ATT H-KWA-FY17-FAC 962-Tank 6-FINAL.pdf
PDF 7 MB Posted
- Attached to
- Above Ground Storage Tank Inspection - Kwajalein
- Solicitation number
- W9128F22Q0075
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question 6.21.2022.pdf | ||
| Question 6.14.2022.pdf | ||
| W9128F22Q0075 KWA.pdf | ||
| ATT F-KWA-FY11-FAC 962-Tank 6-FINAL.pdf | ||
| ATT G-KWA-FY12-FAC 962-Tank 6-FINAL.pdf | ||
| ATT E-API In-Service Template.pdf | ||
| ATT D-Monthly Contractors Progress Management and Status Tool.xlsx | XLSX spreadsheet | |
| ATT C-Fuel Storage Tank Excel Document.xlsx | XLSX spreadsheet | |
| ATT A-General Installation Security Requirements.pdf | ||
| ATT B-KWA-FAC 962-Tank 6-30 MAR 22.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| US | Army | Corps | of | Engineers |
| Omaha | District |
| API | 653 | In‐Service |
| Inspection | Report |
| U.S. | Army | Garrison | Kwajalein | Atoll |
| Facility | Number | 962 | ||
| Tank | Number | 6 |
| US | Army | Corps | of | Engineers | Center | of | Expertise | for | Petroleum, | Oils, | and | Lubricants |
| (USACE | POL‐MCX) | |||||||||||
| September | 29, | 2017 |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| Table | of | Contents |
| ACRONYMS | AND | ABBREVIATIONS .............................................................................................................................................. 3 |
GENERAL SUMMARY
INSPECTION DATE
STATE REGULATIONS
PREVIOUS INSPECTION DATES
RECOMMENDED FUTURE INSPECTION DATES (CALCULATIONS SHALL BE PROVIDED)
GENERAL TANK INFORMATION
A. GENERAL PROJECT INFORMATION
1. API 653 Inspection
2. Site Information
B. TANK INSPECTION COMMENTS
1. Tank Construction
2. Tank Foundation
3. Tank Shell
4. Tank Appurtenances
5. Tank Coating
6. Tank Piping System
7. Fire Protection System
8. Secondary Containment
9. Cathodic Protection
C. FINDINGS AND RECOMMENDATIONS
1. MANDATORY REPAIRS per API 653, UFC 3‐460‐01, or AW 78‐24‐27 Standards
2. REQUIRED REPAIRS to Fully Comply with API 653 or Federal, State, and Local Codes…………………………………..11
3. RECOMMENDED REPAIRS as Part of Regular Maintenance………………………………………………………………………….23
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS…………………………………………………………………………...32
A.1 SHELL SERVICE LIFE EVALUATION
A.2 SHELL SETTLEMENT EVALUATION
A.3 ULTRASONIC UT DATA
A.4 CONTAINMENT LAYOUT DRAWING
A.5 SHELL LAYOUT DRAWING
A.6 OSHA ACCESS STRUCTURE REPORT
APPENDIX B: 3‐D DOCUMENTATION AND ANALYSIS
APPENDIX C: API 653 CHECKLISTS FOR TANK INSPECTIONS
APPENDIX D: PHOTOGRAPHS
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
ACRONYMS AND ABBREVIATIONS
API American Petroleum Institute
ASME American Society of Mechanical Engineers
ASNT American Society of Non‐Destructive Testing
ARD Anti‐rotation device
ATG Automatic Tank Gauge
BBL Barrel
CFR Code of Federal Regulations
CP Cathodic Protection
DFT Dry Film Thickness
HLA High Level Alarm
HLCS High Level Control Shutoff
HHLA High‐High Level Alarm
LLA Low Level Alarm
LLLA Low‐Low Level Alarm
MFL Magnetic Flux Leakage
MT Magnetic Particle Testing
NACE National Association of Corrosion Engineers
NDT Non‐Destructive Testing
NFPA National Fire Protection Association
PSI Pounds per Square Inch
PT Penetrant Testing
P/V Pressure/Vacuum
RP Recommended Practice
PST Product Saver Tank
RT Radiography Testing
TML Thickness Measurement Location
TRV Thermal Relief Valve
UFC Unified Facilities Criteria
UFGS Unified Facilities Guide Specifications
ULS Ultra Low Sulfur
UT Ultrasonic Testing
VT Visual Testing
VPI Valve Position Indicator
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| GENERAL | SUMMARY | |
| Summary | of | Inspection |
| An | API | Standard | 653 | In‐Service | inspection | of | Tank | 6 | (Facility | 962) | at | USAG | Kwajalein‐Atoll, | Republic | of | the | |
| Marshall | Islands | was | completed | on | September | 29, | 2017 | to | evaluate | the | tank’s | integrity, | collect | data, | and | establish | a |
| database | for | future | inspections | and | evaluations. | The | shell | service | life | evaluation | performed | as | having | greater | than | ||
| 30 | years | of | remaining | shell | life | under | current | conditions. | Inspection | Results | are | listed | in | Section | C. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| INSPECTION | DATE | ||||||
| API | In‐Service | (External) | Inspection | Date: | 29 | September | 2017 |
Equipment (s) Used:
| Ultrasonic | Thickness | (A‐scan/B‐scan) | Testing | ||||||||
| Manufacturer: | General | Electric | |||||||||
| Model: | DMS | Go+ | |||||||||
| Calibration | Methods | Used: | Zeroing | Procedure, | Copper | Coating | Calibration | Procedure, | and | Two | Point |
Calibration Procedure
| Tank | Settlement | Surveying | ||||||||||||
| Manufacturer: | Northwest | Instrument | ||||||||||||
| Model: | NRL802K | Rotating | with | NLD5G | Laser | Receiver | ||||||||
| Calibration | Methods | Used: | Main | and | transverse | horizontal | axes | checks | at | 100 | ft. | ≤ | 1/16 | inch |
| Tank | Shell | Surveying | ||||||||||||
| Manufacturer: | Leica | Geosystem | ||||||||||||
| Model: | 3D | Disto | ||||||||||||
| Calibration | Methods | Used: | Tilt | sensor | calibration | automatically | performed | with | unit | set | at | < | 3° | and |
crosshairs calibration using target at a distance > 25 m
Inspector(s): Benyam Berhane
| STATE | REGULATIONS | |||||||
| State | Regulation | for | API | In‐Service | Tank | Inspections | N/A | |
| State | Regulation | for | API | Out‐of‐Service | Tank | Inspections | N/A |
| NOTE: | If | there | are | no | state | regulations | for | tank | inspections, | then | N/A | shall | reside | in‐place | of | the | number | of | years |
| between | inspections. | If | state | regulations | reside, | the | recommended | future | inspection | dates | shall | be | based | on | |||||
| whichever | is | more | stringent | between | the | API | inspector’s | calculations | and | the | state | regulations. |
| PREVIOUS | INSPECTION | DATES | ||||||||||
| API | Out‐of‐Service | (Internal) | Inspection | Date: | 21 | March | 2010 | |||||
| API | In‐Service | (External) | Inspection | Date: | 21 | March | 2010 | (No | record | of | 2015 | Inspection) |
| RECOMMENDED | FUTURE | INSPECTION | DATES | (CALCULATIONS | SHALL | BE | PROVIDED) | |||||
| API | Out‐of‐Service | (Internal) | Inspection | Date: | 21 | March | 2037 | Per | API | 653 | Section | 6.4.2‐Initial |
service for refurbished AST (21 March 2020 IAW
UFC)
API In‐Service (External) Inspection Date: 29 September 2022
| Benyam | Berhane | ||||
| Mechanical | Engineer/Sr. | Inspector | |||
| InterSpec, | LLC | ||||
| API | 653 | Certified | Inspector | No. | 28492 |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
GENERAL TANK INFORMATION
| ITEM | DESCRIPTION | |||||||
| Owner | U.S | Army | ||||||
| Location | U.S. | Army | Garrison | Kwajalein | Atoll; | RMI | ||
| Facility | Number | 962 | ||||||
| Tank | Number | 6 | ||||||
| State | / | Country | Kwajalein | Atoll | / Republic | of | Marshall | Islands |
| City | ‐ | |||||||
| Inspection | Date | 29 | September | 2017 | ||||
| Tank | Manufacturer | Unknown | ||||||
| Design | Standard | Unknown | (Assumed | API | STD | 12C | Eleventh | Edition) |
| Date | of | Construction | 1954 | |||||
| Tank | Contents | JP‐5 | (F‐44) | |||||
| Tank | Serial | Number | None | |||||
| Tank | Diameter | 60 | Feet | |||||
| Shell | Height | 54 | Feet | |||||
| Product | Height | 49.5 | Feet | |||||
| Tank | Capacity | 27,500 | BBL | (1,134,000 | gallons) | |||
| Foundation | Concrete | Ring | Wall |
Construction
Bottom Lap‐Welded (Cone‐Down)
Shell Butt‐Welded (Cylindrical)
Floating Roof None
Fixed Roof Aluminum Geodesic Dome
Material
Bottom Carbon Steel (Unknown Specification)
Shell Carbon Steel (Unknown Specification)
Floating Roof NA
| Fixed | Roof | Aluminum | (Unknown | Specification) | ||||||||||
| Cathodic | Protection | Impressed | Current | |||||||||||
| Interior | Coating | System | Thin | Film | Epoxy | (Completed | April | 2012) | ||||||
