windows Server 2019 Standard (OnGuard and Milestone Servers)

PSG Video Image Control and Display System (VICADS)

• VICADS Version 4.3 tested with LPE v8.1 (on Windows 10)

• VICADS Version 4.3.5 tested with Vindicator Command and Control Platform Version 10 (on Windows 10)

– Server O/S: Microsoft Windows Server 2022 version: 10.0.20348, (OS Build 20348)

– Client O/S: Microsoft Windows 10 Internet of Things Enterprise LTSC version: 10.0.19044, (OS Build 19044)

• VICADS Version V100.2.1 tested with LINX Predator Elite Version 8.1.2100p, subpatch p8121.01.17, Cyber Security Solution 2.0.0 (Windows 10 LTSC 2021; Windows Server 2022, build 21H2; Ubuntu 20.04 LTS in FIPS Mode)

• VICADS Version V100.2.1 tested with Vindicator Command and Control Platform Version 10: Intrusion Detection System (IDS) & Access Control System (ACS) V5 Devices (4.5.2), VR22; IDS & ACS V3 Devices (4.3.2) VR22; Security Archive Workstation (SAW) 1.4.3.0, SP6; and Vindicator Badge Manager (VBM) 2.0.26.7, SP3.

CAMERAS / IMAGERS

Assessment Cameras Note: The following imagers may be used to perform alarm assessments from interior and exterior sensor points.

• Axis Q6075 Indoor PTZ

• Axis Q6075-E Outdoor PTZ

• Axis Q1656

• Bosch NBN-63023-B

• Bosch NBN-73023-BA

• Hanwha PNB-A6001

• Hanwha XNB-6003

• Hanwha XNZ-L6320A

• Pelco Sarix IXE Series Box Cameras w/ SureVision 3.0

• Vicon V2002D-W313MIR

• Vicon V2008-W-NL

• Vivotek IP9165-HT-v2 (Note: for indoor use only and was only integrated with the Video Image Control and Display System (VICADS) V-100 (Version 100.2.1.1) VMS)

Pan-Tilt-Zoom Cameras Note: These cameras may be used to assess alarms received from the approach zone as well as to perform surveillance and situational awareness functions. They will not be used as the primary means to perform alarm assessments of interior or exterior sensor points.

• Avigilon H5A IR PTZ (Model: H5A-IRPTZ-DP40-WP)

• Bosch Auto Dome IP Starlight 7000i Camera (Model: NDP-7512-Z30)

• Bosch MIC IP Fusion 9000i (Model: MIC-9502-Z30WVF)

• Pelco Espirit Enhanced ES6230-15P-R2

• Pelco S7230L-PW

• Vicon V2002-D-PTZ

Camera Environmental Enclosures

• Bosch UHO-HBGS-61 Outdoor Camera Housing

INTRUSION DETECTION SENSORS

Interior Sensors

Note: Balanced Magnetic Switch (BMS) will not be used as a line of detection.

• ASSA ABLOY (Securitron Group) MSS-1 High Security Balanced Magnetic Switch

• Banner Engineering Series Active Infrared (AIR), intrinsically safe, Model SMI30 (Note: Must be installed as an array of individually reporting sensor points, for use across openings in areas where explosive fumes may be present).

• BEA LZR-i30

• BEA LZR-s600

• Bosch ISC-BPQ2-W12 PIR (Curtain Configuration Only)

• Bosch ISC-PDL1-WA18G PIR (Curtain and Volumetric Configuration)

• Dortronics 1110 xD xCT, Magnetic Lock/BMS

• Dortronics 1120 x2D xCT, Series Electromagnetic Lock and BMS

• East Coast Security Products Inc. ESM-6T Tandem BMS

• Edwards 2807T-M BMS

• Eltec 862 Passive Infrared (PIR) Sensor (Wall)

• Eltec 864 PIR

• Fiber Sensys LD204S

• Fiber Sensys LD308SH

• Magnasphere HS-L1.5-101 BMS

• Magnasphere HS-L1.5-111 BMS

• Magnasphere HSS-L2C-101 BMS (Concealed Contact)

