Attach 01 Statement Of Work.docx

DOCX document 13 KB Posted

Attached to
127EAS21Q0001 Thompson Meadow Corral Federal contract opportunity
Solicitation number
127EAS21Q0001
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

View the file

Other files for this federal contract opportunity

Other files attached to 127EAS21Q0001 Thompson Meadow Corral, newest first.
File Type Posted
127EAS21Q0001 Thompson Meadow Corral.doc DOC document
Attach 03 2012 FINALPAL Fire Plan 080212.doc DOC document
Attach 04 Federal Wage Determination.pdf PDF
Attach 02 Wage Determination Letter.docx DOCX document
Attach 06 Map.pdf PDF
Attach 05 California Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The intent of this project is to secure services for the design, purchase and delivery of materials and construction of a 6 rail steel corral for holding, loading and shipping of cattle at the Thompson Meadow gathering Pasture facility on the Stanislaus National Forest, Mi-Wok Ranger District. A continuous fence design type may be used for the rails but other design types will be considered. The corral will be constructed adjacent to Road #2N13.

Design at a minimum shall include the following:

1. Design plan

2. List and specifications of all material to be used

3. Construction details such as but not limited to; joints, footings, gauge and length of pipe, footings, loading shoot, overheads and gates.

4. Work schedule

5. Installation method

6. Outside dimensions shall be approximately 80’ wide along Rd #2N13 by approximately 75’ deep. Approximate dimensions are staked at project site.

7. A holding pen on the SE side with external and gates for entry and to the ally way.

8. Two pens for sorting on the NW side for sorting with internal and external gates.

9. A 14’ ally way between holding and sorting pens with a lead-up to the loading shoot/ramp.

10. A loading Shoot and ramp and deck at the right elevation and angle for loading and offloading trucks.

Contractor Responsibility: The Contractor shall provide everything--including, but not limited to, design, all equipment, supplies, transportation, labor, and supervision--necessary to complete the project, except for that which the contract clearly states is to be furnished by the Government.

Installation shall require that the road and corral surface to be restored to its original tread surface with an easy transition to the loading shoot and gates. Local material may be used to assist with this. No transportation of fill material will be required. All waste material from the installation shall be treated. . Contractor shall follow the manufactures installation requirements.

Map showing the work site location are included in section J.