Attach 05 California Wage Determination.pdf
PDF 247 KB Posted
- Attached to
- 127EAS21Q0001 Thompson Meadow Corral Federal contract opportunity
- Solicitation number
- 127EAS21Q0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 127EAS21Q0001 Thompson Meadow Corral.doc | DOC document | |
| Attach 03 2012 FINALPAL Fire Plan 080212.doc | DOC document | |
| Attach 04 Federal Wage Determination.pdf | ||
| Attach 02 Wage Determination Letter.docx | DOCX document | |
| Attach 06 Map.pdf | ||
| Attach 01 Statement Of Work.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
CRAFT: #LABORER AND RELATED CLASSIFICATIONS
DETERMINATION: NC-23-102-1-2020-1
ISSUE DATE: February 22, 2020 EXPIRATION DATE OF DETERMINATION: June 28, 2020** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director – Research Unit for specific rates at (415) 703-4774.
LOCALITY: All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Marin, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.
Employer Payments Straight-Time Overtime Hourly Rate Classificationa Basic Health Pension Vacation Training Other Hoursf Total Daily Saturdayb Sunday/ (Journeyperson) Hourly and and Payments Hourly Holiday Rateg Welfare Holiday Rate 1 1/2X 1 1/2X 2X AREA 1 c
Construction Specialist 32.49 8.50 12.55 3.05 0.50 0.25 8 57.34 73.59 73.59 89.83 Group 1; Group 1(B)e 31.79 8.50 12.55 3.05 0.50 0.25 8 56.64 72.54 72.54 88.43 Group 1 (A) 32.01 8.50 12.55 3.05 0.50 0.25 8 56.86 72.87 72.87 88.87 Group 1 (C) 31.84 8.50 12.55 3.05 0.50 0.25 8 56.69 72.61 72.61 88.53 Group 1 (E) 32.34 8.50 12.55 3.05 0.50 0.25 8 57.19 73.36 73.36 89.53 Group 1 (G) 31.99 8.50 12.55 3.05 0.50 0.25 8 56.84 72.84 72.84 88.83 Group 2 31.64 8.50 12.55 3.05 0.50 0.25 8 56.49 72.31 72.31 88.13 Group 3; Group 3(A) 31.54 8.50 12.55 3.05 0.50 0.25 8 56.39 72.16 72.16 87.93 Group 4; Group 6(B) 25.23 8.50 12.55 3.05 0.50 0.25 8 50.08 62.70d 62.70d 75.31d Group 6 32.75 8.50 12.55 3.05 0.50 0.25 8 57.60 73.98 73.98 90.35 Group 6 (A) 32.25 8.50 12.55 3.05 0.50 0.25 8 57.10 73.23 73.23 89.35 Group 6 (C) Group 6 (D) Group 6 (E)
31.66 32.37 31.39
8.50 8.50 8.50
12.55 12.55 12.55
3.05 3.05 3.05
0.50 0.50 0.50
0.25 0.25 0.25
56.51 57.22 56.24
72.34 73.41 71.94
72.34 73.41 71.94
88.17 89.59 87.63
Group 7 – Stage 1 (1st 6 months) 22.08 8.50 12.55 3.05 0.50 0.25 8 46.93 57.97 57.97 69.01 Stage 2 (2nd 6 months) 25.23 8.50 12.55 3.05 0.50 0.25 8 50.08 62.70 62.70 75.31 Stage 3 (3rd 6 months) 28.39 8.50 12.55 3.05 0.50 0.25 8 53.24 67.44 67.44 81.63 AREA 2 c
Construction Specialist 31.49 8.50 12.55 3.05 0.50 0.25 8 56.34 72.09 72.09 87.83 Group 1; Group 1(B) e 30.79 8.50 12.55 3.05 0.50 0.25 8 55.64 71.04 71.04 86.43 Group 1 (A) 31.01 8.50 12.55 3.05 0.50 0.25 8 55.86 71.37 71.37 86.87 Group 1 (C) 30.84 8.50 12.55 3.05 0.50 0.25 8 55.69 71.11 71.11 86.53 Group 1 (E) 31.34 8.50 12.55 3.05 0.50 0.25 8 56.19 71.86 71.86 87.53 Group 2 30.64 8.50 12.55 3.05 0.50 0.25 8 55.49 70.81 70.81 86.13 Group 3; Group 3(A) 30.54 8.50 12.55 3.05 0.50 0.25 8 55.39 70.66 70.66 85.93 Group 4; Group 6(B) 24.23 8.50 12.55 3.05 0.50 0.25 8 49.08 61.20d 61.20d 73.31d Group 6 31.75 8.50 12.55 3.05 0.50 0.25 8 56.60 72.48 72.48 88.35 Group 6 (A) 31.25 8.50 12.55 3.05 0.50 0.25 8 56.10 71.73 71.73 87.35 Group 6 (C) Group 6 (D) Group 6 (E)
