About this file
This specifications document establishes the technical requirements for 2026 Region 2 Variable Message Sign (VMS) replacements on Santiam Highway (US20) at mile point 31.27 eastbound and North Santiam Highway (OR22) at mile point 48.86 eastbound in Oregon. The project scope includes providing work zone traffic control, picking up and installing Agency-furnished variable message signs and cabinets, and furnishing and installing structural components including riser frames, camera mounting assemblies, conduit, framing channel, conductors, and mounting members and brackets as shown on plans. The work must comply with the 2024 Oregon Standard Specifications for Construction, with modifications specified in the special provisions sections covering mobilization, traffic accommodations, traffic control signs, environmental protection, metal sign supports, and electrical systems. The document requires submission of traffic control plans five calendar days before the preconstruction conference and establishes specific lane closure windows for each highway, with US20 allowing closures Monday through Thursday between 9:00 a.m. and 4:00 p.m., and Friday between 9:00 a.m. and 12:00 p.m., plus nightly closures Sunday through Friday from 7:00 p.m. to 6:00 a.m.; OR22 permits closures daily or nightly Monday through Thursday and by noon on Fridays during summer months (May 15 through September 15).
The contract involves two lump-sum pay items for ITS Electrical Systems Installation at two separate sites, with the contractor required to remove existing VMS, cabinets, and conductors while installing Agency-furnished equipment and furnishing all necessary materials including cabinet riser frames, termination enclosures, camera mounting assemblies, conduits, conductors, and grounding and bonding materials. Specific material requirements include 14-gauge Type 304 or 316 stainless steel termination enclosures meeting UL 50 Type 4X specifications, rigid metal conduit meeting UL 6 standards, liquid-tight flexible metal conduit meeting UL 360 standards, and electrical splice materials meeting UL and ASTM standards. The contractor must employ only properly licensed electricians according to Oregon Administrative Rules and submit Blue Sheets and Green Sheets within 30 calendar days of contract execution. Payment covers all labor, equipment, materials, and incidental costs, with no separate compensation provided for required submittals, commissioning assistance, removal and disposal, or installation of Agency-furnished materials. The document includes detailed specifications for structural steel, fasteners, galvanizing requirements per ASTM standards, bolt installation procedures with direct tension indicator and turn-of-nut methods, and comprehensive electrical installation protocols including conductor slack requirements, identification and marking procedures, and variable message sign installation sequencing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att B-2_Agency Furnished Material.pdf | ||
| 00018397_ITB.docx | DOCX document | |
| Att C_Bid Pricing Form~76.xlsx | XLSX spreadsheet | |
| Att A_Plans~21.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B-1
SPECIFICATIONS
2026 REGION 2 VMS REPLACEMENTS
SANTIAM HIGHWAY (US20) MP 31.27 EB AND
NORTH SANTIAM HIGHWAY (OR22) MP 48.86 EB
OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION. The 2024 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed specifications in Part 00200 and beyond (“technical specifications”) that apply to this Project. Some sections of the technical specifications may be identified and modified in the Contract Documents. Sections of the technical specifications not identified in the Contract Documents remain applicable to the Contract according to their original terms.
Sections 00120-00199 in Part 00100 of the Standard Specifications are not applicable to the Contract unless they are specifically identified in a Contract Document as being applicable. However, if a section in Part 00100, Section 00120—00199, that has been identified as being applicable references another section in Part 00100, or if a technical specification references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the specification that referenced it. Abbreviations, definitions, and conventions in Part 00100, Section 00110, apply to the ITB and any resulting Contract as required for context within the Contract Document. The Standard Specifications can be accessed online at:
http://www.oregon.gov/ODOT/Business/Pages/Standard_Specifications.aspx
SCOPE
The work to be done under this Contract consists of supplying the materials, equipment, labor and incidentals required to perform the following tasks as described in the Contract plans and specifications:
· Provide Work Zone Traffic Control.
· Pick up and install Agency furnished materials including variable message signs and cabinets. (See Attachment B-2)
· Furnish and install the necessary materials to complete the work including riser frames, camera mounting assemblies, conduit, framing channel, conductors, structure mounting members and brackets, etc. as shown on plans.
Silence of Specifications: The apparent silence of the specifications as to any detail, or the apparent omission of a detailed description concerning any point, shall be regarded as meaning that the highest value commercial practices are to prevail and that only materials and workmanship of first quality are to be used.
SPECIAL PROVISIONS
The special provisions below identify and modify certain sections of the Standard Specifications.
All number references in the special provisions shall be understood to refer to the sections and subsections of the Standard Specifications bearing like numbers.
TABLE OF CONTENTS FOR SPECIAL PROVISIONS
| SECTION 00210 - MOBILIZATION | 2 |
| SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC | 2 |
| SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL | 3 |
| SECTION 00222 - TEMPORARY TRAFFIC CONTROL SIGNS | 3 |
| SECTION 00290 - ENVIRONMENTAL PROTECTION | 4 |
| SECTION 00930 - METAL SIGN SUPPORTS | 4 |
| SECTION 00960 - COMMON PROVISIONS FOR ELECTRICAL SYSTEMS | 9 |
| SECTION 00985 ‑ ITS ELECTRICAL SYSTEM INSTALLATION | 10 |
| SECTION 02530 - STRUCTURAL STEEL | 14 |
| SECTION 02560 ‑ FASTENERS | 15 |
i
PROFESSIONAL OF RECORD CERTIFICATION:
Seal w/signature
June 30, 2028 I certify the Special Provision Sections listed below are applicable to the design for the subject project for Intelligent Transportation Systems (ITS). Modified Special Provisions were prepared by me or under my supervision.