• Magnasphere HSS-L2C-101-A BMS (Concealed Contact)

• Magnasphere HSS-L2C-111 BMS (Concealed Contact)

• Magnasphere HSS-L2C-111-A BMS (Concealed Contact)

• Magnasphere HSS-L2D-000 BMS (Dual Alarm Contact)

• Magnasphere HSS-L2D-800 BMS (Dual Alarm Contact)

• Magnasphere HSS-L2S-000 BMS (Single Alarm Contact)

• Magnasphere HSS-L2S-800 BMS (Single Alarm Contact)

• Magnasphere Interior Barrier Sensor Model MSK-101-MM

• Magnasphere Interior Motion Sensor Model MSK-101-MM

• Optex Redscan RLS-3060V

• Optex Redscan RLS-50100V

• Optex SX360Z PIR

• Protech Maxiris 3000/3100 Active IR Interior Sensor

• Protech Passive IR and Microwave Intruder Detectors (PIRAMID) SDI-76-G (Volumetric)

• Protech PIRAMID SDI-77-D (Volumetric)

• Protech SDI-76M-HS1-H Volumetric (Coverage 60’x 40’, Two Sensors in Combination)

• Protech SDI-76MW Volumetric (Coverage 60’x 40’, Two Sensors in Combination)

• Protech SDI-77XL2-EX, Explosion Proof Volumetric

Exterior Sensors

• BEA LZR-i30 (ECP Configuration)

• BEA LZR-s600 (ECP Configuration)

• DeTekion Defensor 100 Fence Sensor

• DeTekion Defensor 100 Fence Sensor (with Culvert Configuration)

• DeTekion Defensor 100 sensor system with the GD-5000 Eliminator signal analyzer

• DeTekion Vertical Taut Wire Sensor 400 (VTW-400), full fence or out-rigger configuration

• EAG of Americas Infrared Intrusion Detection System 4/2/2 (IIDS4/2/2) Active Infrared Sensor

• EAG of Americas Infrared Intrusion Detection System 4/4/2/2/2 w/ PSTC

• EAG of Americas Intrusion Detection System 4/2 (IDS 4/2) Active Infrared Sensor

• ECSI Infrared Pulsed Intrusion Detection System (IPIDS), up to 80m with spring loaded mount bases and 100m with solid concrete bases.

• Fiber SenSys Fiber Defender The following models have been tested: 331, 332, 341, and 342. (Note: The 331 and 332 series is with “Sensitive” Lead-in cables whereas the 341 and 342 series is with the “Insensitive” Lead-in cables. Also, the last digit (1 or 2) indicates a single channel processor or dual channel processor. Additional note:

The 33x series is normally utilized for TASS applications with the 34x series being utilized for all hardwired configurations.)

• Fiber SenSys Fiber Defender 525 (Note: Not approved for use in Northern tier, or areas where snow and ice accumulations are normal, pending further testing)

• Fiber SenSys Fiber Defender FD-342, v4.47

• Fiber SenSys Fiber Defender FD-342, v4.47 (Culvert Configuration)

• IR Global Infrared Intrusion Detection System 4/4/2

• IR Global IRG-509-15M

• Protech G-Fence with 2400 Processor, v2.5

• Protech G-Fence Gate Connector

• Protech PIRAMID / SDI-76-XL-MIL LT (Ladder and Tower) Only

• Protech PIRAMID / SDI-76-XL-MIL, PIR and Monostatic Microwave Sensor

• Protech Maxiris 3000/3100 Active Infrared Barrier (100 meter) w/ New Cell Insensitive to the Sun (NCIS) cells

• Protech Maxiris 3100 Active Infrared Barrier (100 meter)

• Protech Sorhea Technology G-Fence 600 Zoning (600Z) System

• Protech Sorhea Technology G-Fence 600 Zoning (600Z) System (Culvert Configuration)