30.66 31.37 30.39
8.50 8.50 8.50
12.55 12.55 12.55
3.05 3.05 3.05
0.50 0.50 0.50
0.25 0.25 0.25
55.51 56.22 55.24
70.84 71.91 70.44
70.84 71.91 70.44
86.17 87.59 85.63
Group 7 – Stage 1 (1st 6 months) 21.38 8.50 12.55 3.05 0.50 0.25 8 46.23 56.92 56.92 67.61 Stage 2 (2nd 6 months) 24.43 8.50 12.55 3.05 0.50 0.25 8 49.28 61.50 61.50 73.71 Stage 3 (3rd 6 months) 27.49 8.50 12.55 3.05 0.50 0.25 8 52.34 66.09 66.09 79.83
PLEASE GO TO PAGE 50 FOR CLASSIFICATIONS WITHIN EACH GROUP
# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Internet at http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp.
a GROUP 1(D) - MAINTENANCE OR REPAIR TRACKMEN AND ROAD BEDS AND ALL EMPLOYEES PERFORMING WORK COVERED BY THIS CLASSIFICATION SHALL RECEIVE $0.25 PER PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS SHALL NOT APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. THIS SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER TEMPORARY COVER HAS
BEEN PLACED.
GROUP 1(H) - ALL LABORERS WORKING OFF OR WITH OR FROM BOS’N CHAIRS, SWINGING SCAFFOLDS, BELTS RECEIVE $0.50 PER HOUR ABOVE THEIR APPLICABLE WAGE RATE.
THIS SHALL NOT APPLY TO LABORERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1(A).
b SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER, MAJOR MECHANICAL BREAKDOWN OR LACK OF MATERIALS BEYOND THE CONTROL OF THE EMPLOYER.
c AREA 1 - ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, AND SANTA CLARA COUNTIES.
AREA 2 - ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL NORTE, EL DORADO, FRESNO, GLENN, HUMBOLDT, KINGS, LAKE, LASSEN, MADERA, MARIPOSA, MENDOCINO, MERCED, MODOC, MONTEREY, NAPA, NEVADA, PLACER, PLUMAS, SACRAMENTO, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, SHASTA, SIERRA, SISKIYOU, SOLANO, SONOMA, STANISLAUS, SUTTER, TEHAMA, TRINITY, TULARE, TUOLUMNE, YOLO AND YUBA COUNTIES.
d SERVICE LANDSCAPE LABORER ON NEW CONSTRUCTION MAY WORK ANY FIVE (5) DAYS WITHIN A WEEK.
e GROUP 1(B) RECEIVES AN ADDITIONAL AMOUNT EACH DAY. SEE PAGE 50 FOR DETAILS.
f WHEN THREE SHIFTS ARE EMPLOYED FOR FIVE (5) OR MORE CONSECUTIVE DAYS, SEVEN AND ONE-HALF (7 ½) CONSECUTIVE HOURS (EXCLUSIVE OF MEAL PERIOD), SHALL CONSTITUTE A DAY OF WORK, FOR WHICH EIGHT (8) TIMES THE STRAIGHT TIME HOURLY RATE SHALL BE PAID AT THE NON-SHIFT WAGE RATE FOR THE SECOND SHIFT. THE THIRD SHIFT SHALL BE SEVEN (7) HOURS OF WORK FOR EIGHT (8) HOURS PAY AT THE NON-SHIFT WAGE RATE.
g ZONE PAY AT THREE DOLLARS ($3.00) PER HOUR, FACTORED AT THE APPLICABLE OVERTIME MULTIPLE, WILL BE ADDED TO THE BASE RATE FOR WORK PERFORMED OUTSIDE THE
FREE ZONE DESCRIBED BY THE BOUNDARIES ALONG TOWNSHIP AND RANGE LINES. PLEASE SEE TRAVEL AND SUBSISTENCE PROVISION FOR MAP DESCRIPTION AND EXCEPTIONS.
RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPREWAGEDETERMINATION.HTM. HOLIDAY PROVISIONS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING
THE OFFICE OF THE DIRECTOR – RESEARCH UNIT AT (415) 703-4774.
TRAVEL AND/OR SUBSISTENCE PAYMENT: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPREWAGEDETERMINATION.HTM. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR – RESEARCH UNIT AT (415) 703-4774.
DETERMINATION: NC-23-102-1-2020-1 and NC-23-102-1-2020-1A
CONSTRUCTION SPECIALIST
ASPHALT IRONERS AND RAKERS
CHAINSAW
CONCRETE DIAMOND CHAINSAW
LASER BEAM IN CONNECTION WITH LABORER’S WORK
MASONRY AND PLASTER TENDER
MECHANICAL PIPE LAYER-ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER
CAST IN PLACE MANHOLE FORM SETTERS
PRESSURE PIPELAYERS
DAVIS TRENCHER – 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS)
STATE LICENSED BLASTERS AS DESIGNATED
DIAMOND DRILLERS
DIAMOND CORE DRILLER
MULTIPLE UNIT DRILLS
HIGH SCALERS (INCLUDING DRILLING OF SAME)
HYDRAULIC DRILLS
CERTIFIED WELDER
GROUP 1 (FOR CONTRA COSTA COUNTY ONLY, USE GROUP 1 (G) FOR SOME OF THE
FOLLOWING CLASSIFICATIONS)
ASPHALT SPREADER BOXES (ALL TYPES)
BARKO, WACKER AND SIMILAR TYPE TAMPERS
BUGGYMOBILE
CAULKERS, BANDERS, PIPEWRAPPERS, CONDUIT LAYERS, PLASTIC PIPE LAYERS
CERTIFIED ASBESTOS AND MOLD REMOVAL WORKER
CERTIFIED HAZARDOUS WASTE WORKER (INCLUDING LEAD ABATEMENT)
COMPACTORS OF ALL TYPES
CONCRETE AND MAGNESITE MIXER AND ½ YARD
CONCRETE PAN WORK
CONCRETE SANDERS, CONCRETE SAW
CRIBBERS AND/OR SHORING
CUT GRANITE CURB SETTER
DRI PAK-IT MACHINE
FALLER, LOGLOADER AND BUCKER
FORM RAISERS, SLIP FORMS
GREEN CUTTERS
HEADERBOARD MEN, HUBSETTERS, ALIGNERS BY ANY METHOD
HIGH PRESSURE BLOW PIPE (1-1/2” OR OVER, 100 LBS. PRESSURE/OVER)
HYDRO SEEDER AND SIMILAR TYPE
JACKHAMMER OPERATORS
JACKING OF PIPE OVER 12 INCHES
JACKSON AND SIMILAR TYPE COMPACTORS
KETTLEMEN, POTMEN, AND MEN APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME,
CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING DIPPING, OR
HANDLING OF SUCH MATERIALS)
LAGGING, SHEETING, WHALING, BRACING, TRENCH-JACKING, LAGGING HAMMER
MAGNESITE, EPOXY RESIN, FIBER GLASS AND MASTIC WORKERS (WET/DRY)
NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS
PAVEMENT BREAKERS AND SPADERS, INCLUDING TOOL GRINDER
PERMA CURBS
PRECAST-MANHOLE SETTERS
PIPELAYERS (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING)
PRESSURE PIPE TESTER
POST HOLE DIGGERS-AIR, GAS, AND ELECTRIC POWER BROOM SWEEPERS
POWER TAMPERS OF ALL TYPES, EXCEPT AS SHOWN IN GROUP 2
RAM SET GUN AND STUD GUN
