The State of New Hampshire
Department of Environmental Services
Robert R. Scott, Commissioner www.des.nh.gov
29 Hazen Drive • PO Box 95 • Concord, NH 03302-0095 NHDES Main Line: (603) 271-3503 • Subsurface Fax: (603) 271-6683 • Wetlands Fax: (603) 271-6588
TDD Access: Relay NH 1 (800) 735-2964
WETLANDS AND NON-SITE SPECIFIC PERMIT 2021-00978
NOTE CONDITIONS
PERMITTEE: USDA - FOREST SERVICE
4 FARM COLONY DRIVE
WARREN PA 16365-
PROJECT LOCATION TRIPOLI ROAD, LIVERMORE
TAX MAP # , LOT #
WATERBODY: UNNAMED STREAM
APPROVAL DATE: APRIL 20, 2021 EXPIRATION DATE: APRIL 20, 2026
Based upon review of permit application 2021-00978 in accordance with RSA 482-A and RSA 485-A:17, the New Hampshire Department of Environmental Services (NHDES) hereby issues this Wetlands and Non-Site Specific Permit. To validate this Permit, signatures of the Permittee and the Principal Contractor are required.
PERMIT DESCRIPTION:
Dredge and fill 90 square feet (SF) within the bed and bank of an unnamed stream (Tier 2, impacting 85 linear feet (LF)) to install scour protection in order to maintain/repair an existing, legal 17-foot clear span concrete bridge. In addition, temporarily impact 840 SF of stream channel (impacting 70 LF) to accommodate construction access.
THIS PERMIT IS SUBJECT TO THE FOLLOWING PROJECT-SPECIFIC CONDITIONS:
1. In accordance with Env-Wt 307.16, all work shall be done in accordance with the approved plans dated March 1, 2021 by HEB Engineers, as received by the NH Department of Environmental Services (NHDES) on April 2, 2021.
2. In accordance with Env-Wt 527.05(a), the permit shall be contingent on review and approval by the department of final stream diversion and erosion control plans that detail the timing and method of stream flow diversion during construction and show temporary siltation, erosion, and turbidity control measures to be implemented.
3. In accordance with Env-Wt 527.05(b), the contractor responsible for completion of the work shall use techniques described in Env-Wq 1504.06, Env-Wq 1504.16, Env-Wq 1505.02, Env-Wq 1506, and Env-Wq 1508.
4. In accordance with Env-Wt 307.18(c), a report that describes the monitoring conducted and date(s) of inspections, and includes photos showing the extent of jurisdictional impacts, areas of restoration, and progress of any plantings shall be submitted to the department.
5. In accordance with Env-Wt 307.03(g)(1), the person in charge of construction equipment shall inspect such equipment for leaking fuel, oil, and hydraulic fluid each day prior to entering surface waters or wetlands or operating in an area where such fluids could reach groundwater, surface waters, or wetlands.
6. In accordance with Env-Wt 307.03(g)(3) and (4), the person in charge of construction equipment shall maintain oil spill kits and diesel fuel spill kits, as applicable to the type(s) and amount(s) of oil and diesel fuel used, on site so as to be readily accessible at all times during construction; and train each equipment operator in the use of the spill kits.
7. In accordance with Env-Wt 307.03(g)(2), the person in charge of construction equipment shall repair any leaks prior to using the equipment in an area where such fluids could reach groundwater, surface waters, or wetlands.
8. In accordance with Env-Wt 307.03(h), equipment shall be staged and refueled outside of jurisdictional areas (unless allowed) and in accordance with Env-Wt 307.15.
http://www.des.nh.gov/
File # 2021-00978 April 20, 2021
9. In accordance with Env-Wt 307.03(a), no activity shall be conducted in such a way as to cause or contribute to any violation of surface water quality standards specified in RSA 485-A:8 or Env-Wq 1700; ambient groundwater quality standards established under RSA 485-C; limitations on activities in a sanitary protective area established under Env-Dw
302.10 or Env-Dw 305.10; or any provision of RSA 485-A, Env-Wq 1000, RSA 483-B, or Env-Wq 1400 that protects water quality.
