Att. 1 - PWS 119th Refresh.pdf
PDF 214 KB Posted
- Attached to
- 119th Knowledge Wall Refresh
- Solicitation number
- W50S9826Q003
About this file
This is a Performance Work Statement (PWS) for installation services at McGhee Tyson ANG Base, Building 263, with a period of performance of one month or until project completion. The contractor must restore to functional status three knowledge walls (SCIF 6, SCIF 7, and S7 side rooms) that were previously non-operational due to loss of Authorization to Operate by a predecessor contractor.
The primary requirements include installing TAA-compliant AVoIP video wall systems with pre-configured layouts selectable from in-room touch panels; providing and installing secure KVM solutions with CAC card reader support and secure wired keyboards at multiple workstations; installing LED security state indicators at entry doors and within rooms; providing replacement ATSC tuners (four units each for S6 and S7 rooms); and installing control systems with touch panels featuring "Displays Off" panic buttons to mute images and audio when unauthorized personnel enter. Additional deliverables include 65-inch TAA-compliant displays for side and rear walls, a Blu-ray/DVD player in the S6 conference room, and comprehensive hands-on training for both end-users on equipment operation and maintenance personnel on troubleshooting and basic maintenance not covered by the service contract. The contractor must furnish all personnel, equipment, tools, materials, supervision, and quality control except workspace provided by the Government. Services shall be performed between 0730–1530, Monday through Friday, excluding recognized US federal holidays and facility closures. The contractor must possess or be eligible to receive and maintain a TOP SECRET/SCI facility clearance from DSCA, and all contractor employees must hold TOP SECRET/SCI security clearances. All contractor employees must complete AT Level I training within 15 calendar days of contract start and submit completion certificates to the Contracting Officer within that timeframe. Service Contract Reporting of all labor hours (including subcontractors) is required annually by October 31 via SAM.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 119th Knowledge Wall Refresh Q and A.pdf | ||
| Att. 1 - PWS V2.pdf | ||
| Site Visit Sign In.pdf | ||
| Site Visit Slides.pdf | ||
| Combined Synopsis and Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ver. October 2022
CUI
PERFORMANCE WORK STATEMENT (PWS)
FOR
Installation Services
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Installation Services, as defined in this PWS.
1.2 Background: Installation services to restore to function 3 knowledge walls, within secure areas, that have been used to limited effect due to the loss of ATO by previous contractor.
1.3 Period of Performance (PoP): The Period of Performance shall be 1 month or until project completion.
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0730-1530 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at McGhee Tyson ANG Base, Building 263. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is not authorized.
1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle
CUI
CUI
regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.
The contractor shall not perform services on these days:
1.4.2.1 New Year’s Day: January 1st
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth National Independence Day: June 19th
1.4.2.6 Independence Day: July 4th
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day: November 11th
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day: December 25th
1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS).
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
CUI
CUI
1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.5.2 For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Air Force Instruction (AFI) 10-245, AFI 31-101 and Air Force Manual (AFMAN) 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)
1.4.5.3 Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS) or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the KO within 15 calendar days after completion of training by each employee or subcontractor personnel.
1.4.5.4 Reserved.
1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the http://jko.jten.mil/
CUI
CUI
restriction against using the network to recruit Government personnel or advertise job openings.
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.7 Special Qualifications: Reserved
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.
The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced.
The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.
The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the KO, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees:. Contractor personnel shall wear identification badges distinguishing themselves. The badges shall have the company name and employee name displayed.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at
FAR 22.17.
1.4.12. Reserved.
CUI
CUI
1.4.13. Reserved.
1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
CUI
CUI
2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCR Service Contract Reporting SSN Social Security Number SCIF Sensitive Compartmented Information Facility TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):
Reserved
CUI
CUI
3.1 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS
3.1 Property: Reserved
3.2 Materials: Reserved
3.3 Equipment: Reserved
3.4 Services: Reserved
3.5 Utilities: Reserved
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E): Reserved
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
4.2 The contractor shall possess or be eligible to receive and maintain a TOP SECRET / SCI facility clearance from the Defense Counterintelligence and Security Agency
(DSCA).
4.3 Contractor Security Clearance: The contractor’s employees performing work in support of this contract shall have been granted a TOP SECRET / SCI security clearance from the Defense Industry Security Clearance Office.
5.0 Requirements: The contractor shall:
5.1 Install required systems with SCIF 6 (S6) and SCIF 7 (S7).
5.1.1 S6.
5.1.1.1 Contractor will provide and install a TAA compliant AVoIP video wall system in this room. This will allow for pre-configured layouts on the existing 6x3 video wall.