RIPRAP-STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE
AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE
ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER
ROTO AND DITCH WITCH
ROTOTILLER
SAND BLASTERS, POTMEN, GUNMEN, AND NOZZLEMEN
SIGNALING AND RIGGING
SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, DOORS, PLUMBING
AND ELECTRIC FIXTURES)
TANK CLEANERS
TREE CLIMBERS
TRENCHLESS TECHNOLOGY LABORER- PIPE INSTALLATION, BURSTING, RELINING, OR
SIMILAR
TRENCHLESS LABORER’S WORK, CAMERA CONTROLLER, CCTV
TURBO BLASTER
VIBRA-SCREED-BULL FLOAT IN CONNECTION WITH LABORER’S WORK
VIBRATORS
GROUP 1 (A)
ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER & EXPLOSIVES
OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR LOADING AND PLACING
JOY DRILL MODEL TWM-2A
GARDENER-DENVER MODEL DH 143 AND SIMILAR TYPE DRILLS
TRACK DRILLERS
JACK LEG DRILLERS
WAGON DRILLERS
MECHANICAL DRILLERS-ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER
BLASTERS AND POWDERMAN
TREE TOPPER
BIT GRINDER
GROUP 1 (B) -- SEE GROUP 1 RATES
SEWER CLEANERS (ANY WORKMEN WHO HANDLE OR COME IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS) SHALL RECEIVE $4.00 PER DAY ABOVE GROUP
1 WAGE RATES. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER
SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHALL RECEIVE $5.00 PER
DAY ABOVE GROUP 1 WAGE RATES.
GROUP 1 (C)
BURNING AND WELDING IN CONNECTION WITH LABORER’S WORK
SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING
GROUP 1 (D)
SEE FOOTNOTE A ON PAGE 49
GROUP 1 (E)
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND
IN DEEP FOOTINGS (DEEP FOOTINGS IS A HOLE 15 FEET OR MORE IN DEPTH)
SHAFT IS AN EXCAVATION OVER FIFTEEN (15) FEET DEEP OF ANY TYPE
GROUP 1 (G) APPLIES ONLY TO WORK IN CONTRA COSTA COUNTY
PIPELAYERS (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING),
CAULKERS, BANDERS, PIPEWRAPPERS, CONDUIT LAYERS, PLASTIC PIPE LAYER,
PRESSURE PIPE TESTER, NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF
VOIDS, PRECAST MANHOLE SETTERS, CAST IN PLACE MANHOLE FORM SETTERS IN
CONTRA COSTA COUNTY ONLY
GROUP 1(H)
SEE FOOTNOTE A ON PAGE 49
GROUP 2
ASPHALT SHOVELERS
CEMENT DUMPERS AND HANDLING DRY CEMENT OR GYPSUM
CHOKE-SETTER AND RIGGER (CLEARING WORK)
CONCRETE BUCKET DUMPER AND CHUTEMAN
CONCRETE CHIPPING AND GRINDING
CONCRETE LABORERS (WET OR DRY)
DRILLERS HELPER, CHUCK TENDER, NIPPER (ONE CHUCKTENDER ON SINGLE MACHINE
OPERATION WITH MINIMUM OF ONE CHUCKTENDER FOR EACH TWO MACHINES ON
MULTIPLE MACHINE OPERATION. JACKHAMMERS IN NO WAY INVOLVED IN THIS ITEM.)
