SUMMARY
OFFEROR/COMPANY NAME:
| TAB | SUMMARY | SUMMARY | CLIN | Total Labor (MH) | Labor Cost | Material Cost | ODC Cost | Proposed Price |
| SOLICITATION NO: | | N6264926RA016 | CLIN 0001(8 TGIs) | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| SHIP NAME: | | USS ROBERT SMALLS (CG62) 6A1 Bundle-1 | CLIN 0002 (Growth CLIN) | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| AVAILABILITY: | | 6A1 Bundle-1 | Total for All CLIN | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Total TGIs (Specify Total) | 8 | Total Evaluated Price | ¥0 |
| Growth CLIN % | 8.95% | | |
| Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary. | | | | | | | | | |
| No. | TGI No. | DESCRIPTION | Proposed Labor | | | | Material/ODCs | | Proposed Price (JPY) |
| | | In-House Labor (MH) | Sub-Contractor Labor (MH) | Total Labor (MH) | Overall Total Labor Cost (JPY) | Material Cost (JPY) | ODC (JPY) | |
| 1 | 38CHV59345-A01 | ACCOMPLISH CHEMICAL FLUSH OF FWD CHT PIPING SYSTEM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 2 | 38CHV59345-T01 | SEWAGE SYS (T & OP), CHEM FLUSH - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 3 | 38CHV59346-A01 | ACCOMPLISH CHEMICAL FLUSH AND REPLACEMENT OF MID CHT PP | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 4 | 38CHV59346-T01 | SEWAGE SYS (T & OP), CHEM FLUSH MID - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 5 | 38CHV59350-A01 | REPLACE CHT DISHCARGE PIPING IN 2-346-01-L | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 6 | 38CHV59350-T01 | CU PHASE TITLE: SEWAGE SYS (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 7 | 38CHV86541-A01 | INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 8 | 38CHV86543-A01 | INSTALL AND REMOVE SCAFFOLDING TO/FROM AN/SPY-1B ANT ARRAY FOR S/F WORK | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 9 | | | | | | | | | |
| 10 | | | | | | | | | |
| 11 | | | | | | | | | |
| 12 | | | | | | | | | |
| 13 | | | | | | | | | |
| 14 | | | | | | | | | |
| 15 | | | | | | | | | |
| 16 | | | | | | | | | |
| 17 | | | | | | | | | |
| 18 | | | | | | | | | |
| 19 | | | | | | | | | |
| 20 | | | | | | | | | |
| 21 | | | | | | | | | |
| 22 | | | | | | | | | |
| 23 | | | | | | | | | |
| 24 | | | | | | | | | |
| 25 | | | | | | | | | |
| 26 | | | | | | | | | |
| 27 | | | | | | | | | |
| 28 | | | | | | | | | |
| 29 | | | | | | | | | |
| 30 | | | | | | | | | |
| 31 | | | | | | | | | |
| 32 | | | | | | | | | |
| 33 | | | | | | | | | |
| 34 | | | | | | | | | |
| 35 | | | | | | | | | |
| 36 | | | | | | | | | |
| 37 | | | | | | | | | |
| 38 | | | | | | | | | |
| 39 | | | | | | | | | |
| 40 | | | | | | | | | |
| 41 | | | | | | | | | |
| 42 | | | | | | | | | |
| 43 | | | | | | | | | |
| 44 | | | | | | | | | |
| 45 | | | | | | | | | |
| 46 | | | | | | | | | |
| 47 | | | | | | | | | |
| 48 | | | | | | | | | |
| 49 | | | | | | | | | |
| 50 | | | | | | | | | |
| 51 | | | | | | | | | |
| 52 | | | | | | | | | |
| 53 | | | | | | | | | |
| 54 | | | | | | | | | |
| 55 | | | | | | | | | |
| 56 | | | | | | | | | |
| 57 | | | | | | | | | |
| 58 | | | | | | | | | |
| 59 | | | | | | | | | |
| 60 | | | | | | | | | |
| 61 | | | | | | | | | |
| 62 | | | | | | | | | |
| 63 | | | | | | | | | |
| 64 | | | | | | | | | |
| 65 | | | | | | | | | |
| 66 | | | | | | | | | |
| 67 | | | | | | | | | |
| 68 | | | | | | | | | |
| 69 | | | | | | | | | |
| 70 | | | | | | | | | |
| 71 | | | | | | | | | |
| 72 | | | | | | | | | |
| 73 | | | | | | | | | |
| 74 | | | | | | | | | |
| 75 | | | | | | | | | |
| 76 | | | | | | | | | |
| 77 | | | | | | | | | |
| 78 | | | | | | | | | |
| 79 | | | | | | | | | |
| 80 | | | | | | | | | |
