Att. 01_Carnero Plaster Maintenance Schedule of Items SOI.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Carnero Stucco Repair Project
Solicitation number
1144346_1
Issued by

About this file

This is a Schedule of Items spreadsheet for the GAOA - Carnero Stucco Replacement project on the Rio Grande National Forest. The document outlines nine line items required for the stucco replacement work, including replacement sheathing (12 units), felt paper, stucco netting for corners and general areas, three coats of stucco application (scratch, brown, and finish coats at varying thicknesses), mobilization fees, and corners/edgings. The period of performance is from June 1, 2025 to September 30, 2025, with no option years included.

The project, identified under Workplan Acquisition Plan/Requisition No. 1144346, is managed by the Department of Agriculture Forest Service. The schedule is structured with line items using both Each (EA) and Lump Sum (LS) as units of measure, with blank fields for contractors to input item costs and total costs. The work involves comprehensive stucco replacement, including removal of existing security structures on windows, disposal of old materials, and repair of damaged wall framing, followed by new stucco application in three distinct layers.

View the file

Other files

File Type Posted
Amendment 0001.pdf PDF
Att. 04_Stucco Application.jpg JPG image
Att. 02_Carnero Plaster Maintenance SOW.pdf PDF
SF 1442_1282B125Q0012.pdf PDF
Att. 05_Carnero Plaster Directions.pdf PDF
Att. 06_Davis-Bacon Act WD # WD # CO20250001.pdf PDF
Att. 03_Carnero with measurement.pptx PPTX presentation

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT (NO OPTION YRS)

FILL OUT THE AREAS IN RED BELOW

SCHEDULE OF ITEMS

Rio Grande National Forest PROJECT TITLE: GAOA - Carnero Stucco Replacement WORKPLAN ACQUISITION PLAN/REQUISITION NO: 1144346

SCHEDULE OF ITEMS
Period of Performance Base Year: 06/01/2025 - 09/30/2025
ITEM
NUMBERDESCRIPTIONPAY UNITQTYITEM COSTTOTAL COST
0001Replacement Sheathing 4'x 8'EA12
0002Felt PaperLS1
0003Stucco Netting (Corners)LS1
0004Stucco NettingLS1
0005Scratch Coat (3/8" thickness)LS1
0006Brown Coat (3/8" thickness)LS1
0007Finish Coat (1/8" thickness)LS1
0008Mobilization/ FeeLS1
0009Corners and EdgingsLS1
TOTAL
EA = Each
LS = Lump Sum