Section(s): 00210, 00220, 00221, 00222, 00290
FINAL ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
Seal w/signature
I certify the Special Provision Sections listed below are applicable to the design for the subject project for Intelligent Transportation Systems (ITS). Modified Special Provisions were prepared by me or under my supervision.
Section(s): 00960, 00985
FINAL ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
Seal w/signature
I certify the Special Provision Sections listed below are applicable to the design for the subject project for Intelligent Transportation Systems (ITS). Modified Special Provisions were prepared by me or under my supervision.
Section(s): 00930, 02530 and 02560
FINAL ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
SECTION 00210 - MOBILIZATION
Comply with Section 00210 of the Standard Specifications.
SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC
Comply with Section 00220 of the Standard Specifications modified as follows:
00220.01(b) Abbreviations - Delete this subsection.
00220.40(e)(1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following:
Traffic Lanes may be closed on the North Santiam Highway (OR22) when allowed, shown, or directed during the following periods of time except as specified in 00220.40(e)(2):
Single Lane Closures - One Traffic Lane on the North Santiam Highway OR22 may be closed during the following times:
Daily or nightly, Monday through Thursday Off Highway by noon on Fridays during the Summer (May 15 – Sep 15) No Holiday or Weekend closures
Traffic Lanes may be closed on the Santiam Highway (US20) when allowed, shown, or directed during the following periods of time except as specified in 00220.40(e)(2):
Single Lane Closures - One Traffic Lane on the Santiam Highway US20 may be closed during the following times:
Daily, Monday through Thursday, between 9:00 a.m. and 4:00 p.m.
Friday, between 9:00 a.m. and 12:00 p.m.
Nightly, Sunday night through Friday morning, between 7:00 p.m. and 6:00 a.m.
00220.40(e)(2) Opened Lanes ‑ Replace the paragraph that begins "Keep all Traffic Lanes and …" with the following paragraph:
Keep all Traffic Lanes and pedestrian facilities open during the following periods. Remove all barricades and objects from the Roadway during the periods that Traffic Lanes are to remain open.
00220.40(e)(2)(a) Holidays ‑ Replace the paragraph that begins "When a holiday falls …" with the following paragraph:
When a holiday falls on Sunday, the following Monday is recognized as a legal holiday. When a holiday falls on Saturday, the preceding Friday is recognized as a legal holiday.
SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL
Comply with Section 00221 of the Standard Specifications modified as follows:
00221.06 Traffic Control Plan ‑ Replace this subsection with the following subsection:
00221.06 Traffic Control Plan and Tourist-Oriented Directional and Business Logo Signs –
(a) Traffic Control Plan – Submit the following, 5 Calendar Days before the preconstruction conference:
(1) Contractor Provided Traffic Control Plan – The Contractor shall submit their proposed lane closure traffic control plan to the Engineer for approval.
00221.60 Temporary Traffic Control Devices – Replace the paragraph that begins “TCD delivered to the Project Site found…” with the following paragraph:
Repair or replace TCD delivered to the Project Site found to be in “marginal” or “unacceptable” condition, at no additional cost to the Agency.
00221.90(b) Temporary Protection and Direction of Traffic – Replace the bullet that begins “Providing, Surfacing, maintain…” with the following bullet:
Providing, surfacing, maintaining, removing, and restoring the TPAR.
SECTION 00222 - TEMPORARY TRAFFIC CONTROL SIGNS
Comply with Section 00222 of the Standard Specifications modified as follows:
00222.10 Temporary Signs ‑ Replace the paragraph that begins "Furnish temporary signs meeting …" with the following paragraph:
Furnish temporary signs meeting the requirements of the "Acceptable" category shown in the ATSSA Quality Guidelines for Temporary Traffic Control Devices and Features handbook, available from the ATSSA website. Use Materials and fabricate signs according to Section 00940, Section 02910 and the following:
00222.45(b) Portable Changeable Message Signs - Replace the bullet that begins "Messages shall not scroll …" with the following bullet:
Do not use messages that scroll horizontally or vertically across the face of the sign.
At least seven Calendar Days before the work begins and a lane closure is required, place one or more PCMS displaying the following message as shown, or as directed:
| Panel 1 | Panel 2 | Panel 3 | |
| ROAD | DATE | TIME | |
| WORK | TO | TO | |
| DAY or NIGHTS | DATE | TIME |
SECTION 00290 - ENVIRONMENTAL PROTECTION
Comply with Section 00290 of the Standard Specifications:
SECTION 00930 - METAL SIGN SUPPORTS
Comply with Section 00930 of the Standard Specifications modified as follows:
00930.01 Definitions ‑ Add the following definition at the end of this subsection:
Street Name Sign Mount ‑ This group includes plates, brackets, and fasteners necessary to install a street name sign on a sign support.