• RBtec Ironclad Fence Sensor Double Run Configuration

• Senstar FlexZone Fence Sensor (Note: Not approved for use in Northern tier, or areas where snow and ice accumulations are normal, pending further testing)

• Senstar Omnitrax buried line sensor w/Firmware Version MSP v2.90 w/FPGA v13.93

• Senstar UltraWave Detection Sensor TE (w/ Whiteman AFB tamper protection modification)

• Senstar UltraWave Microwave Detection Sensor (Firmware 3.04)

• Southwest Microwave 330 Digital Microwave System

• Southwest Microwave 385 Monostatic Sensor, up to 100m

• Southwest Microwave 460B Active Infrared Exterior Sensor

• Southwest Microwave Intrepid 334-33465 (Model 334), Double Stacked configuration with Model 336 installed on bottom of stack and Model 334 installed on top (Note: Not approved for use in close proximity with airfield due to X-Band frequency for Model 334)

• Southwest Microwave Intrepid 336-33464 (Model 336), Double Stacked configuration

• Southwest Microwave Intrepid Micropoint II

Wide Area Detection/Approach Zone Sensors

• FLIR Ranger 1 Perimeter Surveillance Radar (700 meters)

• FLIR Ranger 2 Perimeter Surveillance Radar (1400 meters)

• FLIR Ranger 3 Perimeter Surveillance Radar (2800 meters)

• Magos SR-500 Perimeter Surveillance System

– Integrated with the Lenel OnGuard Version 8.1

– Integrated with the Advantor Systems ASN, Version 6.2. MASS Version 2.24.10053, SR-500 Radar Version 3.64 and Radar Manager Version 1.5

• SpotterRF C40D Integrated with Advantor Version 6.2 (Note: Not approved for use in Northern tier, or areas where snow and ice accumulations are normal, pending further testing)

ADDITIONAL PL-3 AND PL-4 ITEMS

In addition to the above components, the following equipment is approved for use in the protection of PL-3 and below assets.

Command, Control and Display Equipment (CCDE): None Video Management Systems (VMS): None

Cameras/Imagers

• Clear Align VZ-250 LRTI 23164-600

• Clear Align VZ-250 LRTI 23164Z1-600 (Improved Cooling)

• Clear Align LRTI-w/CCTV

– C907891 Complete Kit

– TICC/PTH only C907892

• FLIR DEFENDIR MS-UC 640 30/90MM CZ

Interior Sensors: None Exterior Sensors: None

STATEMENT OF WORK (SOW)
16 Sep 2026
1.5 SCOPE OF WORK:
1.5.18 Standalone System Requirement: The camera system shall be a standalone system that allows viewing of all cameras through one NVR. No specific brand is required for cameras, equipment, monitors, or software; however, all cameras shall be selecte...
1.7 GENERAL INFORMATION
2.0 GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3.0 APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
ATTACHMENT LISTING
4.0 Attachment List:
ATTACHMENT 1
Existing System
c. (will not be replaced)
DCC Workstations:
Control Panel:
Overview of Work to Perform
Existing Camera (1 for 1 Swap) Added Camera (900 Ramp/Rolling)
ATTACHMENT 3/CMD (NON-NUCLEAR) EQUIPMENT LIST, 23 MAR 2026 APPROVED FOR NEW PROCUREMENTS, INSTALLS AND UPGRADES
COMMAND, CONTROL AND DISPLAY EQUIPMENT (CCDE)
(Integrated Intrusion Detection (IDS) and Access Control (ACS))
LenelS2
Honeywell Vindicator
VIDEO MANAGEMENT SYSTEMS (VMS)
Milestone
PSG Video Image Control and Display System (VICADS)
CAMERAS / IMAGERS
Assessment Cameras
Pan-Tilt-Zoom Cameras
Camera Environmental Enclosures
INTRUSION DETECTION SENSORS
Interior Sensors
Exterior Sensors
Wide Area Detection/Approach Zone Sensors

ADDITIONAL PL-3 AND PL-4 ITEMS