This document is a drawing package for the Clear Creek Tunnel Lining Repair contract opportunity, Solicitation Number 140R2024R0013, issued by the Department of the Interior Bureau of Reclamation.
The drawings provide detailed specifications and technical requirements for the repair of the Clear Creek Power Conduit Tunnel lining. Key details include the size and dimensions of the tunnel, the materials and methods required for the lining repair, and the performance standards that must be met. The drawings also specify the required equipment, tools, and safety protocols. This contract opportunity is focused on the rehabilitation of the tunnel infrastructure to restore full operational capacity.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tr ini ty Dam
B lvd
Lewiston Lake
Lewiston Dam
Hatchery Rd
Trinity River
Clear Creek Tunnel
Trinity Fish Hatchery
Pipe gate to remain locked.
Contractor to install lock on gate for access.
Access Shaft
Intake Structure
D am
A cc es s
Boat ramp
Existing overhead utility lines Contractor to verify clearances
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
0S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
6-
8-
0-
R D
-1 .D
W G
LA
S T
S A V
ED
D A
TE
-0 8-
LA
S T
S A V
ED
B Y
A U
M S
TE
A D
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
TR
IN
IT
Y
R
IV
ER
D
IV
IS
IO
N
C
LE
A R C
R
EE
K T
U N
N
EL
TUNNEL LINING REPAIR
CONTRACTOR USE AREA
LEWISTON LAKE ACCESS
SACRAMENTO, CA
416-208-60000
2021-08-04
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL -
S. COLBURN
A. UMSTEAD
A. UMSTEAD
Colburn, Scott J P.E.
Civil Engineer
Good, Darryl R P.E.
Civil Engineer
VICINITY OF TUNNEL ACCESS
SCALE: 1" = 100'
NOTES
LEGEND
1. Reference Clear Creek Power Conduit - Access Map
2. The Contractor to maintain clear unobstructed access to the Dam, intake, intake bridge and boat ramp.
3. The Contractor will not use the Lewiston Dam or Trinity Fish Hatchery.
4. The Contractor to verify location of existing overhead utilities and clearance requirements.
Overhead Utility Poles
Overhead Utility Lines
LEWISTON DAM - PLAN VIEW
SCALE: 1" = 250'
Contractor Access
Contractor Use Area
Re le as ed
Specifications No. 20-C0908
Crys tal
Cree k R d
Crystal Creek Rd
Whiskeytown-Shasta-Trinity National Recreation Area
Pipe gate to remain locked, contractor to install lock on gate for access.
Crystal Creek Bypass Access. Contractor to provide lock.
Crystal Creek Falls The Contractor will have use of the Crystal Creek day use area. NPS will remove the picnic tables from the area for the winter.
Whiskeytown-Shasta-Trinity National Recreation Area
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
0S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
6-
8-
3-
R D
-1 .D
W G
LA
S T
S A V
ED
D A
TE
-0 8-
LA
S T
S A V
ED
B Y
A U
M S
TE
A D
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
TR
IN
IT
Y
R
IV
ER
D
IV
IS
IO
N
C
LE
A R C
R
EE
K T
U N
N
EL
TUNNEL LINING REPAIR
CONTRACTOR USE AREA
CRYSTAL CREEK BYPASS
SACRAMENTO, CA
416-208-60013
2021-08-04
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL -
S. COLBURN
A. UMSTEAD
A. UMSTEAD
Colburn, Scott J P.E.
Civil Engineer
Good, Darryl R P.E.
Civil Engineer
CRYSTAL CREEK BYPASS - PLAN VIEW
SCALE: 1" = 200'
VICINITY OF TUNNEL ACCESS
SCALE: 1" = 75'
NOTES
1. Refer to the Access Map in the informational drawings in the Specifications.
LEGEND
Contractor Access
Contractor Use Area
Re le as ed
Saw cut
2" (Typ.)
Sa w cu t
2"
Ty p.
Existing weep hole
Existing structural steel tunnel supports.
See drawing 416-D-3487 for assumed locations.
See Note 2.
Symmetrical about
Existing timber blocking Existing timber lagging
Reinforcement not shown, see 416-D-1306 for details
Drill new weep holes. Minimum 1'-0" beyond concrete lining and rock interface where directed.
Existing concrete lining
Springline
"B" Line
Existing structural steel strut.
Protect in place.
See Note 2.
Existing 2" black grout pipe.
Protect in place. Damaged concrete lining.
Remove and repair.
Concrete removal line, Typ. Saw 2" min.
deep cut around perimeter of damaged lining.
See Note 6.
Geotextile Fabric
Grout holes as directed
Concrete removal line, typ.
Saw 2" min. deep cut around perimeter of damaged lining. See Note 6.
Failure surface
Failure surface
New Gravel Drain
New Concrete
5°
'-6
" d ia
9"
5°
90°
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
0S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
6-
8-
4-
R D
-1 .D
W G
LA
S T
S A V
ED
D A
TE
-0 8-
LA
S T
S A V
ED
B Y
A U
M S
TE
A D
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
TR
IN
IT
Y
R
IV
ER
D
IV
IS
IO
N
C
LE
A R C
R
EE
K T
U N
N
EL
TUNNEL LINING REPAIR
GENERAL SECTION AND
LINING REPAIR TABLE
SACRAMENTO, CA
416-208-60014
2021-08-04
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL -
S. COLBURN
A. UMSTEAD
A. UMSTEAD
Colburn, Scott J P.E.
