Attach_03_REDW_Solar_Plans.pdf
PDF 3 MB Posted
- Attached to
- Replace solar panels and components REDW Federal contract opportunity
- Solicitation number
- 140P8422Q0085
About this file
This document package includes construction plans and specifications for replacing solar panels and electrical components at the North Operations Center of Redwood National Park. The project entails removing the existing 200 solar panels, combiner boxes, disconnects, and power inverters, which were installed in 2009, and replacing them with a new system of similar size, layout, and functionality. Bidders are to fully inspect the existing site and verify conditions. The selected contractor will be responsible for providing approved shop drawings, a fully functional PV system meeting all code and manufacturer requirements, and licensing electricians to perform the electrical work. The existing mounting hardware may potentially be reused if compatible with the new equipment, otherwise it must be removed and replaced without additional cost. The work is to be completed for the National Park Service Pacific West Region under solicitation number 140P8422Q0085.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8422Q0085_Amd_0003.pdf | ||
| Sol_140P8422Q0085_Amd_0002.pdf | ||
| Sol_140P8422Q0085_Amd_0001.pdf | ||
| Attach_01_Quote_Sheet_REDW_Solar.xlsx | XLSX spreadsheet | |
| Attach_02_FINAL_SPECIFICATIONS.pdf | ||
| Attach_05_Technical_Information_Form.docx | DOCX document | |
| Sol_140P8422Q0085.pdf | ||
| Attach_04_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. THIS PLAN SET IS PROVIDED FOR INFORMATIONAL PURPOSES AND DOES NOT
CONSTITUTE AND ENGINEERING DESIGN. THIS PLAN SET IS PROVIDED TO SHOW
POTENTIAL BIDDERS THE ASSUMED EXISTING CONDITIONS AND THE OVERALL
INTENT OF THE PROJECT.
2. PER THE SPECIFICATIONS, THE INTENT OF THIS PROJECT IS TO REMOVE AND
SALVAGE THE EXISTING PV SYSTEM AT THE NORTH OPERATION CENTER AND
REPLACE IT WITH A NEW SYSTEM WITH INCREASED CAPACITY BUT SAME
GENERAL FUNCTIONALITY AND FOOTPRINT. IN GENERAL EXISTING EQUIPMENT
WILL BE REMOVED AND REPLACED WITH SIMILAR EQUIPMENT AT THE SAME
LOCATIONS OF EXISTING.
3. EXISTING EQUIPMENT TO BE REPLACED INCLUDES, BUT IS NOT LIMITED TO,
SOLAR PANELS (X200), COMBINER BOXES, DISCONNECTS, AND POWER
INVERTERS. THE CONTRACTOR SHALL ALSO REMOVE AND REPLACE ELECTRICAL
CONDUITS AND CABLES (EXCEPT UNDERGROUND CONDUIT) AS REQUIRED TO
ACCOMMODATE THE REPLACEMENT SYSTEM PER ALL APPLICABLE CODES.
4. THE CONTRACTOR SHALL FULLY INSPECT THE EXISTING SITE AND VERIFY ALL
EXISTING CONDITIONS.
5. THE CONTRACTOR SHALL PREPARE AND SUBMIT A PV SYSTEM DESIGN SHOWING
THE LAYOUT AND INSTALLATION OF THE NEW SYSTEM PER THE SPECIFICATIONS.
THE CONTRACTOR DOES NOT NEED TO REEVALUATE THE SYSTEM FOR SOLAR
EXPOSURE OR COST-BENEFIT. PRIOR ESTIMATES ARE PROVIDED IN ATTACHMENT
A OF THE SPECIFICATIONS.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A FULLY
FUNCTIONAL PV SYSTEM MEETING THE REQUIREMENTS OF THE SPECIFICATIONS,
EQUIPMENT MANUFACTURER AND APPLICABLE BUILDING AND ELECTRIC CODES.
7. APPLICABLE RECORD DRAWINGS, PRODUCT SUBMITTALS, AND DESIGN
INFORMATION ARE PROVIDED AS AN ATTACHMENT TO SHOW PERSPECTIVE
CONTRACTOR INFORMATION ABOUT THE EXISTING SYSTEM.
8. ALL ELECTRICAL WORK SHALL BE COMPLETED BY A LICENSED ELECTRICIAN.
1. IN GENERAL, EXISTING STRUCTURES, EQUIPMENT, AND FACILITIES ARE SHOWN IN LIGHT LINE WEIGHTS. NEW STRUCTURES, EQUIPMENT, AND FACILITIES ARE SHOWN IN HEAVY LINE WEIGHTS.
2. ALL DISTURBED ASPHALT, GRASS, DRAINAGE PATTERNS, ROADSIDE DITCHES, TRAILS AND GRADE
SHALL BE RESTORED TO ITS ORIGINAL CONDITION OR AS CALLED FOR ON THE CONTRACT
DOCUMENTS, WHICHEVER IS MORE STRINGENT.
3. SCHEDULE ALL EXISTING UTILITY LINE SHUTDOWNS WITH THE CONTRACTING OFFICER.
4. ALL COSTS ASSOCIATED WITH REPAIR AND/OR REPLACEMENT OF EXISTING UTILITIES, DUE TO
CONTRACTOR'S ACTIVITIES, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
5. FIELD LOCATE ALL EXISTING UTILITIES AND ALL OTHER SURFACE AND SUB-SURFACE FEATURES
PRIOR TO CONSTRUCTION. ANY FEATURES DAMAGED BY CONTRACTOR'S ACTIVITIES SHALL BE
REPLACED TO PRE-CONSTRUCTION CONDITION AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT.
