Att. 2 CMNC Alarm SOW 240812.pdf
PDF 3 MB Posted
- Attached to
- Monongahela National Forest - CMNC Fire Alarm System Federal contract opportunity
- Solicitation number
- 12445524Q0127
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to provide and install a new fire alarm system at the Cranberry Mountain Nature Center (CMNC) in West Virginia. The SOW specifies the contractor requirements, technical requirements, and key deliverables for the project. The contractor must be licensed in West Virginia, have 5 years of experience with similar fire alarm system installations, and coordinate with the State Fire Marshal for inspections. The key deliverables include mobilization, demolition of the existing system, supply and installation of the new fire alarm system, and training for USFS staff. The minimum required system components are detailed, including the control panel, detectors, pull stations, and notification devices. The related federal contract opportunity, Solicitation Number 12445524Q0127, is for the Monongahela National Forest - CMNC Fire Alarm System, to be awarded by the Department of Agriculture Forest Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amendment 0002 240904.pdf | ||
| 12445524Q0127 Questions and Answers 240904.docx | DOCX document | |
| 12445524Q0127.pdf | ||
| Amendment 0001.pdf | ||
| 12445524Q0127.pdf | ||
| Att. 5 Vicinity Map 240808.pdf | ||
| Att. 3 CMNC ALARM SPECS 240808.pdf | ||
| Att. 4 CMNC Alarm - Floor Plan 240808.pdf | ||
| Att. 6 Location Map 240808.pdf | ||
| 12445524Q0127.pdf | ||
| Att. 1 Davis Bacon Wage Determination WV20240022 240808.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents Project General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
Attachment
Project CMNC Alarm System
General Information
1.0 Scope of Work
The scope of the project shall include to provide all materials, labor, equipment, appurtenances, and any other items needed to complete the project as described in the plans. Minimum required equipment list for system is below. System must meet all local, state and federal inspections. Contractor must coordinate, schedule, and be present for State Fire Marshal Inspection. The contractor shall also disconnect, remove, and legally dispose of all existing fire alarm system components.
2.0 Background
The Cranberry Mountain Nature Center (CMNC) is located 23 miles West of Richwood, WV along WV Rt. 39. CMNC was constructed in 1968 and is a timber frame structure. The structure has been improved over the last 55 years and is now in need of an updated fire alarm system.
Contractor Requirements
3.0 Technical Requirements / Tasks
Contractor shall be licensed in the state of West Virginia and carry liability insurance. Contractor shall have 5 years of experience with installing fire alarm systems similar in scope to the subject project’s scope.
4.0 Government Furnished
Government shall furnish a key for access to the facility. Any items furnished by the government shall be returned before approval of final invoice. There are restrooms onsite, as well as power and water hookups.
Facility Hours are 8 AM – 4:30 PM Thursday-Monday.
5.0 Deliverables / Schedule
Key Deliverables
Item No. Deliverable Objective Due 1 Mobilization Contractor mobilize and de-mobilize to site with equipment, materials, and personnel to complete the project.
End of Period of Performance.
2 Demolition Disconnect and remove all existing fire alarm equipment, so that there are no extraneous pieces of equipment left upon completion of installation of new system.
End of Period of Performance.
3 Supply and Install Complete Fire Alarm System
Supply and furnish all materials, labor, equipment, appurtenances, and any other items needed to complete the project as described in the plans.
Minimum required equipment list for system is below. System must meet all local, state and federal inspections. Contractor must coordinate, schedule, and be present for State Fire Marshal Inspection.
Any items needed to comply and pass WV State Fire Marshal Inspection are incidental to Item #3.
End of Period of Performance.
4 Setup and Training for USFS Staff
Contractor shall provide adequate training for the staff at the CMNC to properly utilize, operate, and troubleshoot the system.
End of Period of Performance.
Attachment Minimum System Component List (Any additional items required for system operation, to bring the facility to code, or to pass state Fire Marshall Inspection are also required and incidental to the project cost):
1 - Controller w/Power Supply & Built-In Dialer 1 - FACP Backbox 1 - Remote Annunciator
1 - Surge Protector 2 - Main Panel 8mah Backup Batteries 2 - Heat Detector with mounting hardware 2 - Optical Smoke Detector with mounting hardware 1 - Dual Optical/ Heat/ Carbon Monoxide Detector with mounting hardware 1 - Buzzer Sounder Base w/Loop Power 4 - Dual Action Pull Station with Loop Isolation 1 - Duct Housing with Relay 1 - Duct Sampling Tube 4 - Red LED Multi-Candela Horn Strobe 2 - Red LED Multi-Candela Strobe
See Photos Below
Photo 1: Existing Pull Station to be removed and replaced with new
Photo 2: Close up of existing stobe and wiring to be removed
Photo 3: Existing smoke detectors to be removed
Photo 4: Existing Smoke detectors to be removed
Photo 5: Smoke Detectors to be removed, and typical proposed high point/ceiling mounting location.
Photo 6: Existing Smoke Detector to be removed
Photo 7: Existing smoke detector to be removed (both restrooms)
Photo 8: Existing Pull Station and strobe to be removed and replaced
Photo 9: Typical High Point
Photo 10: Proposed mounting location for proposed control panel (utility room)
Photo 11: Proposed annunciator panel mounting location.
*NOTE: Photos do not show entire demo/proposed system scope, they are for reference only. Contractor to reference floor plans for determination of required equipment placement to meet applicable codes and construction specifications.
File details come from the government source that posted it. Updated .