00930.02 Working Drawings ‑ Replace the paragraph that begins “Submit six copies…” with the following paragraph:
Submit six copies of unstamped Working Drawings according to 00150.35 for all structural metal Work. Submit six copies of stamped designs, details, Plans, and calculations according to 00150.35 for all engineered details and drawings that are not prepared by the Agency but are required by the Contract Documents and Specifications for the Project prior to fabrication. Include the Field Verification of Post Lengths form, available from the Engineer. Material ordered or Work performed before the Engineer finishes and returns the documents is at the Contractor's risk.
Replace the paragraph that begins “Working Drawings for these supports…” with the following paragraph:
Working Drawings for these supports are provided by the Engineer. Use the Field Verification of Post Lengths form, available from the Engineer, to provide the necessary site data for the engineer of record to use in producing Working Drawings. Work performed, or Materials ordered, before receiving Working Drawings from the Engineer is at the Contractor’s risk.
Replace the paragraph that begins “Include the completed Field Verification…” with the following paragraph:
Include the completed Field Verification of Post Lengths forms that are available from the Engineer for these intelligent transportation systems supports. Material ordered or work performed before receiving approved Working Drawings from the Engineer is at the Contractor's risk.
00930.09 Identifying Tags - Replace this subsection, except for the subsection number and title, with the following:
Furnish stainless steel or brass identifying tags for overhead and butterfly sign support Structures, except structure mounts. Attach tags to all posts, arms, and truss sections. Furnish tags that are at least 1/16 inch thick with lettering at least 1/4 inch in height, and stamped into the tag. Attach the tags with stainless steel pop rivets of at least 3/16‑inch nominal body diameter. Do not locate pop rivet holes within 6 inches of welds. Locate post tags approximately 5 feet above the baseplate. Drill holes for pop rivets prior to hot-dip galvanizing. Remove excess hot‑dip galvanizing from holes and repair according to ASTM A780.
Include the following information on the tags:
Structure number Manufacturer Month and year of manufacture Highway number and mile point
00930.10 Materials ‑ Replace the paragraph that begins “Except for Perforated Steel Square …” with the following paragraph:
Except for Perforated Steel Square Tube Slip Base Sign Supports and for Perforated Steel Square Tube Anchor Sign Supports, galvanize according to the requirements of Section 02530. Galvanize Perforated Steel Square Tube Slip Base Sign Supports and Perforated Steel Square Tube Anchor Sign Supports according to ASTM A653 G90, zinc coat corner seam weld after scarfing, apply a conversion coating, and apply a final clear polymer coating.
Add the following to the end of this subsection:
For Vertical Supports for Structure #20664, furnish a topcoat color of Black that matches SAE AMS-STD-595 color #27038.
00930.30 Fabricators ‑ Replace this subsection, except for the subsection number and title, with the following:
Fabricators of metal sign supports are required to have either a current AISC Simple Steel Bridge Structures (Sbr) certification or a current AISC Major Steel Bridges (Cbr) certification.
00930.40(a) General ‑ Replace the paragraph that begins “Except for Perforated Steel Square …” with the following paragraph:
Where two or more posts are required to support a sign, orient and position both posts so that no twist or warp is imparted to the sign panels.
00930.40(b) Assembly of Metal - Replace this subsection, except for the subsection number and title, with the following:
Accurately assemble the parts as shown and follow any match marks. Handle the material carefully so that no parts are bent, broken or otherwise damaged. Clean bearing surfaces and surfaces to be in permanent contact before the members are assembled. Roughen faying surfaces of slip-critical structural connections utilizing high strength bolts by means of hand wire brushing after galvanizing. Power wire brushing is not allowed.
Furnish faying surfaces of plates flat to within a tolerance of 1/32 inch in 12 inches and a tolerance of 1/16 inch overall. Furnish base plates with leveling nuts that are flat to within a tolerance of 1/8 inch in 12 inches and a tolerance of 3/16 inch overall.
00930.40(c) Welding ‑ Replace the paragraph that begins “The fabricator shall …” with the following paragraph:
Complete the welding inspection by the fabricator according to the details and requirements called out on the Contract Documents. This requirement overrides all appropriate weld inspection requirements called out in Section 5.15 WELDED CONNECTIONS in AASHTO Standard Specifications for Structural Supports for Highway Signs, Luminaires, and Traffic Signals. Submit all Procedure Qualification Records, Welding Procedure Specifications, and testing procedures for Engineer's review prior to starting manufacturing. Submit certified copies of inspection reports to the Engineer for review.
Replace the paragraph that begins “If requested by the Engineer …” with the following paragraph:
If requested by the Engineer, additional weld inspection may be required upon arrival of the material at the Project Site. If defects are found by this additional inspection, the Contractor is responsible for the additional testing and repair costs. If no defects are found, the Engineer is responsible for the additional inspection costs.
