This notice solicits proposals for the Grand Forks HNRC Labs 150 152 154 156 Renovation project. The project includes renovations to laboratories 150, 152, 154, and 156 located at the USDA Agricultural Research Service Grand Forks Human Nutrition Research Center in Grand Forks, North Dakota. A mandatory pre-proposal conference and site visit will be held on May 23, 2022. Proposals are due by June 2, 2022, and the project value is estimated between $1,000,000 to $5,000,000. This is a total small business set-aside solicited by the USDA Agricultural Research Service Plains Area. Offerors must be registered in the System for Award Management and questions regarding the solicitation must be submitted in writing by June 2, 2022.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 33 PAGES
GRAND FORKS LAB REMODEL 150-156
01 11 00 SD-01 Preconstruction Submittals
1.8 GSalvage Plan
01 14 00 SD-01 Preconstruction Submittals
1.3.1.1List of Contact Personnel
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7.1 GAPP - Construction
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
SD-07 Certificates
1.8Activity Hazard Analysis (AHA)
1.9.1Hot Work Permit
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.7.2Verification Statement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 33 PAGES
01 45 35 SD-01 Preconstruction Submittals
3.1.2Written NDT Practices
SD-06 Test Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
1.5 GSpecial Inspector
3.1.2Qualification Records
SD-11 Closeout Submittals
3.1.2 GInterim Report
3.1.2 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.3.1 GTraffic Control Plan
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.9 GSolid Waste Management Permit
1.6 GEnvironmental Protection Plan
1.6.6.1 GDirt and Dust Control Plan
1.5.4 GEnvironmental Manager
Qualifications
SD-06 Test Reports
1.9.1 GMonthly Solid Waste Disposal
Report
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 33 PAGES
01 57 19 3.4.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
1.9 GSolid Waste Management Permit
3.4.2.1 GProject Solid Waste Disposal
Documentation Report
3.4.3.1 GHazardous Waste/Debris
Management
1.5.2 GRegulatory Notifications
3.4.2.1 GSales Documentation
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan
SD-06 Test Reports
1.9.2Quarterly Reports
1.9.3Annual Report
SD-11 Closeout Submittals
1.10Final Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.8.1Warranty Management Plan
1.8.5Warranty Tags
1.6Spare Parts Data
SD-08 Manufacturer’s Instructions
1.8.1Instructions
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 33 PAGES
01 78 00 3.6 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.2 GRecord Drawings
1.8.1As-Built Record of Equipment and Materials
3.5As-Built Record of Equipment and Materials
3.3 GFinal Approved Shop Drawings
3.4 GConstruction Contract
Specifications
2.1 GCertification of EPA Designated
Items
2.2 GCertification Of USDA Designated
Items
01 78 23 SD-10 Operation and Maintenance
Data
1.3 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 33 PAGES
02 41 00 1.2.2 GDemolition Plan
1.7Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals
3.2.3Receipts
02 84 33 SD-07 Certificates
1.7.1Training certification
1.7.2Qualifications of CIH
1.7.3PCB Removal Work Plan
1.7.4PCB Disposal Plan
1.7.5Notification
3.6Transporter Certification
3.6.1Certificate of Disposal
03 30 00 SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
2.3Reinforcement
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
3.8.2.1Report
07 21 16 SD-03 Product Data
2.1Sound Attenuation Blanket
