Att2_WageDeterminations.pdf
PDF 5 MB Posted
- Solicitation number
- 140R3026Q0066
About this file
This document is a Wage Determination attachment for federal contract solicitation 140R3026Q0066, establishing prevailing wage rates for heavy construction projects in Clark County, Nevada (excluding Nevada Test Site, Tonopah Test Range, and National Test and Training Range). The determination applies General Decision Number NV20260024, effective January 30, 2026, superseding NV20250024.
The wage determination specifies hourly rates and fringe benefits for multiple construction classifications. Key trades include: Electricians ($58.48 base rate with $27.62 fringes); Line Construction workers including Groundmen ($38.74), Heavy Equipment Operators ($43.04), and Linemen ($55.77), each with corresponding fringes ranging from $19.36 to $19.95; Power Equipment Operators for cranes in Groups 12-23 with rates from $65.99 to $72.38 and uniform $36.40 fringes; Power Equipment Operators for backhoe/excavator/trackhoe in Groups 4-16 ranging from $63.57 to $64.52 with $36.40 fringes; Ironworkers for reinforcing ($50.70 rate, $35.15 fringes) and structural ($46.20 rate, $34.30 fringes); Laborers with multiple classifications ($27.18-$30.55 rates, $15.02 fringes); Cement Mason/Concrete Finishers ($52.29, $19.79 fringes); and Plumbers/Pipefitters ($60.00, $26.80 fringes). The document also includes notes regarding Executive Orders 13706 and 13658 regarding paid sick leave requirements and minimum wage provisions applicable to Davis-Bacon Act contracts. An additional wage determination for Arizona heavy dam construction projects (General Decision AZ20260006) covers select counties with specified rates for boilermakers, bricklayers, carpenters, power equipment operators, ironworkers, laborers, painters, cement masons, plumbers, and truck drivers, including zone-based pay adjustments for travel distance.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modification Number
ELEC0357-010 06/01/2025
ELECTRICIAN
Publication Date 01/02/2026 01/30/2026
Rates
Excluding Low Voltage ....... $ 58.48 Low Voltage Wiring Only ..... $ 58.48
ELEC0396-001 06/01/2022
Rates
LINE CONSTRUCTION
Groundman ................... $ 38.74 Heavy Equipment Operator .... $ 43.04 Lineman ..................... $ 55.77
* ENGI0012-014 01/01/2026
POWER EQUIPMENT OPERATOR
(Crane)
Rates
GROUP 12 .................... $ 65.99
GROUP 16 .................... $ 67.41
GROUP 17 .................... $ 67.91
GROUP 19 .................... $ 69.94
GROUP 20 .................... $ 70.55
GROUP 21 .................... $ 71.16
GROUP 22 .................... $ 71. 92
GROUP 23 .................... $ 72.38
Fringes
27.62 27.62
Fringes
19.36 19.51 19.95
Fringes
36.40 36.40 36.40 36.40 36.40 36.40 36.40 36.40
GROUP 12: Crane Operator (up to including 40 ton capacity)
GROUP 16: Crane Operator (over 40 tons up to and including 79 tons)
GROUP 17: Crane Operator (Including 80 tons up to and including 150 tons)
GROUP 19: Crane Operator (over 150 tons up to and including 200 tons)
GROUP 20: Crane Operator (over 200 tons up to and including https://sam.gov/wage-detem,ination/NV20260024/1 1/7
Solicitation No. 140R3026Q0066, Attachment 2 - Wage Determinations
"General Decision Number: NV20260024 01/30/2026
Superseded General Decision Number: NV20250024
State: Nevada
Construction Type: Heavy HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
County: Clark County in Nevada.
EXCLUDES NEVADA TEST SITE (NTS), TONOPAH TEST RANGE (TTR) AND
NATIONAL TEST AND TRAINING RANGE (NTTR)
File details come from the government source that posted it. Updated .