Attach 06 - Specialized Experience Form (3 Pages).pdf
PDF 134 KB Posted
- Attached to
- Y1NZ--FY22: NRM Tier-1 (PROJ 675-22-112) DB Upgrade Lake Nona Building Automation System Infrastructure
- Solicitation number
- 36C24822R0004
About this file
This document contains a specialized experience form and details of a federal contract opportunity. The specialized experience form provides instructions for offerors to submit details of up to three past projects demonstrating relevant experience, including contractor and client information, scope of work, performance period, difficulties encountered and resolutions, and pricing details.
The federal contract opportunity is a solicitation to design and construct a complete replacement of the building automation system infrastructure at the Lake Nona VA Medical Center campus in Orlando, Florida. Offerors must provide controls and devices that upgrade the existing LON protocol system to a new BACnet system. The replacement includes all controllers, devices, and wiring. The work must reprogram and recommission the new system to the same sequence of operations. The solicitation number is 36C24822R0004 with a response due date of October 22, 2021. The requirement is set aside solely for service-disabled veteran-owned small businesses. The contracting office is the VA Network Contracting Office in Miami, Florida.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 - SOLICITATION FOR 36C24822R0004 BUILDING AUTOMATION SYSTEM (BAS)_.pdf | ||
| Attach 04 EMR (1 Page).docx | DOCX document | |
| Attach 05 - Site Map.pdf | ||
| Attach 03 - Past Performance Questionnary.pdf | ||
| Attach 01 - Wage Determination.pdf | ||
| Attach 02- Price Matrix.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIALIZED EXPERIENCE FORM
SPECIALIZED EXPERIENCE INFORMATION SHEET
PROJECT NO. [ ] Page 1 Must have a total of THREE (3) projects, more than 3 will not be evaluated; less than 3 may result in a lower rating.
a. Contractor Information of awarded contract (Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)
b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)
c. Project Title/Name and Location
d. Work Performed as: Prime Contractor, Subcontractor, Joint Venture, Other (explain)
e. Percent (%) of project work performed by your company
f. if you work as subcontractor, who was the prime?
(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)
g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).
EXPERIENCE INFORMATION SHEET
PROJECT NO. [ ] Page 2
h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project:
Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation sheet for additional information, if necessary
EXPERIENCE INFORMATION SHEET
PROJECT NO. [ ] Page 3
i. Describe any difficulties and/or obstacles encountered during performance; steps taken toward resolution
j. Describe unforeseen conditions and how each were resolved
k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy) contract start date:
original completion date, if not completed, projected completion date (mm/dd/yyyy)
l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?
Actual Completion Date:
If not completed, Why?
m. Project is 50% or more complete? YES [ ] No [ ]. If “No” explain percentage of completion, if not 50% completed for any reason, rating may be lower.
n. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.
o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.
Original Contract Price: Final Contract Price:
Explain Differences:
File details come from the government source that posted it. Updated .