Att. (2) - Annual Unit Pricing.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
C-40A Contractor Logistics Support
Solicitation number
N0001925R0003
Issued by

About this file

This document is an Attachment (2) - Annual Unit Pricing spreadsheet related to a federal contract opportunity for Contractor Logistics Support (CLS) for the United States Navy (USN) and United States Marine Corps (USMC) C-40A aircraft fleet.

The spreadsheet provides detailed pricing information for various contract line items (CLINs) such as transition phases, maintenance support labor, depot-level heavy maintenance, field team labor and travel, spare parts procurement, aircraft modifications and repairs, and other related services. The pricing is structured as firm-fixed-price (FFP) or negotiated not-to-exceed (NTE) amounts for each contract year (CY) of the potential 5-year contract period. The attachment also includes appendices with additional details on travel expenses, labor rates, and other supporting information.

The overall federal contract opportunity is being managed by the Naval Air Systems Command (NAVAIR) Tactical Airlift Program Office (PMA-207) and is a follow-on to an existing contract that expires on December 31, 2025. The Government plans to release a draft Request for Proposal (RFP) around September 2024 and the final RFP around November 2024, with a contract award goal of the fourth quarter of Fiscal Year 2025.

View the file

Other files

File Type Posted
Att. (1), App. A - Draft Schedule.pdf PDF
Att. (1), App. D - PSE.xlsx XLSX spreadsheet
Att. (1) - Pre-Draft PWS.pdf PDF
Att. (1), App. J - Draft Preferred Parts List.pdf PDF
Encl. (1) - Industry Feedback (1).xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Att. (2) - Annual Pricing Attachment (2), Annual Unit Pricing

CLINDescriptionUnit of
IssueTypeCY 1CY 2CY 3CY 4CY 5
0001Transition Phase-In: Contractor Logistics SupportEachPre-PricedFFP
0002Transition Phase-In: Commercial Line Maintenance SupportEachPre-PricedFFP
0003Transition Phase-OutEachPre-PricedFFP
0004USN MOB Support Labor: MCBH Kaneohe Bay, HI (VR-51)MonthsPre-PricedFFP
0005USN MOB Support Labor: NAS Oceana, VA (VR-56)MonthsPre-PricedFFP
0006USN MOB Support Labor: NAS North Island, CA (VR-57)MonthsPre-PricedFFP
0007USN MOB Support Labor: NAS Jacksonville, FL (VR-58)MonthsPre-PricedFFP
0008USN MOB Support Labor: NAS JRB Fort Worth, TX (VR-59)MonthsPre-PricedFFP
0009USN MOB Support Labor: NAS Whidbey Island, WA (VR-61)MonthsPre-PricedFFP
0010USMC MOB Support Labor: NAS JRB Ft. Worth (VMR-1)MonthsPre-PricedFFP
0011USN Line Maintenance Labor: MCBH (VR-51)MonthsPre-PricedFFP
0012USMC Line Maintenance: JRB Ft. Worth (VMR-1)MonthsPre-PricedFFP
0013Support Material ReplacementMonthsPre-PricedFFP
0014Government Property ReplenishmentMonthsPre-PricedFFP
0015Detachment Support - Daily On-Site Detachment Travel ExpensesDaysPre-PricedFFPSee Appendix (A)
0016Detachment Support - LodgingLotNegotiatedNTE
0017Detachment Support - TransportationLotNegotiatedNTE
0018Scheduled Depot-Level Heavy Maintenance: 1C-CheckEachPre-PricedFFP
0019Scheduled Depot-Level Heavy Maintenance: 2C-CheckEachPre-PricedFFP
0020Scheduled Depot-Level Heavy Maintenance: 3C-CheckEachPre-PricedFFP
0021Scheduled Depot-Level Heavy Maintenance: 4C-CheckEachPre-PricedFFP
0022Scheduled Depot-Level Heavy Maintenance: 5C-CheckEachPre-PricedFFP
0023Scheduled Depot-Level Heavy Maintenance: 6C-CheckEachPre-PricedFFP
0024Scheduled Depot-Level Heavy Maintenance: 7C-CheckEachPre-PricedFFP
0025Scheduled Depot-Level Heavy Maintenance: 8C-CheckEachPre-PricedFFP
0026Scheduled Depot-Level Heavy Maintenance: 9C-CheckEachPre-PricedFFP
0027Scheduled Depot-Level Heavy Maintenance: 10C-CheckEachPre-PricedFFP
0028Scheduled Depot-Level Heavy Maintenance: 11C-CheckEachPre-PricedFFP
0029Depot-Level Maintenance/Modification/Repair LaborHoursPre-PricedFFP
0030Drop-In Maintenance/Modification/Repair LaborHoursPre-PricedFFP
0031Round-Trip Field Team TransportationEachPre-PricedFFPSee Appendix (B)
0032Daily On-Site Field Team Travel ExpensesDaysPre-PricedFFPSee Appendix (C)
0033Daily Depot Field Team LaborDaysPre-PricedFFP
0034Daily Specialty Field Team LaborDaysPre-PricedFFP
0035Unspecified Field Team Support TravelLotNegotiatedNTE
0036Beyond Fair Wear and Tear MaterialLotNegotiatedNTE
0037Spare Parts ProcurementLotNegotiatedNTE
0038Government Directed ShippingLotNegotiatedNTE
0039Auxiliary Power Unit (APU) Heavy MaintenanceEachPre-PricedFFP
0040Engine Preservation and DepreservationEachPre-PricedFFP
0041Aft Airstairs OverhaulEachPre-PricedFFP
0042Main Landing Gear OverhaulEachPre-PricedFFP
0043Nose Landing Gear OverhaulEachPre-PricedFFP
0044Service Action MaterialLotNegotiatedNTE
0045Service Action Kit Assembly LaborHoursPre-PricedFFP
0046Functional Check Flight (FCF) Ground Service SupportEachPre-PricedFFP
0047Aircraft Strip and PaintEachPre-PricedFFP
0048Over-and-Above LaborHoursPre-PricedFFP
0049Over-and-Above MaterialLotNegotiatedNTE
0050Over-and-Above TravelLotNegotiatedNTE
0051Data AccessMonthsPre-PricedNTE
0052Technical and Administrative DataLotNSPNSP

