SPECIFICATIONS
INDEX
| SECTION 011000 | SUMMARY |
| SECTION 013000 | SUBMITTALS |
| SECTON 015000 | TEMPORARY FACILITIES AND CONTROLS |
| SECTION 024119 | SELECTIVE DEMOLITION |
| SECTION 062013 | EXTERIOR FINISH CARPENTRY |
| SECTION 074646 | COMPOSITE PANEL SIDING |
| SECTION 099100 | PAINTING |
Copyright 2010 by The American Institute of Architects (AIA)
Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
SECTION 011000 - SUMMARY
PART 1 - GENERAL
| 1.1 | PROJECT INFORMATION |
| A. | Project Identification: Saint Ignace Office Siding Repairs |
| 1. | Address: W1900 West US-2, Saint Ignace, MI 49781. |
| B. | Purpose of work: |
| 1. | Replacement of moisture damaged existing HardiePanel Stucco Fiber Cement Siding and Cedar Trim Boards, 11 panels each. |
| C. | Description of work: |
1. The principal features of the work to be performed under these specifications includes:
a. Base bid includes the removal and replacement of 11 each 4’x8’ HardiePanels and adjacent cedar trim boards. The 11 each panels are shown in the attached pictures, four locations on the exterior of the Saint Ignace Office Building. Existing panels and trim shall be removed and disposed of by the Contractor. The new HardiePanels and Cedar Trim shall be painted (one coat printer and two coats finish) and caulked as necessary for water-tight installation.
b. Alternate add price to remove existing and furnish and install new 11 sheets of ½” x4’x8’ OSB wall sheeting including typar house wrap, all to be installed behind HardiePanels if existing ½” wall sheeting is damaged.
| 2. | Floor Plan and Photos: See attached floor plan and photos for panels to be replaced and existing conditions. |
| D. | Performance schedule: Contract time shall be 90 calendar days including submittals and material delivery time. Notice to proceed and suspend/resume work orders will be issued as required to allow time to order materials. The Contractor shall be required to start work and/or order windows within 10 days of the effective date on the Notice to Proceed and shall provide a minimum of 72 hours advance notice to the CO prior to beginning work. The Contractor shall prepare and submit proposed progress schedule within 5 days of the effective date on the Notice to Proceed. |
| G. | Measurement and Payment: Lump Sum Quantities (LSQ) – These quantities denote one complete unit of work as required by or described in the contract; including materials, equipment, labor, and incidentals necessary to complete the job. They will not be measured; progress payments can be processed based upon the completed percentage of the LSQ. |
| H. | Workmanship: The CO shall be the sole judge of workmanship; the CO will use standard construction standards and practices as a basis for judgments. |
| I. | Protection of personnel and property: The Contractor shall provide temporary barricades to protect the public and FS personnel from injury due to construction activities. The Contractor shall be responsible for repairing or replacing FS property that is damaged by construction activities in a manner acceptable to the CO. |
| 1.2 | WORK RESTRICTIONS |
| A. | Contractor's Use of Premises: During construction, Contractor will have limited use of work area indicated: |
First subparagraph below contains an example of limitations on Contractor's use of premises; delete if not applicable. Insert other descriptions of areas or types of limited use, requirements for cooperation with Owner's personnel, noninterference with Owner's or public use, and other necessary restrictions if required.
1. Owner will occupy premises during construction. Perform construction only during normal working hours (8 AM to 4:30 PM Monday thru Friday, other than holidays), unless otherwise agreed to in writing by the Contracting Officer (CO). Clean up work areas and return to usable condition at the end of each work period.
"Limits" Subparagraph below is based on requirements of LEED-NC Credit SS 5.1. See Evaluations.
"Driveways, Walkways, and Entrances" Subparagraph below is an example of a special requirement appropriate to many projects. Revise to suit Project or delete.
