ATT0055 CDRL TS26 Project Concurrence Memo.pdf

PDF 111 KB Posted

Attached to
TOTAL ENGINEERING AND INTEGRATION SERVICES (TEIS) IV On-Ramp Opportunity
Solicitation number
W91RUS27RA001
Issued by

About this file

This is a DD Form 1423-1, Contract Data Requirements List (CDRL), which is a federal form used to specify data deliverables required from contractors under a contract. The example provided documents a single data item requirement identified as TS26, titled "Project Concurrence Memorandum (PCM)," to be delivered under contract Sample Task 2 para 3.1.1.2, 3.2.3 to the requiring office HQUSAISEC FUE-ISE-TS. The PCM shall be developed in accordance with the CDRL and delivered as both draft and final versions as specified in the Project Notification (PN) Form, with the final PCM due five days after receipt of comments from the Technical Monitor. The memorandum must be developed using Microsoft Word with 12-point Arial font on HQUSAISEC letterhead and shall contain seven mandatory sections: Programmatic Direction and Site Impact, Project Responsibilities and Scope, Scheduling Information, Project Agreements, Points of Contact, Request for Concurrence, and supporting enclosures (floor plans, system diagrams, drawings, rack elevation). Delivery shall consist of one soft copy submitted via email to both the Technical Monitor and Contracting Officer's Representative, with the document remaining unlocked to permit government editing and copying.

The form includes distribution requirements specifying one copy each to the Technical Monitor (TM) and Contracting Officer's Representative (COR), and provides instructions for both government personnel completing the CDRL and contractors estimating costs. Contractors must classify the data item into one of four price groups (I through IV) based on the nature of the work and estimate the total price attributable solely to producing and delivering the data item, excluding any costs that would be incurred regardless of the data requirement.

View the file

Other files

File Type Posted
Section J Attachments.xlsx XLSX spreadsheet
ATT0020 TEIS IV - Draft Labor Category Descriptions.docx DOCX document
ATT0063 Past Performance Reference List (PART A).pdf PDF
ATT0066 Small Business Participation Commitment Document (SBPCD).docx DOCX document
ATT0068 Estimated Work Breakout.pdf PDF
ATT0072 DD254 Appendix B- ICD-503.pdf PDF
ATT0021 item a TEIS IV - DD254.pdf PDF
ATT0021 item b TEIS IV - DD254 Item 13 Continuation Page.pdf PDF
ATT0076 DD254 Appendix B- Army Handbook for SCI Contracts.pdf PDF
Solicitation - W91RUS27RA001.pdf PDF
ATT0009 2.5 item n DISN-EN ICAN-DI Standards Specifications v1_09f FINAL.pdf PDF
ATT0010 2.5 item f USAISEC Cyber Security Assessment and Security Engineering Manual V2.1.pdf PDF
ATT0013 CDRL A003.pdf PDF
ATT0016 CDRL A006.pdf PDF
ATT0025 1.6.1C_ESS Ports and Protocols List.xls XLS spreadsheet
ATT0027 1.6.2B_ITV CONOPS Diagrams.pdf PDF
ATT0036 CDRL SE006 Daily Project Report.pdf PDF
ATT0037 CDRL SE007 Out-Brief.pdf PDF
ATT0041 CDRL SE012 Test Data.pdf PDF
ATT0042 CDRL SE013 Data Analysis Work Products.pdf PDF
ATT0043 CDRL SE014 IAVA Compliance Report.pdf PDF
ATT0046 CDRL SE017 Documentation Evaluation Report.pdf PDF
ATT0047 CDRL SE018 POAM.pdf PDF
ATT0048 CDRL SE019 Executive Summary.pdf PDF
ATT0049 CDRL SE021 Risk Calculator.pdf PDF
ATT0050 CDRL SE022 SCAR.pdf PDF
ATT0063 Past Performance Reference List (PART A).pdf PDF
ATT0067 Joint VentureTeaming Informaiton.xlsx XLSX spreadsheet
ATT0075 DD254 Appendix B- Army Handbook for SCI Contracts.pdf PDF
Section J Attachments.xlsx XLSX spreadsheet
ATT0002 2.5 item a CO 2-2023 USAISEC OPSEC Plan.pdf PDF
ATT0003 2.5 item b 24-004 USAISEC Drafting Guide 12 March 2024.pdf PDF
ATT0004 2.5 item c 18-033 USAISEC VIS Software Design Criteria - Final 14 Mar 18.pdf PDF
ATT0006 2.5 item e 13-033-1 Instructional Guide for Developing EIPs-Final_4JUN13.pdf PDF
ATT0012 CDRL A002.pdf PDF
ATT0015 CDRL A005.pdf PDF
ATT0024 1.6.1B_ESS Network Diagram.pdf PDF
ATT0029 1.6.3A_NC HW-SW List.xlsx XLSX spreadsheet
ATT0030 1.6.3B_NC Block Diagram Layout.pdf PDF
ATT0040 CDRL SE011 eMASS upload-download.pdf PDF
ATT0052 Sample Task-Satellite Communications.docx DOCX document
ATT0054 CDRL TS25 EIP.pdf PDF
ATT0056 CDRL TS27 Systems Acceptance Test Plan.pdf PDF
ATT0061 CDRL TS08 Facility Wiring Design Criteria (FWDC).pdf PDF
ATT0062 Past Performance Information Summary (PART B).docx DOCX document
ATT0064 Past Performance Questionnaire.pdf PDF
ATT0065 CONUS High CONUS OCONUS Labor Rates.xlsx XLSX spreadsheet
ATT0066 Small Business Participation Commitment Document (SBPCD).docx DOCX document
ATT0071 DD254 Appendix B- ICD-503.pdf PDF
ATT0005 2.5 item d SIPRNET_Tech_Impl_Criteria V7 - Final 12Nov13.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: TS26
title: Project Concurrence Memorandum (PCM)
sub:
auth: N/A
ref: Sample Task 2 para 3.1.1.2, 3.2.3
req_ofc: HQUSAISEC ELIE-ISE-TS
dd250:
appcode:
dist:
freq:
asof:
firstsub:
subsub:
addressee1: TM
draft1: 1
reg1: 1
repro1:
addressee2: COR
draft2: 1
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 2
total_reg: 2
total_repro: 0
remarks: Date of first and subsequent submissions: As specified in the Government issued Project Notification (PN) Form.