10. In accordance with Env-Wt 307.03(e), all exposed soils and other fills shall be permanently stabilized within 3 days following final grading.
11. In accordance with Env-Wt 307.03(c)(4), water quality control measures shall be capable of minimizing erosion;
collecting sediment and suspended and floating materials; and filtering fine sediment.
12. In accordance with Env-Wt 307.03(c)(3), water quality control measures shall be installed prior to start of work and in accordance with the manufacturer's recommended specifications or, if none, the applicable requirements of Env- Wq 1506 or Env-Wq 1508.
13. In accordance with Env-Wt 307.03(c)(5), water quality control measures shall be maintained so as to ensure continued effectiveness in minimizing erosion and retaining sediment on-site during and after construction.
14. In accordance with Env-Wt 307.03(c)(6), water quality control measures shall remain in place until all disturbed surfaces are stabilized to a condition in which soils on the site will not experience accelerated or unnatural erosion by achieving and maintaining a minimum of 85% vegetative cover using an erosion control seed mix, whether applied in a blanket or otherwise, that is certified by its manufacturer as not containing any invasive species; or placing and maintaining a minimum of 3 inches of non-erosive material such as stone.
15. In accordance with Env-Wt 307.03(d), any sediment collected by water quality control measures shall be removed with sufficient frequency to prevent the discharge of sediment; and placed in an upland location in a manner that prevents its erosion into a surface water or wetland.
16. In accordance with Env-Wt 307.03(c)(7), temporary water quality control methods shall be removed upon completion of work when compliance with Env-Wt 307.03(c)(6) is achieved.
17. In accordance with Env-Wt 307.03(c)(1), water quality control measures shall be selected and implemented based on the size and nature of the project and the physical characteristics of the site, including slope, soil type, vegetative cover, and proximity to jurisdictional areas.
18. In accordance with Env-Wt 307.03(c)(2), water quality control measures shall be comprised of wildlife-friendly erosion control materials if erosion control blankets are utilized; a protected species or habitat has been documented;
the proposed work is in or adjacent to a priority resource area (PRA); if specifically requested by Natural Heritage Bureau of the NH DNCR (NHB) or NH Fish and Game Department (NHF&G); or any if combination of the above conditions apply.
19. In accordance with Env-Wt 307.05(b), equipment to be used in surface waters shall be completely free of all aquatic and terrestrial invasive plants, seeds, and other propagules, and all exotic aquatic species of wildlife as defined in RSA 487:16, I-a.
20. In accordance with Env-Wt 307.05(a), prior to the installation of swamp mats, the mats and any heavy machinery used to install them shall be inspected for and cleaned of all vegetative matter by a method and in a location that prevents the spread of the vegetative matter to jurisdictional areas.
21. In accordance with Env-Wt 307.10(b), work shall be done during low flow or in the dry unless a dredge dewatering, diversion, or cofferdam plan has been approved as part of the project, the project has specific approval based on water depth to operate from a barge; or the work will be conducted in a lake or pond and turbidity containment can be achieved using turbidity controls.
22. In accordance with Env-Wt 307.11(a), fill shall be clean sand, gravel, rock, or other material that meets the project's specifications for its use; and does not contain any material that could contaminate surface or groundwater or otherwise adversely affect the ecosystem in which it is used.
23. All temporary and permanent filling activities shall meet all of the conditions listed in Rule Env-Wt 307.11(a) through (l).
24. In accordance with Env-Wt 307.11(j), wetlands and surface waters shall be restored to pre-impact conditions and elevation as specified in Env-Wt 307.12(i).
25. In accordance with Env-Wt 307.12(f), if any temporary impact area that is stabilized with seeding or plantings does not have at least 75% successful establishment of wetlands vegetation after 2 growing seasons, the area shall be replanted or reseeded, as applicable.
26. In accordance with Env-Wt 307.12(d), mulch used within an area being restored shall be natural straw or equivalent non-toxic, non-seed-bearing organic material.