GUINEA CHASER (STAKEMAN), GROUT CREW
HIGH PRESSURE NOZZLEMAN, ADDUCTORS
HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE)
LOADING AND UNLOADING, CARRYING AND HANDLING OF ALL RODS AND MATERIALS
FOR USE IN REINFORCING CONCRETE CONSTRUCTION
PITTSBURGH CHIPPER, AND SIMILAR TYPE BRUSH SHREDDERS
SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS) – SEE ALSO
SKILLED WRECKER (GROUP 1)
SLOPER
SINGLEFOOT, HAND HELD, PNEUMATIC TAMPER
ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1 (F)
JACKING OF PIPE-UNDER 12 INCHES
GROUP 3
CONSTRUCTION LABORERS INCLUDING BRIDGE LABORERS, GENERAL LABORERS AND
CLEANUP LABORERS
DEMOLITION WORKER
DUMPMAN, LOAD SPOTTER
FLAGPERSON/PEDESTRIAN MONITOR
FIRE WATCHER
FENCE ERECTORS, INCLUDING TEMPORARY FENCING
GUARDRAIL ERECTORS
GARDENER, HORTICULTURAL AND LANDSCAPE LABORERS (SEE GROUP 4, FOR
LANDSCAPE MAINTENANCE ON NEW CONSTRUCTION DURING PLANT ESTABLISHMENT
PERIOD)
JETTING
LIMBERS, BRUSH LOADERS, AND PILERS
PAVEMENT MARKERS (BUTTON SETTERS)
PAVERS/INTERLOCKING PAVERS (ALL TYPES) AND INTERLOCKING PAVER MACHINES
MAINTENANCE, REPAIR TRACKMEN AND ROAD BEDS
STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORERS
TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR
TOOL ROOM ATTENDANT (JOBSITE ONLY)
TREE REMOVAL
WHEELBARROW, INCLUDING POWER DRIVEN
GROUP 3 (A) -- SEE GROUP 3 RATES
COMPOSITE CREW PERSON (OPERATION OF VEHICLES, WHEN IN CONJUNCTION WITH
LABORER’S DUTIES)
GROUP 4
ALL FINAL CLEANUP OF DEBRIS, GROUNDS AND BUILDINGS NEAR THE COMPLETION OF
THE PROJECT INCLUDING BUT NOT LIMITED TO STREET CLEANERS (NOT APPLICABLE
TO ENGINEERING OR HEAVY HIGHWAY PROJECTS)
CLEANING AND WASHING WINDOWS (NEW CONSTRUCTION ONLY), SERVICE LANDSCAPE
LABORERS (SUCH AS GARDENER, HORTICULTURE, MOWING, TRIMMING, REPLANTING,
WATERING DURING PLANT ESTABLISHMENT PERIOD) ON NEW CONSTRUCTION
BRICK CLEANERS (JOB SITE ONLY)
MATERIAL CLEANERS (JOB SITE ONLY)
NOTE: AN ADDITIONAL DETERMINATION FOR LANDSCAPE MAINTENANCE WORK AFTER
THE PLANT ESTABLISHMENT PERIOD OR WARRANTY PERIOD IS PUBLISHED ON PAGE 57
OF THESE GENERAL DETERMINATIONS.
GROUP 6
STRUCTURAL NOZZLEMAN
GROUP 6 (A)
NOZZLEMAN (INCLUDING GUNMAN, POTMAN)
RODMAN
GROUNDMAN
GROUP 6 (B) -- SEE GROUP 4 RATES
GUNITE TRAINEE (ONE GUNITE LABORER SHALL BE ALLOWED FOR EACH THREE (3)
JOURNEYMAN (GROUP 6, 6A, 6C, OR GENERAL LABORER) ON A CREW. IN THE ABSENCE
OF THE JOURNEYMAN, THE GUNITE TRAINEE RECEIVES THE JOURNEYMAN SCALE.).
NOTE: THIS RATIO APPLIES ONLY TO WORK ON THE SAME JOB SITE.
GROUP 6 ( C)
REBOUNDMAN
GROUP 6 (D)
ALIGNER OF WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE
GROUP 6 (E)
ALIGNER HELPER OF WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT
CRETE
GROUP 7
ENTRY LEVEL LANDSCAPE LABORER (RATIO FOR ENTRY LEVEL IS ONE IN THREE. AT
LEAST ONE SECOND PERIOD ENTRY LEVEL AND AT LEAST ONE THIRD PERIOD ENTRY
LEVEL MUST BE EMPLOYED BEFORE EMPLOYING ANOTHER FIRST PERIOD TRAINEE).
NOTE: THIS RATIO APPLIES ONLY TO WORK ON THE SAME JOB SITE.
GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
CRAFT: #LABORER AND RELATED CLASSIFICATIONS (Special Single and Second Shift)
DETERMINATION: NC-23-102-1-2020-1A
ISSUE DATE: February 22, 2020 EXPIRATION DATE OF DETERMINATION: June 28, 2020** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director-Research Unit for specific rates at (415) 703-4774.