| Exterior | Coating | System | Thin | Film | Epoxy/ | Polyurethane (Completed | May | 2012) | ||||||
| Level | Gauging | ENRAF | Automatic | Tank | Gauge | with | Shand | & | Jurs | 92021 | Mechanical | Tape |
| Overfill | Protection | |||||||||
| Hydraulically | Operated | High | Level | Shut‐Off | Valve | with | Dedicated | Float | (Set | at |
| 48.375 | Feet) |
| Piping | Receipt | 8" | Carbon | Steel | ||
| Issue | 6" | Carbon | Steel | |||
| Low | Suction | 6” | Carbon | Steel | ||
| Water | Draw‐Off | 1" | Carbon | Steel |
Level Alarms
| Low‐Level | Alarm: | 7.20 Feet | ||
| Low‐Low | Level | Alarm: | 2.40 | Feet |
| High‐Level | Alarm: | 47.875 | Feet | |
| High‐High | Level | Alarm: | 48.875 | Feet |
| High‐Level | Control | Shutoff: | 48.375 | Feet |
Type of Internal Floating Roof
NA
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
A. GENERAL PROJECT INFORMATION
| 1. API | 653 | Inspection | ||||||||||||
| This | project | will | perform | API | 653 | inspections | of | various | tanks | at | facilities | throughout | the | United |
| States/OCONUS. | Additional | consideration | is | given | to | federal, | state, | and | local | regulations, | as | well | as | |
| applicable | military | criteria | and | general | industry | standards. |
An API Standard 653 In‐Service (External) inspection was performed on Tank 6 (FAC 962).
| 2. Site | Information | ||||||||||||||||||
| On | September | 29, | 2017 | Burns | & | McDonnell | and | our | sub‐consultant | (InterSpec) | performed | an | API | 653 | |||||
| In‐Service | (External) | inspection | of | Tank | 6 | (Facility | 962) | located | at | U.S. | Army | Garrison | Kwajalein | Atoll, | |||||
| RMI. | USAG | Kwajalein | Atoll | (USAG‐KA) | is | home | to | the | Ronald | Reagan | Ballistic | Missile | Defense | Test | Site. | ||||
| The | Reagan | Test | Site | is | a | Major | Range | and | Test | Facility | Base | under | the | DoD | with | the | primary | mission | of |
| researching, | developing | tests, | and | developing | missile | defense | and | space | programs. |
Tank 6 is used as an aboveground JP‐5 fuel storage tank supporting the installation fueling needs.
B. TANK INSPECTION COMMENTS
| 1. Tank | Construction | |||||||||||||||
| Tank | 6 | (FAC | 962) | is | a | nominal | 27,500 | BBL, | 60‐foot | diameter | by | 54‐foot | tall, | F‐44 | (JP‐5), | aboveground |
| vertical | storage | tank. | The | tank | was | constructed | in | 1954 | presumably | to | API | STD | 12C | Eleventh | Edition. | |
| There | are | no | data | or | name | plates | affixed | on | the | tank. | The | tank | has | undergone | several | modifications, |
| including | the | addition | of | a | new | tank | bottom | in | 2012. | Additionally, | modifications | including | level | alarms, | ||
| a | high | liquid | level | shut‐off | system, | additional | aluminum | stilling | wells, | shell | patch | repairs/removal, | and | |||
| internal | pipe | support | modification | were | noted | as | some | of | the | alterations. |
| 2. Tank | Foundation | ||||||||||||||||||
| The | tank | sits | on | a | concrete | ring | wall | foundation | that | is | approximately | 10" | above | the | containment | floor. | |||
| The | foundation | is | designed | with | a | leak | detection | (tell‐tale) | system | that | presumably | extends | to | the | |||||
| center | of | the | tank | (design | drawings | were | not | available | at | the | time | of | the | inspection). | It | is | reported | as | |
| having | a | flexible | membrane | liner | (FML) | for | the | secondary | containment | attached | to | the | foundation | with | |||||
| batten | strips. | Accessible | sections | of | the | foundation | were | visually | evaluated | during | the | inspection | for | ||||||
| broken | concrete, | spalling, | cracks, | and | vegetation | against | the | bottom | of | the | tank. | No | spalling | and | |||||
| vegetation | were | present. | There | is | minor | vegetation | from | the | earthen | secondary | containment | ||||||||
| encroaching | towards | the | foundation‐to‐bottom | interface. | The | foundation | to | chime | interface | is | sealed, | ||||||||
| and | no | caulking | deterioration | was | identified. | Shell | settlement | surveys | were | performed | during | the | |||||||
| inspection | in | accordance | with | Annex | B | of | API | Standard | 653. | Settlement | results | are | listed | in | Appendix | A. | |||
| There | is | no | indication | of | significant | settlement. | Overall, | the | foundation | appears | to | be | is | in | satisfactory | ||||
| condition | (A | small | section | of | the | foundation | is | accessible | for | inspection). |
| 3. Tank | Shell | ||||||||||||||||
| The | tank | shell | is | constructed | from | carbon | steel | material | of | an | unknown | specification. | The | shell | is | of | |
| cylindrical | design, | butt‐welded | together, | and | consisting | of | eight | (8) | courses | with | one | angle | stiffening‐ | ||||
| ring | approximately | 15" | from | the | top | of | the | shell. | Evaluated | the | shell | for | plumbness, | roundness, | peaking, | ||
| and | banding; | all | of | which | were | found | to | be | within | the | allowable | tolerances | of | the | API | Standard | 653. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| Visually | inspected | the | exterior | of | the | shell. | Inspected | the | coating | for | dis‐bonding, | adhesion, | |||||||
| deterioration, | and | discoloration. | The | tank | shell | is | equipped | with | two | 36" | manholes | (180° | apart) | and | an | ||||
| additional | 30" | manhole. | The | tank | is | equipped | with | a | shell | mounted | low | level | alarm | and | high‐high | level | |||
| alarms, | as | well | as | a | high‐level | shut‐off. | The | shell | was | evaluated | for | remaining | metal | thickness | utilizing | ||||
| ultrasonic | technology. | The | ultrasonic | thickness | measurements | and | thickness | measurement | locations | ||||||||||
| (TML) | are | listed | in | the | Shell | Plate | Thickness | Measurements | table | in | Appendix | A. | Three | areas | of | ||||
| laminations | were | located | on | tank | shell | on | plate | number | 1‐2 | (See | Shell | Layout | Drawing | in | Appendix | A | |||
| for | location). | Lamination | is | formed | within | the | metal | sheet | when | a | discontinuity | present | in | the | metal, | ||||
| such | as | porosity | or | inclusions | trapped | in | the | slab, | are | elongated | in | the | direction | of | rolling | during | the | ||
| steel | manufacturing | process. | The | laminations | are | all | less | than | 0.75" | based | on | the | B‐Scan | ultrasonic | data | ||||
| and | are | within | acceptable | limits | of | the | current | API | STD | 650 | section | 6.2.4. | Evaluate | if | any | hot | work | is | |
| performed | at | these | location | in | the | future; | otherwise, | monitor | at | the | next | API | STD | 653 | UT | inspection | |||
| interval. | A | service | life | evaluation | performed | shows | the | shell | with | greater | than | 30 | years | of | remaining | ||||
| life | under | current | conditions. | The | engineering | calculations, | as | per | API | Standard | 653, | for | the | service | life | ||||
| evaluation | are | shown | in | Appendix | A | under | “Service | Life | Evaluation.” | The | tank | shell | is | in | satisfactory | ||||
| mechanical | condition. |
| 4. Tank | Appurtenances | |
| a. Geodesic | Dome | Roof |
| This | tank | is | retrofitted | with | a | clear‐span | aluminum | dome | cover | manufactured | by | ||||
| Conservatek | Industries. | It | is | an | aluminum | geodesic | dome | roof | that | was | retrofitted | to | this | ||
| tank | sometime | in | 1994. | The | dome | is | joined | with | stainless | steel | fasteners | with | an | ||
| interlocking | panel | that | has | an | enclosed | gasket | in | compression | for | a | mechanical | seal. | The | ||
