Att E - Pricing for Powder Handling System.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Powder Handling System
- Solicitation number
- PR372680
- Issued by
-
Department of Energy
About this file
This Excel file is a pricing document for a Powder Handling System for UT-Battelle (UTB) at Oak Ridge National Laboratory. The pricing breakdown includes milestone payments for various system components and stages, with specific completion indicators for each milestone. Key milestones include system design phases (25%, 50%, and 100%), procurement of specific units (Sieve, Decanting, Blending, and Packaging Units), full system installation, testing/acceptance, and shipping/freight. The document outlines a total fixed-price structure with payments tied to specific completion stages and deliverables, allowing for incremental payments as project milestones are achieved. The system is being developed for a new metal powder atomization facility, with each milestone requiring approval from UTB before payment is processed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Cost Element | Total Cost |
| Labor | |
| Materials | |
| Subcontracts | |
| Other Direct Costs | |
| TOTAL FIXED PRICE |
| Milestone Payments | Completion Indicator | Value |
| 25% System Design | 25% design of system completed and approved by UTB. | |
| 50% System Design | 50% design of system completed and approved by UTB. | |
| 100% System Design | 100% design of system completed and approved by UTB. | |
| Sieve Unit | Proof of purchase and confirmed ship/receive date sent to UTB. | |
| Decanting Unit | Proof of purchase and confirmed ship/receive date sent to UTB. | |
| Blending Unit | Proof of purchase and confirmed ship/receive date sent to UTB. | |
| Packaging Unit | Proof of purchase and confirmed ship/receive date sent to UTB. | |
| Installation | Full system installed on site at UTB and TPO sign-off | |
| Testing/Acceptance | Full acceptance of system based on technical requirements | |
| Shipping/Freight | Proof of purchase and confirmed ship/receive date sent to UTB. | |
| TOTAL FIXED PRICE |
File details come from the government source that posted it. Updated .