This package includes plans and specifications for the Construction of an Entry Control Point at Aviano Air Base in Italy. The project involves demolishing existing buildings and infrastructure and constructing new facilities including a gatehouse, search office, guard booths, overhead observation tower, and security barriers. Site plans show the phased construction schedule and logistics for maintaining base access and traffic flow throughout the project. Geotechnical reports document subsurface soil conditions from on-site borings. Electrical, mechanical, plumbing and structural drawings provide construction details for the new facilities. The solicitation for this project is N6247021R0003 issued by the Naval Facilities Engineering Command.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA A1 ENTRY CONTROL POINT
VICINITY MAP
PLANIMETRIA GENERALE
AVIANO AIR BASE, AVIANO, ITALY
LOCATION MAP
PLANIMETRIA AREA DI INTERVENTO
AREA OF WORK
AAB PROJECT NUMBER: N/A
NAVFAC PROJECT NO: N/A
MDE NO: N/A
PROJECT AREA
HAVING PARTICIPATED IN THE DESIGN OF PROJECT NO. N62742-D-0004, AREA A1 ENTRY
CONTROL POINT, AVIANO AIR BASE, ITALY, AND HAVING THOROUGHLY REVIEWED THE
COMPLETED PROJECT DOCUMENTS, I DECLARE THAT THE FACILITY DESIGN INCLUDED
HEREIN COMPLIED WITH ALL APPLICABLE ITALY CODES AND LAWS.
AVENDO PARTECIPATO ALLA DEFINIZIONE DEL PROGETTO NO. N62742-D-0004, AREA A1
ENTRY CONTROL POINT, AVIANO AIR BASE, ITALY, ED AVENDO VERIFICATO
ENTERAMENTE LA DOCUMENTAZIONE, DICHIARIAMO CHE IL PRESENTE PROGETTO E'
CONFORME ALLE LEGGI E NORMATIVE TECNICHE VIGENTI IN ITALIA.
QUALITY CONTROL REVIEW
Signature Date
DATE: SIGNATURE:
A R
E A
A
E N
TR
Y
C O
N
TR
O L
P O
IN
T
N A
V A
L
FA
C
IL
IT
Y
E N
G
IN
E E
R
IN
G S
Y S
TE
M
C O
M M
A N
D
A
TL
A N
TI
C
1917 S. 67TH ST
OMAHA, NE 68106-2973
(402) 399-1000
E - 14505
JOHN D.
SMITH
I, JOHN D. SMITH, AM THE COORDINATING
PROFESSIONAL FOR THE AVIANO ENTRY
CONTROL POINT PROJECT.
G-001
C :\p w w or ki ng \c en tra l0 1\ d1
\P -2
-1
-G -0
.D
W G
, G -0
, 4
/6 /2
7:
:3
P M
, C P
O D
A N
Y
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E
INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR.
NO.
SHEET
NAVFAC DRAWING
NO.
DES DRW CHK
OF
EPROJECT
NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
Y
E N
G
IN
E E
R
IN
G S
Y S
T E
M C
O M
M A
N D
NAVFAC METRIC DRAWFORM REVISION: 07 AUGUST 2018
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
Y E
N G
IN
E
E R
IN
G
S Y
S T
E M
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
IR
G
IN
IA
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
SS
IF
IE
D
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
AR
EA
A
EN
TR
Y C
O N
TR
O
L
PO
IN
T
LET/JSL
DPS
1917 SOUTH 67TH STREET
OMAHA, NE 68106
/7
/2
9:
:1
A M
B
IM
2_
N A
V F
A C
A
_D es ig n_ A vi an o_ Ita ly
8/
-A
-S ite
_v
.r vt
G-002
S H
E E
T
IN
D E
X
IN
DI
CE
JSR
14090005
KMT KMT
22 MARCH, 2021
APPROVED BY SCOTT KIBLER
VIA E-MAIL
1631931
N62470-21-C-0003
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N
RICHARD STEPHENS, PE
DER
NO. NAVFAC NO. CODE SHEET TITLE
INTERIOR DESIGN
149 14090152 ID101 INTERIOR PLANS AND SCHEDULES - OVERWATCH - PIANTA ARREDI E TABELLA - GARITTA
LIFE SAFETY
150 14090153 F-101 CODE COMPLIANCE SITE PLAN - PLANIMETRIA DEL SITO DI CONFORMITÀ AL CODICE
LIFE SAFETY
151 14090154 FB100 CODE ANALYSIS - GATEHOUSE - STUDIO DEL REGOLAMENTO EDILIZIO - CORPO DI GUARDIA 152 14090155 FB101 LIFE SAFETY PLAN - GATEHOUSE - PLANIMETRIA SICUREZZA ANTINCENDIO - CORPO DI GUARDIA
LIFE SAFETY
153 14090156 FC100 CODE ANALYSIS - SEARCH OFFICE - STUDIO DEL REGOLAMENTO EDILIZIO - UFFICIO CONTROLLI 154 14090157 FC101 LIFE SAFETY PLAN - SEARCH OFFICE - PLANIMETRIA SICUREZZA ANTINCENDIO - UFFICIO
CONTROLLI
MECHANICAL
158 14090161 M-001 MECHANICAL LEGEND - LEGENDA MECCANICO
159 14090162 M-002 MECHANICAL LEGEND - LEGENDA MECCANICO
PLUMBING
155 14090158 PB101 PLUMBING FLOOR PLAN - PIANTE IMPIANTO IDRAULICO
156 14090159 PB501 PLUMBING DETAILS - DETTAGLI IDRAULICI
157 14090160 PB601 PLUMBING SCHEDULES / SCHEMI IMPIANTO IDRAULICO
MECHANICAL
160 14090163 MB101 MECHANICAL FLOOR PLAN - PIANTA IMPIANTO MECCANICO
161 14090164 MB501 MECHANICAL DETAILS - DETTAGLI MECCANICO
162 14090165 MB601 MECHANICAL SCHEDULES - TABELLE IMPIANTO MECCANICO
MECHANICAL
163 14090166 MC101 MECHANICAL FLOOR PLAN / PIANTA IMPIANTO MECCANICO - SEARCH OFFICE / UFFICIO CONTROLLI
ELECTRICAL
164 14090167 E-001 ELECTRICAL LEGEND 1 - LEGENDA ELETTRICA 1
165 14090168 E-002 ELECTRICAL LEGEND 2 - LEGENDA ELETTRICA 2
166 14090169 E-003 SECURITY SYMBOLS, LEGENDS, ABBREVIATIONS AND NOTES - SIMBOLI DEI TITOLI, LEGENDE, ABBREVIAZIONI E NOTE
167 14090170 E-101 TELECOMMUNICATIONS UTILITY DEMOLITION PLAN - PIANTA DEMOLIZIONI SERVIZI DI
TELECOMUNICAZIONE
168 14090171 E-102 ELECTRICAL UTILITY DEMOLITION PLAN - PIANTA DEMOLIZIONI INRASTRUTTURE ELETTRICHE 169 14090172 E-103 ELECTRICAL & TELECOMMUNICATIONS DUCT BANK PLAN - PLANIMETRIA CONDOTTI INTERRATI
ELETTRICI E TELECOMUNICAZIONE
171 14090174 E-104 SECURITY SITE PLAN - PIANO DEL SITO DI SICUREZZA
171 14090174 E-105 SECURITY SITE PLAN - PLANIMETRIA ESTERNA SICUREZZA
172 14090175 E-501 POWER DIAGRAMS AND DETAILS - DIAGRAMMI E DETTAGLI DI POTENZA
173 14090176 E-502 RISER DIAGRAM & GROUNDING DIAGRAM - SCHEMA RISER E SCHEMA MESSA A TERRA
174 14090177 E-503 PV SOLAR DETAILS - DETTAGLI FOTOVOLTAICI
175 14090178 E-504 PV SOLAR DETAILS - DETTAGLI FOTOVOLTAICI
176 14090179 E-505 ELECTRICAL DETAILS - DETTAGLI ELETTRICI
177 14090180 E-506 TELECOMMUNICATION DETAILS - DETTAGLI SULLE TELECOMUNICAZIONI
178 14090181 E-507 TELECOMMUNICATION DETAILS - DETTAGLI SULLE TELECOMUNICAZIONI
180 14090183 E-509 SECURITY CAMERA DETAILS - DETTAGLI DELLA TELECAMERA DI SICUREZZA
181 14090184 E-510 SECURITY DETAILS - DETTAGLI SULLA SICUREZZA
182 14090185 E-511 SECURITY DETAILS - DETTAGLI SULLA SICUREZZA
183 14090186 E-512 SECURITY DETAILS - DETTAGLI SULLA SICUREZZA