Insulation
2.1.2 SRecycled Content for Insulation
Materials
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 33 PAGES
07 21 16 2.1.4 SIndoor Air Quality for Insulation
Materials
SD-08 Manufacturer’s Instructions
3.3.1Insulation
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.2 SIndoor Air Quality For Interior
Floor Joint Sealants
08 11 13 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 33 PAGES
08 11 13 2.1 GDoors
2.1 GDoors
2.2 GFrames
2.2 GFrames
SD-03 Product Data
2.1 GDoors
2.1 SRecycled Content for Steel Door
Product
2.2 GFrames
2.2 SRecycled Content for Steel Frame
Product
SD-04 Samples
2.5.1 GFactory-applied Enamel Finish
08 51 23 SD-02 Shop Drawings
2.2 GWindows
SD-03 Product Data
2.2 GFrames
SD-04 Samples
2.8.1 GFactory-Applied Enamel Finish
SD-10 Operation and Maintenance
Data
2.2 GWindows
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 33 PAGES
08 71 00 2.3.5 GKeying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
1.3Glazing Accessories
2.2.1.1Sealants
SD-04 Samples
1.4Fire Rated Glass
SD-08 Manufacturer’s Instructions
2.2Setting and Sealing Materials
3.2Glass Setting
09 29 00 SD-03 Product Data
2.1.1 SRecycled Content for Gypsum
Board
2.1.1 SRecycled Content for Paper
Facing and Gypsum Cores
2.1.3 SVOC Content of Joint Compound
2.1.2Abuse Resistant Type X
Fire-Resistant Gypsum Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 33 PAGES
09 29 00 2.1.2Abuse Resistant Type X
Fire-Resistant Glass-Mat
Sheathing
SD-07 Certificates
2.1 GAsbestos Free Materials
2.1.1 SIndoor Air Quality for Gypsum
Board
SD-08 Manufacturer’s Instructions
2.1Safety Data Sheets
SD-10 Operation and Maintenance
Data
2.1Manufacturer Maintenance
Instructions
09 51 00 SD-02 Shop Drawings
2.1 GApproved Detail Drawings
SD-03 Product Data
2.2.1.1Recycled Content for Type IX
Ceiling Tiles
2.3Recycled Content for Suspension
Systems
2.1.1 GAcoustical Performance
SD-04 Samples
2.2 GAcoustical Ceiling Tiles
SD-07 Certificates
2.2.1.1Indoor Air Quality for Type IX
Ceiling Tiles
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 33 PAGES
09 62 38 SD-03 Product Data
2.1.1.1 SRecycled content for
Static-Dissipative Vinyl Tile
2.4 GAccessories
2.3 GAdhesives
1.9Warranty
SD-04 Samples
2.1Static-Dissipative Vinyl Tile
2.4 GAccessories
SD-06 Test Reports
2.7Fire Resistance
3.2Moisture, Alkalinity and Bond
3.7Testing
SD-07 Certificates
2.1.1.1 SIndoor Air Quality for
Static-Dissipative Vinyl Tile
2.3 SIndoor Air Quality for Adhesives
1.6Qualifications of Applicator
SD-08 Manufacturer’s Instructions
2.1Static-Dissipative Vinyl Tile
2.4 GAccessories
SD-10 Operation and Maintenance
Data
2.1Static-Dissipative Vinyl Tile
2.4 GAccessories
09 90 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 33 PAGES
09 90 00 3.8Piping Identification
SD-03 Product Data
2.1 GCoating
2.1Product Data Sheets
SD-04 Samples
2.2 GColor
SD-07 Certificates
1.6.5Indoor Air Quality for Paints and
Primers
SD-08 Manufacturer’s Instructions
3.2.1Application Instructions
2.1Mixing
1.8.1Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings
10 26 00 SD-02 Shop Drawings
2.1 GCorner Guards
SD-03 Product Data
2.1 GCorner Guards
2.1.1 SRecycled content for steel
component of corner guards
SD-04 Samples
2.1 GCorner Guards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 33 PAGES
10 26 00 SD-10 Operation and Maintenance
Data
2.1 GCorner Guards
10 28 13 SD-02 Shop Drawings
2.1 GProduct Schedule
SD-03 Product Data
2.1.3 GItem A5145
10 44 16 SD-02 Shop Drawings
Part 2 GCabinets
SD-03 Product Data
Part 2 GAccessories
Part 2 GCabinets
11 53 00 SD-02 Shop Drawings
