ATT B Plans~6.pdf

PDF 1 MB Posted

Attached to
Bid No. 234042 Underwater Services
Solicitation number
S-KS0043-00006715
Issued by
Marion County, Oregon

About this file

This is a project plans document prepared by the Oregon Department of Transportation (ODOT) for culvert repair work on US 101 in Curry County, specifically at Brush Creek crossing locations at mile posts (MP) 307.99 and 308.38 along the Coast Highway near Port Orford and Gold Beach. The project involves repair of two corrugated metal pipe (CMP) culverts: a 48-inch diameter culvert at MP 307.99 (88 linear feet) and a 54-inch diameter culvert at MP 308.38 (120 linear feet). Work includes sediment removal, stream channel re-grading, natural weir preservation and protection, installation of culvert markers, and fish passage considerations. The project design engineer is Wade Holaday, with Robert Trevis as the designer and Allen Gillette as the checker. The plans include detailed hydraulic data for various flood events (95% exceedance, 5% exceedance, 50-year, and 100-year storms) and specify design considerations for fish passage compatibility. The in-water work period extends from July 15 through September 30, with project number 56V-079.

The plans emphasize safety as a primary concern throughout all project phases and detail comprehensive temporary water management requirements for both culvert locations. Temporary water management includes full isolation concepts utilizing sandbag barriers, sediment control facilities, energy dissipators, and dewatering sump pumps to prevent sediment-laden water from leaving the work site during construction. The contractor is responsible for implementing, maintaining, and upgrading the temporary water management facility as necessary and must restore the site upon project completion. Hydraulic modeling shows estimated discharges for Brush Creek during the work period, with specific calculations provided for different rainfall event probabilities. Elevations are referenced to a temporary benchmark of 100.00, and the plans are drawn at 1"=20' scale with detailed cross-sectional and profile views of existing conditions and proposed repairs.

View the file

Other files

File Type Posted
234042 Technical Specifications~1.pdf PDF
234042 Technical Specifications.pdf PDF
234042 Tabulation Sheet.pdf PDF
234042 Proposal Page Attachment 1.xlsx XLSX spreadsheet
234042 Bid Manual.pdf PDF
234042 Notice Intent to Award.pdf PDF
Zoom Bid Opening Instruction s5.16.23.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Z

Z

PLANS FOR PROPOSED PROJECT

ST. HELENS

ASTORIA

TILLAMOOK

MCMINNVILLE

ALBANYNEWPORT

CORVALLIS

HOOD

RIVER

DALLES

THE

MADRAS

PRINEVILLE

BEND

COQUILLE

GRANTS

PASS

Ashland

BURNS

KLAMATH

FALLS

CONDON

MORO

PENDLETON

LA GRANDE

ENTERPRISE

VALE Ontario

PORTLAND

SALEM

MEDFORD

EUGENE

ROSEBURG

Athena

N. Powder

Unity Dayville

Sisters

Juntura

Frenchglen

Burns Jct.

McDermitt

Paisley

La Pine

Crescent

Biggs

Lexington

Hermiston Boardman

Ukiah

Arlington

Malin

Brookings

Coos Bay

Drain

Canyonvil le

Reedsport

Oakridge

Goshen Florence

Lincoln City

Waldport

Home Sweet

Detroit Antelope

Maupin

Forest Grove

Hebo

Cannon Beach

Seaside Rainier

Milton-Freewater

W

26 35 197

39519

3953197

Bonanza

Junction City

BAKER CITY

HEPPNER

Copperfield

Lake Silver

Junction CaveBEACH

GOLD

Orford Port

LAKEVIEW

CANYON

CITY

Day John

CITY

OREGON

HILLSBORO

DALLAS

Redmond

Val ley Jordan

STATE OF OREGON

DEPARTMENT OF TRANSPORTATION

LET'S ALL

WORK TOGETHER

TO MAKE THIS

JOB SAFE

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

O T

N E

MTRAPED

N

O G

E R

O

N

OI

T

ATROPS

N A

R T

H_M22072_ts_01.dgn :: Default 3/13/2023 10:27:59 AM hwyr33e 1"=100' Scale: Rotation: 0°

ATTENTION:

(503) 232-1987).