184 14090187 E-513 WEDGE GATE DETAIL - DETTAGLIO CANCELLO A CUNEO
185 14090188 E-514 WEDGE GATE FOUNDATION DETAIL - DETTAGLIO FONDAZIONE CANCELLO A CUNEO
186 14090189 E-601 LUMINAIRE SCHEDULES - ORARI DEGLI APPARECCHI
187 14090190 E-602 PANEL SCHEDULES - ORARI DEL PANNELLO
188 14090191 E-603 PANEL SCHEDULES - ORARI DEL PANNELLO
189 14090192 E-604 SECURITY SINGLE LINE - SICUREZZA LINEA SINGOLA
ELECTRICAL
190 14090193 EA101 LIGHTING PLAN - ID CHECK - PIANO DI ILLUMINAZIONE - CONTROLLO ID
191 14090194 EA102 POWER PLAN - ID CHECK - POWER PLAN - CONTROLLO ID
192 14090195 EA103 LIGHTNING PROTECTION PLAN - ID CHECK - PIANO DI PROTEZIONE DAI FULMINI - CONTROLLO ID 193 14090196 EA104 PV SOLAR SITE PLAN - ID CHECK - PIANO DEL SITO SOLARE FOTOVOLTAICO - CONTROLLO ID 194 14090197 EA105 TELECOMMUNICATION PLAN - ID CHECK - PIANO TELECOMUNICAZIONI - CONTROLLO ID 195 14090198 EA106 SECURITY FLOOR PLAN - ID CHECK - PIANO DI SICUREZZA - CONTROLLO ID
ELECTRICAL
196 14090199 EB101 LIGHTING PLAN - GATEHOUSE - PIANO DI ILLUMINAZIONE - GATEHOUSE
197 14090200 EB102 POWER PLAN - GATEHOUSE - IMPIANTO ELETTRICO - GATEHOUSE
198 14090201 EB103 LIGHTNING PROTECTION PLAN - GATEHOUSE - PIANO DI PROTEZIONE DAI FULMINI - GATEHOUSE 199 14090202 EB104 TELECOMMUNICATION PLAN - GATEHOUSE - PIANO DI TELECOMUNICAZIONI - GATEHOUSE 200 14090203 EB105 SECURITY FLOOR PLAN - GATEHOUSE - PLANIMETRIA DI SICUREZZA - PORTINERIA
205 14090208 EC105 SECURITY FLOOR PLAN - SEARCH OFFICE - PLANIMETRIA DI SICUREZZA - UFFICIO DI RICERCA
ELECTRICAL
201 14090204 EC101 LIGHTING PLAN - SEARCH OFFICE - UFFICIO RICERCA PIANO DI ILLUMINAZIONE
202 14090205 EC102 POWER PLAN - SEARCH OFFICE - UFFICIO RICERCA POWER PLAN
203 14090206 EC103 LIGHTNING PROTECTION PLAN - SEARCH OFFICE - UFFICIO RICERCA PIANO PROTEZIONE FULMINI 204 14090207 EC104 TELECOMMUNICATIONS PLAN - SEARCH OFFICE - UFFICIO RICERCA PIANO TELECOMUNICAZIONI
ELECTRICAL
206 14090209 ED101 LIGHTING PLAN - OVERWATCH (BID OPTION 3) - PIANO DI ILLUMINAZIONE - OVERWATCH (OPZIONE
OFFERTA 3)
207 14090210 ED102 POWER PLAN - OVERWATCH (BID OPTION 3) - POWER PLAN - OVERWATCH (OPZIONE OFFERTA 3)
NO. NAVFAC NO. CODE SHEET TITLE
79 14090082 S-501 TYPICAL STRUCTURAL CONCRETE DETAILS - DETTAGLI STRUTTURALI TIPICI NEL CALCESTRUZZO 80 14090083 S-502 TYPICAL STRUCTURAL CONCRETE DETAILS - DETTAGLI STRUTTURALI TIPICI NEL CALCESTRUZZO 81 14090084 S-503 TYPICAL STRUCTURAL CONCRETE DETAILS - DETTAGLI STRUTTURALI TIPICI NEL CALCESTRUZZO 82 14090085 S-504 TYPICAL STRUCTURAL CONCRETE DETAILS - DETTAGLI STRUTTURALI TIPICI DI FONDAZION
83 14090086 S-505 TYPICAL STRUCTURAL FOUNDATION DETAILS
84 14090087 S-510 TYPICAL STRUCTURAL METAL DETAILS - DETTAGLI STRUTTURALI METALLICI TIPICI
STRUCTURAL
85 14090088 SA101 FOUNDATION PLAN - ID CHECK CANOPY - PIANTA FONDAZIONI - PENSILINA CONTROLLO PERMESSI 86 14090089 SA501 DETAILS - ID CHECK CANOPY - DETTAGLI PENSILINA CONTROLLO PERMESSI
STRUCTURAL
87 14090090 SB101 FOUNDATION PLAN - GATEHOUSE - PIANTA FONDAZIONI CORPO DI GUARDIA 88 14090091 SB102 ROOF FRAMING PLAN - GATEHOUSE - CARPENTERIA COPERTURA CORPO DI GUARDIA 89 14090092 SB501 SECTIONS AND DETAILS - GATEHOUSE - SEZIONI E DETTAGLI CORPO DI GUARDIA 90 14090093 SB502 SECTIONS AND DETAILS - GATEHOUSE - SEZIONI E DETTAGLI CORPO DI GUARDIA
STRUCTURAL
91 14090094 SC101 FOUNDATION PLAN - SEARCH OFFICE - PIANTA FONDAZIONI UFFICIO CONTROLLI 92 14090095 SC102 ROOF FRAMING PLAN - SEARCH OFFICE - CARPENTERIA COPERTURA - UFFICIO CONTROLLI 93 14090096 SC501 SECTIONS AND DETAILS - SEARCH OFFICE - SEZIONI E DETTAGLI DI UFFICIO CONTROLLI 94 14090097 SC502 SECTIONS AND DETAILS - SEARCH OFFICE - SEZIONI E DETTAGLI DI UFFICIO CONTROLLI
STRUCTURAL
95 14090098 SD101 FOUNDATION PLAN - 0VERWATCH (BID OPTION 3) - PIANTA FONDAZIONI -TORRE DI GUARDIA
ARCHITECTURE
96 14090099 A-001 ARCHITECTURAL SYMBOLS, LEGENDS, ABBREVIATIONS AND NOTES - SIMBOLI ARCHITETTONICI, LEGENDE, ABBREVIAZIONI E NOTE
97 14090100 A-101 DEMOLITION PLAN - EXISTING BUILDING 1001 - PIANTA DEMOLIZIONI - EDIFICIO 1001 ESISTENTE 98 14090101 A-102 DEMOLITION PLAN - EXISTING BUILDING 103 - PIANTA DEMOLIZIONI- EDIFICIO 103 ESISTENTE 99 14090102 A-103 DEMOLITION PLAN - EXISTING BUILDING 103 - PIANTA DEMOLIZIONI- EDIFICIO 103 ESISTENTE
100 14090103 A-104 DEMOLITION IMAGES - FOTO DELLE DEMOLIZIONI
101 14090104 A-105 DEMOLITION PLAN - EXISTING BUILDING 106 - PIANTA DEMOLIZIONI- EDIFICIO 106 ESISTENTE
102 14090105 A-106 DEMOLITION IMAGES - FOTO DELLE DEMOLIZIONI
103 14090106 A-107 DEMOLITION IMAGES - FOTO DELLE DEMOLIZIONI
104 14090107 A-108 DEMOLITION SCHEDULES - TABELLA DEMOLIZIONI
105 14090108 A-109 DEMOLITION SCHEDULES - TABELLA DEMOLIZIONI
106 14090109 A-501 WALL SCHEDULE - ABACO DELLE PARETI
107 14090110 A-502 WALL SCHEDULE - ABACO DELLE PARETI
108 14090111 A-503 WALL SCHEDULE - ABACO DELLE PARETI
109 14090112 A-504 DETAILS - DETTAGLI
110 14090113 A-505 DETAILS - DETTAGLI
111 14090114 A-506 DETAILS - DETTAGLI
ARCHITECTURE
112 14090115 AA101 FLOOR PLAN - ID CHECK - PIANTA LIVELLO TERRA - CONTROLLO
113 14090116 AA102 ROOF PLAN - ID CHECK - PIANTA COPERTURE - CONTROLLO
114 14090117 AA103 REFLECTED CEILING PLAN - ID CHECK - PIANTA RIFLESSA CONTROSOFFITTI - CONTROLLO
115 14090118 AA201 BUILDING ELEVATIONS - ID CHECK - PROSPETTI EDIFICIO CONTROLLO
116 14090119 AA202 BUILDING ELEVATIONS - ID CHECK - PROSPETTI EDIFICIO CONTROLLO
117 14090120 AA301 SECTIONS - ID CHECK - SEZIONI EDIFICIO CONTROLLO
ARCHITECTURE
118 14090121 AB101 FLOOR PLAN - GATEHOUSE - PIANO TERRA - CORPO DI GUARDIA
119 14090122 AB102 ROOF PLAN - GATEHOUSE - COPERTURA - CORPO DI GUARDIA
120 14090123 AB103 REFLECTED CEILING PLAN - GATEHOUSE - PIANTA RIFLESSA CONTROSOFFITTI - CORPO DI
GUARDIA
121 14090124 AB104 SIGNAGE PLAN - GATEHOUSE - PIANTA SEGNALETICA - CORPO DI GUARDIA 122 14090125 AB201 BUILDING ELEVATIONS - GATEHOUSE - PROSPETTI - CORPO DI GUARDIA 123 14090126 AB202 BUILDING ELEVATIONS - GATEHOUSE - PROSPETTI - CORPO DI GUARDIA
