US Department of Agriculture (USDA)
Statement of Work
Project Gauley Storage Construction
General Information
1.0 Scope of Work
Install the government supplied prefabricated storage building according to plans and specifications in Fenwick, WV. The work includes site preparation, unloading and placing of the government building, and hookup of electrical service to the building.
2.0 Background
The Gauley Ranger District requires a new Flammable Storage Building in Fenwick, WV.
Contractor Requirements
3.0 Technical Requirements / Tasks
• Site Preparation o Clear Trees and Brush along proposed power line according to contract plans and specifications.
o Maintain Erosion Control according to contract plans and specifications.
• Set Government Supplied Building o Follow contract plans and specifications.
o Unload Government Supplied Building from Transport Vehicle.
o Install Government Supplied Building on Concrete Slab.
o Adhere to the Building manufacturer specifications where applicable for installation.
• Electrical Hookup o Hookup electrical service to the Government Supplied Building according to contract plans and specifications in addition to manufacturer specifications.
o All electrical work requires compliance with the National Electrical Code.
o Adhere to the Building manufacturer specifications where applicable for installation.
4.0 Government Furnished
The government will furnish the following:
• Prefabricated Storage Building Delivered to the site.
• Surveyed Control Points with elevations and coordinates.
• Government will provide the concrete slab on which to place the building.
• Government will mark location of utility pole in the field.
| Project |
| General Information |
| 1.0 Scope of Work |
| 2.0 Background |
| Contractor Requirements |
| 3.0 Technical Requirements / Tasks |
| 4.0 Government Furnished |