00930.40(d) Bolt Installation ‑ Replace the paragraph that begins “Provide all high …” with the following paragraph:
Furnish all high strength bolts with hardened washers under the element (nut or bolt head) turned in tightening. If a high strength bolt is installed in an oversized or short slotted hole in an outer ply, use a hardened washer. If a high strength bolt is installed in a long slotted hole in an outer ply, use a plate washer or a continuous bar made of structural grade steel at least 5/16 inch thick with standard holes. Make the washer or bar sufficiently large to completely cover the slot after installation.
00930.40(d)(1) Bolt Installation for Slip Bases (Breakaway) - Replace the paragraph that begins “Furnish, at no additional …” with the following paragraph:
Provide, at no additional cost to the Agency, a calibrated torque wrench of a capacity appropriate to the size of the high-strength bolts installed and tightened. Confirm the accuracy of the calibrated torque wrench through calibration by an approved testing agency at least once a year.
00930.40(e)(1) General - Replace this subsection, except for the subsection number and title, with the following:
Notify the Engineer in writing at least 24 hours before starting installation. The Engineer will observe the installation and tightening of bolts to determine that the selected tightening procedure is properly used and that all bolts are tightened, and in the case of direct tension indicators that the correct indication of tension has been achieved. Bolts may reach tensions substantially above the value given in Table 00560-1, but this will not be cause for rejection. The installation is rejected if the geometry does not satisfy the requirements of 02560.05.
00930.40(e)(2) Direct Tension Indicator Method - Replace this subsection, except for the subsection number and title, with the following:
Upon completion of a bolted joint, the Engineer will determine that all bolts have been tightened. A minimum of 10 percent, but not less than two bolts in each joint, are inspected. The joint is accepted as properly tightened when one open space allows entry of a 0.005‑inch feeler gauge. If there is more than one space between the direct tension indicator protrusions that allow entry of a 0.005‑inch feeler gauge, re‑inspect all bolts, retighten bolts in the joint as required, and resubmit the joint for inspection. If no spaces exist between the direct tension indicator protrusions that allow entry of a 0.005‑inch feeler gauge, replace bolt assembly, tighten bolts in the joint as required, and resubmit the joint for inspection. For connections with all bolts fully tightened, one bolt at a time may be replaced without providing crane support of the mast arm.
00930.40(e)(3) Turn-of-Nut Method - Replace the bullet that begins "In the presence …" with the following bullet:
In the presence of the Engineer, use an inspection wrench, that may be a calibrated torque wrench.
Replace the bullet that begins "Tighten each bolt specified …" with the following bullet:
Tighten each bolt specified in the paragraph above in the calibration device by any convenient means to an initial condition equal to 20 percent of the required tension, and then to a tension not less than 5 percent greater than specified for its size in Table 00560‑1 in Section 00560. Do not produce greater nut rotation than 1.5 times that allowed in Table 00560‑3 in Section 00560 when tightening beyond the initial condition. Then apply the inspecting wrench to the tightened bolt and determine the torque necessary to turn the nut or head 5 degrees, approximately 1 inch at 12 inches radius, in the tightening direction. Take the average torque measured in the tests of three bolts as the job inspecting torque to be used in the manner specified in the next paragraph.
Replace the bullet that begins "Test bolts that have been …" with the following bullet:
Test bolts that have been tightened in the Structure and are represented by the sample prescribed above with the inspecting wrench. Apply the job inspecting torque to 10 percent of the bolts, but not less than two bolts selected at random. If no nut or bolt head is turned by this application of the job inspecting torque, the connection is accepted as properly tightened. If any nut or bolt head is turned by the application of the job inspecting torque, test all bolts in the connections. Retighten all bolts whose nut or head is turned by the job inspecting torque, and re-inspect. Retighten all of the bolts in the connection and then resubmit the connection for the specified inspection.
00930.40(f) Tube Bending ‑ Replace this subsection, except for the subsection number and title, with the following:
For Major sign supports, bend tube using induction heating methods according to TPA-IBS-98 Recommended Standards for Induction Bending of Pipe and Tube. Provide written bend qualifications that include bending procedures, essential variables, material group, and destructive testing results. Destructive testing results includes yield strength, tensile strength, and elongation at locations indicated in Table 2-1 of the TPA‑IBS‑98.
00930.41 Adjustable Sign Mounts - Replace this subsection, except for the subsection number and title, with the following:
Furnish adjustable sign mounts that allow vertical adjustment for positioning the sign and allow rotation to plumb the sign. Use galvanized or stainless steel nuts, bolts and washers for fasteners.
Add the following subsection:
00930.48 Coating - Prepare and powder coat supports according to the applicable portions of Section 00593 or prepare and coat supports according to the applicable portions of Section 00594. Furnish coating materials for field application, repairing damaged coatings, and coating hardware after installation, according to Section 00593 or 00594. Do not coat:
Slip plate or arm connection surfaces.
Slip base bolting hardware.
Anchor rods, anchor rod washers, and anchor rod nuts.
00930.80 Measurement - Add the following to the end of this subsection:
The estimated quantities of structural steel are as follows:
| Item | Quantity |
| (Pound) |
Mounts
Vertical Sign Mounts on Existing Structures 500
00930.90 Payment - Replace the paragraph that begins "Payment will be payment …" with the following paragraph:
Payment will be payment in full for furnishing and placing all Materials, and for providing all Equipment, labor, and Incidentals necessary to complete the Work as specified.