The Oregon Utility Notification Center Is

The Center (Note: The Telephone Number For

You May Obtain Copies Of The Rules By Calling

Through OAR 952-001-0090.

Those Rules Are Set Forth In OAR 952-001-0001

By The Oregon Utility Notification Center.

Oregon Law Requires You To Follow Rules Adopted

T. 33 S., R. 15 W., W.M.

PROJECT SITE

INDEX OF SHEETS

SHEET NO. DESCRIPTION

Title SheetA01

HB01

MP 307.99 & MP 308.38

CULVERTS

US 101: CULVERT REPAIRS

MP 307.99 & 308.38

COAST HIGHWAY

CURRY COUNTY

ADMINISTRATION

FEDERAL HIGHWAY

DIVISION

OREGON

PROJECT NUMBER

NO.

SHEET

AVAILABLE UPON REQUEST

FINAL ELECTRONIC DOCUMENT

CURRY COUNTY

COAST HIGHWAY

MP 307.99 & MP 308.38

US 101: CULVERT REPAIRS

A01M22072

HB02

HD01

HD02

TWM Plan, MP 307.99

TWM Plan, MP 308.38

HB03

HB04 Profile Sheet, MP 308.38

Plan Sheet, MP 308.38

Profile Sheet, MP 307.99

Plan Sheet, MP 307.99

56V-079

APRIL 2023

H_M22072_clpl_01.dgn :: HB01 3/13/2023 10:28:02 AM hwyr33e 1"=20' Scale: Rotation: 0°

PLAN SHEET

HB01

U S

P o rt O rf o rd

P R

O P

O S E

D F

L O

W S

E X

IS

T

IN

G F

L O

W S

(ft.)

(yrs.)

(ft.)

(ft.)

(cfs)

50 100

FISH FLOWS

LOW

DESIGN

EVENT

ITEMS

BASE

RECURRENCE INTERVAL

(ft./s)

FLOOD

DISCHARGE

5% 95%

HIGH

100 5%

DESIGN

EVENT

95%

HIGH

BASE

LOW

FLOOD

FISH FLOWS

AT CULVERT OUTLET

AVERAGE VELOCITY

AT CULVERT OUTLET

TAILWATER DEPTH

AT CULVERT INLET

HEADWATER ELEVATION

CULVERT INLET

BACKWATER DEPTH AT

(UNITS)

Elevations shown are based on a TBM of 100.00

NOTE:

0 (0.5) 0 (0.5)

PLAN

SCALE: 1"=20'-0"

48"I.E.=95.39

G o ld B e a c h

MP 307.99

48" cm p

0.92421 21 24 0.9

0 0 0 0

OF TRANSPORTATION

OREGON DEPARTMENT

Checker:Drafter:

Designer:

SHEET NO.

Reviewer:

AVAILABLE UPON REQUEST

FINAL ELECTRONIC DOCUMENT

CURRY COUNTY

COAST HIGHWAY

MP 307.99 & MP 308.38

US 101: CULVERT REPAIRS

F O

T N

E

MTRAPED

N

O G

E R

O

N

OI

T

ATROPS

N A

R T

OREGON

RE

GI

ST

ERE

D PROFESSIONALEN

GINEER

RENEWS: 6-30-2023

51 99

JU

LD

E R

HOLA

W A

19202

D A

Y

Y

YDER

98.0298.0399.00 99.19

0.020.030.240.22

0.070.123.172.77

98.0298.0398.54 98.45

0.240.22 0.020.03

0.040.082.011.76

B ru s h C re e k

48" I.E.=94.15

Type 2 Marker - 1 EA

Type 1 marker - 1 EA

Install culvert markers

Repair 48" culvert - 88 LF elev. =98.00 natural wier

Robert Trevis

Allen Gillette

Wade Holaday

Wade Holaday

00 00

"N O W

O R

K

A

E A

"N O W

O R K A

R

EA

Preserve and protect natural wier

FISH PASSAGE HYDRAULIC DATA @ MP 307.99

Extg. surface Extg. 48"culvert

CULVERT INLET

95% = 98.02 5% = 98.03 50 Yr. = 98.45 100 Yr. = 98.54

OHW

H_M22072_clpl_01.dgn :: HB02 3/13/2023 10:28:03 AM hwyr33e 1"=20' Scale: Rotation: 0°

MP 307.99

OF TRANSPORTATION

OREGON DEPARTMENT

Checker:Drafter:

Designer:

SHEET NO.