| 81 | | | | | | | | | |
| 82 | | | | | | | | | |
| 83 | | | | | | | | | |
| 84 | | | | | | | | | |
| 85 | | | | | | | | | |
| 86 | | | | | | | | | |
| 87 | | | | | | | | | |
| 88 | | | | | | | | | |
| 89 | | | | | | | | | |
| 90 | | | | | | | | | |
| 91 | | | | | | | | | |
| 92 | | | | | | | | | |
| 93 | | | | | | | | | |
| 94 | | | | | | | | | |
| 95 | | | | | | | | | |
| 96 | | | | | | | | | |
| 97 | | | | | | | | | |
| 98 | | | | | | | | | |
| 99 | | | | | | | | | |
| 100 | | | | | | | | | |
1_38CHV59345-A01
| SHIP NAME/AVAILABILITY: | USS ROBERT SMALLS (CG62) 6A1 Bundle-1 - 6A1 Bundle-1 | | | | | TGI 1_38CHV59345-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA016 | | | | | | | | | | |
| SRF-JRMC TGI #: | 1_38CHV59345-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | ACCOMPLISH CHEMICAL FLUSH OF FWD CHT PIPING SYSTEM | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
HOURS
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
2_38CHV59345-T01
| SHIP NAME/AVAILABILITY: | USS ROBERT SMALLS (CG62) 6A1 Bundle-1 - 6A1 Bundle-1 | | | | | TGI 2_38CHV59345-T01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA016 | | | | | | | | | | |
| SRF-JRMC TGI #: | 2_38CHV59345-T01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | SEWAGE SYS (T & OP), CHEM FLUSH - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
3_38CHV59346-A01
| SHIP NAME/AVAILABILITY: | USS ROBERT SMALLS (CG62) 6A1 Bundle-1 - 6A1 Bundle-1 | | | | | TGI 3_38CHV59346-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA016 | | | | | | | | | | |
| SRF-JRMC TGI #: | 3_38CHV59346-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | ACCOMPLISH CHEMICAL FLUSH AND REPLACEMENT OF MID CHT PP | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
4_38CHV59346-T01
| SHIP NAME/AVAILABILITY: | USS ROBERT SMALLS (CG62) 6A1 Bundle-1 - 6A1 Bundle-1 | | | | | TGI 4_38CHV59346-T01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA016 | | | | | | | | | | |
| SRF-JRMC TGI #: | 4_38CHV59346-T01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | SEWAGE SYS (T & OP), CHEM FLUSH MID - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
5_38CHV59350-A01
| SHIP NAME/AVAILABILITY: | USS ROBERT SMALLS (CG62) 6A1 Bundle-1 - 6A1 Bundle-1 | | | | | TGI 5_38CHV59350-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA016 | | | | | | | | | | |
| SRF-JRMC TGI #: | 5_38CHV59350-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | REPLACE CHT DISHCARGE PIPING IN 2-346-01-L | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
6_38CHV59350-T01
| SHIP NAME/AVAILABILITY: | USS ROBERT SMALLS (CG62) 6A1 Bundle-1 - 6A1 Bundle-1 | | | | | TGI 6_38CHV59350-T01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA016 | | | | | | | | | | |
| SRF-JRMC TGI #: | 6_38CHV59350-T01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE TITLE: SEWAGE SYS (T & OP) - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
7_38CHV86541-A01
| SHIP NAME/AVAILABILITY: | USS ROBERT SMALLS (CG62) 6A1 Bundle-1 - 6A1 Bundle-1 | | | | | TGI 7_38CHV86541-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA016 | | | | | | | | | | |
| SRF-JRMC TGI #: | 7_38CHV86541-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
8_38CHV86543-A01
| SHIP NAME/AVAILABILITY: | USS ROBERT SMALLS (CG62) 6A1 Bundle-1 - 6A1 Bundle-1 | | | | | TGI 8_38CHV86543-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA016 | | | | | | | | | | |
| SRF-JRMC TGI #: | 8_38CHV86543-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | INSTALL AND REMOVE SCAFFOLDING TO/FROM AN/SPY-1B ANT ARRAY FOR S/F WORK | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0