Replace the paragraph that begins "No separate or additional payment will…" with the following paragraph:
No separate or additional payment will be made for:
Coating steel sign supports Route marker frames Wind bracing Pole clamps Stainless steel clamps Mast Arm Street Name Sign Mounts Street Name Sign Mounts Special sign brackets.
SECTION 00960 - COMMON PROVISIONS FOR ELECTRICAL SYSTEMS
Comply with Section 00960 of the Standard Specifications modified as follows:
00960.01 Regulations, Standards, and Codes - Replace the paragraph that begins "All electrical Materials …" with the following paragraph:
Furnish all electrical Materials and perform all Work according to the following standards where applicable:
00960.02 Equipment List and Drawing Submittals - Replace the paragraph that begins "Within 30 Calendar Days …" with the following paragraph:
Within 30 Calendar Days after execution of the Contract, submit the Blue Sheets (see 00160.00 and 00160.07) and the Green Sheets (see 00160.00 and 00160.07) according to 00150.37 for all Materials the Contractor proposes to install. Blue Sheets and Green Sheets contain submittal instructions and are made available to the Contractor by the Engineer.
00960.10 Materials - Replace the paragraph that begins "Anchor rods shall …" with the following paragraph:
Use anchor rods meeting the requirements of 02560.30 and to the types and sizes shown.
Add the following subsection:
00960.11 Coating - Prepare and powder coat equipment where shown according to the applicable portions of Section 00593 or prepare and coat equipment according to the applicable portions of Section 00594. Do not coat equipment fabricated of aluminum, stainless steel, or hot-dipped galvanized material, except as shown or specified.
Provide the following colors:
| Item | SAE AMS-STD-595 | ||
| Color Number | |||
| Cabinet Riser Frame at Detroit Lake VMS Site | 20040 |
00960.30 Licensed Electricians ‑ Replace this subsection, except for the subsection number and title, with the following:
Only individuals that are properly registered or licensed are allowed to perform electrical work, according to Oregon Administrative Rule 918‑282‑0120(1). Provide a copy of the electrical license or apprentice registration to the Engineer prior to performing any electrical Work. Every person who installs electrical systems on the Project must be licensed as an S or a J under Oregon Administrative Rule 918-282-0140 or 918-282-0170.
00960.41 Horizontal Directional Drilling ‑ Replace the paragraph that begins "Drilling shall …" with the following paragraph:
Do not "hump" or deform the Pavement during horizontal directional drilling. Use guided horizontal directional drilling. Keep drilling pits at least 2 feet from the edge of Pavement. Do not use water to the extent that the Pavement might be undermined or Subgrade softened. Sand bedding and marking tape are not required with this method.
Add the following subsection:
00960.42(c) Metallic Conduit ‑ Paint the following with rust-preventative coating:
Threads on all metal conduit.
Areas where the coating has been damaged so underlying metal is exposed.
Exposed, ungalvanized threads resulting from field cuts.
If corrosive Soil conditions exist, coat metallic conduit with a nonmetallic coating or wrap with corrosion protection tape at least 10 mils thick.
Add the following subsection:
00960.42(d) Connecting Non-Metallic Conduit to Metallic Conduit - Use a nonmetallic female threaded connector to connect nonmetallic conduit to metallic conduit.
00960.42(f) Conduit on Structures ‑ Install conduit according to 00583.40.
00960.45(b) Grounding/Bonding Wire - Replace this subsection, except for the subsection number and title, with the following:
Use a THWN No. 6 AWG stranded copper grounding/bonding wire in conduit or as shown. Use an un-insulated No. 4 AWG stranded copper grounding/bonding wire outside of conduit or as shown. When splicing grounding/bonding wire, use a reversable electrical splice.
00960.71 As-Built Plans - Replace this subsection, except for the subsection number and title, with the following:
Upon completion of the installation, submit a red-lined copy of the original Plans noting all changes made. In the red-lined Plans, include all modifications made to accurately show the operation and materials installed. Sufficiently detail the red-lined Plans to enable maintenance forces to replace or repair any part of the Project under routine or emergency maintenance by direct reference.
SECTION 00985 ‑ ITS ELECTRICAL SYSTEM INSTALLATION
Section 00985 is not a Standard Specification and is included in this Project by Special Provision.
Description
00985.00 Scope - In addition to requirements of Section 00960, install ITS electrical system as shown or specified. Install Agency-furnished Equipment listed in contract.
00985.01 Regulations, Standards, and Codes ‑ Comply with the following standards where applicable:
Underwriters Laboratories (UL) 6-2007 – Electrical Rigid Metal Conduit - Steel 50-2015 - Enclosures for Electrical Equipment, Non-Environmental Considerations 360-2013 - Standard for Liquid-Tight Flexible Metal Conduit 723-2018 – Test for Surface Burning Characteristics of Building Materials 486A-D-2018 – Wire, Splicing Wire, and Sealed Wire Connector Systems 510-2020 - Polyvinyl Chloride, Polyethylene, and Rubber Insulating Tape American Society for Testing and Materials (ASTM) D3005-17 – Low-Temperature Resistant Vinyl Chloride Plastic Pressure-Sensitive Electrical Insulating Tape D4388-20 - Nonmetallic Semi-Conducting and Electrically Insulating Rubber Tapes
00985.02 Submittals - Submit according to 00150.37, within 30 Calendar Days after execution of the Contract, the following:
Termination enclosures according to 00985.12 Metal conduit according to 00985.16 Metallic conduit fittings according to 00985.17 Conduit seal according to 00985.18 Electrical splice materials according to 00985.19
Include the manufacturer’s name, model numbers, catalog sheets and other descriptive literature of proposed materials. Provide the catalog sheets and literature including technical data, physical properties and operational description in sufficient detail to demonstrate the equipment meets these specifications.