| batten | bars | and | gusset | cover | are | sealed | with | caulking | (external | joint | seals). | There | is | minor | |
| to | moderate | caulking | deterioration | and | signs | of | standing | water | on | the | geodesic | roof | panels. | ||
| Inspection | of | the | dome | roof | is | limited | to | what | is | accessible | from | the | platform. |
b. Gauging
| The | tank’s | Enraf | (Model | # | 854) | ATG | is | installed | through | an | 8‐inch | aluminum | stilling | well. | |||
| The | stilling | well | is | slotted. | The | Enraf | system | was | not | in | working | order | at | the | time | of | the |
| inspection. | There | is | no | manual | gauging | and | sampling | well, | but | it | appears | this | action | is | |||
| performed | via | the | geodesic | roof | access | hatch. | A | separate | slotted | 8‐inch | carbon | steel | well | is | |||
| used | for | the | ATG | water | probe. | The | tank | is | equipped | with | a | float | and | tape | type | mechanical | |
| tape | gauge | manufactured | by | Shand | & | Jurs | (Model | 92021). | The | system | is | not | in | good | |||
| working | condition. |
| c. Level | Alarms | ||||||||||||||
| The | high | level | alarm, | the | HLV | float | chamber, | and | the | high‐high | level | alarm | are | mounted | on |
| the | shell | and | are | accessible | via | the | circumferential | stairway. | The | tank | is | equipped | with | a | |
| low‐level | alarm, | but | no | independent | low‐low | level | alarm | system | was | installed, | as | required | |||
| by | military | criteria. |
| d. Stairs | and | Platforms | |||||||||||||
| The | tank’s | fixed | roof | is | accessible | by | a | circumferential | stairway | mounted | on | the | shell | of | the |
| tank | with | a | top | platform. | The | stairs | and | platform | were | inspected | for | corrosion | and | ||
| structural | soundness. | The | stairway | handrail | is | constructed | with | 1½" | angle | iron | handrails | ||||
| and | coated | steel | plate | treads | with | non‐slip | profile. | The | top | platform | is | a | galvanized | grating |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| type, | and | several | stairway | treads | were | replaced | in | the | past | with | carbon | steel | grating. | The |
| overall | general | condition | of | the | stairs | and | platform | are | mostly | satisfactory | (with | some | ||
| exception | – | See | Section | C). |
| e. Grounding | and | Bonding | ||||||||||||
| There | is | one | grounding | cable | mechanically | connected | to | lug | on | the | tank’s | shell. | The | |
| grounding | rod | penetrates | through | the | secondary | containment | floor | liner | and | is | attached | to | ||
| a | grounding | cable. | The | tank | is | not | equipped | with | a | copper | grounding | bar | for | personnel |
| static | electric | discharge | (typically | required | by | military | criteria). |
| 5. Tank | Coating | |||||||||||||||
| The | tank | shell, | stairway, | handrails, | piping, | and | appurtenances | are | coated. | The | exterior | coating | is | an | ||
| epoxy | with | a | polyurethane | top | completed | in | May | 2012. | The | exterior | shell | coating | is | mostly | satisfactory | |
| with | isolated | coating | failures | near | the | appurtenances. | Isolated | coating | failure | was | noted | on | the | |||
| appurtenances, | product | piping, | and | valves | within | the | secondary | containment. |
| 6. Tank | Piping | System | ||||||||||||||||
| The | fuel | is | received | through | 8‐inch | carbon | steel | piping | , | and | product | is | issued | from | the | tank | through | a |
| 6‐inch | carbon | steel | pipe. | The | tank | is | also | equipped | with | other | auxiliary | piping | for | the | water | draw | (NPS | |
| 1) attached | to | a | product | saver | tank | (PST) | and | a | 6‐inch | low | suction | piping | that | terminates | to | a | Camlock | |
| fitting | adjacent | to | the | PST. | Inspected | and | evaluated | each | tank | nozzle | in | accordance | with | API | Standards | |||
| 650 | and | 653. | Identified | the | type | and | use | of | each | shell | nozzle | and | measured | the | nozzle | neck | thickness | |
| on | all | accessible | shell | nozzles. | Evaluated | all | nozzles | and | reinforcement | plates | for | leaks | and | corrosion. |
| 7. Fire | Protection | System | |||||||||||||||
| The | storage | tank | is | equipped | with | a | surface | application | fixed | foam | fire | suppression | system | that | uses | a | |
| mobile | foam | supply. | One | NPS | 8 | foam | chamber | is | mounted | approximately | 24 | inches | down | from | the | top | |
| of | the | tank | on | shell | course | eight. | All | Victaulic | couplings | for | the | fire | suppression | system | piping | have | |
| deteriorated | fasteners. | Serval | locations | have | completely | failed | couplings. | No | fire | hydrants | were | noted | |||||
| near | the | tank | during | the | inspection. |
| 8. Secondary | Containment | |||||||||||||||||||
| The | tank | sits | inside | an | earthen | secondary | containment | basin | with | a | geotextile | liner | positioned | |||||||
| approximately | eight | to | ten | inches | below | the | soil | and | concrete | dike | walls. | The | overall | dimension | of | the | ||||
| secondary | containment | is | 189.67 | feet | x | 129.33 | feet, | with | a | vertical | height | of | 72.125" | (to | top | soil). | The | |||
| secondary | containment | is | equipped | with | a | 6" | drain | inlet | and | a | drain | valve | that | tie | to | the | underground | |||
| PVC | piping | system | to | the | OWS. | The | secondary | containment | release | valve | is | housed | inside | a | valve | pit | ||||
| adjacent | to | the | drain | inlet | within | the | dike. | The | PVC | piping | system | is | manifolded | together | and | cannot | be | |||
| individually | isolated | outside | of | the | valve | pit. | The | drain | line, | the | drain | inlet, | and | valve | pit | were | visually | |||
| evaluated | to | determine | if | the | drainage | system | is | liquid‐tight. | The | valve | pit | has | rain | covers, | but | standing | ||||
| water | was | noted | in | the | valve | pit. | Additional | testing | and | evaluation | may | be | required | to | determine | if | the | |||
| valve | pit | is | liquid‐tight. | The | liquid | in | the | valve | pit | was | lower | than | the | liquid | in | the | adjacent | drain | inlet | |
| and | thus | suggests | that | the | drain | inlet | is | satisfactory. | However | the | source | of | the | standing | water | in | the | |||
| valve | pit | should | be | determined. |
| The | secondary | containment | was | visually | evaluated | during | the | inspection | for | broken | concrete, | spalling, | |||||
| cracks, | and | vegetation | growth. | Minor | hairline | cracks | (temperature | cracks) | and | some | moderate | cracks | |||||
| were | noted | in | the | secondary | containment | wall. | An | approximate | total | of | 183 | linear | feet | of | cracks | in | the |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| secondary | containment | wall | were | identified. | Hairline | cracks | do | not | seriously | affect | the | strength | of | the | ||
| concrete | structures; | however, | these | cracks | can | be | potential | access | points | for | moisture | or | water | |||
| seepage | that | could | corrode | the | reinforcing | steel | (rebar). | There | are | several | CP | test | port/anode | access | ||
| PVC | openings | around | the | perimeter | of | the | tank | that | penetrate | the | FML. | Some | of | these | PVC | openings |
| have | deteriorated | caulking. | The | secondary | containment | is | in | mostly | satisfactory | mechanical | condition, | |||||
| with | the | exception | of | the | discrepancies | identified | in | Section | C | below. | Field | assessment | indicates | that | ||
| the | secondary | containment | is | of | sufficient | size | to | contain | a | total | tank | loss. | The | secondary | containment | |