27. In accordance with Env-Wt 307.12(g), a temporary impact area restored by seeding or plantings shall not be deemed successful if the area is invaded by nuisance species such as common reed or purple loosestrife during the first full growing season following the completion of construction; and a remediation plan shall be submitted to the department that proposes measures to be taken to eradicate nuisance species during this same period.
28. In accordance with Env-Wt 307.12(i), wetland areas where permanent impacts are not authorized shall be restored to their pre-impact conditions and elevation by replacing the removed soil and vegetation in their pre-construction location and elevation such that post-construction soil layering and vegetation schemes are as close as practicable to pre-construction conditions.
29. In accordance with Env-Wt 307.12(b), upon completion of construction, all disturbed wetland areas shall be stabilized with wetland seed mix containing non-invasive plant species only.
30. In accordance with Env-Wt 307.12(e), wetland soils from areas vegetated with purple loosestrife or other state-listed invasive plant species shall not be used in the area being restored.
31. In accordance with Env-Wt 307.15(a), heavy equipment shall not be operated in any jurisdictional area unless specifically authorized by this permit.
32. In accordance with Env-Wt 527.05(b), the contractor responsible for completion of the work shall use techniques described in Env-Wq 1504.06, Env-Wq 1504.16, Env-Wq 1505.02, Env-Wq 1506, and Env-Wq 1508.
THIS PERMIT IS SUBJECT TO THE FOLLOWING GENERAL CONDITIONS:
1. Pursuant to RSA 482-A:12, a copy of this permit shall be posted in a secure manner in a prominent place at the site of the approved project.
2. In accordance with Env-Wt 313.01(a)(5), and as required by RSA 482-A:11, II, work shall not infringe on the property rights or unreasonably affect the value or enjoyment of property of abutting owners.
3. In accordance with Env-Wt 314.01, a standard permit shall be signed by the permittee, and the principal contractor who will build or install the project prior to start of construction, and will not be valid until signed.
4. In accordance with Env-Wt 314.03(a), the permittee shall notify the department in writing at least one week prior to commencing any work under this permit.
5. In accordance with Env-Wt 314.08(a), the permittee shall file a completed notice of completion of work and certificate of compliance with the department within 10 working days of completing the work authorized by this permit.
6. In accordance with Env-Wt 314.06, transfer of this permit to a new owner shall require notification to, and approval of, the NHDES.
7. The permit holder shall ensure that work is done in a way that protects water quality per Env-Wt 307.03; protects fisheries and breeding areas per Env-Wt 307.04; protects against invasive species per Env-Wt 307.05; meets dredging activity conditions in Env-Wt 307.10; and meets filling activity conditions in Env-Wt 307.11.
8. This project has been screened for potential impact to known occurrences of protected species and exemplary natural communities in the immediate area. Since many areas have never been surveyed, or only cursory surveys have been performed, unidentified sensitive species or communities may be present. This permit does not absolve the permittee from due diligence in regard to state, local or federal laws regarding such communities or species. This permit does not authorize in any way the take of threatened or endangered species, as defined by RSA 212-A:2, or of any protected species or exemplary natural communities, as defined in RSA 217-A:3.
9. In accordance with Env-Wt 307.06(a) through (c), no activity shall jeopardize the continued existence of a threatened or endangered species, a species proposed for listing as threatened or endangered, or a designated or proposed critical habitat under the Federal Endangered Species Act, 16 U.S.C. §1531 et seq.; State Endangered Species Conservation Act, RSA 212-A; or New Hampshire Native Plant Protection Act, RSA 217-A.
10. In accordance with Env-Wt 307.02, and in accordance with federal requirements, all work in areas under the jurisdiction of the U.S. Army Corps of Engineers (USACE) shall comply with all conditions of the applicable state general permit.
APPROVED:
Joseph Schmidl, CWS, DSDS, PG Wetlands Specialist, Wetlands Bureau Land Resources Management, Water Division
THE SIGNATURES BELOW ARE REQUIRED TO VALIDATE THIS PERMIT (Env-Wt 314.01).
PERMITTEE SIGNATURE (required) PRINCIPAL CONTRACTOR SIGNATURE (required)