124 14090127 AB301 BUILDING SECTIONS - GATEHOUSE - SEZIONI - CORPO DI GUARDIA
125 14090128 AB302 WALL SECTIONS - GATEHOUSE - SEZIONI - CORPO DI GUARDIA
126 14090129 AB303 WALL SECTIONS - GATEHOUSE - SEZIONI - CORPO DI GUARDIA
127 14090130 AB401 ENLARGED VIEWS - GATEHOUSE - VISTE INGRANDITE - CORPO DI GUARDIA 128 14090131 AB501 WINDOW ELEVATIONS - GATEHOUSE - ABACO DEGLI INFISSI - CORPO DI GUARDIA 129 14090132 AB502 WINDOW DETAILS - GATEHOUSE - DETTAGLI FINESTRE – CORPO DI GUARDIA
130 14090133 AB503 DETAILS - GATEHOUSE - DETTAGLI - CORPO DI GUARDIA
131 14090134 AB504 DETAILS - GATEHOUSE - DETTAGLI - CORPO DI GUARDIA
132 14090135 AB601 DOOR SCHEDULE AND DETAILS - GATEHOUSE - TABELLA PORTE E DETTAGLI - CORPO DI GUARDIA
ARCHITECTURE
133 14090136 AC101 FLOOR PLAN - SEARCH OFFICE - PIANO TERRA - UFFICIO CONTROLLI
134 14090137 AC102 ROOF PLAN - SEARCH OFFICE - PIANTA COPERTURA - UFFICIO CONTROLLI 135 14090138 AC103 REFLECTED CEILING PLAN - SEARCH OFFICE - PIANTA RIFLESSA CONTROSOFFITTI - UFFICIO
CONTROLLI
136 14090139 AC104 SIGNAGE PLAN - SEARCH OFFICE - PIANTA SEGNALETICA - UFFICIO CONTROLLI 137 14090140 AC201 BUILDING ELEVATIONS - SEARCH OFFICE - PROSPETTI - UFFICIO DI GUARDIA 138 14090141 AC202 BUILDING ELEVATIONS - SEARCH OFFICE - PROSPETTI - UFFICIO DI GUARDIA 139 14090142 AC301 BUILDING SECTIONS - SEARCH OFFICE - SEZIONI - UFFICO CONTROLLI 140 14090143 AC302 WALL SECTIONS - SEARCH OFFICE - SEZIONI PARETI - UFFICO CONTROLLI
141 14090144 AC501 DETAILS - SEARCH OFFICE - DETTAGLI - UFFICIO CONTROLLI
142 14090145 AC601 DOOR SCHEDULE AND DETAILS - SEARCH OFFICE - TABELLA PORTE E DETTAGLI - UFFICIO
CONTROLLI
143 14090146 AC602 WINDOW ELEVATIONS - SEARCH OFFICE - PROSPETTI PORTE - UFFICIO CONTROLLI
ARCHITECTURE
144 14090147 AD101 PLANS AND ELEVATIONS - OVERWATCH - PIANTE E PROSPETTI - GARITTA
INTERIOR DESIGN
145 14090148 IB101 INTERIOR FINISH PLAN AND SCHEDULES - GATEHOUSE - PIANTA FINITURE INTERNE E TABELLE –
CORPO DI GUARDIA
146 14090149 IB102 INTERIOR FURNITURE PLAN - GATEHOUSE - PIANTA FORNITURE INTERNE – CORPO DI GUARDIA
INTERIOR DESIGN
147 14090150 IC101 INTERIOR FINISH PLAN AND SCHEDULES - SEARCH OFFICE - PIANTA FINITURE INTERNE E TABELLE
– UFFICIO CONTROLLI
148 14090151 IC102 INTERIOR FURNITURE PLAN - SEARCH OFFICE - PIANTA FORNITURE INTERNE – UFFICIO
CONTROLLI
NO. NAVFAC NO. CODE SHEET TITLE
GENERAL
1 14090004 G-001 COVER SHEET - COPERTINA
2 14090005 G-002 SHEET INDEX - INDICE
3 14090006 G-101 OVERALL PROJECT PHASING PLAN - PLANIMETRIA GENERALE DELLE FASI DI PROGETTO
4 14090007 G-102 CONSTRUCTION PHASE 1A PLAN - PLANIMETRIA FASE COSTRUTTIVA 1A
5 14090008 G-103 CONSTRUCTION PHASE 1B PLAN - PLANIMETRIA FASE DI COSTRUZIONE 1B
6 14090009 G-104 CONSTRUCTION PHASE 2 PLAN - PLANIMETRIA FASE DI COSTRUZIONE 2
7 14090010 G-105 CONSTRUCTION PHASE 3 PLAN - PLANIMETRIA FASE DI COSTRUZIONE 3
CIVIL
8 14090011 B-101 SUBSURFACE INVESTIGATION PLAN - PLANIMETRIA DI INDAGINE SOTTOSUOLO 9 14090012 B-102 SOIL BORINGS LOG SHEET 1 OF 4 - RILIEVO DI TRIVELLAZIONE DEL SUOLO 1 DI 4 10 14090013 B-103 SOIL BORINGS LOG SHEET 2 OF 4 - RILIEVO DI TRIVELLAZIONE DEL SUOLO 2 DI 4 11 14090014 B-104 SOIL BORINGS LOG SHEET 3 OF 4 - RILIEVO DI TRIVELLAZIONE DEL SUOLO 3 DI 4 12 14090015 B-105 SOIL BORINGS LOG SHEET 4 OF 4 - RILIEVO DI TRIVELLAZIONE DEL SUOLO 4 DI 4
13 14090016 B-106 LABORATORY TEST RESULTS - RISULTATI DELLE PROVE DI LABORATORIO
CIVIL
14 14090017 C-001 CIVIL SYMBOLOGY - SIMBOLOGIA SERVIZI
15 14090018 C-101 EXISTING CONDITIONS - STATO DI FATTO
16 14090019 C-102 GENERAL SITE DEMOLITION PLAN - PLANIMETRIA GENERALE DI DEMOLIZIONE 17 14090020 C-103 STORM DRAINAGE UTILITY DEMOLITION PLAN - PLANIMETRIA DELLE DEMOLIZIONI DEGLI IMPIANTI
DI SCARICO DELLE ACQUE METEORICHE
18 14090021 C-104 SANITARY SEWER UTILITY DEMOLITION PLAN - PLANIMETRIA DELLE DEMOLIZIONI DELL'IMPIANTO
FOGNARIO
19 14090022 C-105 WATER UTILITY DEMOLITION PLAN - PLANIMETRIA DELLE DEMOLIZIONI DELLA RETE IDRICA 20 14090023 C-106 NATURAL GAS UTILITY DEMOLITION PLAN - PLANIMETRIA DELLE DEMOLIZIONI IMPIANTO GAS
NATURALE
21 14090024 C-107 SITE PLAN - PLANIMETRIA DEL SITO
22 14090025 C-108 GEOMETRICS PLAN - PLANIMETRIA DELLE GEOMETRIE
23 14090026 C-109 GRADING AND DRAINAGE PLAN - PLANIMETRIA QUOTATA E DRENAGGIO
24 14090027 C-110 CIVIL UTILITY PLAN - PLANIMETRIA SOTTOSERVIZI
25 14090028 C-111 STORM SEWER UTILITY PLAN - PLANIMETRIA IMPIANTO ACQUE METEORICHE
26 14090029 C-112 SANITARY SEWER UTILITY PLAN - PLANIMETRIA IMPIANTO FOGNARIO
27 14090030 C-113 WATER UTILITY PLAN - PLANIMETRIA RETE IDRICA
28 14090031 C-114 TEMPORARY GATE 3 ACCESS POINT - PUNTO DI ACCESSO TEMPORANEO 3
29 14090032 C-115 CIVIL SIGNING PLAN - PLANIMETRIA DI SEGNALETICA STRADALE
30 14090033 C-116 CIVIL PAVEMENT STRIPING PLAN - PLANIMETRIA DELLA SEGNALETICA ORIZZONTALE 31 14090034 C-117 BID OPTION 2 - NORTH PARKING LOT - OPZIONE DI GARA 2 - PARCHEGGIO NORD 32 14090035 C-201 MAIN GATE PAVEMENT PROFILES - PROFILI DELLA PAVIMENTAZIONE AL CANCELLO PRINCIPALE
33 14090036 C-202 DRAINAGE PROFILES - PROFILI DI SCARICO
34 14090037 C-203 DRAINAGE PROFILES CONT. - PROFILI DI SCARICO (SEGUE)
35 14090038 C-204 DRAINAGE PROFILES - CANOPY - PROFILI DI SCARICO - TETTOIA
36 14090039 C-205 PROFILES - CROSS BASIN CONNECTORS
37 14090040 C-206 SEWER PROFILES - PROFILI RETE FOGNARIA
38 14090041 C-207 WATER PROFILES - PROFILI RETE IDRICA
39 14090042 C-301 TYPICAL SECTIONS - SEZIONI TIPICHE
40 14090043 C-302 TYPICAL SECTIONS - SEZIONI TIPICHE
41 14090044 C-303 CROSS SECTIONS - ENTRANCE - SEZIONI TRASVERSALI - INGRESSO
42 14090045 C-304 CROSS SECTIONS - MAINLINE - SEZIONI TRASVERSALI - LINEA PRINCIPALE 43 14090046 C-305 CROSS SECTIONS - MAINLINE - SEZIONI TRASVERSALI - LINEA PRINCIPALE 44 14090047 C-306 CROSS SECTIONS - MAINLINE - SEZIONI TRASVERSALI - LINEA PRINCIPALE 45 14090048 C-307 CROSS SECTIONS - MAINLINE - SEZIONI TRASVERSALI - LINEA PRINCIPALE 46 14090049 C-308 CROSS SECTIONS - MAINLINE - SEZIONI TRASVERSALI - LINEA PRINCIPALE 47 14090050 C-401 ENLARGED GEOMETRICS PLAN - PLANIMETRIA INGRANDITA DELLE GEOMETRIE
