Attach 1. Statement of Work 5DEC23.pdf

PDF 2 MB Posted

Attached to
LRS Fuel PIT Water Removal Federal contract opportunity
Solicitation number
FA462024QA103
Issued by
Department of the Air Force Air Mobility Command

About this file

This statement of work outlines requirements for the removal and disposal of contaminated fuel pit water at Fairchild Air Force Base in Washington. The contractor will be required to pump and remove an estimated 5,000 gallons of contaminated water from various fuel pits up to three times per year, for a total not exceeding 20,000 gallons annually. The work must be completed in accordance with all applicable federal, state and local environmental laws. The contractor will develop a work plan and properly containerize and dispose of the contaminated water off base. The government will provide utilities access and flightline escort as needed. The performance period is three years from date of award, with task orders issued as required.

View the file

Other files for this federal contract opportunity

Other files attached to LRS Fuel PIT Water Removal, newest first.
File Type Posted
Attach 2. Pricing Schedule (Rev 3) 03 JAN 24.xlsx XLSX spreadsheet
Amend 3 SF30.pdf PDF
Amend 2 SF30.pdf PDF
24QA103 Combo (Rev 1) 27 DEC 23.pdf PDF
Attach 1. Statement of Work (Rev 1) 27 DEC 23.pdf PDF
Attach 2. Pricing Schedule (Rev 2) 27 DEC 23.xlsx XLSX spreadsheet
Amend 1 SF30.pdf PDF
Attach 2. Pricing Schedule (Rev 1) 11 DEC 23.xlsx XLSX spreadsheet
Attach 3. WD 2015-5537 Rev 20.pdf PDF
Attach 2. Pricing Schedule.xlsx XLSX spreadsheet
24QA103 Combo 5DEC23-Fuel Pits.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) For

Removal of Contaminated Fuel Pit Water Fairchild AFB, WA

1. DESCRIPTION OF SERVICE: The contractor shall provide all necessary tools, equipment and materials required by law to provide for the removal of fuel contaminated water from the flightline fuel pits and dispose of contaminated water currently on Fairchild AFB, WA.

2. SCOPE OF WORK: The Contractor shall complete all work, which includes furnishing all supervision, labor, material, equipment and services, unless otherwise specified herein, required under this contract. All work shall be performed in accordance with all Federal, State, local laws and regulations, manufacturer’s recommendations and this Statement of Work (SOW).

- Work shall be accomplished for a period of performance of three years from the date of award, and will be accomplished through the issuance of task orders.

- It is estimated that pumping will be required 3 times annually to dispose of approximately 5,000 gallons of fuel contaminated per visit for a total amount not expected to exceed 20,000 gallons of fuel contaminated water annually.

- Contractor shall provide appropriate certified personnel to properly dispose of contaminated water from fuel pit(s), see attachment 1 for specific locations.

- Contractor shall properly remove fuel contaminated water and properly container and dispose off base in accordance with all local, state and federal environmental laws.

- Contractor shall develop a detailed work plan. This work plan shall consist of, as a minimum, the scope and location of work performed, location map of the worksite noting locations of water removal, photographs of the worksite, notification records, employee training records, and waste shipment records.

- Contractor shall removal any debris generated at the completion of work and will be removed from the installation and disposed at an off-base facility designated for the material.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES: The government will provide access to utilities and flightline escort as needed.

4. GENERAL INFORMATION

4.1. HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding Federal Holidays and any other designated down day. Work can be done at other than the normal hours of operation with the approval of the Contracting Officer. The contractor shall coordinate in advance all hours of work and any service interruptions with the MSgt Daniel Rey and/or MSgt Julio Chavez at 509- 247-4258, daniel.rey@us.af.mil or julio.chavez.1@us.af.mil, 509-247-4255.

January 1 New Year’s Day 3rd Monday in January Martin Luther King, Jr. Day 3rd Monday in February President’s Day Last Monday in May Memorial Day June 18 Juneteenth July 4 Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day November 11 Veterans Day 4th Thursday in November Thanksgiving Day December 25 Christmas

FA462024QA103

Attach. 1 Statement of Work

4.2. SECURITY REQUIREMENTS: All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the government installation, shall abide by all Fairchild Air Force Base security regulations.

5. CONTRACTOR REPONSE TIME: The contractor shall respond to a request to remove and dispose of contaminated fuel within 72 hours of a request by the government.

6. PERFORMANCE PERIOD: Task orders may be issued immediately from the date of award and can be issued for a period of performance of three years from the date of award.

7. ATTACHMENT:

Attachment 1: Installation location map and Location of Work Area

FA462024QA103

Attach. 1 Statement of Work

SOW Attach 1.

1260419532A Line

1260419532A Line

1260419532A Line

1260419532A Sticky Note Fuel Pit 23

1260419532A Sticky Note Fuel Pit 24

1260419532A Sticky Note Fuel Pit 22

1260419532A Sticky Note Fuel Pit 21

1260419532A Sticky Note Fuel Pit 20

1260419532A Line

1260419532A Line

1260419532A Line

1260419532A Line

1260419532A Line

1260419532A Line

1260419532A Sticky Note Fuel Pit 19

1260419532A Sticky Note Fuel Pit 18

1260419532A Sticky Note Fuel Pit 17

1260419532A Sticky Note Fuel Pit 16

1260419532A Sticky Note Fuel Pit 15

1260419532A Line

1260419532A Sticky Note Isolation Pit

Line

SOW Attach. 1

Line

1260419532A Sticky Note

LP 14T

1260419532A Line

1260419532A Sticky Note Fuel Pit 50

1260419532A Line

1260419532A Sticky Note Fuel Pit 51

1260419532A Line

1260419532A Sticky Note Fuel Pit 52

1260419532A Line

1260419532A Line

1260419532A Sticky Note Fuel Pit 54

1260419532A Line

1260419532A Sticky Note Fuel Pit 55

1260419532A Sticky Note Fuel Pit 60

1260419532A Line

1260419532A Sticky Note Fuel Pit 62

1260419532A Line

1260419532A Line

1260419532A Sticky Note Fuel Pit 63

1260419532A Line

1260419532A Sticky Note Fuel Pit 64

1260419532A Line

1260419532A Sticky Note Fuel Pit 65

1260419532A Line

1260419532A Sticky Note Fuel Pit 66

1260419532A Line

1260419532A Sticky Note Fuel Pit 53

1260419532A Sticky Note Fuel Pit 67

1260419532A Sticky Note Fuel Pit 56

1260419532A Line

1260419532A Line

1260419532A Sticky Note Fuel Pit 57

1260419532A Line

1260419532A Sticky Note Fuel Pit 58

1260419532A Sticky Note Fuel Pit 59

1260419532A Line

1260419532A Line

1260419532A Sticky Note Fuel Pit 60

1260419532A Line

1260419532A Sticky Note High Point 5

File details come from the government source that posted it. Updated .