1.4.2 Glayout
1.4.3equipment and hood
SD-03 Product Data
2.2.1 GFumehood assembly
1.4.4 GBiological safety cabinet
2.2.2 GBiological safety cabinet
2.2.3 GSnorkel
SD-04 Samples
1.4.1 GExterior hood paints
SD-06 Test Reports
1.4.4 GFumehood test
2.2.3 GSnorkel
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 33 PAGES
11 53 00 2.2.1Fumehood assembly
1.4.4Biological safety cabinet
2.2.2Biological safety cabinet
2.2.3Snorkel
SD-10 Operation and Maintenance
Data
2.2.1 GFumehood assembly
1.4.4 GBiological safety cabinet
2.2.2 GBiological safety cabinet
2.2.3 GSnorkel
12 24 13 SD-02 Shop Drawings
3.3 GDetailed Drawings
2.1 GLocation Schedule
SD-03 Product Data
2.1 GWindow Shades
2.1 SRecycled Content for various
fiber components
SD-04 Samples
2.1 GWindow Shades
SD-06 Test Reports
1.4.2 GFlammability Requirements
SD-07 Certificates
2.1 SIndoor Air Quality for roller
window shades
1.4.1.1Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 33 PAGES
12 24 13 SD-10 Operation and Maintenance
Data
2.1 GWindow Shades
12 30 90 SD-02 Shop Drawings
2.2 GLaboratory Service Fixtures
3.1 GLaboratory Service Fixtures
SD-03 Product Data
2.2.1 GHot & Cold Water Fixtures
2.2.2 GRO Water Fixtures
2.2.3 GLaboratory Gas Fixtures
2.2.4 GElectrical Service Fixtures
2.2.5 GFume Hood Service Fixtures
2.2.6 GSafety Station
SD-10 Operation and Maintenance
Data
2.2 GLaboratory Service fixtures
3.1 GLaboratory Service fixtures
12 31 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
1.2.1 GInstallation Drawings
SD-03 Product Data
1.2.1 GCabinets
1.2.1 GCorrosion-Resistant Steel
1.2.1 GGlass
1.2.1 GAdhesives
1.2.1 GFiller Material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 33 PAGES
12 31 00 1.2.1 GFasteners
1.2.1 GEpoxy Sinks
1.2.1 GStainless Steel Sinks
1.2.1 GService Fixtures
1.2.1 GAccessories and Hardware
1.2.1 GCountertops
2.5.1Solvent Storage Cabinets
2.5.2Acid Storage Cabinets
2.5.3Cylinder Restraints
SD-04 Samples
1.2.1 GAccessories and Hardware
1.2.1 GManufacturer's Standard Color
Charts
2.3.9.1 GBaked enamel finish
2.3.9.1 GMetal Color
1.2.1 GCounter Tops
SD-07 Certificates
1.2.1 GCorrosion-Resistant Steel
1.2.1 GGlass
1.2.1 GAdhesives
1.2.1 GFiller Material
1.2.1 GFasteners
1.2.1 GService Fixtures
1.2.1 GAccessories and Hardware
SD-08 Manufacturer’s Instructions
1.2.1 GManufacturer's Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 33 PAGES
22 00 00 SD-03 Product Data
2.4Fixtures
2.4.2Flush Tank Water Closets
2.4.2 SWaterSense Label for Flush Tank
Water Closet
2.4.3Wall Hung Lavatories
2.8 GWater Heaters
2.8.1.1 SEnergy Star Label for Gas
Storage Water Heater
3.7.1.1 GBackflow Prevention Assemblies
1.5.1Welding
3.7.1Plumbing System
SD-06 Test Reports
3.7Tests, Flushing and Disinfection
3.7.1.1 GTest of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
2.1.1Bolts
SD-10 Operation and Maintenance
Data
3.7.1 GPlumbing System
22 66 53.00 40 SD-02 Shop Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.1.1 GPolyethylene Material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 33 PAGES
22 66 53.00 40 SD-06 Test Reports
3.1 GTest Reports
SD-07 Certificates
1.3 GListing of Product Installations
2.1.1 GPolyethylene Material
2.1.2 GPolypropylene Material
23 05 15 SD-01 Preconstruction Submittals
1.2 GMaterial, Equipment, and Fixture
Lists
SD-02 Shop Drawings
1.2 GRecord Drawings
1.2 GConnection Diagrams
1.2 GCoordination Drawings
1.2 GFabrication Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.1 GPipe and Fittings
2.2 GPiping Specialties
2.3 GValves
2.4 GMiscellaneous Materials
2.5 GSupporting Elements
1.2 GEquipment Foundation Data