LOCALITY: All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Marin, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.
Employer Payments Straight-Time Overtime Hourly Rate Classificationa Basic Health Pension Vacation Training Other Hours Total Daily Saturdayb Sunday/ (Journeyperson) Hourly and and Payments Hourly Holiday Ratef Welfare Holiday Rate 1 1/2X 1 1/2X 2X AREA 1 c
Construction Specialist 35.49 8.50 12.55 3.05 0.50 0.25 8 60.34 78.09 78.09 95.83 Group 1; Group 1(B)e 34.79 8.50 12.55 3.05 0.50 0.25 8 59.64 77.04 77.04 94.43 Group 1 (A) 35.01 8.50 12.55 3.05 0.50 0.25 8 59.86 77.37 77.37 94.87 Group 1 (C) 34.84 8.50 12.55 3.05 0.50 0.25 8 59.69 77.11 77.11 94.53 Group 1 (E) 35.34 8.50 12.55 3.05 0.50 0.25 8 60.19 77.86 77.86 95.53 Group 1 (G) 34.99 8.50 12.55 3.05 0.50 0.25 8 59.84 77.34 77.34 94.83 Group 2 34.64 8.50 12.55 3.05 0.50 0.25 8 59.49 76.81 76.81 94.13 Group 3; Group 3(A) 34.54 8.50 12.55 3.05 0.50 0.25 8 59.39 76.66 76.66 93.93 Group 4; Group 6(B) 28.23 8.50 12.55 3.05 0.50 0.25 8 53.08 67.20d 67.20d 81.31d Group 6 35.75 8.50 12.55 3.05 0.50 0.25 8 60.60 78.48 78.48 96.35 Group 6 (A) 35.25 8.50 12.55 3.05 0.50 0.25 8 60.10 77.73 77.73 95.35 Group 6 (C) Group 6 (D) Group 6 (E)
34.66 35.37 34.39
8.50 8.50 8.50
12.55 12.55 12.55
3.05 3.05 3.05
0.50 0.50 0.50
0.25 0.25 0.25
59.51 60.22 59.24
76.84 77.91 76.44
76.84 77.91 76.44
94.17 95.59 93.63
Group 7 – Stage 1 (1st 6 months) 25.08 8.50 12.55 3.05 0.50 0.25 8 49.93 62.47 62.47 75.01 Stage 2 (2nd 6 months) 28.23 8.50 12.55 3.05 0.50 0.25 8 53.08 67.20 67.20 81.31 Stage 3 (3rd 6 months) 31.39 8.50 12.55 3.05 0.50 0.25 8 56.24 71.94 71.94 87.63 AREA 2 c
Construction Specialist 34.49 8.50 12.55 3.05 0.50 0.25 8 59.34 76.59 76.59 93.83 Group 1; Group 1(B) e 33.79 8.50 12.55 3.05 0.50 0.25 8 58.64 75.54 75.54 92.43 Group 1 (A) 34.01 8.50 12.55 3.05 0.50 0.25 8 58.86 75.87 75.87 92.87 Group 1 (C) 33.84 8.50 12.55 3.05 0.50 0.25 8 58.69 75.61 75.61 92.53 Group 1 (E) 34.34 8.50 12.55 3.05 0.50 0.25 8 59.19 76.36 76.36 93.53 Group 2 33.64 8.50 12.55 3.05 0.50 0.25 8 58.49 75.31 75.31 92.13 Group 3; Group 3(A) 33.54 8.50 12.55 3.05 0.50 0.25 8 58.39 75.16 75.16 91.93 Group 4; Group 6(B) 27.23 8.50 12.55 3.05 0.50 0.25 8 52.08 65.70d 65.70d 79.31d Group 6 34.75 8.50 12.55 3.05 0.50 0.25 8 59.60 76.98 76.98 94.35 Group 6 (A) 34.25 8.50 12.55 3.05 0.50 0.25 8 59.10 76.23 76.23 93.35 Group 6 (C) Group 6 (D) Group 6 (E)
33.66 34.37 33.39
8.50 8.50 8.50
12.55 12.55 12.55
3.05 3.05 3.05
0.50 0.50 0.50
0.25 0.25 0.25
58.51 59.22 58.24
75.34 76.41 74.94
75.34 76.41 74.94
92.17 93.59 91.63
Group 7 – Stage 1 (1st 6 months) 24.38 8.50 12.55 3.05 0.50 0.25 8 49.23 61.42 61.42 73.61 Stage 2 (2nd 6 months) 27.43 8.50 12.55 3.05 0.50 0.25 8 52.28 66.00 66.00 79.71 Stage 3 (3rd 6 months) 30.49 8.50 12.55 3.05 0.50 0.25 8 55.34 70.59 70.59 85.83
PLEASE GO TO PAGE 50 FOR CLASSIFICATIONS WITHIN EACH GROUP
# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Internet at http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp.