Materials
00985.12 Termination Enclosure - Furnish enclosures constructed from 14‑gauge Type 304 or 316 stainless steel, as well as be UL 50 compliant and Type 4X rated with a #4 brushed finish. Remove all sharp edges. Include doors with a continuous hinge and seamless gasket that is liquid-tight. Enclosures are to be padlockable. Dimensions are location specific as shown.
00985.16 Metal Conduit ‑ Furnish metal conduit meeting the following requirements:
Rigid Metal Conduit ‑ Galvanized rigid metal manufactured of mild steel conforming to UL 6, Rigid Metal Electrical Conduit.
Liquid-Tight Flexible Metal Conduit ‑ Furnish UL 360 listed, liquid-tight, nonmetallic, sunlight resistant outer jacket over an inner flexible metal core.
00985.17 Metallic Conduit Fittings ‑ Furnish conduit fittings meeting the following requirements:
Metallic Expansion Fittings ‑ Weatherproof, hot dip galvanized malleable iron expansion head and body. Where the Plans do not specify an Equipment grounding wire in the conduit run, furnish fittings with external bonding jumpers. Permit a 4‑inch conduit movement minimum.
Metallic Bushings ‑ Galvanized steel or die cast zinc with insulated throat. Include a bonding lug if required.
Conduit Hub ‑ Hot-dip galvanized malleable iron screw-on style with neoprene "O" ring.
00985.18 Conduit Seal ‑ Furnish conduit plug Material used to seal the ends of conduit composed of duct seal that is UL 723 listed clay putty material designed to seal electrical conduit. Seal all conduit impacted by the Project.
00985.19 Electrical Splice Materials ‑ Furnish electrical splice Material meeting the following requirements:
Split Bolt ‑ Made of silicon bronze to securely join the wires both mechanically and electrically.
Heat-Shrink Tubing ‑ Surface-irradiated tube complying with UL 486, rated at 194 °F, with 600 V inner melting wall or liner to provide void-free encapsulated insulation.
Insulating Rubber Tape ‑ Electrical grade, nondrying, rubber based, elastic type according to ASTM D4388.
Insulating Vinyl Plastic Tape ‑ Comply with ASTM D3005, Type II and UL 510.
Construction
00985.40 Installation - Install the Materials as specified, shown, and according to the manufacturer’s instructions.
Install the Agency-furnished Materials listed in contract; and all other Incidental items necessary to complete the Work as shown.
00985.41 Metallic Conduit ‑ If corrosive Soil conditions exist, coat metallic conduit with a nonmetallic coating or wrap with corrosion protection tape at least 10 mils thick.
(a) Metallic Conduit ‑ Paint the following with rust-preventative coating:
Threads on all metal conduit Areas where the coating has been damaged so underlying metal is exposed.
Exposed, non-galvanized threads resulting from field cuts.
(b) Bushings ‑ Furnish and install bushing according to the following:
Metallic Bushing ‑ Use metallic bushings with rigid metallic elbows, metallic risers, and junction boxes containing circuits less than 25 V.
Metallic Bonding Bushing ‑ Use metallic bonding bushings with rigid metallic elbows, metallic risers, and junction boxes containing 25 V or greater circuits.
00985.42 Cable and Wire ‑ Install No. 16 AWG THWN orange base with blue tracetone wire in all conduits as a locate wire. Leave slack as required in 00985.43 and install a wire nut. Do not join multiple locate wires under a common wire nut unless otherwise shown.
Tape the ends of unused conductors with insulated vinyl plastic tape.
Install polyethylene pull line in all new conduits for future use. Leave 6 feet of slack pull line. If an existing pull line is used, replace the existing pull line with a new pull line during the installation.
Arrange wiring neatly within cabinets and junction boxes. Use electrical lubricants when inserting conductors in conduit. Before pulling wires through underground conduit runs, blow the conduit out with 120 cubic feet per minute compressed air.
Do not use tapes, straps, ties or other binding materials to bundle single conductors or cables together inside conduits or poles. Bundling of conductors or cables are allowed at the terminating end points for pulling only.
Pull all wire and cable by hand and on a straight line with the conduit opening to prevent damage to wire and cable insulation. Use a pulley device to achieve a straight pull if pulls are made with poles or controller cabinet in place.