SD-04 Samples
1.2 GManufacturer's Standard Color
Charts
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 33 PAGES
23 05 15 2.1 GPipe and Fittings
2.2 GPiping Specialties
2.3 GValves
SD-06 Test Reports
3.1 GHydrostatic Tests
3.1 GAir Tests
3.1 GValve-Operating Tests
3.1 GDrainage Tests
3.1 GPneumatic Tests
3.1 GNon-Destructive Electric Tests
3.1 GSystem Operation Tests
SD-07 Certificates
1.4.2 GRecord of Satisfactory Field
Operation
1.4.3 GList of Qualified Permanent
Service Organizations
1.2 GListing of Product Installations
1.2 GRecords of Existing Conditions
3.1 GSurface Resistance
3.1 GShear and Tensile Strengths
3.1 GTemperature Ratings
3.1 GBending Tests
3.1 GFlattening Tests
3.1 GTransverse Guided Weld Bend
Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 33 PAGES
23 05 15 SD-10 Operation and Maintenance
Data
3.9 GOperation and Maintenance
Manuals
23 05 48.00 40 SD-02 Shop Drawings
1.2 GInstallation Drawings
1.2 GOutline Drawings
SD-03 Product Data
1.2 GEquipment and Performance
Data
2.2.4 GIsolators
SD-06 Test Reports
2.4 GType of Isolator
2.4 GType of Base
2.4 GAllowable Deflection
2.4 GMeasured Deflection
23 05 93 SD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
SD-06 Test Reports
3.3.5 GCompleted Pre-Final DALT
Report
3.3.8 GCertified Final DALT Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 33 PAGES
23 05 93 SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
2.3.1 SRecycled content for insulation
materials
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
SD-04 Samples
3.1.1 GDisplay Samples
SD-07 Certificates
2.2.1 SIndoor air quality for adhesives
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
23 09 00 SD-02 Shop Drawings
3.2 GDDC Contractor Design Drawings
3.2 GDraft As-Built Drawings
3.2 GFinal As-Built Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 33 PAGES
23 09 00 SD-03 Product Data
1.8.3 GProgramming Software
1.8.4 GController Application Programs
1.8.1 GConfiguration Software
1.8.2 GController Configuration Settings
1.1.1.3 GProprietary Multi-Split
Engineering Tool Software
2.2 GManufacturer's Product Data
SD-06 Test Reports
3.4.2 GStart-Up Testing Report
3.5.2 GPVT Report
1.9.1 GPre-Construction Quality Control
(QC) Checklist
1.9.2 GPost-Construction Quality Control
(QC) Checklist
SD-10 Operation and Maintenance
Data
3.6 GOperation and Maintenance
(O&M) Instructions
3.8.1 GTraining Documentation
SD-11 Closeout Submittals
2.5 GEnclosure Keys
3.1.6.1 GPassword Summary Report
1.9.3 GCloseout Quality Control (QC)
Checklist
23 11 20 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 33 PAGES
23 11 20 1.5.2 GGas Piping System
2.2 GGas Piping System
3.2 GGas Piping System
SD-03 Product Data
1.5.2 GGas Equipment Connectors
1.5.2 GGas Piping System
2.2 GGas Piping System
3.2 GGas Piping System
2.1 GPipe Coating Materials
2.6 GPressure Regulators
2.4 GRisers
2.2.8 GTransition Fittings
2.3 GValves
2.2.4 GWarning and Identification Tape
SD-06 Test Reports
3.18 GTesting
3.18.1 GPressure Tests
3.18.2 GTest with Gas
SD-07 Certificates
1.5.1 GWelders Procedures and
Qualifications
1.5.1 GAssigned Number, Letter, or
Symbol
SD-08 Manufacturer’s Instructions
2.1 GPipe Coating Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 33 PAGES
23 11 20 SD-10 Operation and Maintenance
Data
1.3.1 GGas Facility System and
Equipment Operation
1.3.2 GGas Facility System Maintenance
1.3.3 GGas Facility Equipment
Maintenance
23 30 00 SD-02 Shop Drawings
1.4.4 GDetail Drawings
SD-03 Product Data
2.7.1.1Metallic Flexible Duct
2.7.1.2Insulated Nonmetallic Flexible
Duct Runouts