| is | partially | sloped | to | allow | for | drainage | away | from | the | tank. |
| A | formal | secondary | containment | evaluation, | in | accordance | with | 40 | CFR | 112, | may | be | required | in | order |
| to | satisfy | federal, | state, | and | local | requirements. |
| 9. Cathodic | Protection | ||||||||||||||||||
| A | new | impressed | current | Cathodic | Protection | (CP) | system | was | installed | on | this | tank | during | the | tank | ||||
| bottom | repair | project | in | 2012. | The | CP | system | is | manufactured | by | Universal | Rectifiers, | Inc. | (Model | OSOI | ||||
| Serial | # | 114453). | This | unit | is | a | 50 | volt | 6 | ampere | oil‐cooled | rectifier | unit | (numbered | CP | 4) | and | is | |
| mounted | on | the | outside | of | the | pumphouse | on | the | northeast | end | of | the | secondary | containment. | The | CP | |||
| test | box | is | mounted | on | the | secondary | containment | wall | adjacent | to | the | rectifier. | The | tank | appears | to | |||
| have | a | mixed | metal | oxide | anode | (total | of | 9) | laid | under | the | tank | bottom | that | lead | to | an | explosion | proof |
| junction | box | mounted | on | the | side | of | the | tank. | The | tank | is | also | equipped | with | three | permanently | |||
| installed | reference | cells | buried | beneath | the | new | bottom. |
| At | the | time | of | the | inspection, | the | rectifier | was | powered | on | and | in | serviceable | operation | condition. | Base |
| personnel | performed | the | required | testing | and | data | logging. | The | January | 2017 | report | provided | ||||
| indicated | that | Tank | # | 6 | is | receiving | cathodic | protection | based | on | NACE | criterion. | The | rectifier, | anode | |
| junction | box, | and | tank | junction | box | are | all | in | satisfactory | condition. |
C. FINDINGS AND RECOMMENDATIONS
| The | tank | is | generally | not | in | accordance | with | current | military | criteria | for | some | of | the | tank | design, |
| appurtenances | and | piping | configuration. | Therefore, | the | recommendations | are | not | meant | to | bring | the | tank | into | ||
| full | compliance | with | UFC | 3‐460‐01 | or | AW | 78‐24‐27 | standards | but | rather | to | identify | these | items | for | the |
| owner/user’s | planned | upgrades, | rehabilitation, | and | priority | repairs. | Mandatory | repairs | should | be | completed | |||||
| to | assure | compliance | with | industry | standards, | as | well | as | federal | or | state | jurisdictional | requirements. |
| During | this | evaluation, | the | tank | was | found | to | be | in | a | generally | serviceable | condition, | with | no | imminent | risk | to |
| operation | and | overall | integrity. | However, | there | were | several | deficiencies | that | were | noted. | These | noted | |||||
| deficiencies | are | listed | below | in | no | particular | order, | with | repair | recommendations. |
| All | repairs | and | modifications | should | be | performed | in | accordance | with | API | Standard | 653, | UFC | 3‐460‐01, | DoD |
| Standard | Design | 78‐24‐27, | and | applicable | UFGS | specifications. |
| 1. MANDATORY | REPAIRS | per | API | 653, | UFC | 3‐460‐01, | or | AW | 78‐24‐27 | Standards | ||||
| Mandatory | repairs | represent | items | that | require | immediate | attention, | in | order | to | prevent | imminent | risk | |
| to | system | operators, | equipment | integrity, | or | the | adjacent | environment. | The | tank | should | remain | out | of |
| service | until | these | repairs | are | completed. |
No mandatory repairs were identified for this tank.
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
2. REQUIRED REPAIRS to Fully Comply with API 653 or Federal, State, and Local Codes
| Required | repairs | represent | items | that | should | be | addressed | in | a | timely | manner, | in | order | to | prevent |
| future | potential | risks | to | system | operators, | equipment | integrity, | or | the | adjacent | environment. | These | |||
| items | are | be | required | by | API‐653 | or | federal, | state, | and | local | codes. |
| a. Secondary | Containment | Cracks | ||||||||||||||||
| OBSERVATION: | Unsealed | cracks | were | identified | in | the | secondary | containment | wall | (this | includes | |||||||
| areas | that | were | previously | sealed). | ||||||||||||||
| Code | REFERENCE: | 40 | CFR | Section | 112.7(c) | states | that | the | entire | secondary | containment | system, | ||||||
| “including | walls | and | floor, | must | be | capable | of | containing | oil | and | must | be | constructed | so | that | any | ||
| discharge | from | a | primary | containment | system | ... | will | not | escape | containment | before | cleanup | occurs.” | |||||
| §§112.8(c)(2) | and | 112.12(c)(2) | state | that | diked | areas | must | be | “sufficiently | impervious | to | contain | oil.” | |||||
| RECOMMENDATION: | Repair | all | exposed | cracks | in | the | containment | walls | by | grinding | in | a | V‐shape | |||||
| pattern, | with | at | least | ¼‐inch | width | at | the | surface | and | a | depth | of | at | least | ¼‐inch | and | sealing | with |
| flexible | urethane | (e.g. | Sikaflex | 1c) | or | a | similar | approved | sealant | (Quantity: | 183 | linear | feet). |
| b. Secondary | Containment | Expansion | Joint | Sealant | ||||||||||||
| OBSERVATION: | There | are | areas | of | weathered | and | deteriorated | sealant | at | the | expansion | joints | for | the | ||
| secondary | containment | wall. | ||||||||||||||
| Code | REFERENCE: | 40 | CFR | Section | 112.7(c) | (See | reference | from | above) | |||||||
| RECOMMENDATION: | Remove | the | damaged | joint | sealant | and | install | new | backer | rods | and | sealant | within | |||
| the | containment. | The | sealant | shall | be | adequate | to | accommodate | a | joint | compression | equal | to | 50 | ||
| percent | of | the | width | of | the | joint. | The | backer | rod | shall | be | compressible | rod | stock | of | polyethylene |
| foam, | polyurethane | foam, | butyl | rubber | foam, | or | other | flexible, | non‐absorptive | material, | as | |||||
| recommended | by | the | sealant | manufacturer. | The | sealant | shall | conform | to | UFGS | 07 | 92 | 00 | Joint | Sealant | |
| (Quantity: | 28 | linear | feet | – | four | locations). |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| c. Secondary | Containment | Drain | ||||||||||||||||||
| OBSERVATION: | The valve | pit | has | rain | covers, | but | standing | water | was | noted | in | the | valve | pit. | The | liquid | ||||
| in | the | valve | pit | was | lower | than | the | liquid | in | the | adjacent | drain | inlet | and | thus | suggests | that | the | drain | |
| inlet | is | satisfactory. | However, | the | source | of | the | standing | water | in | the | valve | pit | should | be | determined. | ||||
| Code | REFERENCE: | 40 | CFR | Section | 112.7(c) | (See | reference | from | above) | |||||||||||
| RECOMMENDATION: | Upgrade | the | concrete | drain | inlet | as | detailed | in | AW | 78‐24‐27 | Drawing | CD.09 | ||||||||
| Detail | 3 | or | similar. | Use | ductile | iron | piping | in | lieu | of | the | PVC | dike | drain | lines. | At | a | minimum, | ||
| investigate | and | repair | the | source | of | water | inside | the | valve | pit. | Slope | dike | basin | surfaces | a | minimum | ||||
| of | 1% | for | drainage. | Drainage | swales | should | be | sloped | no | flatter | than | 0.5% | to | drainage | inlet | (see | AW |
78‐24‐27
Drain Valve
Secondary Containment Drain
Valve Pit Rain Cover
Drain Inlet
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| d. Secondary | Containment | Liner | and | Penetration | |||||||||||||
| OBSERVATION: | The | secondary | containment | has | a | liner | with | an | earthen | cover. | The | condition | of | the | |||
| liner | is | unknown, | but | some | penetration, | including | the | PVC | cathodic | protection | anode | access | caps | and | |||
| the | tank | grounding | rod | sleeve, | have | deteriorated | caulking | and | loose | hose | clamps. | The | majority | of | the | ||
| batten | strips | on | the | perimeter | of | the | foundation, | the | perimeter | of | the | dike | wall, | and | the | pipe | support |
| piers | are | not | accessible | for | inspection. | A | higher | rate | of | rain | displacement | was | noted | for | this | ||
| secondary | containment | compared | to | the | other | AST | dike | systems | (Particularly | Tank | 8 | and | 9 | without | |||
| earthen | cover). | Some | of | the | water | displacement | is | likely | due | to | the | water | absorption | rate | of | the | |
| soil/vegetation. | However, | the | evaporation | of | the | excess | water | above | grade | is | expected | to | be | constant | |||
| for | all | dikes | unless | there | is | a | deteriorated | liner. | |||||||||
| Code | REFERENCE: | 40 | CFR | Section | 112.7(c) | (See | reference | from | above) | ||||||||
| RECOMMENDATION: | Reseal | all | PVC | FML | penetrations | and | secure | the | hose | clamps. | See | similar | |||||
| application | over | concrete | in | AW | 78‐24‐27 | Drawing | CD.02 | Detail | 2. |
| e. Secondary | Containment | Liner | and | Penetration | ||||||||||||
| OBSERVATION: | There | is | an | open | six‐inch | PVC | pipe | in | the | dike | that | penetrates | the | secondary | ||
| containment | floor. | This | is | a | potential | breach | in | the | secondary | containment | if | this | pipe | extends | ||
| outside | of | the | dike, | with | no | means | of | isolation. | ||||||||
| Code | REFERENCE: | 40 | CFR | Section | 112.7(c) | (See | reference | from | above) | |||||||
| RECOMMENDATION: | Investigate | the | use | and | routing | of | the | PVC | pipe. | Either | cap | or | remove | the | pipe. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| f. Secondary | Containment | Wall | Penetration | ||||||||
| OBSERVATION: | The | fire | suppression | piping | penetrates | through | the | secondary | containment | wall | |
| without | the | use | of | an | adequate | pipe | sleeve/seal | (Quantity: | 3). | ||
| Code | REFERENCE: | 40 | CFR | Section | 112.7(c) | (See | reference | from | above) | ||
| RECOMMENDATION: | Reseal | all | secondary | containment | wall | penetrations. | Consider | upgrading | all | ||
| secondary | containment | wall | penetrations | per | AW | 78‐24‐27 | Drawing | CD.08 | Detail | NA | (CONCRETE |
| WALL | PENETRATION | DETAIL). |
| g. Foundation | Cracking/Spalling | |||||||||||||
| OBSERVATION: | There | are | spalling | and | breaks | in | the | foundation | (approximately | 4” | x | 18” | section). | |
| Code | REFERENCE: | API | 653 | section | 4.5.2.2, | “Concrete | pads, | ring | walls, | and | piers, | showing | evidence | of |
| spalling, | structural | cracks, | or | general | deterioration, | shall | be | repaired | to | prevent | water | from | entering | |
| the | concrete | structure | and | corroding | the | reinforcing | steel.” | |||||||
| RECOMMENDATION: | Repair | the | spalling | area | (Quantity: | 1). |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| h. Foam | Chamber | “Fixed | Foam | Discharge | Outlets” | |||||||||||
| OBSERVATION: | The | foam | chamber | air | inlet | screen | on | the | fire | suppression | system | is | coated. | The | foam | |
| chamber | may | not | produce | the | required | foam | when | the | air | inlet | is | blocked | due | to | the | coating. |
| Code | REFERENCE: | NFPA | 11 | Section | 5.2.5.1.2.2, | “Each | outlet | shall | be | sized | to | deliver | foam | at | the | |
| minimum | application | rate | or | higher.” | ||||||||||||
| RECOMMENDATION: | Replace | with | a | new | stainless | steel | screen. |
| i. Deteriorated | Victaulic | Coupling | (Associated | with | the | Fire | Suppression | System) | ||||||||
| OBSERVATION: | All | Victaulic | couplings | for | the | fire | suppression | piping | have | deteriorated | bolts. | Several | ||||
| locations | have | completely | failed | Victaulic | couplings. | This | could | result | in | a | breach | in | the | secondary | ||
| containment | because | this | pipe | extends | outside | of | the | secondary | containment, | and | a | similar | type | of | ||
| corrosion | was | noted | on | the | coupling | fasteners | outside | of | the | dike. | A | section | of | the | fire | suppression |
| piping | is | also | routed | underground | outside | of | the | dike, | and | the | tightness | of | the | piping | is | unknown. |
| The | fire | suppression | system | will | not | function | with | these | deteriorated | coupling | fasteners. | |||||
| Code | REFERENCE: | 40 | CFR | Section | 112.7(c) | (See | reference | from | above). | Also | NFPA | 11 | Section | 4.7.1.4, | ||
| “Where | exposed | to | corrosive | influences, | the | piping | shall | be | corrosion | resistant | or | protected | against | |||
| corrosion” | InterSpec | concludes | the | integrity | of | the | piping | is | dependent | on | the | fasteners, | thus | |||
| incorporating | the | code | reference | for | the | coupling | fasteners. | |||||||||
| RECOMMENDATION: | Replace | all | deteriorated | bolts, | couplings, | and | pipe. | Repair | the | pipe | to | meet | the | |||
| requirements | of | NFPA | 11 | Section | 4.7.1.4 | by | installing | stainless | steel | fasteners. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| j. Corrosion | on | Piping | and | Pipe | Supports | |||||||||||||
| OBSERVATION: | The | piping | and | pipe | supports | within | the | tank’s | secondary | containment | have | moderate | ||||||
| to | major | corrosion. | The | majority | of | the | pipe | supports | have | completely | deteriorated. | |||||||
| Code | REFERENCE: | API | RP | 574 | Section | 7.4.14 | (Contact | Point | Corrosion) | API | RP | 574 | Section | 8.2 | ||||
| (Proper | position | and | function | of | supports, | hangers, | and | anchors). | In | accordance | with | API | 570 | Section | ||||
| 7.5, | “Piping | shall | be | supported | and | guided | so | that | (a) | its | weight | is | carried | safely, | (b) | it | has | sufficient |
| flexibility | for | thermal | expansion | or | contraction, | and | (c) | it | does | not | vibrate | excessively.” | ||||||
| RECOMMENDATION: | Repair | the | coating | failure | on | the | piping. | Replace | the | deteriorated | piping | supports | ||||||
| per | AW | 78‐24‐27 | Drawing | CD.13 | Detail | 1 | and | 2. |
| k. Corrosion | and | Pitting | on | Containment | Piping | |||||||||||
| OBSERVATION: | There | were | areas | of | pitting | noted | on NPS | 8 | receipt | piping. | ||||||
| Code | REFERENCE: | API | RP | 574 | Section | 7.4.14 | (Crevice | Corrosion). | API | RP | 574 | Section | 10.1.6.3 | (Loss | ||
| in | thickness) | |||||||||||||||
| RECOMMENDATION: | Replace | the | spools | of | piping | that | have | significant | pitting | and | corrosion. | It | may | be | ||
| practical | to | conduct | a | detailed | API | STD | 570 | inspection | of | the | containment | piping | to | get | an | overall |
| condition | assessment. | NDT | tools | such | as | guided | wave | examination | can | also | be | employed | to | get | the | |
| condition | of | inaccessible | areas | between | the | pipe | supports, | sleeved | piping, | wrapped | piping, | or | the | |||
| through | dike | wall | penetration. | Guided | wave | examination | is | a | screening | tool | used | to | inspect | large | ||
| sections | of | piping | from | a | single | test | location. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| l. Corroded | Fasteners | on | HLV | ||||||||||||
| OBSERVATION: | There | is | significant | corrosion | on | the | body | cover | fastener | on | the | High | Liquid | Level | |
| shut‐off | valve | (HLV). | The | fasteners | do | not | appear | to | have | sufficient | thread | engagement | due | to | the |
corrosion.
| Code | REFERENCE: | API | 570 | Section | 5.15, | “Flange | fasteners | should | be | examined | visually | for | corrosion | ||
| and | thread | engagement. | Fasteners | should | be | fully | engaged. | Any | fastener | failing | to | do | so | is | considered |
| acceptably | engaged | if | the | lack | of | complete | engagement | is | not | more | than | one | thread.” | ||
| RECOMMENDATION: | Replace | the | corroded | studs | and | bolts. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| m. Tank | Grounding | Lug | ||||||||||||||||
| OBSERVATION: | The | tank | grounding | straps | are | bolted | to | the | tank | shell | (mechanical | joint | on | a | coated | |||
| interface) | and | have | no | reinforcement | plates | or | grounding | lugs | IAW | AW | 78‐24‐27 | Drawing | ED.02 | |||||
| Detail | 2. | |||||||||||||||||
| Code | REFERENCE: | AW | 78‐24‐27 | Drawing | ED.02 | Detail | 2. | (See | also | API | 650 | Section | 5.8.11.3) | |||||
| RECOMMENDATION: | Exothermically | weld | the | grounding | cables | to | the | lug | and | install | reinforcement | at | ||||||
| the | shell, | in | accordance | with | AW | 78‐24‐27 | Drawing | ED.02 | Detail | 2. | Note: | if | repairs | are | elected | not | to | |
| be | done, | the | paint | should | be | removed | where | the | cable | bolts | to | the | lug, | to | provide | a | better | connection |
| to | ground | (Quantity: | 1 | ground | connections). | Note | the | current | edition | of | API | STD | 650 | suggests | a | |||
| maximum | lug | spacing | of | 100 | ft. | with | a | minimum | of | four | lugs. |
| n. Product | Saver | Tank | (PST) | Grounding | |||||||||||||||
| OBSERVATION: | The | Product | Saver | Tank | is | not | grounded | at | the | leg | and | does | not | have | a | vent | installed | ||
| in | accordance | with | AW | 78‐24‐27 | Drawing | D.13 | Detail | A1. | The | PST | is | a | stainless | steel | tank | with | a | top | |
| lid. | The | PST | tank | has | no | means | of | grounding. | |||||||||||
| Code | REFERENCE: | AW | 78‐24‐27 | Drawing | D.13 | Detail | A1. | In | accordance | with | NFPA | 30, | paragraph | ||||||
| 6.5.4, | “All | equipment | such | as | tanks, | machinery, | and | piping | shall | be | designed | and | operated | to | prevent | ||||
| electrostatic | ignitions. | All | metallic | equipment | where | an | ignitable | mixture | could | be | present | shall | be | ||||||
| bonded | or | grounded. | The | bond | or | ground | or | both | shall | be | physically | applied | or | shall | be | inherently | |||
| present | by | the | nature | of | the | installation.” | |||||||||||||
| RECOMMENDATION: | Install | a | ground | cable | and | vent | piping | to | the | Product | Saver | Tank | in | accordance | |||||
| with | AW | 78‐24‐27 | Drawing | D.13 | Detail | 5 | (Quantity: | 1 | ground, | 1 | vent | pipe | (1 | ¼ | NPS, | 2‐feet | high). |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| o. Shell | Manhole | Cover | with | no | Hinge | or | Davit | Arm | ||||||||||
| OBSERVATION: | The | shell | manhole | covers | are | not | equipped | with | a | hinge | or | davit | arm | to | facilitate | the | ||
| handling | of | the | manhole | cover | plates. | |||||||||||||
| Code | REFERENCE: | API | STD | 650 | Section | 5.8.3.5 | states, | “Shell | manhole | covers | shall | have | two | handles. | ||||
| Those | covers | weighing | more | than | 34 | kg | (75 | lb) | shall | be | equipped | with | either | a | hinge | or | davit | to |
| facilitate | the | handling | of | the | manhole | cover | plate. | The | davit | support | arm | shall | not | be | welded | directly | ||
| to | the | shell | without | a | reinforcing | plate.” | Also | AW | 78‐24‐27 | drawing | D.10 | detail | 3 | |||||
| RECOMMENDATION: | Install | a | shell | manhole | davit | arm | IAW | with | API | STD | 650 | and | AW | 78‐24‐27 | ||||
| drawing | D.10 | detail | 3 | (Quantity: | 2) |
| p. Top | Platform | Grating | Not | Secured | Down | |||||||||
| OBSERVATION: | The | stairway | top | platform | does | not | have | anchor/saddle | clips. | Tack | welds | were | noted, | |
| but | some | are | cracked. | |||||||||||
| Code | REFERENCE: | OSHA | and | AW | 78‐24‐27 | Drawing | D.11 | Detail | 1, | “Grating | shall | be | anchored | with |
| saddle | clips.” | |||||||||||||
| RECOMMENDATION: | Install | grating | anchors. |
| q. Cracked | Gasket | |||||||||||||||
| OBSERVATION: | The | TRV | test | Tee | blind | flange | for | the | product | issue | nozzle | has | a | cracked | gasket. | |
| Code | REFERENCE: | API | RP | 574 | Section | 10.3.5.1, | “Sites | should | have | a | program | to | assure | that | flanges | are |
| made | up | properly. | Proper | make‐up | of | every | flange | in | a | piping | system | is | important | for | reliability. | |
| Proper | make‐up | includes | the | use | of | the | proper | gasket | and | fastener | material, | type | and | size, | proper |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| positioning | of | the | gasket | and | proper | torquing | of | the | fasteners. | The | assurance | program | should | include |
| procedures | for | gasket | and | fastener | selection | and | for | fastener | torquing.” | |||||
| RECOMMENDATION: | Replace | the | gasket | (3/4” | flange). |
| r. Circumferential | Stairway | Path | Restricted | ||||||||||||
| OBSERVATION: | There | is | a | limited | or | restricted | path | on | the | circumferential | stairway | due | to | the | |
| geodesic | dome | roof | flashing | projection | towards | the | circumferential | stairway. | There | is | no | ||||
| intermediate | platform. | There | is | an | approximately | sixteen | (16) | inch | clearance | between | the | handrail | |||
| and | the | geodesic | dome | roof. | This | reduces | the | existing | tread | width. | |||||
| REFERENCE: | UFC | 3‐460‐01 | Section | Table | 8‐1 | item | j. | OSHA | minimum | required | tread | width | is | 22 | inches |
| (1920.25(C)(3)). | See | also | API | 650 | Table | 5.18 | item | 3. | |||||||
| RECOMMENDATION: | Install | an | intermediate | platform | or | rework | the | circumferential | stairway | to | |||||
| provide | a | sufficient | path | past | the | geodesic | dome | roof. |
| s. No | or | Faded | Confined | Space | Markings | at | Manholes | ||||||||||
| OBSERVATION: | The | tank | is | not | equipped | with | a | confined | space | marking. | |||||||
| Code | REFERENCE: | In | accordance | with | OSHA | Regulation | 29 | CFR | 1910.146(c)(2), | “If | the | workplace | |||||
| contains | permit | spaces, | the | employer | shall | inform | exposed | employees, | by | posting | danger | signs | or | by | |||
| any | other | equally | effective | means, | of | the | existence | and | location | of | and | the | danger | posed | by | the | permit |
| spaces. | NOTE: | A | sign | reading | DANGER | ‐‐ | PERMIT‐REQUIRED | CONFINED | SPACE, | DO | NOT | ENTER | or | ||||
| using | other | similar | language | would | satisfy | the | requirement | for | a | sign.” | |||||||
| RECOMMENDATION: | Install | confined | space | markings | on | all | tank | entry | points. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| t. Tank | Marking | (NFPA | Diamond) | ||||||||||||
| OBSERVATION: | The | tank | is | not | equipped | with | an | NFPA | marking | ||||||
| Code | REFERENCE: | Mark | the | tank | in | accordance | with | NFPA | 704. | AW | 78‐24‐27 | Drawing | D.13 | Detail | 3 |
| Note | 4) “Provide | hazard | identification | system | labeling | in | accordance | with | NFPA | 704.” | |||||
| RECOMMENDATION: | Install | an | NFPA | 704 | marking. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| u. Conduit, | Junction | Boxes, | Fittings, | and | Mounting | Hardware | ||||||||||||
| OBSERVATION: | The | conduits, | junction | boxes, | fittings, | and | mounting | hardware | within | the | secondary | |||||||
| containment | have | deteriorated. | This | will | not | meet | the | Class | 1, | Division | 1 | rating | requirements | for | ||||
| hazardous | locations. | |||||||||||||||||
| Code | REFERENCE: | All | wiring | and | fittings | in | a | Class | I | location | that | is | a | bulk | plant | or | terminal | must |
| comply | with | the | applicable | provisions | of | NEC | Article | 501 | or | Article | 505 | [515.7]. | ||||||
| RECOMMENDATION: | Replace | all | corroded/deteriorated | conduits, | junction | boxes, | fittings, | and | ||||||||||
| mounting | hardware. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| 3. RECOMMENDED | REPAIRS | as | Part | of | Regular | Maintenance | ||||||||
| Recommended | repairs | represent | items | that | should | be | addressed | in | a | timely | manner, | in | order | to |
| prevent | future | potential | risks | to | system | operators, | equipment | integrity, | or | the | adjacent | environment. |
| a. Exterior | Coating | Failures | on | Tank | and | Appurtenances | |||||||||||
| OBSERVATION: | There | is | isolated | coating | failure | on | the | exterior | shell | mostly | around | the | stiffening | ring, | |||
| top | platform, | circumferential | stairway | wind | girder, | and | shell | manholes. | Similar | isolated | coating | ||||||
| failure | is | noted | on | the | PST | pump, | HLV | tubing | support | mounting | brace, | and | low | level | and | high | level |
| sensor | chambers. | There | is | moderate | coating | failure | and | corrosion | noted | on | the | LLA, | HLA, | HHLA, | and | ||
| HLV | on | the | pipe | nipples | and | flanges. | |||||||||||
| Code | REFERENCE: | UFC | 3‐460‐01, | Section | 8‐3.10 | and | Section | 9‐10 | |||||||||
| RECOMMENDATION: | Mechanically | clean | and | recoat | the | areas | of | coating | failure | on | the | tank | shell, | ||||
| circumferential | stairway, | landing, | piping, | and | appurtenances. | Repairs | should | be | accomplished | using | |||||||
| an | epoxy | based | coating | system | or | equivalent. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| b. Missing | Leak | Detection | Plugs | |||||||||||||||
| OBSERVATION: | The | leak | detection | plugs | are | missing | on | the | fitting | mounted | between | the | old | and | new | |||
| bottom. | Water | intrusion | is | likely | during | a | heavy | rain | event | or | if | the | containment | fills | with | rain | water | |
| up | to | the | new | tank | bottom | fittings. | ||||||||||||
| Code | REFERENCE: | API | 650 | section | I.5.5 | “If | specified | by | the | owner, | the | undertank | drains | shall | be | fitted | ||
| with | a | valve | or | piped | to | leak | detection | well | as | shown | in | Figure | I.10.” | The | figure | details | the | leak |
| detection | with | rain | cover | or | positioned | above | the | maximum | high | water | level | within | the | dike. | AW | |||
| 78‐24‐27 | Drawing | D.03 | Detail | 2 | shows | the | leak | detection | with | a | pipe | cap). | ||||||
| RECOMMENDATION: | Install | plugs | (Quantity: | 2). |
| c. Water | in | Leak | Detection | Well | |||||||||||||||
| OBSERVATION: | A | small | amount | of | water | was | noted | in | the | NPS | 4 | stainless | steel | leak | detection | well. | |||
| Code | REFERENCE: | General | maintenance | ||||||||||||||||
| RECOMMENDATION: | Remove | the | water | and | monitor. | Compare | with | the | rain | water | accumulation | ||||||||
| within | the | dike | to | ensure | the | source | of | water. | Some | water | due | to | condensation | is | normal | and | may | be |
disregarded.
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| d. Tank | Electronic | ATG | and | Water | Probe | |||||||||||||
| OBSERVATION: | The | tank’s | Enraf | (Model | # | 854) | ATG | is | installed | through | an | 8‐inch | aluminum | steel | ||||
| well. | The | stilling | well | is | slotted. | The | Enraf | system | was | reported | to | be | in | non‐working | order | at | the | |
| time | of | the | inspection. | The | water | probe | is | not | mounted | over | the | sump | and | is | installed | via | an | eight |
| inch | carbon | steel | well. | The | water | probe | is | not | installed | over | the | tank | bottom | sump | through | a | water | |
| probe | well | (separate | well). | |||||||||||||||
| Code | REFERENCE: | UFC | 3‐460‐01 | Table | 8‐1 | (item | p | and | s) | and | AW | 78‐24‐27 | Drawing | D.07 | Detail | 3, | 4 | |
| and | 5) | |||||||||||||||||
| RECOMMENDATION: | Replace | or | repair | the | ATG. | Modify | the | stilling | wells | IAW | with | AW | 78‐24‐27. | |||||
| Mounting | plate | welding | per | API | STD | 653 | Section | 9.10.3 |
| e. Independent | Low‐Low | Level | Alarm | |||||||||||||
| OBSERVATION: | The | tank | is | not | equipped | with | an | independent | low‐low | level | alarm. | There | is | a | low | |
| level | alarm | sensor | installed | on | the | side | of | the | tank | shell | (see | photo | below). | |||
| Code | REFERENCE: | UFC | 460 | 3‐460‐01 | Table | 8‐1(k) | and | AW | 78‐24‐27 | Drawing | D.12 | Detail | 1 | |||
| RECOMMENDATION: | Install | an | independent | low‐low | level | alarm. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| f. Product | Saver | Tank | (PST) | Pump | and | Level | Alarm | ||||||||
| OBSERVATION: | The | Product | Saver | Tank | (PST) | is | not | equipped | with | an | electrical | pump | and | does | not |
| have | high | level | alarms. | The | existing | diaphragm | operated | pump | has | moderate | corrosion | with | |||
| deteriorated | appurtenances | (broken | regulator, | corroded | air | filter | housing, | and | corroded | valve |
handle)
| Code | REFERENCE: | AW | 78‐24‐27 | Drawing | D.13 | Detail | 5. | IAW | UFC | 3‐460‐01 | Section | 3‐6.6.7, | “Mount | |
| permanently | installed | pumps | on | substantial | foundations | of | reinforced | concrete | designed | in | ||||
| accordance | with | Hydraulic | Institute | Standards.” | ||||||||||
| RECOMMENDATION: | Consider | replacement | of | the | existing | system | in | accordance | with | AW | 78‐24‐27. |
| g. Mechanical | Tape | Gauge | (MTG) | |||||||||||||||
| OBSERVATION: | The | tank | is | equipped | with | a | float | and | tape | type | mechanical | tape | gauge | manufactured | ||||
| by | Shand | & | Jurs | (Model | 92021). | The | system | is | not | in | good | working | condition. | The | checker | knob | did | |
| not | respond | when | actuated. | |||||||||||||||
| Code | REFERENCE: | General | maintenance/manufacturer’s | instruction | and | UFC | 3‐460‐01 | Table | 8‐1 | |||||||||
| (item | o) | |||||||||||||||||
| RECOMMENDATION: | Consider | replacement | of | existing | system | with | new | MTG. | Consider | increasing | the | |||||||
| elevation | of | the | gauge | head, | so | the | product | level | reading | window | is | at | “convenient | eye | level” | from | ||
| grade. | UFC | 3‐460‐01 | Section | 8‐8.3 | (item | o) | lists | a | liquid | level | gauge | mounted | at | 60” | above | the | ||
| walking | surface. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| h. Internal | ladder | |||||||||||||||
| OBSERVATION: | There | is | no | internal | ladder | (note | roof | is | not | equipped | with | floating | roof, | and | this | |
| recommendation | may | be | deferred | to | until | IFR | is | installed). | ||||||||
| Code | REFERENCE: | UFC | 460 | 3‐460‐01 | Table | 8‐1(h) | and | AW | 78‐24‐27 | Drawing | D.08 | Detail | 2 | |||
| RECOMMENDATION: | Install | the | internal | ladder | (in | accordance | with | OSHA | criteria) | for | tanks | of | 5,000 | |||
| gallons | (19 | 000 | L) | or | larger | per | UFC | 460 | 3‐460‐01 | Table | 8‐1(h) | and | AW | 78‐24‐27 | Drawing | D.08 |
| Detail | 2 |
| i. No | Sample | Gauge | Well | ||||||||||||||||
| OBSERVATION: | There | is | no | manual | sampling/gauging | well. | |||||||||||||
| Code | REFERENCE: | UFC | 460 | 3‐460‐01 | Table | 8‐1(s) | and | AW | 78‐24‐27 | Drawing | D.07 | Detail | 2 | ||||||
| RECOMMENDATION: | Install | a | 10‐inch | roof | nozzle | and | an | aluminum, | slotted | stilling | well | that | extends | to | |||||
| within | 3 | inches | of | the | bottom | of | the | tank | for | gauging | and | sampling | with | a | datum | plate | to | establish | a |
| gauging | zero | point. |
| j. Double | Block | and | Bleed | Valve | Missing | Tube | |||||||||||
| OBSERVATION: | The | product | receipt | double | block | and | bleed | valve | is | missing | the | manual | bleed | valve | |||
| goose | neck | tube. | Coating, | water, | and | some | corrosion | were | noted | inside | the | differential | thermal | relief | |||
| (DTR) | valves, | and | long | term | exposure | to | the | internal | section | of | DTR | valve | could | cause | the | system | to |
| not | perform | as | designed. | ||||||||||||||
| Code | REFERENCE: | General | maintenance/manufacturer | drawing. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| RECOMMENDATION: | Reinstall | the | goose | neck | tube | to | prevent | drainage | of | body | liquid | and | to | prevent | |||
| water | and | debris | from | entering | the | DTR | valve. | The | tube | should | be | above | the | highest | point | of | the |
| body | cavity. | A | steel | plug | can | also | be | used | to | prevent | water | intrusion. |
| k. Broken | Valve | Handle | on | Double | Block | and | Bleed | Valve | DTR | ||||
| OBSERVATION: | The | product | receipt | double | block | and | bleed | valve | has | a | broken | differential | thermal |
| relief | (DTR) | valve | and | corrosion | on | the | DTR | tubing | compression | fitting. | |||
| Code | REFERENCE: | General | maintenance/manufacturer | drawing. | |||||||||
| RECOMMENDATION: | Replace | the | DTR | valve | and | corroded | tube | fitting. |
| l. Product | Piping | Label | Marking | |||||||||||
| OBSERVATION: | The | majority | of | the | secondary | containment | piping | has | product | pipe | marking. | Faded | or | |
| missing | marking | was | noted. | |||||||||||
| Code | REFERENCE: | AW | 78‐24‐27 | Drawing | CD.13 | Detail | x. | (refer | to | MIL‐STD‐161G | for | correct | fuel | type) |
| RECOMMENDATION: | Reapply | product | piping | marking. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| m. Fixed | Roof | Deteriorated | Caulking | |||||||||||
| OBSERVATION: | There | is | minor | to | moderate | caulking | deterioration | on | the | geodesic | dome | roof | panels. | |
| Inspection | of | the | dome | roof | is | limited | to | what | is | accessible | from | the | platform. | |
| Code | REFERENCE: | General | maintenance/ | manufacturer | instruction | |||||||||
| RECOMMENDATION: | Seal | the | top | side | of | the | geodesic | dome | roof | as | needed | to | eliminate | water |
intrusion.
| n. Roof | Hatch | Door | |||||||||
| OBSERVATION: | The | geodesic | doom | roof | hatch | lid | was | in | the | open | position. |
| Code | REFERENCE: | General | maintenance/ | manufacturer | instruction | ||||||
| RECOMMENDATION: | Secure | roof | hatch. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| o. Shell | Lamination | (No | Repair | Recommendation) | |||||||||||||
| OBSERVATION: | Three | areas | of | laminations | were | located | on | tank | shell | on | plate | number | 1‐2 | (See | Shell | ||
| Layout | Drawing | in | Appendix | A | for | location). | Lamination | is | formed | within | the | metal | sheet | when | a | ||
| discontinuity | present | in | the | metal, | such | as | porosity | or | inclusions | trapped | in | the | slab, | are | elongated | in | |
| the | direction | of | rolling | during | the | steel | manufacturing | process. | The | laminations | are | all | less | than | 0.75" | ||
| based | on | the | B‐Scan | ultrasonic | data | and | are | the | within | acceptable | limits | of | the | current | API | STD | 650 |
| section | 6.2.4. | ||||||||||||||||
| Code | REFERENCE: | API | 653 | Section | 4.3.6, | “Flaws | such | as | cracks | or | laminations | shall | be | thoroughly | |||
| examined | and | evaluated | to | determine | their | nature | and | extent | and | need | for | repair.” | |||||
| RECOMMENDATION: | No | repairs | recommend. | Evaluate | if | any | hot | work | is | performed | at | these | location | in | |||
| the | future; | otherwise, | monitor | at | the | next | API | STD | 653 | UT | inspection | interval. |
| p. Personnel | Static | Electric | Discharge | |||||||||||
| OBSERVATION: | The | tank | is | not | equipped | with | a | copper | grounding | bar | for | personnel | static | electric |
| discharge | (typically | required | by | military | criteria). | |||||||||
| Code | REFERENCE: | UFC | 3‐460‐03 | Section | 2‐3.21 | and | AW | 78‐24‐27 | Drawing | D.11 | Detail | 4 | ||
| RECOMMENDATION: | Install | a | copper | grounding | bar | for | personnel | static | electric | discharge | at | the | base | |
| of | the | circumferential | stairway. |
| q. AST Exterior | Fire | Protection | Water | Systems | ||||||||||||
| OBSERVATION: | The | tank | does | not | appear | to | meet | equipment | requirement | for | AST | exterior | fire | |||
| protection | system. | The | stand | post | mounted | water | jet | monitor | was | noted | along | the | facility | fence | line | |
| northeast | corner | of | the | dike. |
API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll
| Code | REFERENCE: | UFC | 3‐460‐03 | Section | 2‐15.2.1 | ||||||||||||||
| RECOMMENDATION: | Install | additional | services | for | tank | exterior | fire | protection | water | systems | IAW | ||||||||
| UFC | 3‐460‐01 | Section | 2‐15.2.1 | (fire | protection | water | mains, | hydrants, | valves, | pumps, | and | application | |||||||
| devices | outside | of | dike) | to | control | of | brush | and | grass | fires | and | cooling | of | storage | tanks | in | the | event | of |
| a | fire | exposure. |
API 653 In-Service Inspection Report USAG Kwajalein-Atoll
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS
A.1 SHELL SERVICE LIFE EVALUATION
A.2 SHELL SETTLEMENT EVALUATION
A.3 ULTRASONIC UT DATA
A.4 CONTAINMENT LAYOUT DRAWING
A.5 SHELL LAYOUT DRAWING
A.6 ROOF LAYOUT DRAWING
A.7 OSHA ACCESS STRUCTURE REPORT
Shannon T Gray Typewritten Text
Shannon T Gray Typewritten Text
Shannon T Gray Typewritten Text
Shannon T Gray Typewritten Text
Shannon T Gray Typewritten Text
Shannon T Gray Typewritten Text
Shannon T Gray Typewritten Text
Where:
t min = minimum acceptable shell thickness for each course, in inches; however, t min shall not be less than 0.1 inch for any tank course.
t nom = nominal shell thickness, in inches.
t act = current measured shell thickness, excluding pits and corrosion, in inches.
t prev = previous measured shell thickness, excluding pits and corrosion or t nom , in inches.
D = nominal diameter of the tank, in feet.
H = height from the bottom of the shell course under considerations to the established maximum liquid level, in feet.
H c = calculated safe fill height, in feet, for the current product.
G = specific gravity of the contents.
Y = specified minimum yield strength of the plate; use 30,000 pounds per square inch if not known (N/A for riveted tanks).
T = smaller of the specified minimum tensile strength of the plate or 80,000 pounds per square inch; use 55,000 psi if not known (N/A for riveted tanks).
S = The maximum allowable stress, in pounds per square inch. For welded tanks, use the smaller of 0.80Y or 0.429T for the bottom and the second course or the smaller of 0.88Y or 0.472T for all other courses. For riveted tanks, use S =21,000 psi. For elevated temperatures above
200OF, the maximum allowable stress shall be the smaller of 2/3 the minimum yield strength multiplied by the M-factor (M) of API Standard 650 Appendix M or the product design stress value listed in Table M-1a or M-1b of API Standard 650.
E = original joint efficiency for the tank. Use Table 4-2 from API Standard 653 if original E is unknown; E =1.0 when evaluating the retirement thickness in a corroded plate, when away from welds or joints by at least the greater of one inch or twice the plate thickness.