About this file

This is a Bid Pricing Form for Oregon Department of Transportation (ODOT) contract S-73000-00018397. The form requests bids for a transportation infrastructure project encompassing multiple work items including mobilization, temporary work zone traffic control, pollution control planning, vertical sign mount installation on existing structures, and electrical systems installation at two separate sites. The project involves an estimated 500 pounds of vertical sign mounts to be installed on existing structures, with lump sum pricing requested for mobilization, traffic control, pollution control, and both ITS electrical systems installation sites. No specific response deadline, site visit requirements, bidders' conference details, award date, or contract term information is provided in this form excerpt.

The bid pricing form presents all line items with $0.00 unit prices and a total bid amount of $0.00, indicating this is a blank template awaiting bidder completion rather than a submitted bid. The form does not contain information regarding pricing terms, set-asides, incumbent contractors, funding sources, or budget amounts. Bidders are required to furnish all materials, equipment, and labor in accordance with the Invitation to Bid (ITB), Plans, Specifications, and other incorporated provisions, with pricing to be submitted on a lump sum or unit price basis as applicable to each line item.

View the file

Other files

File Type Posted
Att B-2_Agency Furnished Material.pdf PDF
00018397_ITB.docx DOCX document
Att B-1_Specifications.docx DOCX document
Att A_Plans~21.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT C - BID PRICING FORM S-73000-00018397
Bidder name:
City, State:

The Bidder proposes to furnish all material, equipment and labor, and perform all work for ODOT, in strict accordance with the ITB and the Plans, Specifications and other provisions incorporated in the ITB, on the basis of the lump sum or unit prices, or both, as follows:

ItemDescriptionEst QtyUnitUnit PriceTotal
1Mobilization1LS$0.00
2Temporary Work Zone Traffic Control, Complete1LS$0.00
3Pollution Control Plan1LS$0.00
4Vertical Sign Mounts on Existing Structures500LB$0.00
5ITS Electrical Systems Installation, Site 11LS$0.00
6ITS Electrical Systems Installation, Site 21LS$0.00
BID TOTAL$0.00

File details come from the government source that posted it. Updated .