a GROUP 1(D) - MAINTENANCE OR REPAIR TRACKMEN AND ROAD BEDS AND ALL EMPLOYEES PERFORMING WORK COVERED BY THIS CLASSIFICATION SHALL RECEIVE $0.25 PER PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS SHALL NOT APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. THIS SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER TEMPORARY COVER HAS
BEEN PLACED.
GROUP 1(H) - ALL LABORERS WORKING OFF OR WITH OR FROM BOS’N CHAIRS, SWINGING SCAFFOLDS, BELTS RECEIVE $0.50 PER HOUR ABOVE THEIR APPLICABLE WAGE RATE.
THIS SHALL NOT APPLY TO LABORERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1(A).
b SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER, MAJOR MECHANICAL BREAKDOWN OR LACK OF MATERIALS BEYOND THE CONTROL OF THE EMPLOYER.
c AREA 1 - ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, AND SANTA CLARA COUNTIES.
AREA 2 - ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL NORTE, EL DORADO, FRESNO, GLENN, HUMBOLDT, KINGS, LAKE, LASSEN, MADERA, MARIPOSA, MENDOCINO, MERCED, MODOC, MONTEREY, NAPA, NEVADA, PLACER, PLUMAS, SACRAMENTO, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, SHASTA, SIERRA, SISKIYOU, SOLANO, SONOMA, STANISLAUS, SUTTER, TEHAMA, TRINITY, TULARE, TUOLUMNE, YOLO AND YUBA COUNTIES.
d SERVICE LANDSCAPE LABORER ON NEW CONSTRUCTION MAY WORK ANY FIVE (5) DAYS WITHIN A WEEK.
e GROUP 1(B) RECEIVES AN ADDITIONAL AMOUNT EACH DAY. SEE PAGE 50 FOR DETAILS.
f ZONE PAY AT THREE DOLLARS ($3.00) PER HOUR, FACTORED AT THE APPLICABLE OVERTIME MULTIPLE, WILL BE ADDED TO THE BASE RATE FOR WORK PERFORMED OUTSIDE THE
FREE ZONE DESCRIBED BY THE BOUNDARIES ALONG TOWNSHIP AND RANGE LINES. PLEASE SEE TRAVEL AND SUBSISTENCE PROVISIONS FOR MAP DESCRIPTION AND EXCEPTIONS.
RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPREWAGEDETERMINATION.HTM. HOLIDAY PROVISIONS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING
THE OFFICE OF THE DIRECTOR – RESEARCH UNIT AT (415) 703-4774.
TRAVEL AND/OR SUBSISTENCE PAYMENT: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPREWAGEDETERMINATION.HTM. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR – RESEARCH UNIT AT (415) 703-4774.
50-A
| CRAFT: #LABORER AND RELATED CLASSIFICATIONS |
| DETERMINATION: NC-23-102-1-2020-1 and NC-23-102-1-2020-1A |
| CONSTRUCTION SPECIALIST |
| SEE FOOTNOTE A ON PAGE 49 |
| GROUP 2 |
| GROUP 3 |
| GROUP 4 |
| GROUP 6 |
| GROUP 6 ( C) |
| GROUP 7 |
| GROUP 1 (C) |
| CRAFT: #LABORER AND RELATED CLASSIFICATIONS (Special Single and Second Shift) |
File details come from the government source that posted it. Updated .