| 2. | Driveways, Walkways, and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. |
| 3. | Storage: In-building storage is limited; an area for the selected Contractor’s storage/job trailer will be designated in the prework meeting. |
| 4. | Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor-air intakes. |
| 1.3 | STANDARDS AND CODES |
| A. | All work shall comply with latest edition of applicable standards and codes of following: |
| ASA | American Standards Association |
| ASTM | American Society of Testing Materials |
| ANSI | C2, American National Standards Institute |
| CFR | Code of Federal Regulations |
| NECA | Standards for Installation |
| NEMA | Standards for Materials and Products |
| NFPA | National Fire Protection Association |
| OSHA | Occupational Safety and Health Act |
| UL | Underwriters Laboratories |
| IBC | International Building Code |
| IMC | International Mechanical Code |
| IPC | International Plumbing Code |
| IFGA | International Fuel Gas Code |
| AWWA | American Water Works Association |
| NSF | National Sanitation Foundation |
| NEC | National Electric Code |
PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
| Saint Ignace Office Siding Repairs | Hiawatha National Forest |
| Saint Ignace Office Siding Repairs | Hiawatha National Forest |
SECTION 013000 - SUBMITTALS
PART 1 - GENERAL
| 1.1 | REQUIREMENTS |
| A. | It will be the Contractor’s responsibility to submit all items with promptness as to cause no delay in the work. Approvals must be obtained before starting work involving the item. Contractor shall allow ten (10) calendar days for processing of submittals by the Government. |
| B. | The following submittals are required following award of contract for review and/or approval pursuant to contract provisions. |
1. Cost breakdown listing main types of work and totaling amount of contract.
2. The Contractor shall prepare and submit proposed progress schedule within 5 days of the effective date on the Notice to Proceed.
| 1.2 | MANUFACTURER”S LITERATURE AND SHOP DRAWINGS |
| A. | Submit one (1) copy of product data on the items required herein to the COR for approval. Literature which is not marked or otherwise designated to show the exact model, size, etc. which the Contractor proposes to use, will be returned by the COR “without action.” Circle or check items on submittals. Highlighter pens may print black or not at all when copied. |
| B. | Information must be adequate to determine compliance with specifications. |
| C. | Submit three (3) copies of materials that cannot reasonably be copied on typical copy machines. |
| D. | One (1) copy of all submittals will be returned to the Contractor. |
| E. | Submittals which are received from sources other than through the Contractor’s office will be returned by the COR “without action.” |
PART 2 - PRODUCTS (Not Applicable) PART 3 - EXECUTION (Not Applicable)
END OF SECTION 01300
Saint Ignace Office Siding Repairs Hiawatha National Forest
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
"(Water) (and) (Electric Power)" Paragraph below assume services are available and Owner will permit tapping into existing system without charge.
A. Water and Electric Power: Available from Owner's existing system without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.
"Erosion- and Sedimentation-Control Plan" Paragraph below is based on requirements for LEED-NC Prerequisite SS-1 and assumes that Contract Documents do not include erosion- and sedimentation-control Drawings.
PART 2 - PRODUCTS
| 2.1 | TEMPORARY FACILITIES |
| A. | Provide field offices, storage and fabrication sheds, and other support facilities as necessary for construction operations. Store combustible materials apart from building. |
| 2.2 | EQUIPMENT |
| A. | Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures. |
Revise "HVAC Equipment" Paragraph below to suit Project. Liquid-propane-gas or fuel-oil heaters are commonly used. Steam or hot-water heaters, gas-fired space heaters, or electric unit heaters are also used.
PART 3 - EXECUTION
| 3.1 | TEMPORARY UTILITY INSTALLATION |
| A. | Sanitary Facilities: |
Delete "Toilets" Subparagraph below if facilities are unavailable or if their use is not permitted.
| 1. | Toilets: Use of Owner's existing toilet facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to Owner. At Substantial Completion, restore these facilities to condition existing before initial use. |
| 3.2 | SUPPORT FACILITIES INSTALLATION |
| A. | Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction. |
Retain paragraph below if use of existing elevators will be permitted.
| 3.4 | OPERATION, TERMINATION, AND REMOVAL |
| A. | Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. |
| B. | At Substantial Completion, repair, renovate, and clean permanent facilities used during construction period. |
END OF SECTION 015000
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
Retain, revise, or delete first paragraph below to suit Project. Insert other limitations if necessary, such as when adjacent floors will be occupied.
A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.
PART 2 - PRODUCTS
| 2.1 | PEFORMANCE REQUIREMENTS |
| A. | Regulatory Requirements: Comply with EPA regulations and with hauling and disposal regulations of authorities having jurisdiction. |
PART 3 - EXECUTION
| 3.1 | DEMOLITION |
| A. | Maintain services/systems indicated to remain and protect them against damage during selective demolition operations. Before proceeding with demolition, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of the building. |
| B. | Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain. |
Retain "Refrigerant" Paragraph below if selective demolition includes mechanical equipment containing refrigerant. Refrigerant may be part of equipment such as air-conditioning units, chillers, refrigerators, freezers, icemakers, heat pumps, dehumidifiers, and drinking water coolers.
| C. | Protect walls, ceilings, floors, and other existing finish work that are to remain. |
| D. | Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. |
| E. | Remove demolition waste materials from Project site and legally dispose of them. |
| F. | Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began. |
END OF SECTION 024119
Copyright 2010 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
Copyright 2010 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
SECTION 062013 - EXTERIOR FINISH CARPENTRY
PART 1 - GENERAL
| 1.1 | TYPES OF WORK |
| A. | Types of exterior finish carpentry in this section include: Exterior running and standing trim. |
| 1.2 | PRODUCT HANDLING |
| A. | Do not deliver material of any kind to the job until the building is in proper condition and arrangements are made to properly handle, store, and protect such material. |
| B. | All material shall be delivered to the site in undamaged condition and shall be stored in fully covered, well-ventilated areas. |
PART 2 - PRODUCTS
| 2.1 | MATERIALS – GENERAL |
| A. | Nominal sizes are indicated, except as shown by detailed dimensions. |
| B. | Provide dressed or worked and dressed lumber, as applicable, manufactured to the actual sizes as required by PS 20 or to actual sizes and patterns as shown, unless otherwise indicated. |
| C. | Moisture content of Softwood Lumber: Provide seasoned (KD) lumber having a moisture content from time of manufacture until time of installation not greater than values required by the applicable grading rules of the respective grading and inspecting agency for the species and product indicated. |
| 2.2 | STANDING AND RUNNING TRIM FOR PAINTED FINISH |
| A. | For trim in form of boards and worked products, provide lumber complying with the following requirements including those of the grading agency listed with species. |
| B. | Species: |
Redwood (RIS); Clear grade.
Western Red Cedar (WWP); A grade.
| 1. | Contractors Option: Provide either species listed above. |
| C. | Texture: Surface (smooth). |
| 1. | One face saw-textured, the other surfaced (smooth). |
| D. | Fasteners: Aluminum or hot-dipped zinc-coated siding or common nails, 8d where siding attached directly to studs, 10d where applied over sheathing. |
PART 3 - EXECUTION
| 3.1 | RUNNING AND STANDING TRIM, ETC. |
| A. | Cut to eliminate defects. |
| B. | Use full-length trim pieces accurately, install as detailed on drawings. |
| C. | Miter exterior corners; cope interior angles. |
| D. | Cut end-to-end joints at 45o angle, glue and nail. |
| E. | Use caulking compound at any joints subject to leaking. |
| F. | Blind nail where practicable. Drive face nails flush with surface. |
| G. | Nail adequately for solid, durable, warp-free, installation, |
| H. | All finish work shall be straight, plumb, and level, true to line, closely fitted, free from hammer marks or other flaws. Hammer marks or other defects visible after completion of painting will be cause for rejection. |
END OF SECTION 062013
SECTION 074646 – COMPOSITE PANEL SIDING
PART 1 - GENERAL
| 1.1 | TYPES OF WORK |
| A. | This Section covers exterior vertical siding for the lower levels of the office. |
| 1.2 | PRODUCT HANDLING |
| A. | Do not deliver material of any kind to the job until the building is in proper condition and arrangements are made to properly handle, store, and protect such material. |
| B. | All material shall be delivered to the site in undamaged condition and shall be stored in fully covered, well-ventilated areas. |
PART 2 - PRODUCTS
| 2.1 | MATERIALS – GENERAL |
| A. | Siding shall consist of a durable, fiber-reinforced cement sheet and shall be "Hardipanel" with "Stucco" finish, as manufactured by James Hardie Building Products, or approved equal. |
PART 3 - EXECUTION
| 3.1 | RUNNING AND STANDING TRIM, ETC. |
| A. | Hardipanel may be installed over wood or metal framing complying with the appropriate codes, including the use of vapor barriers where required. |
| B. | The maximum variation in alignment shall be 1/8-inch in 10 linear feet. |
| C. | Use full-length trim pieces accurately, install as detailed on drawings. |
| D. | Use caulking compound at any joints subject to leaking. |
| E. | Blind nail where practicable. Drive face nails flush with surface. |
| F. | Nail adequately for solid, durable, warp-free, installation, |
| G. | All finish work shall be straight, plumb, and level, true to line, closely fitted, free from hammer marks or other flaws. Hammer marks or other defects visible after completion of painting will be cause for rejection. |
END OF SECTION 074646
END OF SECTION 074646Copyright 2010 by The American Institute of Architects (AIA)
SECTION 099100 - PAINTING
PART 1 - PRODUCTS
| 1.1 | SECTION REQUIREMENTS |
| A. | Summary: Exterior painting. |
| B. | Work Included: Painting of new Hardipanel Siding & new Cedar Trim Boards. |
| C. | Work Not Included: |
| 1. | Prefinished items, items with an integral finish, and operating parts, except as otherwise indicated. |
| 2. | Labels: do not paint over code-required labels or any equipment identification, performance rating, name or nomenclature plates. |
| D. | Submittals: |
| 1. | Product Data: MSDS Sheets, Manufacturer’s product data and color charts of products selected. |
| 2. | Color Charts: Furnish color charts of proposed products for selection of colors by the Contracting Officer. |
| E. | Project Conditions: |
| 1. | Store materials in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 45 deg F. Maintain storage containers in a clean condition, free of foreign materials and residue. |
| F. | MPI Standards: |
| 1. | Preparation and Workmanship: Comply with requirements in "MPI Architectural Painting Specification Manual" for products and paint systems indicated. |
PART 2 - PRODUCTS
| 2.1 | PAINT AND COATINGS |
| A. | Products: |
| 1. | Exterior Hardipanel siding & trims: |
| a. | Primer: Zero VOC, Sherwin Williams or equivalent. |
| b. | First Coat: Zero VOC, Sherwin-Williams or equivalent. |
| c. | Second Coat: Zero VOC, Sherwin-Williams, or equivalent. |
| B. | Material Compatibility: Provide materials that are compatible with one another and with substrates. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated. Each coating system is to be from a single manufacturer and lot number. |
| C. | Delivery, Storage and Protection: Deliver materials to site in original, unopened packages and containers bearing labels as follows: |
| 1. | Name or title of material. |
| 2. | Federal specification number, if applicable. |
| 3. | Manufacturer’s name and stock number. |
| 4. | Contents by volume, for major pigment constituents. |
| 5. | Instructions for use. |
| 6. | Safety precautions. |
PART 3 - EXECUTION
| 3.1 | PREPARATION |
| A. | Perform preparation procedures for each substrate in strict accordance with paint manufacturer’s instructions and as specified. |
| B. | Remove hardware, lighting fixtures, and similar items that are not to be painted. Mask items that cannot be removed. Reinstall items in each area after painting is complete. |
| C. | Clean and prepare surfaces in an area before beginning painting in that area. Schedule painting so cleaning operations will not damage newly painted surfaces. |
| 3.2 | MATERIAL PREPARATION |
| A. | Prepare painting materials in accordance with manufacturer’s directions. Mix materials before application to produce uniform density. Stir as required during application of materials. Do not stir surface film into material; remove film and, if necessary, strain material before using. |
| B. | Store materials not in actual use in tightly covered containers. Maintain containers used in storage, mixing and application of paint in a clean condition, free of foreign materials and residue. |
| 3.3 | APPLICATION |
| A. | Apply paints according to manufacturer's written instructions. Use applicators and techniques best suited for type of material being applied. |
| B. | Apply additional coats when undercoats or other conditions show through final coat of paint. Finished paint coatings shall be free from pinholes, bubbles, runs, drops, ridges, waves, laps, unnecessary brush marks, and variations in color, texture, and gloss. |
| C. | When painting new substrates patched into existing surfaces or touching up missing or damaged finishes, apply coating system specified for the specific substrate. Apply final finish coat over entire surface from edge to edge and corner to corner. |
| 3.4 | PROTECTION AND CLEAN-UP |
| A. | Protect work from paint drippings and spatterings by use of masking, drop cloths, removal of items or by other approved methods. |
| B. | Provide “WET PAINT” signs as required to protect newly painted finishes. |
| C. | During progress of work, dispose of discarded paint materials, rubbish, cans, and rags. |
| D. | Upon completion of painting work, clean all paint-spattered surfaces by proper methods of washing and scraping, using care not scratch or otherwise damaged finished surfaces. |
PART 1 -
PART 2 -
PART 3 -
SCHEDULE 0 -
PRODUCT DATA SHEET 0 -
3.1 3.2 3.3 3.4
EXTERIOR PAINT & STAIN APPLICATION SCHEDULE
All materials shall receive:
Bare and weathered materials shall receive one coat of primer and then two coats of finish.
Contractor shall match existing finishes (i.e. Flat, Low-Sheen, Semigloss, or Gloss).
Existing St. Ignace Office & Warehouse Colors:
SW3033 Light Cork Foundation EIFS finish.
Facica, window, and all other trim boards.
Roof finials.
Steel front ramp hand railing.
SW2205 Townhall Tan Hardipanel siding.
SW3005 Navajo White Beveled wood siding.
Plywood soffits.
Plywood porch ceilings.
SW3009 Pineneedle 1x4 wood trim board at drip edge.
Brown (match existing) Steel 3070 entry doors.
END OF SECTION 099100