Civil Engineer
Good, Darryl R P.E.
Civil Engineer
0 1' 2' 3'
416-208-60015 Lining Repair Details 416-D-328 Piezometer Installation 40-D-7100 Grout Manifold for Circulating Line System 416-D-1306 Clear Creek Power Conduit - Pressure Tunnel - Reinforcement 416-D-3487 Clear Creek Power Conduit - Pressure Tunnel Repair - Location of Steel Supports Station 72+76 Through Station 269+43 - Tables
1. Refer to Specifications Section 31 74 10 Table A for repair locations.
1.a. Full depth type repairs require sawcutting and removal of existing damaged concrete and underlying gravel drain as shown on this drawing.
1.b. Shallow type repairs can be cleaned and filled with concrete.
2. The size and location of the existing features shown is assumed and may not accurately represent "as-built" conditions.
3. The repair concrete shall have a minimum 28-day compressive strength of f'c = 5000 lb/in2
4. Position locations in above table are based on clockwise locations looking downstream in the tunnel.
5. As required, provide a gravel drain beneath each repair to relieve hydrostatic pressure against the new lining and to keep water from the concrete lining placement. Maintain pumping for minimum time after concrete placement per project specifications.
6. See "Guide to Concrete Repair, 3rd Edition (2015)"; published by the Department of the Interior, Bureau of Reclamation, for additional guidance on repairing lining.
Reference Drawings
Notes
R
EV
N O
-0 8-
C ol bu rn
S co tt J
P .E
D am ag ed
C on cr et e Li ni ng t ab le d el et ed
N ot es re vi se d.
N ot e 1.
c.
a nd N ot e de le te d.
R
EV
N O
-0 8-
C ol bu rn
S co tt J
P .E
U pd at ed
N ot e nu m be rs
Re le as ed
Existing Rock Surface Replaced Gravel Drain
Grout Pipe with drilled holes
Existing 2" Black Steel Grout Pipe.
Protect in place.
Tunnel Invert
Grout Pipes. See Note 3 Existing
Concrete LiningConcrete
Lining Repair
Geotextile Fabric
Existing strut.
Protect in place.
Place gravel drain up to competent concrete
10'-0" Max
Limits of Lining Replacement
Tunnel Invert (Centerline) Existing 2" Black Steel Grout Pipe
Protect in place
Grout pipe
Concrete Lining Repair
FLOW
Existing Concrete Lining
Vent pipe with drilled holes.
(Typ)
Grout Vent
Grout pipe with drilled holes, Typ.
Cap all horizontal pipe ends, Typ.
2' -0
O r to e dg e of ex ca va tio n
2' -0
O r to e dg e of ex ca va tio n
Weep hole.
See Note 5. (Typ)
Weep hole.
See Note 5
4"
4"
10'-0" Max
Existing Rock Surface
Replaced Gravel Drain (Typ)
Tunnel Invert
Grout Pipe
Geotextile Fabric.
See Note 2
FLOW
Existing Concrete
Lining
Existing Gravel Drain
Existing 2" Black Steel Grout Pipe
Concrete Lining Repair
Geotextile Fabric
See Note 3
Vent Pipe
2" See Note 4
See Note 3
Geotextile Fabric.
See Note 2
Weep Hole.
See Note 5
Weep Hole.
See Note 5
2" - See Note 4
Connection to grout manifold
Handles Mechanical squeeze packer
Tee Closure Valve
Geotextile Fabric
2-inch diameter PVC Pipe
Unreinforced concrete lining repair
See Note 3
Gravel Drain
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
0S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
6-
8-
5-
R D
-1 .D
W G
LA
S T
S A V
ED
D A
TE
-0 8-
LA
S T
S A V
ED
B Y
A U
M S
TE
A D
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
TR
IN
IT
Y
R
IV
ER
D
IV
IS
IO
N
C
LE
A R C
R
EE
K T
U N
N
EL
TUNNEL LINING REPAIR
LINING REPAIR
PARTIAL PLAN,
SECTIONS AND DETAILS
SACRAMENTO, CA
416-208-60015
2021-08-04
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL -
S. COLBURN
A. UMSTEAD
A. UMSTEAD
Colburn, Scott J P.E.
Civil Engineer
Good, Darryl R P.E.
Civil Engineer
416-208-60014 General Section and Repair Table 40-D-7100 Grout Manifold for Circulating Line System
1. See Specifications for additional repair information.
2. Wrap geotextile fabric completely around the longitudinal ends of the gravel drain and weight the fabric in place to prevent grout backfill from escaping into the existing gravel drain.
3. Vertical vent and grout pipes to extend above tunnel invert. Do not cap vertical pipes extending up out of the lining. See Specifications for additional information.
4. Horizontal vent grout pipes to be 2 inches below the concrete lining. The horizontal grout pipes to be 2 inches from the bottom of gravel drain. Cap all horizontal grout pipes.
5. A minimum of 2 weep holes to be drilled at each full depth repair.
One on the upstream side at 7 O'clock and one on the downstream side at 5 O'clock. Additional weep holes may be needed per actual field conditions at the direction of COR.
PARTIAL PLAN - LINING REPAIR AREAS
NOT TO SCALE
Reference Drawings
Notes
Re le as ed
Specifications No. 20-C0908
Specifications N
o. 20-C0908
File details come from the government source that posted it. Updated .