Att02_Quality Assurance Surveillance Plan.pdf

PDF 102 KB Posted

Attached to
Hydraulic Simulator Maintenance
Solicitation number
W9098S20R0006
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. Project Title: MTS Hydraulic Simulator Maintenance

2. Work Requirements:

Engineering Support, Proprietary Repair Parts, and as needed repairs for RIA- JMTC’s hydraulic simulators.

3. Primary Method of Surveillance:

100% Inspection of services requested.

4. Performance Standards:

Must respond to all service requests within 3 days.

5. Acceptable Quality Level (AQL):

Response time must be within performance standards 100% of the time for services requested.

6. Evaluation Method:

The COR will document all calls for service requests and record the call-in time, response time, and receipt of services.

File details come from the government source that posted it. Updated .