Attach_1_Price Breakdown.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Oily Waste Water Storage Barge Repair
- Solicitation number
- N6264921Q0175
About this file
This document contains an attachment with a price breakdown sheet and information about a related federal contract opportunity for oily waste water storage barge repair services. The price breakdown sheet lists fourteen line items with descriptions of repair and maintenance services required by the statement of work, along with the unit of issue, quantity, unit price, and total price for each item. Services include towing, dry docking, hull cleaning, tank cleaning, scaffolding erection, tank and void preservation and painting, rubber fender replacement, fender fastener installation, tank access hole modification, mooring bitt repair, crew compartment repair and painting, oil transfer pipe removal, and miscellaneous work. The federal contract opportunity is solicited by the Department of the Navy Naval Supply Systems Command as a competitive unrestricted procurement under FAR Subpart 13.5 for simplified procedures for commercial items. A site visit is scheduled for interested offerors to attend, with an RSVP required via email.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264921Q0175.pdf | ||
| Attach_ 4_ CDRL A001_Schedule.pdf | ||
| Attach_ 6_ CDRL_A003_Photos.pdf | ||
| Attach_3_Financial Data.doc | DOC document | |
| Attach_2_ Past Performance Information.doc | DOC document | |
| Attach_ 5_ CDRL A002_Work Completion Book.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment 1 | 28-May-21 | ||||
| Solicitation No. N6264921Q0175 | |||||
| Oily Waste Water Storage Barge Repair | |||||
| Company Name: | |||||
| Provide Price 001 through 014 in accordance with the Statement of Work. | |||||
| Item No. | DESCRIPTION | Unit of Issue | QTY | Unit Price (JPY) | Total Price (JPY) |
| 001 | Towing Cost | LT | 1 | ||
| 002 | Facility Cost (Example: Dry Dock and setblock) | LT | 1 | ||
| 003 | Hull Cleaning | ||||
| Labor | MH | ||||
| Equipment/Material | LT | 1 | |||
| 004 | Clean eight (8) tanks | ||||
| Labor | MH | ||||
| Equipment/Material | LT | 1 | |||
| 005 | Erect Scaffolding | ||||
| Labor | MH | ||||
| Equipment/Material | LT | 1 | |||
| 006 | Tank Preservation/Paint | ||||
| Labor | MH | ||||
| Equipment/Material | LT | 1 | |||
| 007 | Void Preservation/Paint | ||||
| Labor | MH | ||||
| Equipment/Material | LT | 1 | |||
| 008 | Rubber Fender Replacement | ||||
| Labor | MH | ||||
| Equipment/Material | EA | 2 | |||
| 009 | Fender Fasteners | ||||
| Labor | MH | ||||
| Equipment/Material | LT | 1 | |||
| 010 | Tank Access Hole Modification | ||||
| Labor | MH | ||||
| Equipment/Material | EA | 8 | |||
| 011 | Mooring Bitts Repair | ||||
| Labor | MH | ||||
| Equipment/Material | LT | 1 | |||
| 012 | Crew Compartment Repair Paint and Non Skid Tape | ||||
| Labor | MH | ||||
| Equipment/Material | LT | 1 | |||
| 013 | Oil Transfer Pipe Removal | ||||
| Labor | MH | ||||
| Equipment/Material | LT | 1 | |||
| 014 | Miscellaneous | LT | 1 | ||
| Grand Total JPY (Item No. 001-014) |
| Abbreviations MH: Man Hours | |
| LT: Lot |
File details come from the government source that posted it. Updated .