Attach 02- Price Matrix.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Y1NZ--FY22: NRM Tier-1 (PROJ 675-22-112) DB Upgrade Lake Nona Building Automation System Infrastructure
- Solicitation number
- 36C24822R0004
About this file
This file contains a price matrix and details of a federal contract opportunity for upgrading a building automation system. The price matrix provides a cost breakdown by construction division with blank fields for labor costs, material costs, and total costs.
The federal contract opportunity is a design-build project with the Department of Veterans Affairs to replace the existing LonWorks building automation system infrastructure at the Lake Nona VA Medical Center campus in Orlando, Florida. The scope includes replacing all existing LonWorks controllers and devices with new BACnet protocol controllers and devices, and upgrading all existing LON communication wiring from 2-wire to 3-wire. The estimated value of construction is over $10 million. The solicitation number is 36C24822R0004 and it will be issued on or around November 1, 2021 via beta.SAM.gov. The response deadline is October 22, 2021. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Base Offer Cost Breakdown
| Project Number: | Date: | ||
| Project Title | |||
| Project Location | |||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
| Item | Description | Labor Cost | Material Cost | Total Cost |
| Division 1 | General Requirements | $- | $- | $- |
| Division 2 | Existing Conditions | - | - | - |
| Division 3 | Concrete | - | - | - |
| Division 4 | Masonry | - | - | - |
| Division 5 | Metals | - | - | - |
| Division 6 | Wood and Plastic | - | - | - |
| Division 7 | Thermal & Moisture Protect | - | - | - |
| Division 8 | Doors and Windows | - | - | - |
| Division 9 | Finishes | - | - | - |
| Division 10 | Specialties | - | - | - |
| Division 11 | Equipment | - | - | - |
| Division 12 | Furnishings | - | - | - |
| Division 13 | Special Construction | - | - | - |
| Division 14 | Conveying Equipment | - | - | - |
| Division 21 | Fire Suppression | - | - | - |
| Division 22 | Plumbing | - | - | - |
| Division 23 | HVAC | - | - | - |
| Division 26 | Electrical | - | - | - |
| Division 27 | Communications | - | - | - |
| Division 28 | Electronic Safety & Security | - | - | - |
| Division 31 | Earthwork | - | - | - |
| Division 32 | Exterior Improvements | - | - | - |
| Division 33 | Utilities | - | - | - |
| Division 34 | Transportation Subtotal | - | - | - |
| Division Subtotals : | $- | $- | $- |
| Overhead % | 0.00% | - |
| Profit % | 0.00% | - |
| Bond % | 0.00% | - |
| Overhead/Profit Subtotals : | $- |
Total Price $- $- $-
File details come from the government source that posted it. Updated .