ANY FIELD LOCATED EXISTING CONDITIONS IMPACTING NEW WORK SHALL BE IMMEDIATELY BROUGHT
TO THE CONTRACTING OFFICER'S ATTENTION.
1. THE INTENT OF THIS PROJECT IS TO REPLACE THE EXISTING PV PANELS WITH
PANELS OF SIMILAR SIZE, LAYOUT, AND DIMENSION. EXISTING PANELS ARE
STANDARD 60-CELL PANELS INSTALLED IN 2009.
2. IF DETERMINED TO BE FEASIBLE, THE EXISTING MOUNTING HARDWARE MAY BE
REUSED. HOWEVER, VARIATIONS IN MANUFACTURERS MAY REQUIRE NEW
MOUNTING HARDWARE AND SLIGHT ADJUSTMENTS TO THE CONFIGURATION.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING IF THE EXISTING
MOUNTING HARDWARE CAN BE REUSED ACCORDING TO THE SPECIFICATIONS.
PRIOR SUBMITTALS SHOWING THE SPECIFICS OF THE EXISTING MOUNTING
HARDWARE ARE PROVIDED AS AN ATTACHMENT.
4. IF THE CONTRACTOR DETERMINES THAT THE EXISTING MOUNTING HARDWARE
CANNOT BE REUSED THE EXISTING HARDWARE SHALL BE REMOVED AND
REPLACED AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT. IN ADDITION,
EXISTING ROOF PENETRATIONS SHALL BE PATCHED.
5. THE GOVERNMENTS PREFERENCE IS TO REUSE THE EXISTING HARDWARE TO
AVOID ADDITIONAL ROOF PENETRATIONS. HOWEVER, IT IS UNDERSTOOD THAT
THAT THIS MAY NOT BE FEASIBLE DEPENDING ON THE PRODUCT CHOSEN BY THE
CONTRACTOR.
1616 0 32
HORIZ.
PV PANELS (X144)
EXISTING PV PANELS (X156)
MAINTENANCE INVERTER
(IN MEZZANINE)
WATERHOUSE INVERTER
(GROUND FLOOR))
COMBINER PANEL
MAIN SERVICE PANEL (E)
XFRM (E)
MANUAL TRANSFER SWITCH (E)
PV DISCONNECTS
GENERATOR (E)
WAREHOUSE PHOTO
MAINTENANCE WEST PHOTO
MAINTENANCE EAST PHOTO
COMBINER PANEL
ACCESS FROM AUBELL LANE VIA ELK VALLEY ROAD
2" UNDERGROUND CONDUIT
FROM WAREHOUSE TO PV DISCONNECT.
REMOVE (PULL) WIRE AND REUSE CONDUIT.
ONLY USE NEW WIRING SIZE TO MAXIMUM ALLOWED BY CODE.
IF NEW PANEL OUTPUT IS GREATER THAN WIRE CAPACITY
REDUCE NUMBER OF PV PANELS. NPS DOES NOT
INTEND TO EXCAVATE PARKING LOT.
WAREHOUSE BUILDING
MAINTENANCE BUILDING
2525 0 50
HORIZ.
MAINTENANCE
PV ARRAY
WAREHOUSE
PV ARRAY
WAREHOUSE
INVERTER
MAINTENANCE
INVERTER
PV DISCONNECTPV DISCONNECT MTS (E)
UTILITY
277/480V
3PH
MAIN SWITCH-
BOARD (E)
PV DISCONNECTPV DISCONNECT
XFMR(E)
PANEL
PMDA
277/480 V
PANEL MSB
120/208 V
ENTRY &
METERING
PANEL
BRANCH CIRCUITS
TO DISTRIBUTION
BRANCH CIRCUITS
TO DISTRIBUTION
MAIN SWITCHBOARD
(3 PANELS)
GENERATOR
MTS
PV DISCONNECTS
XFRM
1. THIS ONE-LINE DIAGRAM REPRESENTS A GENERALIZED SCHEMATIC OF EXISTING
ELECTRICAL SYSTEM. THE DIAGRAM SHOULD NOT BE TAKEN AS COMPLETE.
2. ITEMS IN HEAVIER LINE WEIGHT INDICATE THE PORTION OF THE ELECTRICAL
SYSTEM THAT ARE TO BE REPLACED (ALL COMPONENTS BETWEEN PV PANELS
AND MTS.)
3. THE GENERATOR AND TRANSFER SWITCH WERE ADDED SEVERAL YEARS AFTER
THE CONSTRUCTION OF THE BUILDINGS AND DO NOT APPEAR IN THE RECORD
DRAWINGS.
4. FIELD VERIFY CONNECTION WHICH CONNECTION EXISTS. PV PANELS ARE EITHER
CONNECTED VIA THE MANUAL TRANSFER SWITCH, OR BACK-FEED TO THE 2ND
PANEL. ORIGINAL CONNECTION WAS TO THE 2ND PANEL, HOWEVER THE
CONNECTION POINT MAY HAVE CHANGED WHEN THE GENERATOR WAS
INSTALLED. REMOVE AND REPLACE CIRCUIT BREAKER AT DETERMINED
CONNECTION POINT.
METER (E)
METER
SEE NOTE 4
| REDW 255224 BASE DESIGN-G1 |
| REDW 255224 BASE DESIGN-G2 |
| REDW 255224 BASE DESIGN-E1 |
| REDW 255224 BASE DESIGN-E2 |
File details come from the government source that posted it. Updated .