ATT C - CPM Plan - Feedwater Pump.docx

DOCX document 17 KB Posted

Attached to
Y1DA--Steam Feedwater Pump for Boiler at the Bronx VAMC
Solicitation number
36C24221Q1292
Issued by

About this file

This solicitation is for a construction contract to replace the steam-turbine driven boiler feed water pump and associated components at the James J. Peters Veterans Affairs Medical Center in Bronx, New York. The scope of work includes removing and disposing of the existing turbine pump, installing a new turbine pump that meets the minimum performance specifications provided in the attachment, and making all necessary connections. The contractor will also be responsible for commissioning activities including having a field service engineer present, providing submittals for review, and submitting a construction log and progress schedule to the VA. The project completion date is 60 calendar days from notice to proceed. Responses must be submitted by the date specified in the solicitation, which will be released on or about August 13, 2021 via SAM.gov. The estimated cost range for this project is between $100,000 and $200,000. This is a SDVOSB set-aside solicitation to be awarded by the Department of Veterans Affairs Veterans Health Administration VISN 2.

View the file

Other files

File Type Posted
36C24221Q1292 0001.docx DOCX document
20210825_PreBid_Clarifications_PreBid_Site_Visit_FeedwaterPump.docx DOCX document
wage determination.txt TXT text file
36C24221Q1292.docx DOCX document
ATT A - Performance Specifications - Feedwater Pump.docx DOCX document
ATT B Pictures - Feedwater Pump.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment C Construction Project Management Plan Directions: Provide a short synopsis on each of the following subjects listed below (no more than one page each / 500 words maximum). Provide response in PDF format.

Construction Project Management Plan (Specific to Project)

a. Safety Plan (in addition to safety plan include a “cleanup and disposal” plan for infection control)

b. Construction Means and Methods

c. Organizational Chart (include role of each project member – include subcontractors if applicable)

d. Quality Control Plan

e. Field Document Control Method and Plan (how does contractor plan to communicate and track requests for information, submittals, field changes, condition reports, schedule updates, daily logs, redline / as-builts, invoicing)