48 14090051 C-402 AVB SITE PLAN - PLANIMETRIA BARRIERE VEICOLARI AUTOMATICHE
49 14090052 C-403 PCC ROAD PLAN - PLANIMETRIA STRADE IN CLS
50 14090053 C-404 STORM WATER UTILITY PLAN - PLANIMETRIA SCARICO DELLE ACQUE METEORICHE
51 14090054 C-501 CIVIL DETAILS - DETTAGLI CIVILI
52 14090055 C-502 CIVIL DETAILS - DETTAGLI CIVILI
53 14090056 C-503 CIVIL DETAILS - DETTAGLI CIVILI
54 14090057 C-504 CIVIL DETAILS - DETTAGLI CIVILI
55 14090058 C-505 CIVIL DETAILS - DETTAGLI CIVILI
56 14090059 C-506 CIVIL DETAILS - DETTAGLI CIVILI
57 14090060 C-507 CIVIL DETAILS - DETTAGLI CIVILI
58 14090061 C-508 CIVIL DETAILS - DETTAGLI CIVILI
59 14090062 C-509 CIVIL DETAILS - DETTAGLI CIVILI
60 14090063 C-510 CIVIL DETAILS - DETTAGLI CIVILI
61 14090064 C-511 CIVIL DETAILS - DETTAGLI CIVILI
62 14090065 C-512 CIVIL DETAILS - DETTAGLI CIVILI
63 14090066 C-513 CIVIL DETAILS - DETTAGLI CIVILI
64 14090067 C-514 CIVIL DETAILS - DETTAGLI CIVILI
65 14090068 C-515 CIVIL DETAILS - DETTAGLI CIVILI
66 14090069 C-516 CIVIL DETAILS - DETTAGLI CIVILI
67 14090070 C-601 GRADING POINT TABLES - TABELLE PUNTI QUOTATI
68 14090071 C-602 GRADING POINT TABLES 2 - TABELLE PUNTI QUOTATI
69 14090072 C-603 UTILITY STRUCTURE UPDATES - AGGIORNAMENTI DELLA RETE DI SOTTOSERVIZI 70 14090073 C-604 SIGNAGE LOCATION TABLE - TABELLA DELLE POSIZIONI DELLA SEGNALETICA
71 14090074 C-605 SIGNAGE SCHEDULE - TABELLA DELLA SEGNALETICA
72 14090075 C-606 CIVIL PAVEMENT STRIPING POINT TABLES - TABELLE DEI PUNTI DI DISPOSIZIONE DELLA
SEGNALETICA ORIZZONTALE
LANDSCAPE
73 14090076 L-101 OVERALL LANDSCAPE SITE PLAN - PLANIMETRIA PAESAGGISTICA GENERALE
74 14090077 L-501 LANDSCAPE DETAILS - PARTICOLARI PAESAGGISTICI
75 14090078 LH-501 HARDSCAPE DETAILS - PARTICOLARI IN PIETRA
STRUCTURAL
76 14090079 S-001 GENERAL STRUCTURAL NOTES - NOTE GENERALI STRUTTURALI
77 14090080 S-002 GENERAL STRUCTURAL NOTES - NOTE GENERALI STRUTTURALI
78 14090081 S-003 GENERAL STRUCTURAL NOTES AND PLAN LEGEND - NOTE GENERALI STRUTTURALI E LEGENDA DI
TAVOLA
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
Reference point
ST
O P
X X
X X
X X
X X
X X
X
X X
X X
X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X X
X X
X X
X
X
X X
X
X
X
X
X
X
X
X
X
X
A R
E A
A
E N
TR
Y
C O
N
TR
O L
P O
IN
T
N A
V A
L
FA
C
IL
IT
Y
E N
G
IN
E E
R
IN
G S
Y S
TE
M
C O
M M
A N
D
A
TL
A N
TI
C
1917 S. 67TH ST
OMAHA, NE 68106-2973
(402) 399-1000
E - 17437
CHRISTOPHER J.
PODANY
G-101
3010 40m20 1:400
SCALE:
OVERALL PROJECT PHASING PLAN -
1:400
PLAN
NORTH
GENERAL NOTES - NOTE GENERALI
LEGEND - LEGENDA
KEYNOTES - NOTE CHIAVE
PHASE 1A - FASE 1A
PHASE 1B - FASE 1B
PHASE 2 - FASE 2
PHASE 3 - FASE 3
PLANIMETRIA GENERALE DELLE FASI DI PROGETTO
c:
\p w w or ki ng \c en tra l0 1\ d1
\P -2
-1
-G -1
.D
W G
.d w g, G
-1
, 4 /6
/2
7:
:0
P
M , C
H E
M P
H
IL
L
STOP
O P
ST
OP
R12
N: 5104435.59 E: 312857.23
N: 5104450.21 E: 312872.43
N: 5104426.14 E: 312850.29
N: 5104414.14 E: 312862.12
N: 5104419.42 E: 312862.12
N: 5104419.44 E: 312866.33
N: 5104432.92 E: 312843.93
R15
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
X
A
A
X
X
X
XXX
X
X X
X X
X X
X
X
X
X X
X
X
X
WORK AREA A
AREA DI LAVORO A
DRIVING LANE,
3.1M MIN.
CORSIA DI
GUIDA 3.1 M
MINIMO
PEDESTRIAN WALKWAY,
1.5M MIN.
PASSAGGIO PEDONALE
1.5M MINIMO
TEMP FENCING
RECINZIONE TEMPORANEA
D3 SECTION A-A - SEZIONE A-A
A R
E A
A
E N
TR
Y
C O
N
TR
O L
P O
IN
T
N A
V A
L
FA
C
IL
IT
Y
E N
G
IN
E E
R
IN
G S
Y S
TE
M
C O
M M
A N
D
A
TL
A N
TI
C
1917 S. 67TH ST
OMAHA, NE 68106-2973
(402) 399-1000
E - 17437
CHRISTOPHER J.
PODANY
GENERAL NOTES - NOTE GENERALI
3010 40m20 1:400
1. NORMAL OPERATION OF EXISTING GATES 1 & 3.
NORMALE OPERATIVITA' DEGLI INGRESSI ESISTENTI UNO E TRE
2. CLEAN AND MAINTAIN EROSION AND SEDIMENT CONTROL DEVICES DURING
CONSTRUCTION AND REMOVE ANY SEDIMENT RESULTING FROM CONSTRUCTION.
PULIRE E FARE MANUTENZIONE AI DISPOSITIVI DI CONTROLLO DELL'EROSIONE E
DEI SEDIMENTI DURANTE LA COSTRUZIONE E RIMUOVERE EVENTUALI SEDIMENTI
RISULTANTI DALLA COSTRUZIONE.
3. COORDINATE ALL LAND DISTURBING ACTIVITIES TO MINIMIZE SEDIMENTATION
DAMAGE.
COORDINARE TUTTE LE ATTIVITÀ CHE PERTURBANO IL TERRENO PER RIDURRE AL
MINIMO I DANNI CAUSATI DALLA SEDIMENTAZIONE.
4. SEDIMENT IS NOT PERMITTED TO LEAVE THE PROJECT. PROVIDE MEASURES IN
ADDITION TO THOSE SHOWN TO CONTROL DUST, STABILIZE SITE, AND AVOID
SILTING OF STREAMS.
NON È CONSENTITO LASCIARE SEDIMENTI. FORNIRE TUTTE LE MISURE PREVENTIVE
OLTRE A QUELLE INDICATE PER CONTROLLARE LA POLVERE, STABILIZZARE IL SITO
ED EVITARE L'INSABBIAMENTO DEI FLUSSI.
5. PROVIDE SEDIMENT FENCING AROUND CATCH BASINS DURING GRADING. ONCE
PAVEMENT HAS BEEN CONSTRUCTED, PROVIDE ROLLED INLET PROTECTION
DEVICES.
INSTALLARE UNA RECINZIONE PER I SEDIMENTI ATTORNO AI BACINI DI RACCOLTA
DURANTE LA MOVIMENTAZIONE DEL TERRENO. UNA VOLTA CHE LA
PAVIMENTAZIONE È STATA COSTRUITA, FORNIRE ADEGUATI DISPOSITIVI DI
PROTEZIONE DI RACCOLTA.
6. SCHEDULE TEMPORARY SEEDING OPERATIONS IMMEDIATELY AFTER SITE GRADING
WORK IS COMPLETE.
PIANIFICARE LE OPERAZIONI DI SEEDING TEMPORANEO IMMEDIATAMENTE DOPO IL
COMPLETAMENTO DEL LAVORO DI CLASSIFICAZIONE DEL SITO.
7. REMOVE THE TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AND VERIFY
THE CLEANING OUT OF ALL STORM DRAINAGE STRUCTURES ONCE FINAL
STABILIZATION HAS OCCURRED.
RIMUOVERE I DISPOSITIVI TEMPORANEI DI CONTROLLO ALL'EROSIONE E DEI
SEDIMENTI E VERIFICARE LA PULIZIA DI TUTTE LE STRUTTURE DI DRENAGGIO
APPENA COMPLETATA LA STABILIZZAZIONE DEL SITO.
1. CONSTRUCT TEMPORARY PAVEMENT. CONTRACTOR TO KEEP TWO LANES OPEN AT
ALL TIMES.
OSTRUIRE PAVIMENTAZIONE PROVVISORIA. L'APPALTATORE DEVE GARANTIRE DUE
CORSIE SEMPRE APERTE.
2. PROVIDE POST-DRIVEN CHAIN LINK FENCING TO SECURE WORK AREA A. FENCING
MUST CONNECT TO THE EXISTING PERIMETER WALL, FORMING A CONTIGUOUS
PERIMETER AND PREVENTING ACCESS TO AREA A1. PROVIDE A VEHICLE GATE WITH
ACCESS TO VIA PEDEMONTE.
FORNIRE RECINZIONI IN RETE METALLICA PER METTERE IN SICUREZZA L'AREA DI
LAVORO A. LA RECINZIONE DEVE COLLEGARSI ALL'ESISTENTE PARETE PERIMETRALE,
FORMANDO UN PERIMETRO CONTIGUO IMPEDENDO L'ACCESSO ALL'AREA A1.
PREVEDERE UN INGRESSO PER VEICOLI CON ACCESSO SU VIA PEDEMONTE.
3. PROVIDE TEMPORARY CHAIN LINK PANEL FENCING TO SECURE WORK AREA B.
PROVIDE A VEHICLE GATE.
FORNIRE UNA RECINZIONE TEMPORANEA IN PANNELLI DI RETE METALLICA PER
METTERE IN SICUREZZA L'AREA DI LAVORO B. FORNIRE UN PASSAGGIO PER I VEICOLI.
4. CONSTRUCT ID CHECK AREA FACILITIES INCLUDING, GATEHOUSE, CANOPY, GUARD
BOOTHS, AND SEARCH OFFICE.
COSTRUIRE UNA STRUTTURA DI CONTROLLO CHE INCLUDA, UN CORPO DI GUARDIA,
UNA PENSILINA, CABINE DI GUARDIA PREFABBRICATE, UN UFFICIO CONTROLLI.
5. CONSTRUCT OVERWATCH.
COSTRUIRE UNA GARITTA.
6. CONSTRUCT AND COMMISSION FINAL DENIAL BARRIERS.
COSTRUIRE E COMMISSIONARE UNA BARRIERA VEICOLARE FINALE.
7. CONSTRUCT PASSIVE BARRIER WITHIN WORK AREA.
COSTRUIRE UNA BARRIERA PASSIVA ALL'INTERNO DELL'AREA DI LAVORO.
8. DEMOLISH BUILDING 103.
DEMOLIRE L'EDIFICIO 103.
9. DEMOLISH BUILDING 106.
DEMOLIRE L'EDIFICIO 106.
10. SHIFT EXISTING CONC. BARRIER. COORDINATE BARRIER RELOCATION WITH
CONTRACTING OFFICER.
SPOSTARE L'ESISTENTE BARRIERA IN CALCESTRUZZO. COORDINARNE LA
RICOLLOCAZIONE CON L'UFFICIALE CONTRAENTE.
11. MATCH EXISTING EDGE OF ROADWAY.
INTERVENIRE SINO AL MARGINE ESISTENTE DELLA STRADA
12. CONSTRUCT SIDEWALK OUTSIDE OF WORK AREA TO MAINTAIN PEDESTRIAN ACCESS TO BUILDING
108 AT ALL TIMES.
REALIZZARE UN MARCIAPIEDE AL DI FUORI DELL'AREA DI LAVORO PER CONSENTIRE
L'ACCESSO PEDONALE ALL'EDIFICIO 108 IN OGNI MOMENTO.
LEGEND - LEGENDA
G-102
CONSTRUCTION PHASE 1A PLAN -
1:400
PLAN
NORTH
TEMPORARY PAVEMENT - PAVIMENTAZIONE TEMPORANEA
WORK AREA - AREA DI LAVORO
STAGING AREA - AREA DI SOSTA
TEMPORARY FENCING - RECINZIONE TEMPORANEA
SEDIMENT FENCING - RECINZIONE PER SEDIMENTI
X
KEYNOTES - NOTE CHIAVE
PLANIMETRIA FASE COSTRUTTIVA 1A
c:
\p w w or ki ng \c en tra l0 1\ d1
\P -2
-1
-G -1
.D
W G
, G -1
, 4
/3 0/
:3
1:
P M
, C H
E M
P H
X
X X
X X
X
X
X
X
X X
X
WORK AREA B
AREA DI LAVORO B
STOP
ST
O P
ST
OP
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
X
X
X
A R
E A
A
E N
TR
Y
C O
N
TR
O L
P O
IN
T
N A
V A
L
FA
C
IL
IT
Y
E N
G
IN
E E
R
IN
G S
Y S
TE
M
C O
M M
A N
D
A
TL
A N
TI
C
1917 S. 67TH ST
OMAHA, NE 68106-2973
(402) 399-1000
E - 17437
CHRISTOPHER J.
PODANY
GENERAL NOTES - NOTE GENERALI
3010 40m20 1:400
1. NORMAL OPERATION OF EXISTING GATES 1 & 3.
NORMALE OPERATIVITA' DEGLI INGRESSI ESISTENTI 1 E 3
2. CLEAN AND MAINTAIN EROSION AND SEDIMENT CONTROL DEVICES DURING
CONSTRUCTION AND REMOVE ANY SEDIMENT RESULTING FROM CONSTRUCTION.
PULIRE E FARE MANUTENZIONE AI DISPOSITIVI DI CONTROLLO DELL'EROSIONE E
DEI SEDIMENTI DURANTE LA COSTRUZIONE E RIMUOVERE EVENTUALI SEDIMENTI
RISULTANTI DALLA COSTRUZIONE.
3. COORDINATE ALL LAND DISTURBING ACTIVITIES TO MINIMIZE SEDIMENTATION
DAMAGE.
COORDINARE TUTTE LE ATTIVITÀ CHE PERTURBANO IL TERRENO PER RIDURRE AL
MINIMO I DANNI CAUSATI DALLA SEDIMENTAZIONE.
4. SEDIMENT IS NOT PERMITTED TO LEAVE THE PROJECT. PROVIDE MEASURES IN
ADDITION TO THOSE SHOWN TO CONTROL DUST, STABILIZE SITE, AND AVOID SILTING
OF STREAMS.
NON È CONSENTITO LASCIARE SEDIMENTI. FORNIRE TUTTE LE MISURE PREVENTIVE
OLTRE A QUELLE INDICATE PER CONTROLLARE LA POLVERE, STABILIZZARE IL SITO
ED EVITARE L'INSABBIAMENTO DEI FLUSSI.
5. PROVIDE SEDIMENT FENCING AROUND CATCH BASINS DURING GRADING. ONCE
PAVEMENT HAS BEEN CONSTRUCTED, PROVIDE ROLLED INLET PROTECTION
DEVICES.
INSTALLARE UNA RECINZIONE PER I SEDIMENTI ATTORNO AI BACINI DI RACCOLTA
DURANTE LA MOVIMENTAZIONE DEL TERRENO. UNA VOLTA CHE LA
PAVIMENTAZIONE È STATA COSTRUITA, FORNIRE ADEGUATI DISPOSITIVI DI
PROTEZIONE DI RACCOLTA.
6. SCHEDULE TEMPORARY SEEDING OPERATIONS IMMEDIATELY AFTER SITE GRADING
WORK IS COMPLETE.
PIANIFICARE LE OPERAZIONI DI SEEDING TEMPORANEO IMMEDIATAMENTE DOPO IL
COMPLETAMENTO DEL LAVORO DI CLASSIFICAZIONE DEL SITO.
7. REMOVE THE TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AND VERIFY
THE CLEANING OUT OF ALL STORM DRAINAGE STRUCTURES ONCE FINAL
STABILIZATION HAS OCCURRED.
RIMUOVERE I DISPOSITIVI TEMPORANEI DI CONTROLLO ALL'EROSIONE E DEI
SEDIMENTI E VERIFICARE LA PULIZIA DI TUTTE LE STRUTTURE DI DRENAGGIO
APPENA COMPLETATA LA STABILIZZAZIONE DEL SITO.
1. CONSTRUCT TEMPORARY PAVEMENT. CONTRACTOR TO KEEP
TWO LANES OPEN AT ALL TIMES.
COSTRUIRE PAVIMENTAZIONE PROVVISORIA. L'APPALTATORE
DEVE GARANTIRE DUE CORSIE SEMPRE APERTE.
2. PROVIDE POST-DRIVEN CHAIN LINK FENCING TO SECURE WORK
AREA A. FENCING MUST CONNECT TO THE EXISTING
PERIMETER WALL, FORMING A CONTIGUOUS PERIMETER AND
PREVENTING ACCESS TO AREA A1. PROVIDE A VEHICLE GATE
WITH ACCESS TO VIA PEDEMONTE.
FORNIRE RECINZIONI IN RETE METALLICA PER METTERE IN
SICUREZZA L'AREA DI LAVORO A. LA RECINZIONE DEVE
COLLEGARSI ALL'ESISTENTE PARETE PERIMETRALE,
FORMANDO UN PERIMETRO CONTIGUO IMPEDENDO L'ACCESSO
ALL'AREA A1. PREVEDERE UN INGRESSO PER VEICOLI CON
ACCESSO SU VIA PEDEMONTE.
3. PROVIDE TEMPORARY CHAIN LINK PANEL FENCING TO SECURE
WORK AREA B. PROVIDE A VEHICLE GATE.
FORNIRE UNA RECINZIONE TEMPORANEA IN PANNELLI DI RETE
METALLICA PER METTERE IN SICUREZZA L'AREA DI LAVORO B.
FORNIRE UN PASSAGGIO PER I VEICOLI.
4. CONSTRUCT ID CHECK AREA FACILITIES INCLUDING,
GATEHOUSE, CANOPY, GUARD BOOTHS, AND SEARCH OFFICE.
COSTRUIRE UNA STRUTTURA DI CONTROLLO CHE INCLUDA, UN
CORPO DI GUARDIA, UNA PENSILINA, CABINE DI GUARDIA
PREFABBRICATE, UN UFFICIO CONTROLLI.
5. CONSTRUCT OVERWATCH.
COSTRUIRE UNA GARITTA.
6. CONSTRUCT AND COMMISSION FINAL DENIAL BARRIERS.
COSTRUIRE E COMMISSIONARE UNA BARRIERA VEICOLARE
FINALE.
7. CONSTRUCT PASSIVE BARRIER WITHIN WORK AREA.
COSTRUIRE UNA BARRIERA PASSIVA ALL'INTERNO DELL'AREA
DI LAVORO.
8. DEMOLISH BUILDING 103.
DEMOLIRE L'EDIFICIO 103.
9. DEMOLISH BUILDING 106.
DEMOLIRE L'EDIFICIO 106.
10. SHIFT EXISTING CONC. BARRIER. COORDINATE BARRIER
RELOCATION WITH CONTRACTING OFFICER.
SPOSTARE L'ESISTENTE BARRIERA IN CALCESTRUZZO.
COORDINARNE LA RICOLLOCAZIONE CON L'UFFICIALE
CONTRAENTE.
11. MATCH EXISTING EDGE OF ROADWAY.
INTERVENIRE SINO AL MARGINE ESISTENTE DELLA STRADA
G-103
SCALE:
CONSTRUCTION PHASE 1B PLAN -
1:400
KEYNOTES - NOTE CHIAVE
PLAN
NORTH
PLANIMETRIA FASE DI COSTRUZIONE 1B
LEGEND - LEGENDA
TEMPORARY PAVEMENT - PAVIMENTAZIONE TEMPORANEA
WORK AREA - AREA DI LAVORO
STAGING AREA - AREA DI SOSTA
TEMPORARY FENCING - RECINZIONE TEMPORANEA
SEDIMENT FENCING - RECINZIONE PER SEDIMENTI
X c:
\p w w or ki ng \c en tra l0 1\ d1
\P -2
-1
-G -1
.d w g, G -1
, 4
/3 0/
:3
2:
P M
, C H
E M
P H
X
X
X
X
Reference point
ST
O P
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X
X
XX
X
XXX
X X
X X
X
X
X
X
X
X
X X
X
A R
E A
A
E N
TR
Y
C O
N
TR
O L
P O
IN
T
N A
V A
L
FA
C
IL
IT
Y
E N
G
IN
E E
R
IN
G S
Y S
TE
M
C O
M M
A N
D
A
TL
A N
TI
C
1917 S. 67TH ST
OMAHA, NE 68106-2973
(402) 399-1000
E - 17437
CHRISTOPHER J.
PODANY
GENERAL NOTES - NOTE GENERALI
3010 40m20 1:400
1. CLOSE ACCESS TO GATE 1. BASE TRAFFIC USE TEMPORARY ACCESS POINT AT GATE
3 DURING THIS STAGE.
CHIUDERE L'ACCESSO DALL' INGRESSO UNO. DURANTE QUESTA FASE ,INDIRIZZARE
IL TRAFFICO VERSO IL GATE TRE COME PUNTO DI ACCESSO TEMPORANEO.
2. CLEAN AND MAINTAIN EROSION AND SEDIMENT CONTROL DEVICES DURING
CONSTRUCTION AND REMOVE ANY SEDIMENT RESULTING FROM CONSTRUCTION.
PULIRE E FARE MANUTENZIONE AI DISPOSITIVI DI CONTROLLO DELL'EROSIONE E
DEI SEDIMENTI DURANTE LA COSTRUZIONE E RIMUOVERE EVENTUALI SEDIMENTI
RISULTANTI DALLA COSTRUZIONE.
3. COORDINATE ALL LAND DISTURBING ACTIVITIES TO MINIMIZE SEDIMENTATION
DAMAGE.
COORDINARE TUTTE LE ATTIVITÀ CHE PERTURBANO IL TERRENO PER RIDURRE AL
MINIMO I DANNI CAUSATI DALLA SEDIMENTAZIONE.
4. SEDIMENT IS NOT PERMITTED TO LEAVE THE PROJECT. PROVIDE MEASURES IN
ADDITION TO THOSE SHOWN TO CONTROL DUST, STABILIZE SITE, AND AVOID
SILTING OF STREAMS.
NON È CONSENTITO LASCIARE SEDIMENTI. FORNIRE TUTTE LE MISURE PREVENTIVE
OLTRE A QUELLE INDICATE PER CONTROLLARE LA POLVERE, STABILIZZARE IL SITO
ED EVITARE L'INSABBIAMENTO DEI FLUSSI.
5. PROVIDE SEDIMENT FENCING AROUND CATCH BASINS DURING GRADING. ONCE
PAVEMENT HAS BEEN CONSTRUCTED, PROVIDE ROLLED INLET PROTECTION
DEVICES.
INSTALLARE UNA RECINZIONE PER I SEDIMENTI ATTORNO AI BACINI DI RACCOLTA
DURANTE LA MOVIMENTAZIONE DEL TERRENO. UNA VOLTA CHE LA
PAVIMENTAZIONE È STATA COSTRUITA, FORNIRE ADEGUATI DISPOSITIVI DI
PROTEZIONE DI RACCOLTA.
6. SCHEDULE TEMPORARY SEEDING OPERATIONS IMMEDIATELY AFTER SITE GRADING
WORK IS COMPLETE.
PIANIFICARE LE OPERAZIONI DI SEEDING TEMPORANEO IMMEDIATAMENTE DOPO IL
COMPLETAMENTO DEL LAVORO DI CLASSIFICAZIONE DEL SITO.
7. REMOVE THE TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AND VERIFY
THE CLEANING OUT OF ALL STORM DRAINAGE STRUCTURES ONCE FINAL
STABILIZATION HAS OCCURRED.
RIMUOVERE I DISPOSITIVI TEMPORANEI DI CONTROLLO ALL'EROSIONE E DEI
SEDIMENTI E VERIFICARE LA PULIZIA DI TUTTE LE STRUTTURE DI DRENAGGIO
APPENA COMPLETATA LA STABILIZZAZIONE DEL SITO.
1. MAINTAIN ACCESS TO BUILDING 108 PARKING (2 ACCESSIBLE
SPACES AND 2 REGULAR SPACES).
MANTENERE L'ACCESSO AL PARCHEGGIO DELL'EDIFICIO 108
(DUE SPAZI ACCESSIBILI E DUE SPAZI REGOLARI).
2. BASE TRAFFIC FROM TEMPORARY ACCESS POINT AT GATE 3.
INDIRIZZARE IL TRAFFICO DAL PUNTO DI ACCESSO
TEMPORANEO SITUATO AL GATE 3.
3. PROVIDE POST-DRIVEN CHAIN LINK FENCING TO SECURE WORK
AREA. FENCING MUST CONNECT TO TEMPORARY FENCING
FROM PREVIOUS PHASES, FORMING A CONTIGUOUS
PERIMETER AND PREVENTING ACCESS TO AREA A1. PROVIDE A
VEHICLE GATE WITH ACCESS AT THIS LOCATION IN ADDITION
TO THE VEHICLE GATE AT VIA PEDEMONTE.
FORNIRE RECINZIONI A RETE METALLICA PER METTERE IN
SICUREZZA L'AREA DI LAVORO. LA RECINZIONE DEVE ESSERE
COLLEGATA ALLA RECINZIONE USATA NELLE PRECEDENTI FASI,
FORMANDO UN PERIMETRO CONTIGUO E IMPEDENDO
L'ACCESSO ALL'AREA A1. FORNIRE UN INGRESSO VEICOLARE
CON ACCESSO IN QUESTA POSIZIONE, IN AGGIUNTA
ALL'INGRESSO VEICOLARE A VIA PEDEMONTE.
LEGEND - LEGENDA
G-104
SCALE:
CONSTRUCTION PHASE 2 PLAN -
1:400
PLAN
NORTH
TEMPORARY PAVEMENT - PAVIMENTAZIONE TEMPORANEA
WORK AREA - AREA DI LAVORO
STAGING AREA - AREA DI SOSTA
TEMPORARY FENCING - RECINZIONE TEMPORANEA
SEDIMENT FENCING - RECINZIONE PER SEDIMENTI
X
KEYNOTES - NOTE CHIAVE
PLANIMETRIA FASE DI COSTRUZIONE 2
c:
\p w w or ki ng \c en tra l0 1\ d1
\P -2
-1
-G -1
.D
W G
.d w g, G
-1
, 4 /3
0/
:3 2:
P
M , C
H E
M P
H
Reference point
O P
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X
XX
X
A R
E A
A
E N
TR
Y
C O
N
TR
O L
P O
IN
T
N A
V A
L
FA
C
IL
IT
Y
E N
G
IN
E E
R
IN
G S
Y S
TE
M
C O
M M
A N
D
A
TL
A N
TI
C
1917 S. 67TH ST
OMAHA, NE 68106-2973
(402) 399-1000
E - 17437
CHRISTOPHER J.
PODANY
GENERAL NOTES - NOTE GENERALI
3010 40m20 1:400
1. OPEN GATE 1 FOR ACCESS TO BUILDING 108 AND SOUTH AREA A1. MAINTAIN
OPERATION OF TEMPORARY ACCESS POINT AT GATE 3.
APRIRE L'INGRESSO 1 PER L'ACCESSO ALL'EDIFICIO 108 ED ALL'AREA SUD A1.
MANTENERE L'OPERATIVITA' DEL PUNTO DI ACCESSO TEMPORANEO SITUATO
ALL'INGRESSO 3.
2. CLEAN AND MAINTAIN EROSION AND SEDIMENT CONTROL DEVICES DURING
CONSTRUCTION AND REMOVE ANY SEDIMENT RESULTING FROM CONSTRUCTION.
PULIRE E FARE MANUTENZIONE AI DISPOSITIVI DI CONTROLLO DELL'EROSIONE E
DEI SEDIMENTI DURANTE LA COSTRUZIONE E RIMUOVERE EVENTUALI SEDIMENTI
RISULTANTI DALLA COSTRUZIONE.
3. COORDINATE ALL LAND DISTURBING ACTIVITIES TO MINIMIZE SEDIMENTATION
DAMAGE.
COORDINARE TUTTE LE ATTIVITÀ CHE PERTURBANO IL TERRENO PER RIDURRE AL
MINIMO I DANNI CAUSATI DALLA SEDIMENTAZIONE.
4. SEDIMENT IS NOT PERMITTED TO LEAVE THE PROJECT. PROVIDE MEASURES IN
ADDITION TO THOSE SHOWN TO CONTROL DUST, STABILIZE SITE, AND AVOID
SILTING OF STREAMS.
NON È CONSENTITO LASCIARE SEDIMENTI. FORNIRE TUTTE LE MISURE
PREVENTIVE OLTRE A QUELLE INDICATE PER CONTROLLARE LA POLVERE,
STABILIZZARE IL SITO ED EVITARE L'INSABBIAMENTO DEI FLUSSI.
5. PROVIDE SEDIMENT FENCING AROUND CATCH BASINS DURING GRADING. ONCE
PAVEMENT HAS BEEN CONSTRUCTED, PROVIDE ROLLED INLET PROTECTION
DEVICES.
INSTALLARE UNA RECINZIONE PER I SEDIMENTI ATTORNO AI BACINI DI RACCOLTA
DURANTE LA MOVIMENTAZIONE DEL TERRENO. UNA VOLTA CHE LA
PAVIMENTAZIONE È STATA COSTRUITA, FORNIRE ADEGUATI DISPOSITIVI DI
PROTEZIONE DI RACCOLTA.
6. SCHEDULE TEMPORARY SEEDING OPERATIONS IMMEDIATELY AFTER SITE
GRADING WORK IS COMPLETE.
PIANIFICARE LE OPERAZIONI DI SEEDING TEMPORANEO IMMEDIATAMENTE DOPO
IL COMPLETAMENTO DEL LAVORO DI CLASSIFICAZIONE DEL SITO.
7. REMOVE THE TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AND
VERIFY THE CLEANING OUT OF ALL STORM DRAINAGE STRUCTURES ONCE FINAL
STABILIZATION HAS OCCURRED.
RIMUOVERE I DISPOSITIVI TEMPORANEI DI CONTROLLO ALL'EROSIONE E DEI
SEDIMENTI E VERIFICARE LA PULIZIA DI TUTTE LE STRUTTURE DI DRENAGGIO
APPENA COMPLETATA LA STABILIZZAZIONE DEL SITO.
1. MAINTAIN ACCESS TO BUILDING 108 PARKING.
ANTENERE L'ACCESSO AL PARCHEGGIO DELL'EDIFICIO 108.
2. PROVIDE TEMPORARY CHAIN LINK PANEL FENCING TO SECURE
WORK AREA. PROVIDE A VEHICLE GATE AT THIS LOCATION.
FORNIRE UNA RECINZIONE TEMPORANEA IN PANNELLI DI RETE
METALLICA PER METTERE IN SICUREZZA L'AREA DI LAVORO.
FORNIRE UN INGRESSO PER I VEICOLI IN QUESTA POSIZIONE.
3. MAINTAIN PEDESTRIAN ACCESS TO BUILDING 108 AT ALL TIMES.
REALIZZARE UN MARCIAPIEDE AL DI FUORI DELL'AREA DI
LAVORO PER CONSENTIRE L'ACCESSO PEDONALE ALL'EDIFICIO
108 IN OGNI MOMENTO.
LEGEND - LEGENDA
G-105
SCALE:
CONSTRUCTION PHASE 3 PLAN -
1:400
PLAN
NORTH
TEMPORARY PAVEMENT - PAVIMENTAZIONE TEMPORANEA
WORK AREA - AREA DI LAVORO
STAGING AREA - AREA DI SOSTA
TEMPORARY FENCING - RECINZIONE TEMPORANEA
SEDIMENT FENCING - RECINZIONE PER SEDIMENTI
X
KEYNOTES - NOTE CHIAVE
PLANIMETRIA FASE DI COSTRUZIONE 3
C :\p w w or ki ng \c en tra l0 1\ d1
\P -2
-1
-G -1
.D
W G
.d w g, G
-1
, 4 /3
0/
:4 0:
P
M , C
H E
M P
H
S1
S2 S3
S4
S5
S6
S7
GENERAL NOTES - NOTE GENERALI
3010 40m20 1:400
1. NO ABANDONED WASTE WAS ENCOUNTERED DURING THE INVESTIGATION AND NO
MONITORING WELLS OR OTHER ENVIRONMENTAL MONITORING DEVICES WERE
DETECTED.
NESSUN RIFIUTO ABBANDONATO È STATO RINVENUTO DURANTE L'INDAGINE E NON
SONO STATI RILEVATI POZZI DI MONITORAGGIO O ALTRI DISPOSITIVI DI
MONITORAGGIO AMBIENTALE.
2. 5cm OF TOPSOIL WAS ENCOUNTERED IN GRASSY AREAS.
NELLE ZONE ERBOSE SONO STATI RILEVATI 5 cm DI TERRICCIO.
3. GROUNDWATER WAS NOT PRESENT IN ANY OF THE SOIL BORINGS.
L'ACQUA FREATICA NON ERA PRESENTE IN NESSUNO DEI SONDAGGI DEL SUOLO.
LEGEND - LEGENDA
B-101
SCALE:
SUBSURFACE INVESTIGATION PLAN -
1:400
SOIL BORING NOTES - NOTE SULLA
TRIVELLAZIONE DEL SUOLO
PLAN
NORTH
SOIL BORING LOCATION - REFER TO SHEETS B-102 THROUGH
B-105 FOR BORING LOGS.
POSIZIONI DI FORATURA DEL TERRENO - FARE RIFERIMENTO
ALLE TAVOLE DA B-102 A B-105 PER I RILIEVI DI PERFORAZIONE.
A R
E A
A
E N
TR
Y
C O
N
TR
O L
P O
IN
T
N A
V A
L
FA
C
IL
IT
Y
E N
G
IN
E E
R
IN
G S
Y S
TE
M
C O
M M
A N
D
A
TL
A N
TI
C
1917 S. 67TH ST
OMAHA, NE 68106-2973
(402) 399-1000
E - 17437
CHRISTOPHER J.
PODANY
1. SOIL BORING RECORDS REPRESENT THE GEOTECHNICAL ENGINEER'S
INTERPRETATION OF THE SUBSURFACE CONDITIONS ENCOUNTERED AT THE
SPECIFIC BORING LOCATIONS AT THE TIME OF THE FIELD EXPLORATION BASED ON
VISUAL EXAMINATION OF THE FIELD SAMPLES OBTAINED AND LABORATORY
CLASSIFICATION TESTING PREFORMED ON SELECTED SAMPLES.
LA RELAZIONE SULLA TRIVELLAZIONE DEL SUOLO RAPPRESENTA
L'INTERPRETAZIONE DELL'INGEGNERE GEOTECNICO DELLE CONDIZIONI DEL
SOTTOSUOLO RISCONTRATE NELLE SPECIFICHE SEDI DI PERFORAZIONE AL
MOMENTO DELL'ESPLORAZIONE DEL SITO, SULLA BASE DELL'ESAME VISIVO DEI
CAMPIONI OTTENUTI SUL CAMPO E DELLE PROVE DI CLASSIFICAZIONE DI
LABORATORIO ESEGUITE SU CAMPIONI SELEZIONATI.
2. LINES DESIGNATING THE INTERFACE BETWEEN VARIOUS STRATA ON THE BORING
RECORDS REPRESENT THE APPROXIMATE INTERFACE LOCATION. THE ACTUAL
TRANSITION BETWEEN STRATA MAY BE MORE GRADUAL THAN INDICATED. THE
BORING RECORDS MAY NOT NECESSARILY BE REPRESENTATIVE OF THE MATERIAL
CHARACTER AND STRATA THICKNESS OVER THE ENTIRE CONSTRUCTION AREA.
LE LINEE CHE INDICANO IL PASSAGGIO TRA I VARI STRATI SULLE RILEVAZIONI DI
TRIVELLAZIONE RAPPRESENTANO LA POSIZIONE APPROSSIMATIVA DI TALE
PASSAGGIO. LA TRANSIZIONE EFFETTIVA TRA GLI STRATI PUÒ ESSERE PIÙ
GRADUALE DI QUANTO INDICATO. LE RILEVAZIONI DEI SONDAGGI POSSONO NON
ESSERE NECESSARIAMENTE RAPPRESENTATIVE DEL CARATTERE DEL MATERIALE E
DELLO SPESSORE DEGLI STRATI NELL'INTERA AREA DI COSTRUZIONE.
3. THE LABORATORY TEST RESULTS REPRESENT THE SUBSURFACE SOIL PROPERTIES
ENCOUNTERED AT THE SPECIFIC BORING LOCATIONS AND DEPTHS. IT IS POSSIBLE
THAT SOIL PROPERTIES AND CONDITIONS BETWEEN THE INDIVIDUAL BORING
LOCATIONS AND DEPTHS WILL BE DIFFERENT FROM THOSE INDICATED.
LABORATORY TESTS WERE PERFORMED IN ACCORDANCE WITH ASTM OR
EQUIVALENT EUROPEAN STANDARDS.
I RISULTATI DELLE PROVE DI LABORATORIO RAPPRESENTANO LE PROPRIETÀ DEL
SOTTOSUOLO RILEVATE NELLE SPECIFICHE POSIZIONI E PROFONDITÀ DI
TRIVELLAZIONE. È POSSIBILE CHE LE PROPRIETÀ E LE CONDIZIONI DEL SUOLO TRA
LE SINGOLE POSIZIONI E PROFONDITÀ DI TRIVELLAZIONE SIANO DIVERSE DA
QUELLE INDICATE. LE PROVE DI LABORATORIO SONO STATE ESEGUITE IN
CONFORMITÀ CON ASTM O STANDARD EUROPEI EQUIVALENTI.
PLANIMETRIA DI INDAGINE SOTTOSUOLO
c:
\p w w or ki ng \c en tra l0 1\ d1
\P -2
-1
-B -1
.d w g, B -1
, 4
/6 /2
7:
:3
P M
, C H
E M
P H
A R
E A
A
E N
TR
Y
C O
N
TR
O L
P O
IN
T
N A
V A
L
FA
C
IL
IT
Y
E N
G
IN
E E
R
IN
G S
Y S
TE
M
C O
M M
A N
D
A
TL
A N
TI
C
1917 S. 67TH ST
OMAHA, NE 68106-2973
(402) 399-1000
E - 17437
CHRISTOPHER J.
PODANY
B-102
SCALE:
A1 BOREHOLE: S1
NO SCALE SCALE:
A3 BOREHOLE: S2
NO SCALE
SOIL BORING LOGS SHEET 1 OF 4 - RILIEVO DI TRIVELLAZIONE DEL SUOLO FOGLIO 1 DI 4
c:
\p w w or ki ng \c en tra l0 1\ d1
\P -2
-1
-B -1
-1
.d w g, B -1
, 4
/6 /2
7:
:5
P M
, C H
E M
P H
E A
A
E N
TR
Y
C O
N
TR
O L
P O
IN
T
N A
V A
L
FA
C
IL
IT
Y
E N
G
IN
E E
R
IN
G S
Y S
TE
M
C O
M M
A N
D
A
TL
A N
TI
C
1917 S. 67TH ST
OMAHA, NE 68106-2973
(402) 399-1000
E - 17437
CHRISTOPHER J.
PODANY
B-103
SCALE:
A1 BOREHOLE: S3
NO SCALE SCALE:
A3 BOREHOLE: S4
NO SCALE
SOIL BORING LOGS SHEET 2 OF 4 - RILIEVO DI TRIVELLAZIONE DEL SUOLO FOGLIO 2 DI 4
c:
\p w w or ki ng \c en tra l0 1\ d1
\P -2
-1
-B -1
-1
.d w g, B -1
, 4
/6 /2
7:
:5
P M
, C H
E M
P H
E A
A
E N
TR
Y
C O
N
TR
O L
P O
IN
T
N A
V A
L
FA
C
IL
IT
Y
E N
G
IN
E E
R
IN
G S
Y S
TE
M
C O
M M
A N
D
A
TL
A N
TI
C
1917 S. 67TH ST
OMAHA, NE 68106-2973
(402) 399-1000
E - 17437
CHRISTOPHER J.
PODANY
B-104
SCALE:
A1 BOREHOLE: S5
NO SCALE SCALE:
A3 BOREHOLE: S6
NO SCALE
SOIL BORING LOGS SHEET 3 OF 4 - RILIEVO DI TRIVELLAZIONE DEL SUOLO FOGLIO 3 DI 4
c:
\p w w or ki ng \c en tra l0 1\ d1
\P -2
-1
-B -1
-1
.d w g, B -1
, 4
/6 /2
7:
:0
P M
, C H
E M
P H
E A
A
E N
TR
Y
C O
N
TR
O L
P O
IN
T
N A
V A
L
FA
C
IL
IT
Y
E N
G
IN
E E
R
IN
G S
Y S
TE
M
C O
M M
A N
D
A
TL
A N
TI
C
1917 S. 67TH ST
OMAHA, NE 68106-2973
(402) 399-1000
E - 17437
CHRISTOPHER J.
PODANY
B-105
SCALE:
A1 BOREHOLE: S7
NO SCALE
SOIL BORING LOGS SHEET 4 OF 4 - RILIEVO DI TRIVELLAZIONE DEL SUOLO FOGLIO 4 DI 4
c:
\p w w or ki ng \c en tra l0 1\ d1
\P -2
-1
-B -1
-1
.d w g, B -1
, 4
/6 /2
7:
:0
P M
, C H
E M
P H
E A
A
E N
TR
Y
C O
N
TR
O L
P O
IN
T
N A
V A
L
FA
C
IL
IT
Y
E N
G
IN
E E
R
IN
G S
Y S
TE
M
C O
M M
A N
D
A
TL
A N
TI
C
1917 S. 67TH ST
OMAHA, NE 68106-2973
(402) 399-1000
E - 17437
CHRISTOPHER J.
PODANY
B-106
SCALE:
A1
LABORATORY TESTS FROM BORINGS S1, S2, S3, S4
NO SCALE SCALE:
A3
LABORATORY TESTS FROM BORINGS S5, S6, AND S7
NO SCALE
LABORATORY TEST RESULTS - RISULTATI DELLE PROVE DI LABORATORIO
RISULTATI DI LABORATORIO DEI FORI S1, S2, S3, S4 RISULTATI DI LABORATORIO DEI FORI S5, S6, S7 c:
\p w w or ki ng \c en tra l0 1\ d1
\P -2
-1
-B -1
-1
.d w g, B -1
, 4
/6 /2
7:
:1
P M
, C H
E M
P H
| GENERAL |
| G-001 - COVER SHEET |
| G-002 - SHEET INDEX -INDICE |
| G-101 - OVERALL PROJECT PHASING PLAN |
| G-102 - CONSTRUCTION PHASE 1A PLAN |
| G-103 - CONSTRUCTION PHASE 1B PLAN |
| G-104 - CONSTRUCTION PHASE 2 PLAN |
| G-105 - CONSTRUCTION PHASE 3 PLAN |
| GEOTECHNICAL |
| B-101 - SUBSURFACE INVESTIGATION PLAN |
| B-102 - SOIL BORING LOGS SHEET 1 OF 4 |
| B-103 - SOIL BORING LOGS SHEET 2 OF 4 |
| B-104 - SOIL BORING LOGS SHEET 3 OF 4 |
| B-105 - SOIL BORING LOGS SHEET 4 OF 4 |
| B-106 - LABORATORY TEST RESULTS |
| 2021-05-17T12:54:29+0200 | |
| arch. Paola Izzo | |
| I am signing to certify the authenticity of this document. |
| 2021-05-17T12:55:22+0200 | |
| arch. Paola Izzo | |
| I am signing to certify the authenticity of this document. |
| 2021-05-17T13:14:20-0500 | |
| Chicago | |
| Craig Olson | |
| I authorize this document. |
| 2021-05-17T13:17:39-0500 | |
| Chicago | |
| John Smith | |
| I authorize this document. |
| 2021-05-17T13:19:20-0500 | |
| Chicago | |
| Kristopher Tourek | |
| I authorize this document. |
| 2021-05-17T13:21:30-0500 | |
| Chicago | |
| Christopher Podany | |
| I authorize this document. |
| 2021-05-17T13:22:10-0500 | |
| Chicago | |
| Christopher Podany | |
| I authorize this document. |
| 2021-05-17T13:22:10-0500 | |
| Chicago | |
| Christopher Podany | |
| I authorize this document. |
| 2021-05-17T13:22:11-0500 | |
| Chicago | |
| Christopher Podany | |
| I authorize this document. |
| 2021-05-17T13:22:11-0500 | |
| Chicago | |
| Christopher Podany | |
| I authorize this document. |
| 2021-05-17T13:22:11-0500 | |
| Chicago | |
| Christopher Podany | |
| I authorize this document. |
| 2021-05-17T13:22:12-0500 | |
| Chicago | |
| Christopher Podany | |
| I authorize this document. |
| 2021-05-17T13:22:12-0500 | |
| Chicago | |
| Christopher Podany | |
| I authorize this document. |
| 2021-05-17T13:22:12-0500 | |
| Chicago | |
| Christopher Podany | |
| I authorize this document. |
| 2021-05-17T13:22:13-0500 | |
| Chicago | |
| Christopher Podany | |
| I authorize this document. |
| 2021-05-17T13:22:13-0500 | |
| Chicago | |
| Christopher Podany | |
| I authorize this document. |
| 2021-06-01T10:14:22-0400 | |
| NAVFAC Atlantic | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2021-06-01T10:15:03-0400 | |
| NAVFAC Atlantic | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2021-06-01T10:15:28-0400 | |
| NAVFAC Atlantic | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2021-06-01T10:15:49-0400 | |
| NAVFAC Atlantic | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2021-06-01T10:16:07-0400 | |
| NAVFAC Atlantic | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2021-06-01T10:16:25-0400 | |
| NAVFAC Atlantic | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2021-06-01T10:16:56-0400 | |
| NAVFAC Atlantic | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2021-06-01T10:17:13-0400 | |
| NAVFAC Atlantic | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2021-06-01T10:17:57-0400 | |
| NAVFAC Atlantic | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2021-06-01T10:18:30-0400 | |
| NAVFAC Atlantic | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2021-06-01T10:18:46-0400 | |
| NAVFAC Atlantic | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2021-06-01T10:19:01-0400 | |
| NAVFAC Atlantic | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2021-06-01T10:19:16-0400 | |
| NAVFAC Atlantic | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
File details come from the government source that posted it. Updated .