2.7.1.2Duct Connectors
2.7.2 GDuct Access Doors
2.7.3Fire Dampers
2.7.4.1Diffusers
2.7.4.2Registers and Grilles
2.7.5Air Vents, Penthouses, and
Goosenecks
2.8.1.1Centrifugal Fans
2.8.1.2In-Line Centrifugal Fans
2.8.1.3Axial Flow Fans
2.8.1.4Centrifugal Type Power Wall
Ventilators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 33 PAGES
23 30 00 2.8.1.5Centrifugal Type Power Roof
Ventilators
2.8.1.6Ceiling Exhaust Fans
2.8.1.6 SPL-109-58 label for ceiling
exhaust fan product
2.9 GAir Handling Units
2.10.1.1 GConstant Volume, Single Duct
Terminal Units
2.10.1.2 GVariable Volume, Single Duct
Terminal Units
2.10.1.3 GReheat Units
1.4.5Test Procedures
2.7.1 SIndoor Air Quality for Duct
Sealants
SD-06 Test Reports
3.11 GPerformance Tests
3.9 GDamper Acceptance Test
SD-07 Certificates
1.4.3Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
3.13.2Operation and Maintenance
Training
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 33 PAGES
23 30 00 SD-10 Operation and Maintenance
Data
3.13.1 GOperation and Maintenance
Manuals
2.7.3 GFire Dampers
2.8.1.1 GCentrifugal Fans
2.8.1.2 GIn-Line Centrifugal Fans
2.8.1.3 GAxial Flow Fans
2.8.1.4 GCentrifugal Type Power Wall
Ventilators
2.8.1.5 GCentrifugal Type Power Roof
Ventilators
2.8.1.6 GCeiling Exhaust Fans
2.9 GAir Handling Units
2.10.1.1 GConstant Volume, Single Duct
Terminal Units
2.10.1.2 GVariable Volume, Single Duct
Terminal Units
2.10.1.3 GReheat Units
SD-11 Closeout Submittals
3.12 SIndoor Air Quality During
Construction
25 05 11 SD-01 Preconstruction Submittals
3.1.5.3 GWireless Communication
Request
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 33 PAGES
25 05 11 3.1.2.2 GDevice Account Lock Exception
Request
3.8 GMultiple IP Connection Device
Request
1.8.1.4 GContractor Computer
Cybersecurity Compliance
Statements
1.8.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
SD-02 Shop Drawings
3.1.3.1 GUser Interface Banner Schedule
1.6.2 GNetwork Communication Report
1.6.5 GCybersecurity Riser Diagram
1.6.3 GControl System Inventory Report
1.6.1 GCybersecurity Interconnection
Schedule
SD-03 Product Data
1.6.6 GControl System Cybersecurity
Documentation
SD-06 Test Reports
3.1.5.4 GWireless Communication Test
Report
SD-07 Certificates
1.7 GSoftware Licenses
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 33 PAGES
25 05 11 3.5.2.2.5 GPassword Summary Report
1.6.4 GSoftware Recovery And
Reconstitution Images
3.2.2.1 GDevice Audit Record Upload
Software
26 05 00.00 40 SD-02 Shop Drawings
3.2.8.1 GMarking Strips
SD-03 Product Data
2.1.1 GConduits and Raceways
2.2.1 GWire and Cable
3.2.7 GSplices and Connectors
2.2.3 GSwitches
2.2.5 GReceptacles
2.1.3 GOutlet Boxes, Pull Boxes and
Junction Boxes
2.1.4.1 GCircuit Breakers
2.1.4 GPanelboards
2.1.5 GDry-Type Distribution
Transformers
2.2.2 GDevice Plates
SD-06 Test Reports
3.6 GContinuity Test
3.6 GPhase-Rotation Tests
3.6 GInsulation Resistance Test
3.6 G600-Volt Wiring Test
3.6 GTransformer Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 33 PAGES
26 05 00.00 40 3.6 GGround-Fault Receptacle Test
3.6 GInsulation-Resistance Test
SD-08 Manufacturer’s Instructions
3.1Manufacturer's Instructions
26 05 19.10 10 SD-03 Product Data
2.1.1 GWire and Cable
2.1.3.1 GConductors
3.1Cable Manufacturing Data
SD-06 Test Reports
3.2 GTest Report(s), Inspection
Report(s), and Verification
Report(s)
26 05 26.00 40 SD-03 Product Data
2.1.1 GGround Wires
2.1.2 GConnectors and Fasteners
2.1.3 GConductive Corrosion Inhibiting
Compounds
2.1.4 GGround Buses
SD-06 Test Reports
3.2.1 GBond Resistance Test
3.2.2 GGround Isolation Test