Layouts will be selectable from the in-room touch panel. Available sources will include
(3) KVM driven workstations and (4) ATSC decoded channels
5.1.1.2 Contractor will provide and install at each of the (3) workstations a secure KVM solution including support for a CAC card reader (included) as well as a secure wired keyboard with integrated KVM remote for simplified switching.
5.1.1.3 Contractor will provide and install (3) new 65” TAA compliant displays on the side wall.
CUI
CUI
5.1.1.4 Contractor will provide and install (2) new 65” TAA compliant displays on the rear wall.
5.1.1.5 Contractor will provide and install an LED sign at the entry door and another in the room indicating the current security state of the room. (i.e. Unclassified, Secret and Top Secret).
5.1.1.6 Contractor will provide and install a control system with a touch panel to be located at the credenza.
5.1.1.6.1 Touch panel will include a “Displays Off” panic button which, when selected, will mute the images and audio in the room in the event someone without clearance enters the room.
5.1.1.7 Contractor will provide and install (4) replacement ATSC tuners for the S6 rooms.
5.1.2. S6 Conference Room
5.1.2.1 Contractor will provide and install a TAA compliant AVoIP video wall system in this room. This will allow for pre-configured layouts on the existing 3x2 video wall.
Layouts will be selectable from the in-room touch panel. Available sources will include
(3) KVM driven workstations in S6, (4) ATSC decoded channels, (1) HDMI wall plate input, and Future connections for conferencing devices.
5.1.2.2 Contractor will provide and install (2) new 65” TAA compliant displays on the left wall.
5.1.2.3 Contractor will provide and install (2) new 65” TAA compliant displays on the right wall.
5.1.2.4 Contractor will provide and install an LED sign at the entry door and another in the room indicating the current security state of the room. (i.e. Unclassified, Secret and Top Secret).
5.1.2.5 Contractor will provide and install a control system with a touch panel to be located at the corner desk.
5.1.2.5.1 Touch panel will include a “Displays Off” panic button which, when selected, will mute the images and audio in the room in the event someone without clearance enters the room.
5.1.2.6 Contractor will provide and install a TAA compliant Blu-ray/DVD player in the 12RU OFE rack.
5.1.3 S7
CUI
CUI
5.1.3.1 Contractor will provide and install a TAA compliant AVoIP video wall system in this room. This will allow for pre-configured layouts on the existing 4x2 video wall.
Layouts will be selectable from the in-room touch panel. Available sources will include
(4) KVM driven workstations and (4) ATSC decoded channels.
5.1.3.2 Contractor will provide and install at each of the (4) workstations a secure KVM solution including support for a CAC card reader (included) as well as a secure wired keyboard with integrated KVM remote for simplified switching.
5.1.3.3 Contractor will provide and install an LED sign at the entry door and another in the room indicating the current security state of the room. (i.e. Unclassified, Secret and Top Secret).
5.1.3.4 Contractor will provide and install a control system with touch panel to be located at one of the workstations.
5.1.3.4.1 Touch panel will include a “Displays Off” panic button which, when selected, will mute the images and audio in the room in the event someone without clearance enters the room.
5.1.3.5 Contractor will provide and install (4) replacement ATSC tuners for the S7 rooms.
5.1.4 S7 (4) Side Rooms:
5.1.4.1 Contractor will provide and install an AVoIP video distribution system. Available sources will include (1) KVM driven workstation and (4) ATSC decoded channels.
5.1.4.2 Contractor will provide and install at the workstation a secure KVM solution including support for a CAC card reader (included) as well as a secure wired keyboard with integrated KVM remote for simplified switching.
5.1.4.3 Contractor will provide and install an LED sign at the entry door and another in the room indicating the current security state of the room. (i.e. Unclassified, Secret, and Top Secret).
5.1.4.4 Contractor will provide and install a control system with a touch panel to be located at one of the workstations.
5.1.4.4.1 Touch panel will include a “Displays Off” panic button which, when selected, will mute the images and audio in the room in the event someone without clearance enters the room.
5.2 Train employees on how to properly utilize the new equipment, and the maintenance section on how to troubleshoot issues and basic hands-on maintenance that is not covered by the service contract to ensure continued utilization.
5.3: Service Contract Reporting:
5.3.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the 119th Cyberspace Operations Squadron via a secure data collection site.
5.3.2 The contractor shall completely fill in all required data fields using the following web address: https://sam.gov. Log in and select Entity Registrations and then select Service Contract Reporting.
The Contractor shall report the required information annually by October 31, for services performed under this contract during the preceding Government fiscal year (October 1- September 30).