&"Cambria,Bold"&14Annual Unit Pricing &9N0001923RXXXX

&9

XX Month 2023&9
&P of &N&9Attachment (2)

Annual Unit Pricing

2A

Attachment (2), Annual Unit Pricing, Appendix (A)
Daily On-Site Detachment Travel Expenses
(CLIN 0015)
CY 1CY 2CY 3CY 4CY 5
VR-51
VR-56
VR-57
VR-58
VR-59
VR-61
VMR-1
Japan
Bahrain
Sigonella
CONUS
OCONUS

&9N0001924RXXXX

XX Month 2023&9
&P of &N&9Attachment (2), Appendix (A)

Scheduled On-Site Engine Removal and Replacement

2B

Attachment (2), Annual Unit Pricing, Appendix (B)
Depot-Level Maintenance/Modification/Repair Labor
(CLIN 0029)
CY 1CY 2CY 3CY 4CY 5
VR-51
VR-56
VR-57
VR-58
VR-59
VR-61
VMR-1
Japan
Bahrain
Sigonella
CONUS
OCONUS
XX Month 2023&9
&P of &N&9Attachment (2), Appendix (B)

Scheduled Outbound Engine Shipment

2C

Attachment (2), Annual Unit Pricing, Appendix (C)
Drop-In Maintenance/Modification/Repair Labor
(CLIN 0030)
CY 1CY 2CY 3CY 4CY 5
VR-51
VR-56
VR-57
VR-58
VR-59
VR-61
VMR-1
Japan
Bahrain
Sigonella
CONUS
OCONUS
XX Month 2023&9
&P of &N&9Attachment (2), Appendix (C)

Unscheduled On-Site Engine Removal and Replacement

File details come from the government source that posted it. Updated .