3.2.3 GEquipment Continuity Test
SD-07 Certificates
1.3.3 GMicro-Ohmmeter Test Equipment
SD-11 Closeout Submittals
3.3Record Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 33 PAGES
26 05 71.00 40 SD-02 Shop Drawings
2.1 GConnection Diagrams
2.1 GFabrication Drawings
3.1 GControl Devices
3.1 GProtective Devices
SD-03 Product Data
2.2.3 GFuses
2.2.1 GMotor Controllers
2.3.2 GEnclosures
2.2.2 GCircuit Breakers
3.1 GControl Devices
2.3.3 GIndicating Lights
SD-06 Test Reports
3.2.1 GFinal Test Reports
SD-08 Manufacturer’s Instructions
3.1 GControl Devices
3.1 GProtective Devices
SD-10 Operation and Maintenance
Data
2.2.1.1 GManual Motor Controllers
2.2.1.2 GMagnetic Motor Controllers
2.2.1.3 GCombination Motor Controllers
2.2.2 GCircuit Breakers
26 09 23.00 40 SD-02 Shop Drawings
2.1 GLighting System Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 33 PAGES
26 09 23.00 40 3.1 GInstallation Instructions
2.2.2 GDimming Controls
2.2.3 GLight Level Sensor
2.2.4 GOccupancy Sensors
SD-06 Test Reports
3.3System Operation Tests
SD-10 Operation and Maintenance
Data
3.4Lighting Control System, Data
Package 5
26 20 00 SD-02 Shop Drawings
2.12 GPanelboards
2.26 GWireways
3.1.6.1 GMarking Strips
SD-03 Product Data
2.11 GReceptacles
2.12.1 GCircuit Breakers
2.9 GSwitches
2.13 GEnclosed Circuit Breakers
2.16 GMotor Controllers
2.17 GManual Motor Starters
2.20.2 GSecondary Bonding Busbar
2.27 GSurge Protective Devices
SD-06 Test Reports
3.5.2 G600-volt Wiring Test
3.5.3 GGround-fault Receptacle Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 33 PAGES
26 20 00 3.5.4 GArc-fault Receptacle Test
SD-07 Certificates
2.10 GFuses
SD-10 Operation and Maintenance
Data
1.5.1 GElectrical Systems
26 51 00 SD-02 Shop Drawings
1.5.1 GLuminaire Drawings
1.5.9 GOccupancy/Vacancy Sensor
Coverage Layout
1.7.2 GLighting Control System One-Line
Diagram
2.5.1 GSequence of Operation for
Lighting Control System
SD-03 Product Data
2.2 GLuminaires
2.3 GLight Sources
2.4 GLED Drivers
1.6.1 GLuminaire Warranty
1.6.2 GLighting Controls Warranty
2.5.2.1 GSwitches
2.5.2.2 GWall Box Dimmers
2.5.2.3 GOccupancy/Vacancy Sensors
2.5.2.4 GPhotosensors
2.5.2.3.2 GPower Packs
2.6.1 GExit Signs
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 33 PAGES
26 51 00 2.6.3 GEmergency Drivers
SD-04 Samples
2.2.1 GLuminaire Samples
SD-05 Design Data
1.5.2 GLuminaire Design Data
1.5.8 GPhotometric Plan
SD-06 Test Reports
1.5.3 GANSI/IES LM-79 Test Report
1.5.4 GANSI/IES LM-80 Test Report
1.5.5 GANSI/IES TM-21 Test Report
1.5.6 GANSI/IES TM-30 Test Report
3.2.1.1 GOccupancy/Vacancy Sensor
Verification Test
3.2.1.1 GPhotosensor Verification Test
SD-07 Certificates
1.5.7 GLED Driver and Dimming Switch
Compatibility Certificate
SD-10 Operation and Maintenance
Data
1.7.1 GLighting System
1.7.2 GLighting Control System
3.3.2.1 GMaintenance Staff Training Plan
3.3.2.2 GEnd-User Training Plan
26 53 00.00 40 SD-01 Preconstruction Submittals
1.2.1 GMaterial, Equipment, and Fixture
Lists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 33 PAGES
26 53 00.00 40 SD-02 Shop Drawings
1.2.1 GExit Lighting Units
1.2.1 GExit Lighting Units Outline
Drawings
SD-03 Product Data
1.2.1 GExit Lighting Units
1.2.1 GContemporary Fixtures
1.2.1 GAccessories
SD-06 Test Reports
3.2.1 GOperational Tests
SD-07 Certificates
1.2.1 GEnergy Efficiencies
27 05 28.36 40 SD-02 Shop Drawings
2.2 GFabrication Drawings
3.1.2 GInstallation Drawings
SD-03 Product Data
1.2.1 GCable Trays
1.2.1 GSupports
SD-08 Manufacturer’s Instructions
3.1.1Manufacturer's Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .