This document is a Statement of Work (SOW) for a contract to replace the flooring in designated areas of Building 1008 at the 89th Attack Squadron, Ellsworth Air Force Base. The SOW outlines the project requirements, including demolition of existing carpet, surface preparation, installation of new carpet and vinyl tile flooring, and installation of new rubber wall base and transition strips. The work is to be completed within a 60-day period of performance. Key submittal requirements, project management contacts, and drawings are also provided.
The related federal contract opportunity is for the Carpet and Flooring Replacement project at Ellsworth AFB, solicitation number FA469024Q0066. The Department of the Air Force Air Combat Command is the procuring agency. The SOW and other attachments provide the detailed requirements for this carpet and flooring replacement project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Replace Flooring 89th Attack Squadron
Project Number: 1140857 Period of Performance: 60 Days
SECTION 1: PROJECT INFORMATION
1.1 PROJECT LOCATION: Project shall be completed as a routine requirement at the 89th Attack Squadron Building 1008, along main office area, and room 131. Project hours are standard work hours.
1.2 UNIQUE REQUIREMENT: No unique requirements.
1.3 PROJECT DESCRIPTION: The user for B 1008 is requesting the current flooring in designated areas (outlined in attachment 1) be 100% remodeled. Work will include, but is not limited to; demolition of carpet flooring, surface prep/removal of adhesive, installation of new carpet flooring, installation of vinyl floor tile, and installing rubber wall base along all new flooring, and transitions strips.
SECTION 2: GENERAL REQUIREMENTS
2.1 WORKMANSHIP: All work shall be accomplished in accordance with all applicable building and fire codes. Contractor shall field verify all measurements, quantities, or value stated by the Government.
The Contractor shall be responsible for procuring, supplying, transporting, and providing all labor, materials, tools, plant, and equipment to complete the project as per scope of work, specifications, and attached drawings.
2.2 EXISTING CONDITIONS: The plans represent the best available information at the time they were prepared. While every effort has been made to correctly show all major existing items which will affect the work, it is recommended that the Contractor examine the site prior to submitting a bid. No additional payment will be made for extra work required by obstacles which were in place and clearly visible at the time of bidding.
2.3 WORKSITE: The contractor shall limit the work to the areas indicated by the government. The contractor shall make every effort not to disturb or obstruct portions of the facilities still occupied by the government. The contractor shall make efforts to minimize interference to Government operations. The contractor shall coordinate and schedule work with the 28 CES/SABER office prior the start of any operation. The contractor shall dispose of all construction debris off base at an approved disposal facility.
2.4 SITE SECURITY AND PROTECTION: The contractor shall make every effort to secure the work site, allowing only authorized personnel to enter the work site. The contractor shall protect the site from damage from weather, vandalism, and/or theft.
2.5 DAMAGE TO EXISTING SITE CONDITIONS: The contractor shall be responsible to repair any and all damage incurred to existing Real Property/Grounds due to poor workmanship at no cost to the government. Contractor shall not park or drive on sidewalk or grassy/snowy areas. Damage incurred shall be repaired at no cost to the government.
2.6 HEALTH/SAFETY: The contractor shall be responsible for compliance with OSHA and AFOSH standards. The contractor shall maintain a clean and debris free site at all times. The contractor shall keep driveways and entrances into and around the work site clear at all times. The contractor shall not use driveways or entrances as employee parking or storage of materials unless otherwise stated. The contractor shall minimize storage of materials and equipment on site.
2.7 GREEN PROCURMENT: Contractor must incorporate “green procurement” principles into the design of their projects. Specifically, consult the EPA’s web site at www.epa.gov/cpg/products.htm for a listing of the products that have been mandated as green procurement requirements for purchases.
SECTION 3: DESCRIPTION OF WORK AND SPECIAL INSTRUCTIONS
BUILDING 1008
3.1 DEMO (B 1008)
3.1.1 Demolish and dispose of existing carpeting in designated areas (see attachment
1) (Approx. 5,968 SQFT)
3.1.2 Scrape and surface prep for new adhesive and flooring (Approx. 5,968 SQFT)
3.2 STRUCTURAL (B 1008)
3.2.1 Install new carpet in designated areas (Approx. 5,382 sqft)
3.2.2 Install new vinyl tile in designated area (Approx. 586 sq ft)
3.2.3 Install new 4” standard rubber wall base around new floor (Approx. 600 LF)
3.2.4 Install transition strips from carpeted areas to tile and offices.
3.3 FINISHES (B 1008)
3.3.1 None
SECTION 4: SUBMITTALS
4.1 Contractor will use AF Form 3000 Material Approval Submittal for all material submittals.
Please refer to page two of AF Form 3000 Material Approval Submittal on instructions for properly filling out the form.
4.2 All submittals specified shall not be installed without CE approval. Any specified materials installed without prior approval, is at the Contractor’s own risk.
4.3 All submittals will be submitted via email, with the exception of physical samples. All submittal emails will include SSgt Garrett Gallardo and Mr. Lane Meinen.
4.4 Physical submittal samples will be brought to CE, building 8225, room 1111, Ops Engineering Support. Office is located behind the metal bull, at the entrance. If the room is inaccessible, please leave submittals at the front desk with the secretary, Ms. Jen Dunlap.
SECTION 5: DRAWINGS
5.1 See Attachment 1: Map – Carpet Requirements
SECTION 6: SPECIAL PROVISIONS/NOTES/SPECIFICATIONS
6.1 If due to unforeseen circumstances, work is uncovered which is necessary for the completion of the project, the Contractor shall immediately submit to the Government, in writing, an email detailing the additional work. The Contractor shall not proceed with the additional work identified until the change order is executed.
SECTION 7: PROJECT MANAGERS
7.1 SSgt Garrett Gallardo, 28 CES/CEOER, 605-385-1511, garrett.gallardo@us.af.mil
7.2 Lane Meinen, 28 CES/CEOER, 605-385-4758 lane.meinen.ctr@us.af.mi