SPECIFICATIONS

INDEX

SECTION 011000SUMMARY
SECTION 013000SUBMITTALS
SECTON 015000TEMPORARY FACILITIES AND CONTROLS
SECTION 024119SELECTIVE DEMOLITION
SECTION 085000WINDOWS
SECTION 099100PAINTING

Copyright 2010 by The American Institute of Architects (AIA)

Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1PROJECT INFORMATION
A.Project Identification: New Windows Raco North Warehouse
1.Address: Raco Work Station, 9200 South Ranger Rd, Brimley, MI 49715.
B.Purpose of work:
1.Replacement of existing windows at the Raco North Warehouse.
C.Description of work:

1. The principal features of the work to be performed under these specifications includes:

a. Base bid includes the removal and replacement of 5 windows (Windows A, B, C, D, and E). Existing windows and exterior/interior trim shall be removed and disposed of by the Contractor. The windows are assumed to have asbestos containing glazing and caulking. They shall be removed by a trained accredited asbestos abatement contractor. The Contractor shall furnish and install new Pella Impervia Sliding Windows (or approved equal), white in color with standard screens and cam-action sash locks. The existing window rough openings are 4’-8 3/4” (56.75”) wide x 4’-1 5/8” high (49.625”). The Contractor shall verify the window rough openings before ordering. The Contractor shall provide new exterior pine trim and flashing at the window exteriors. The new trim shall be painted white (one coat printer and two coats finish) and caulked as necessary for water tight installation. The Contractor shall install fiberglass insulation around the window between the new window and existing framing. The Contractor shall provide new interior pine trim and window extension jambs (No interior painting). The Contractor shall un-attached and re-attach interior electrical fastened to the interior trim.

b. The Alternate Add prices are to add additional window replacements (Window F, Windows G & H, and Windows I & J) if pricing and funds allow. The same scope of work as noted above apply.

c. Alternate Add to replace existing Second Floor Attic Windows, two each one at each gable. Existing windows and exterior trim shall be removed and disposed of by the Contractor. The windows are assumed to have asbestos containing glazing and caulking. They shall be removed by a trained accredited asbestos abatement contractor. The Contractor shall furnish and install new Pella Impervia Double-Hung Windows (or approved equal), white in color with standard screens and cam-action sash locks. The existing window rough openings are 3’-0” (36”) wide x 4’-0” high (48”). The Contractor shall verify the window rough openings before ordering. The Contractor shall provide new exterior pine trim and flashing at the window exteriors. The new trim shall be painted white (one coat printer and two coats finish) and caulked as necessary for water tight installation. No interior insulation, trim, and/or painting is required on these two windows.

2. Floor Plan and Photos: See attached floor plan and photos for window locations and existing conditions.

D.Performance schedule: Contract time shall be 90 calendar days including window submittal and window delivery time. Notice to proceed and suspend/resume work orders will be issued as required to allow time to order materials. The Contractor shall be required to start work and/or order windows within 10 days of the effective date on the Notice to Proceed and shall provide a minimum of 72 hours advance notice to the CO prior to beginning work. The Contractor shall prepare and submit proposed progress schedule within 5 days of the effective date on the Notice to Proceed.
G.Measurement and Payment: Lump Sum Quantities (LSQ) – These quantities denote one complete unit of work as required by or described in the contract; including materials, equipment, labor, and incidentals necessary to complete the job. They will not be measured; progress payments can be processed based upon the completed percentage of the LSQ.
H.Workmanship: The CO shall be the sole judge of workmanship; the CO will use standard construction standards and practices as a basis for judgments.
I.Protection of personnel and property: The Contractor shall provide temporary barricades, dust partitions, and other forms of protection as required to protect public and FS personnel from injury due to construction activities. The Contractor shall be responsible for repairing or replacing FS property that is damaged by construction activities in a manner acceptable to the CO.
1.2WORK RESTRICTIONS
A.Contractor's Use of Premises: During construction, Contractor will have limited use of work area indicated. Contractor's use of premises is limited by Owner's right to perform work or employ other contractors on portions of Project and as follows:

First subparagraph below contains an example of limitations on Contractor's use of premises; delete if not applicable. Insert other descriptions of areas or types of limited use, requirements for cooperation with Owner's personnel, noninterference with Owner's or public use, and other necessary restrictions if required.

1. Owner will occupy premises during construction. Perform construction only during normal working hours (8 AM to 4:30 PM Monday thru Friday, other than holidays), unless otherwise agreed to in writing by the Contracting Officer (CO). Clean up work areas and return to usable condition at the end of each work period.

"Limits" Subparagraph below is based on requirements of LEED-NC Credit SS 5.1. See Evaluations.

"Driveways, Walkways, and Entrances" Subparagraph below is an example of a special requirement appropriate to many projects. Revise to suit Project or delete.

2.Driveways, Walkways, and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
3.Storage: In-building storage is limited; an area for the selected Contractor’s storage/job trailer will be designated in the prework meeting.
4.Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor-air intakes.
1.3STANDARDS AND CODES
A.All work shall comply with latest edition of applicable standards and codes of following:
ASAAmerican Standards Association
ASTMAmerican Society of Testing Materials
ANSIC2, American National Standards Institute
CFRCode of Federal Regulations
NECAStandards for Installation
NEMAStandards for Materials and Products
NFPANational Fire Protection Association
OSHAOccupational Safety and Health Act
ULUnderwriters Laboratories
IBCInternational Building Code
IMCInternational Mechanical Code
IPCInternational Plumbing Code
IFGAInternational Fuel Gas Code
AWWAAmerican Water Works Association
NSFNational Sanitation Foundation
NECNational Electric Code

PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

Raco North Warehouse WindowsHiawatha National Forest
Raco North Warehouse WindowsHiawatha National Forest

Raco North Warehouse Windows Hiawatha National Forest

SECTION 013000 - SUBMITTALS

PART 1 - GENERAL

1.1REQUIREMENTS
A.It will be the Contractor’s responsibility to submit all items with promptness as to cause no delay in the work. Approvals must be obtained before starting work involving the item. Contractor shall allow ten (10) calendar days for processing of submittals by the Government.
B.The following submittals are required following award of contract for review and/or approval pursuant to contract provisions.

1. Cost breakdown listing main types of work and totaling amount of contract.

2. The Contractor shall prepare and submit proposed progress schedule within 5 days of the effective date on the Notice to Proceed.

1.2MANUFACTURER”S LITERATURE AND SHOP DRAWINGS
A.Submit one (1) copy of product data on the items required herein to the COR for approval. Literature which is not marked or otherwise designated to show the exact model, size, etc. which the Contractor proposes to use, will be returned by the COR “without action.” Circle or check items on submittals. Highlighter pens may print black or not at all when copied.
B.Information must be adequate to determine compliance with specifications.
C.Submit three (3) copies of materials that cannot reasonably be copied on typical copy machines.
D.One (1) copy of all submittals will be returned to the Contractor.
E.Submittals which are received from sources other than through the Contractor’s office will be returned by the COR “without action.”

PART 2 - PRODUCTS (Not Applicable) PART 3 - EXECUTION (Not Applicable)

END OF SECTION 01300

SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

"(Water) (and) (Electric Power)" Paragraph below assume services are available and Owner will permit tapping into existing system without charge.

A. Water and Electric Power: Available from Owner's existing system without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.

"Erosion- and Sedimentation-Control Plan" Paragraph below is based on requirements for LEED-NC Prerequisite SS-1 and assumes that Contract Documents do not include erosion- and sedimentation-control Drawings.

PART 2 - PRODUCTS

2.1TEMPORARY FACILITIES
A.Provide field offices, storage and fabrication sheds, and other support facilities as necessary for construction operations. Store combustible materials apart from building.
2.2EQUIPMENT
A.Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.

Revise "HVAC Equipment" Paragraph below to suit Project. Liquid-propane-gas or fuel-oil heaters are commonly used. Steam or hot-water heaters, gas-fired space heaters, or electric unit heaters are also used.

PART 3 - EXECUTION

3.1TEMPORARY UTILITY INSTALLATION
A.Sanitary Facilities:

Delete "Toilets" Subparagraph below if facilities are unavailable or if their use is not permitted.

1.Toilets: Use of Owner's existing toilet facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to Owner. At Substantial Completion, restore these facilities to condition existing before initial use.
3.2SUPPORT FACILITIES INSTALLATION
A.Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction.

Retain paragraph below if use of existing elevators will be permitted.

3.4OPERATION, TERMINATION, AND REMOVAL
A.Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion.
B.At Substantial Completion, repair, renovate, and clean permanent facilities used during construction period.

END OF SECTION 015000

SECTION 024119 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

Retain, revise, or delete first paragraph below to suit Project. Insert other limitations if necessary, such as when adjacent floors will be occupied.

A.Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.
B.It is assumed the existing windows have asbestos containing window glazing and caulk. They shall be removed by a trained accredited asbestos abatement contractor.

PART 2 - PRODUCTS

2.1PEFORMANCE REQUIREMENTS
A.Regulatory Requirements: Comply with EPA regulations and with hauling and disposal regulations of authorities having jurisdiction.

PART 3 - EXECUTION

3.1DEMOLITION
A.Maintain services/systems indicated to remain and protect them against damage during selective demolition operations. Before proceeding with demolition, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of the building.
B.Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

Retain "Refrigerant" Paragraph below if selective demolition includes mechanical equipment containing refrigerant. Refrigerant may be part of equipment such as air-conditioning units, chillers, refrigerators, freezers, icemakers, heat pumps, dehumidifiers, and drinking water coolers.

C.Protect walls, ceilings, floors, and other existing finish work that are to remain.
D.Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
E.Remove demolition waste materials from Project site and legally dispose of them.
F.Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 024119

Copyright 2010 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

Copyright 2010 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

SECTION 085000 - WINDOWS

PART 1 - GENERAL

1.1SECTION REQUIREMENTS
A.Submittals: Product Data, Shop Drawings, and color Samples.

Retain requirements for AAMA or WDMA certification and labeling if required.

B. Provide AAMA- or WDMA-certified fiberglass composite windows with an attached label.

PART 2 - PRODUCTS

2.1 FIBERGLASS WINDOWS

Retain option in "Manufacturers" Paragraph below to limit manufacturers to those listed.

A.Manufacturers:
B.Basis-of-Design Product: Pella Impervia or a comparable product of one of the following:

Retain manufacturers in list below after verifying availability and suitability of products for applications indicated. Insert other manufacturers if required.

1.Duxton Windows and Doors.
2.Fibertec Window and Door Manufacturing.
3.Inline Fiberglass Ltd.
4.Milgard Windows, Inc.
5.Pella Corporation.
6.Serious Materials Inc.
7.Thermotech Windows Ltd.
C.Window Types: The following types, as indicated on Drawings:
1.2- Panel horizontal sliding for first floor windows.
2.Double-hung windows for the two attic windows.
D.Frames and Sashes: Pultruded fiberglass finished with factory applied powder coat complying with AAMA 623.
1.Exterior Color: White.
2.Interior Finish: Matching exterior color and finish.
3.Glazing: Double pane float glass.
E.Grille Pattern: None.
2.2WINDOWS
A.Performance Requirements: AAMA/WDMA/CSA 101/I.S.2/A440.
1.Performance Class: LC.

AAMA/WDMA/CSA 101/I.S.2/A440 establishes a gateway Performance Grade for windows to qualify for each Performance Class. The gateway Performance Grade is 15 for Class R, 25 for Class LC, and 30 for Class CW. For a particular project, the minimum Performance Grade for windows is typically based on the design pressure.

2. Performance Grade: 40.

Retain "Thermal Transmittance" Subparagraph below if required to comply with requirements of authorities having jurisdiction. Options below are based on ENERGY STAR requirements effective January 2010 and requirements in ICC-700.

3. Thermal Transmittance: NFRC 100 maximum whole-window U-factor of 0.27 Btu/sq. ft. x h x deg F.

Options in "Solar Heat-Gain Coefficient" Subparagraph below are based on ENERGY STAR requirements effective January 2010 and requirements in ICC-700.

4. Solar Heat-Gain Coefficient: NFRC 200 maximum whole-window SHGC of 0.28.

For projects in hurricane-prone locations, retain "Windborne-Debris Resistance" Subparagraph below. If retaining, verify requirements of authorities having jurisdiction. Model building codes and ASCE/SEI 7 establish criteria for buildings in hurricane-prone locations. Requirements of authorities having jurisdiction vary by location.

B. Trim: Provide indicated trim, matching material and finish of frame members.

Delete first paragraph below if no bow or bay window units are required.

C.Provide self-aligning cam-action lock for sliding for windows.
D.Provide nylon roller housing with acetal rollers for sliding windows.
E.Equip units with vinyl-coated, glass-fiber mesh insect screens at operable sashes.
F.Glaze units with clear (advanced comfort), low-e coated, argon-filled, sealed insulating glass.

PART 3 - EXECUTION

3.1INSTALLATION
A.Install windows in accordance with manufacturer’s instructions.
B.Set units level, plumb, and true to line, without warp or rack of frames and panels. Provide proper support and anchor securely in place. Windows should be freely operating.
C.Set sill members in bed of sealant or with gaskets, as indicated, to provide weathertight construction.
D.Integrate window system installation with exterior water-resistant barrier using flashing/sealant tape. Apply and integrate flashing/sealant tape with water-resistant barrier using watershed principles in accordance with window manufacturer's instructions.
E.Adjust operating panels, screens, and hardware to provide a tight fit at contact points and weather stripping for smooth operation and weathertight closure. Lubricate hardware and moving parts.
F.Clean glass and fiberglass surfaces immediately after installing windows. Remove nonpermanent labels from glass surfaces.

END OF SECTION 085000

Copyright 2010 by The American Institute of Architects (AIA)

Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

SECTION 099100 - PAINTING

PART 1 - PRODUCTS

1.1SECTION REQUIREMENTS
A.Summary: Exterior painting.
B.Work Included: Painting of new exterior pine trim around windows..
C.Work Not Included:
1.Prefinished items, items with an integral finish, and operating parts, except as otherwise indicated.
2.Labels: do not paint over code-required labels or any equipment identification, performance rating, name or nomenclature plates.
D.Submittals:
1.Product Data: MSDS Sheets, Manufacturer’s product data and color charts of products selected.
2.Color Charts: Furnish color charts of proposed products for selection of colors by the Contracting Officer.
E.Project Conditions:
1.Store materials in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 45 deg F. Maintain storage containers in a clean condition, free of foreign materials and residue.
F.MPI Standards:
1.Preparation and Workmanship: Comply with requirements in "MPI Architectural Painting Specification Manual" for products and paint systems indicated.

PART 2 - PRODUCTS

2.1PAINT AND COATINGS
A.Products:
1.Exterior window trim:
a.Primer: Zero VOC, Sherwin Williams or equivalent.
b.First Coat: Zero VOC, Sherwin-Williams or equivalent.
c.Second Coat: Zero VOC, Sherwin-Williams, or equivalent.
B.Material Compatibility: Provide materials that are compatible with one another and with substrates. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated. Each coating system is to be from a single manufacturer and lot number.
C.Colors: White to match existing exterior wall finish.
D.Delivery, Storage and Protection: Deliver materials to site in original, unopened packages and containers bearing labels as follows:
1.Name or title of material.
2.Federal specification number, if applicable.
3.Manufacturer’s name and stock number.
4.Contents by volume, for major pigment constituents.
5.Instructions for use.
6.Safety precautions.

PART 3 - EXECUTION

3.1PREPARATION
A.Perform preparation procedures for each substrate in strict accordance with paint manufacturer’s instructions and as specified.
B.Remove hardware, lighting fixtures, and similar items that are not to be painted. Mask items that cannot be removed. Reinstall items in each area after painting is complete.
C.Clean and prepare surfaces in an area before beginning painting in that area. Schedule painting so cleaning operations will not damage newly painted surfaces.
3.2MATERIAL PREPARATION
A.Prepare painting materials in accordance with manufacturer’s directions. Mix materials before application to produce uniform density. Stir as required during application of materials. Do not stir surface film into material; remove film and, if necessary, strain material before using.
B.Store materials not in actual use in tightly covered containers. Maintain containers used in storage, mixing and application of paint in a clean condition, free of foreign materials and residue.
3.3APPLICATION
A.Apply paints according to manufacturer's written instructions. Use applicators and techniques best suited for type of material being applied.
B.Apply additional coats when undercoats or other conditions show through final coat of paint. Finished paint coatings shall be free from pinholes, bubbles, runs, drops, ridges, waves, laps, unnecessary brush marks, and variations in color, texture, and gloss.
C.When painting new substrates patched into existing surfaces or touching up missing or damaged finishes, apply coating system specified for the specific substrate. Apply final finish coat over entire surface from edge to edge and corner to corner.
3.4PROTECTION AND CLEAN-UP
A.Protect work from paint drippings and spatterings by use of masking, drop cloths, removal of items or by other approved methods.
B.Provide “WET PAINT” signs as required to protect newly painted finishes.
C.During progress of work, dispose of discarded paint materials, rubbish, cans, and rags.
D.Upon completion of painting work, clean all paint-spattered surfaces by proper methods of washing and scraping, using care not scratch or otherwise damaged finished surfaces.

END OF SECTION 099100