The DoD Guidebook for Service Contract Reporting in SAM, available on the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr. The General Services Administration (GSA) has also posted additional guidance such as quick start guides, informational videos, and frequently asked questions, that can be accessed by going to https://sam.gov and searching the “HELP” section. The SAM Federal User Guide is also available in the “HELP” section for comprehensive instructions on navigating SAM. Contractors requiring assistance using SAM should contact the Federal Service Desk at https://www.fsd.gov.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page)
Date of Publication
Mandatory or Advisory
Website
Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition
Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/in dex.html or https://www.acquisition.gov/dfars Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm
DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)
01/23/2014 (Change 1:
07/28/2020) http://www.esd.whs.mil/Directives/issuances/dodm
Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors
(paragraph 9)
August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201 -2.pdf
DoDM 5200.2 Procedures for the DoD Personnel Security Program
(PSP)
04/03/2017 https://www.esd.whs.mil/Directives/issuances/dodm/
DoDI 5200.46 DoD Investigative and Adjudicative Guidance for Issuing the Common
Access Card (CAC)
09/09/14 (Change 1:
05/04/2018) https://www.esd.whs.mil/Directives/issuances/dodi/
Homeland Security Presidential Directive (HSPD)-12
08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12 https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr https://www.fsd.gov/ https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/dfars http://www.esd.whs.mil/Directives/issuances/dodm http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12
CUI
CUI
Policy for a Common Identification Standard for Federal Employees and
Contractors DoDI 5400.11
Department of Defense Privacy and Civil Liberties Programs
01/29/2019
DoD 5400.11-R Department of Defense Privacy
Program
05/14/2007 https://www.esd.whs.mil/Directives/issuances/dodm/
DoDD 8140.01 Cyberspace Workforce Management
10/05/2020 https://www.esd.whs.mil/Directives/issuances/dodd/
DoD 8570.01-M Information Assurance Workforce
Improvement Program
12/19/2005 (Change 4:
11/10/2015) https://www.esd.whs.mil/Directives/issuances/dodm/
DoD 5220.22-M National Industrial Security Program
Operating Manual (NISPOM)
02/28/2006 (Change 2:
05/18/2016) https://www.esd.whs.mil/Directives/issuances/dodm/
AFI 10-245
Antiterrorism
03/28/2013 (Certified current
03/30/2017) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
AFI 31-101
Security Forces Standards and
Procedures
08/18/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
AFMAN 31-113
Security Forces Standards and Procedures
03/05/2013 Change 1:
12/02/2015 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
AFPD 17-1
Information Dominance Governance and Management
04/12/2016 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
AFMAN 17-1301
Computer Security (COMPUSEC) 02/12/2020 https://www.e-publishing.af.mil/Product-
Index/#/?view=pubs&orgID=10141&catID=1&series =-1&modID=449&tabID=131
AFI 10-701
Operations Security
7/24/2019 (Change 1:
06/09/2020) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
Form Date Website
DD 1172-2
Application for Identification Card/DEERS Enrollment
Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm
I-9 Employment Eligibility Verification
10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf
DD 441
Department of Defense Security
Agreement
Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001- 0499.htm
DD 250
Material Inspection and Receiving
Report
Aug 2000 https://www.esd.whs.mil/Directives/forms/dd0001_0499/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/index.htm https://www.uscis.gov/sites/default/files/files/form/i-9.pdf http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm https://www.esd.whs.mil/Directives/forms/dd0001_0499/
CUI
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
Performance
Objective Performance Standard Acceptable Quality
Levels (AQL) Surveillance Method / By
Whom
5.1 Install
Equipment
Install equipment sufficient to display data from multiple positions within three SCIFs over multiple networks
Equipment is fully functional
Demonstration by contract personnel to Squadron
Leadership
5.2 Train
employees on the equipment and maintain the equipment
The contractor shall provide training on the functionality of the knowledge wall controller and any touch maintenance not covered by purchased protection plan
Training sufficient that operators are able to function equipment as needed and maintainers are able to service equipment
Final Inspection / Squadron Leadership
CUI
TECHNICAL EXHIBIT 2
Deliverables Schedule
PWS Reference / Deliverable Title
Frequency Number of Copies
Medium/Format Submit To
5.2 Train
employees on the equipment and maintain the equipment
Upon Completion of installation
N/A Hands on Knowledge Wall Operators
5.2 Train
employees on how to maintain the equipment
Upon Completion of installation
Hands on Knowledge Wall Maintainers
1.4.5.3 AT Level 1
Awareness Training
Certificates
Provide within 15 calendar days after employee completes training.
1 Electronic Submission
COR
1.4.5.11 OPSEC
Training Certificates
Provide within 15 calendar days after employee completes training.
1 Electronic Submission
COR
CUI
TECHNICAL EXHIBIT 3
Estimated Workload Data
Reserved