Project Concurrence Memorandums (PCM) shall be developed in accordance with this CDRL and with reference to TTP 12-01. PCMs (draft and final) shall be delivered as specified in the Project Notification (PN) Form. Delivery of the FINAL PCM shall be 5 days after receipt of comments from the TM. If comments are not provided within 10 business days following delivey of the DRAFT PCM, the DRAFT will become the FINAL deliverable.

PCMs are developed using the standard format. Each section of the PCM is technically complete and written using good grammar and sentence structure. All acronyms are spelled out at the first usage. Enclosures to the PCM will not be embedded in the Word version of the PCM unless the enclosure was developed in Word or can be embedded in the PCM without loss of quality or clarity. Enclosures to the PCM are provided in both the native format and as a PDF sized to an 8-1/2” x 11” page (11”x17” is acceptable for floor plans). Unless the facility is small enough that the complete floor plan is easily readable on a page no greater tha 11”x17”, floor plans provided in support of the PCM should be excerpted to show the area of the facility being impacted and clearly annotated with the planned changes. When a PCM is developed for a similar project conducted at another location, the final PCM from the like project should be used as the template for the new PCM and updated, as required.

All PCMs shall be developed in Microsoft Word using 12 pt. Arial font. The first page of the PCM shall be on HQUSAISEC letterhead as shown in the sample. The PCM shall contain the following information:

1. Programmatic Direction and Site Impact. This paragraph states that this project is being done in response to programmatic direction, who directed the implementation or effort, and a brief overview of the project to be implemented. Subparagraphs shall be included as required to provide additional information regarding each aspect of the project, to include the impact the project will have on site operations. References to supporting drawings and enclosures shall be included in this section.

2. Project Responsibilities and Scope. This paragraph states who directed USAISEC to accomplish this project and who is responsible for providing materials and equipment. It shall address who is responsible for providing the equipment and materials required in support of the project; what standards will be followed by the installation organization; who will provide on-site engineering and acceptance test support; and address the requirement

group:
total_price:
prep_name:
line_item:
exhibit:
xtdp: Off
xtm: Off
othercat:
system:
ctr_no:
contr:
remarksb: for the development and presentation of a Technical Acceptance Recommendation (TAR). If applicable, this paragraph shall be broken out in subparagraphs, as follows:

a. Tasking

b. New Equipment Training (NET)

c. Logistics Support

3. Scheduling Information. This paragraph states what document provides the schedule, the current installation start date, and that the O&M Command will be notified of any changes to this schedule. A detailed schedule shall be identified, if applicable.

4. Project Agreements. This paragraph identifies the local O&M Command and states their responsibility for site support for the project including following up on agreements made during the site survey and via other correspondence. It also identifies other agencies that have responsibilities that must be carried through in support of the project. The subparagraphs list the specific agreements and requirements, when an action needs to be completed, why the action is required.

5. Points of Contact. Provide POC information for the government project lead, project management, logistics (if applicable), and the O&M command. Other POCs may be included, as applicable. POC listings shall include

- POC name w/ DSN phone number

- Email address

- Mailing address

- Commercial phone number

- FAX number (commercial and DSN)

6. Request for Concurrence. This paragraph requests concurrence to the PCM or changes necessary to obtain concurrence. It requests the name of the O&M Command POC for coordination purposes and specifies the date by which concurrence is required in order to minimize impacts to the installation schedule.

The number of enclosures shall be listed, as shall the signature block of the designated signing official. A list of Copy Furnished (CF) addressees shall follow the signature block.

Enclosures to the PCM shall follow the text of the PCM. All embedded drawings and figures shall be pasted as pictures (Paste Special – Picture) in order to minimize the overall file size of the document. Embedded drawing and figures shall also be provided as separate documents in their original format. Enclosures may include the following, as applicable:

- Floor Plans

- System diagrams and drawings

- Rack elevation

7. Method of delivery: One (1) soft copy of the report shall be submitted to the Technical Monitor (TM), and Contracting Officer’s Representative (COR) via e-mail. The report shall be fully identified and referenced in the subject line of the email message. The document shall not be locked or protected in any fashion that would prevent text to be copied or edited by the Government after delivery.

Page2: 2
Reset:
prep_date:
app_by:
app_date:
Page: 1
of_pages: 2
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .