Att.2-WSS Fuel Storage Project SOW.pdf
PDF 39 KB Posted
- Attached to
- MOF-WSS Fuel Storage Project
- Solicitation number
- 12445525Q0078
- Issued by
-
Department of Agriculture Forest Service
About this file
This Statement of Work details the White Sulphur Springs Fuel Storage Project for a ranger station, which requires mobilization, traffic control, site preparation, and equipment installation. The project involves creating a 10' x 15' compacted gravel pad, procuring and placing a prefabricated fuel storage building, and installing a new 200-amp electrical service. Specific deliverables include removing topsoil, leveling and compacting the subgrade with limestone, unloading and installing the fuel storage building according to manufacturer specifications, and connecting electrical service by a licensed electrician in compliance with local utility company and National Electrical Code requirements. The primary objective is to provide a proper storage facility for hazardous and flammable materials at the White Sulphur Springs Ranger Station.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att.3-WSS Fuel Storage Project SOI.pdf | ||
| Att.1-Davis-Bacon Act WD# WV20250009.pdf | ||
| Att.4-WSS Fuel Storage Specs.pdf | ||
| Att.5-Location Map.pdf | ||
| 12445525Q0078.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work – White Sulphur Springs Fuel Storage Project
Project
White Sulphur Springs Fuel Storage Project
General Information
1.0 Scope of Work
The project consists of mobilization, traffic control, compacted gravel pad, procurement and placement of prefabricated fuel storage building, and hookup of electrical service to the building. All operations at White Sulphur Springs Ranger Station.
2.0 Background
White Sulphur Springs Ranger Station is need of a new fuel storage building to properly store hazardous/flammable material.
3.0 Deliverables / Schedule
See table below.
Item No. Deliverable Specification Section
Objective
001 Mobilization All sections Mobilization, demobilization, all erosion and sediment control, and all items not incidental to or under another item.
Telephone, water, electrical, and sewer utilities are in the area. The contractor is responsible for locating and preserving all existing utilities, including repair or replacement of lines damaged from contract operations.
002 Traffic Control
Perform all necessary traffic control to protect workers and road users during contract operations. Traffic control shall be in place during all operations.
003 Compacted 24” Gravel Pad – Remove topsoil, level and compact subgrade. Bring up 2’, slope to drain away from the building and ensure the pad is level.
Provide 10’ x 15’ compacted gravel pad.
1.5’’ crusher run. Limestone shall be compacted to 95% of the standard proctor in 6" lifts. All lifts shall be tested in 2 locations and a report provided showing that the material meets compaction requirements
004 Procure and place prefabricated fuel storage building.
Follow contract plans and specifications.
Unload Fuel Storage Building from Transport Vehicle. Install Fuel Storage Building on compacted gravel pad. Adhere to the Building manufacturer specifications where applicable for installation.
005 Hookup of electrical service to the building.
Provide a new 200-amp service rated NEMA 3R installed to suit the local Utility Company's requirements. The service shall be installed by a licensed electrician in accordance with the NEC and Utility Company's requirements and inspected and approved by someone qualified to perform inspections on behalf of the local utility company
File details come from the government source that posted it. Updated .