00985.43 Conductor Slack ‑ Leave slack in each wire and cable as follows:
2 feet in junction boxes and poles 6 feet in the first junction box nearest the controller cabinet 6 feet in controller cabinet and service cabinet
00985.44 Identification and Marking ‑ Clearly and permanently label all cables and wiring between subsystems. Mark all conductors within 2 inches of wire terminations by means of imprinted tubular white or yellow plastic wire markers at termination points. Install marker nomenclature that is visible without moving wires or markers. Use thermal transfer label printer with minimum 3/4” tape.
00985.45 Covers and Guarding - Furnish covers or guarding for live parts of terminations on circuits of 50 V or more to ground.
00985.46 Conductor Splicing ‑ Install all conductors as shown without splicing. Field verify lengths prior to ordering cables. If splicing is required to complete Work as shown, then submit the method using all materials listed in 00985.19 and the location of splicing for approval by Engineer before construction.
00985.47 Variable Message Sign (VMS) Installation ‑ Install the Agency-furnished variable message signs, sign control cable, and controller cabinets as shown. Coil and stow minimum 50 feet slack of sign control cable in the sign housing and controller cabinet after pulling. Sign control cable is terminated by Agency.
Notify the Engineer at least 14 Calendar Days before taking any individual VMS out of service, if applicable. Keep the existing VMS and cabinets in service until the new VMS and cabinets are ready to be installed, and minimize the time that the individual signs are out of service.
Measurement
00985.80 Measurement - No measurement of quantities will be made for Work performed under this Section.
Payment
00985.90 Payment - The accepted quantities of Work performed under this Section will be paid for at the Contract unit price, per unit of measurement, for the following items:
Pay Item Unit of Measurement
| (a) | ITS Electrical Systems Installation, Site 1 | Lump Sum |
| (b) | ITS Electrical Systems Installation, Site 2 | Lump Sum |
Items (a) and (b) include removal of the existing VMS, cabinets, and associated conductors; installing the Agency furnished VMS; furnishing and installing the cabinet riser frames, termination enclosure, camera mounting assemblies, conduits, conductors, grounding and bonding, and all other Incidental items necessary to complete the Work as shown
Payment will be payment in full for furnishing and placing all Materials; and for providing all Equipment, labor, and Incidentals necessary to complete the Work as specified.
No separate or additional payment will be made for:
Required submittals and documentation Assistance for commissioning Equipment and systems Pick-up and installation of the Agency-furnished Material listed in 00160.30, furnishing and installing the conductors and mounting hardware, and removal and disposal.
SECTION 02530 - STRUCTURAL STEEL
Comply with Section 02530 of the Standard Specifications modified as follows:
02530.10 Structural Steel for Bridges ‑ Replace the paragraph that begins “Structural steel for Bridges…” with the following:
Furnish structural steel for Bridges meeting the following, as shown or specified:
02530.20 Structural Steel for Non-Bridge Structures - Replace the paragraph that begins “Structural steel for metal…” with the following:
Structural steel for metal sign Structures and other non-Bridge Structures meeting the following, or as shown or specified:
Replace the paragraph that begins “Notch toughness…” with the following:
Ensure notch toughness of all structural steel members and plates greater than 1/2 inch thick in load carrying members of sign Bridges and cantilever sign supports meets Zone 2 requirements of AASHTO M 270.
02530.50 Universal Mill Plate - Replace the paragraph that begins “Universal mill plate…” with the following:
Universal mill plate is not allowed.
02530.70 Galvanizing ‑ Replace this subsection, except for the subsection number and title, with the following:
Hot-dip galvanize according to the following, as applicable:
AASHTO M 111 (ASTM A123)
AASHTO M 232 (ASTM A153)
Furnish steel that is finished by hot-dip galvanizing for use as sign bridges, illumination poles, traffic signal poles, sign supports, bridge rail and items designated on the Plans as "Galvanize - Control Silicon" having controlled silicon content of either 0 - 0.06 percent or 0.13 percent ‑ 0.25 percent. Before galvanizing, submit mill test certificates verifying silicon content to the Engineer and the galvanizer.
02530.80 Acceptance - Replace this subsection, except for the subsection number and title, with the following:
Acceptance of structural steel is according to 00165.35 and this Section.
SECTION 02560 ‑ FASTENERS
Comply with Section 02560 of the Standard Specifications modified as follows:
02560.05 Geometry ‑ Replace this subsection, except for the subsection number and title, with the following:
Use a bolt or rod length such that the end of the bolt or rod extends beyond or is at least flush with the outer face of the nut when properly installed.
02560.10(a) Bolts - Replace this subsection, except for the subsection number and title, with the following:
Furnish carbon steel bolts meeting the requirements of ASTM A307, Grade A or B.
02560.10(b) Nuts - Replace the paragraph that begins “Nuts for carbon steel bolts…” with the following:
Furnish nuts for carbon steel bolts meeting the requirements of the following, or equivalent:
02560.20(a) Bolts - Replace the paragraph that begins “High-strength bolts used in…” with the following:
Use Type 3 high-strength bolts in noncoated weathering steel connections. Furnish high‑strength bolts meeting the requirements of the following:
02560.20(b) Nuts - Replace the paragraph that begins “Nuts for high-strength bolts…” with the following:
Furnish nuts for high-strength bolts meeting the following requirements, or equivalent:
02560.20(c) Washers - Replace this subsection, except for the subsection number and title, with the following:
Furnish washers for high-strength bolts meeting the requirements of ASTM F436. Use Type 3 washers with Type 3 bolts.
02560.20(d) Direct Tension Indicators - Replace this subsection, except for the subsection number and title, with the following:
Furnish direct tension indicators that are the compressible-washer type, mechanically galvanized, according to ASTM F959. Adjust bolt lengths to accommodate both direct tension indicators and hardened washers.
02560.20(e) Markings - Replace this subsection, except for the subsection number and title, with the following:
Mark all bolts, nuts, washers and direct tension indicators according to the appropriate AASHTO/ASTM specifications and with a symbol identifying the manufacturer.
02560.30(a) Steel Tie Rods, Anchor Bolts, and Anchor Rods - Replace this subsection, except for the subsection number and title, with the following:
Furnish steel tie rods, anchor bolts, and anchor rods meeting the requirements of AASHTO M 314, Grade 36 or 55; ASTM F1554, Grade 36 or 55.
02560.30(b) High-Strength Tie Rods, Anchor Bolts, and Anchor Rods - Replace this subsection, except for the subsection number and title, with the following:
Furnish high-strength tie rods, anchor bolts, and anchor rods meeting the requirements of AASHTO M 314, Grade 105; ASTM F1554, Grade 105; or ASTM A449, Type 1.
End stamp all ASTM F1554, Grade 105 according to ASTM F1554 Supplementary Requirements S2 and S3. If the end of the bolt is to be embedded in concrete, mark the projecting end from the concrete.
02560.30(c) Nuts - Replace the paragraph that begins “Nuts for tie rods…” with the following:
Furnish nuts for tie rods, anchor bolts, and anchor rods meeting the following requirements, or equivalent:
02560.30(d) Washers - Replace this subsection, except for the subsection number and title, with the following:
Furnish washers for anchor bolts meeting the requirements of ASTM F436, Type 1.
02560.60(a) Rotational Capacity Test ‑ Replace the paragraph that begins “Test each combination of bolt…” with the following:
Test each combination of bolt production lot, nut lot and washer lot as an assembly. Assign a rotational capacity lot number to each combination of lots tested. The minimum frequency of testing is two assemblies per rotational capacity lot. Test according to one of the following requirements:
02560.60(a)(1) Method 1 ‑ Replace the paragraph that begins “the above measured torque…” with the following:
Do not allow the above measured torque to exceed the torque value calculated by the following equation:
Replace the paragraph that begins “Continue to tighten the nut until…” with the following:
Continue to tighten the nut until the nut has turned twice the rotation shown in Table 00560‑3 of Section 00560 from its snug-tight position mark for bolt lengths up to 8D ( for greater than 8D up to 12D bolt lengths tighten to 1 1/6 turn from snug-tight).
02560.60(a)(2) Method 2 - Replace this subsection, except for the subsection number and title, with the following:
Test bolts that are too short to be tested in a direct bolt tension indicating device in a steel joint.
Place the lubricated fastener including a washer in one or more flat structural steel plates. The total thickness including the washer is such that three to five full threads of the bolt are located between the bearing surfaces of the bolt head and the nut. Provide the hole in the joint at the same nominal diameter as the hole in the washer. Using a calibrated torque wrench, tighten the nut to a snug-tight condition to produce an initial torque in the bolt equal to approximately 10 percent of the torque calculated using the equation given in Method 1 above where P is the minimum tension in the bolt according to Table 00560-1 of Section 00560. Mark the nut's position relative to the fixed bolt for this snug tight position.
Using the calibrated torque wrench, further tighten the nut until the nut has turned the rotation shown in Table 00560-3 of Section 00560 from its snug-tight position mark. Prevent the bolt head from turning during the tightening process. Record the measured torque with the nut in motion. The measured torque is not to exceed 1.15 times the torque value calculated in the preceding step of Method 2. Reject assemblies with torque values exceeding the calculated value.
Tighten the nut further until the nut has turned twice the rotation shown in Table 00560-3 from its snug-tight position mark. Reject assemblies that fail this rotation either by stripping or fracture.
Loosen and remove the nut. Examine the threads on the nut and bolt. Reject assemblies showing evidence of thread shear failure, stripping or torsional failure of the bolt.
02560.60(b) Other Test Requirements ‑ Replace the paragraph that begins “Provide three high‑strength bolt …” with the following:
Furnish three high‑strength bolt assemblies per size per lot for check testing.
Replace the paragraph that begins “Provide one high‑strength tie rod…” with the following:
Furnish one high‑strength tie rod, one high‑strength anchor bolt, and one high‑strength anchor rod assembly per size per lot for check testing.
02560.70 Lubricating Fasteners - Replace the paragraph that begins “Furnish all galvanized and coated…” with the following:
Furnish all galvanized and coated fasteners with a factory applied commercial water‑soluble wax that contains a visible dye of a color that contrasts with the color of galvanizing or coating. Furnish black fasteners that are "oily" to the touch when installed.
02560.80 Acceptance - Replace this subsection, except for the subsection number and title, with the following:
Acceptance of fasteners are according to 00165.35 and this Section.
image1.jpg image2.png image3.png