Reviewer:

AVAILABLE UPON REQUEST

FINAL ELECTRONIC DOCUMENT

CURRY COUNTY

COAST HIGHWAY

MP 307.99 & MP 308.38

US 101: CULVERT REPAIRS

F O

T N

E

MTRAPED

N

O G

E R

O

N

OI

T

ATROPS

N A

R T

HB02

ST

ERE

JU

LD

E R

HOLA

W A

19202

D A

Y

Y

YDER

U S

Extg. surface

48" I.E.=94.15

48" I.E.=95.39

Extg. 48" cmp

Extg. sediment elev.

PROFILE SHEET

Remove extg. sediment

S= 1.4%

(12/7/2022)

Brush Creek WS Elev. = 97.71 natural wier elev.=98.00 WS Elev. = 98.89 (12/7/2022)

B r u s h C r e e k

Robert Trevis

Allen Gillette

Wade Holaday

Wade Holaday

95% WS Elev. = 98.02 (post repair)

5% WS Elev. = 98.03 (post repair)

50 Yr. WS Elev. = 98.45 (post repair)

100 Yr. WS Elev. = 98.54 (post repair)

PLAN SHEET

U S

P o r t

O r fo r d

P R

O P

O S E

D F

L O

W S

E X

IS

T

IN

G F

L O

W S

(ft.)

(yrs.)

(ft.)

(ft.)

(cfs)

50 100

FISH FLOWS

LOW

DESIGN

EVENT

ITEMS

BASE

RECURRENCE INTERVAL

(ft./s)

FLOOD

DISCHARGE

5% 95%

HIGH

100 5%

DESIGN

EVENT

95%

HIGH

BASE

LOW

FLOOD

FISH FLOWS

AT CULVERT OUTLET

AVERAGE VELOCITY

AT CULVERT OUTLET

TAILWATER DEPTH

AT CULVERT INLET

HEADWATER ELEVATION

CULVERT INLET

BACKWATER DEPTH AT

(UNITS)

Elevations shown are based on a TBM of 100.00

NOTE:

0 (1.0) 0 (1.0)

PLAN

SCALE: 1"=20'-0"

54"I.E.=96.50

Type 2 Marker - 1 EA

Type 1 marker - 1 EA

Install culvert markers

G o ld B e a c h

MP 308.38

B r u s h C r e e k

6.7 6.7

0 0 0

OF TRANSPORTATION

OREGON DEPARTMENT

Checker:Drafter:

Designer:

SHEET NO.

Reviewer:

AVAILABLE UPON REQUEST

FINAL ELECTRONIC DOCUMENT

CURRY COUNTY

COAST HIGHWAY

MP 307.99 & MP 308.38

US 101: CULVERT REPAIRS

F O

T N

E

MTRAPED

N

O G

E R

O

N

OI

T

ATROPS

N A

R T

H_M22072_clpl_01.dgn :: HB03 3/13/2023 10:28:04 AM hwyr33e 1"=20' Scale: Rotation: 0°

HB03

154135 135 154

54" I.E.=95.81

" c m p

ST

ERE

JU

LD

E R

HOLA

W A

19202

D A

Y

Y

YDER

Repair 54" culvert - 120 LF

99.93100.65116.25116.19

15.2515.19

1.491.491.491.49

2.163.88

98.2998.35105.33104.04

4.333.040

9.889.86

1.491.491.491.49

0.110.7511.1910.43

Robert Trevis

Allen Gillette

Wade Holaday

Wade Holaday

(grade channel as directed) stream channel excation - 12 CY

Re-grade stream channel

FISH PASSAGE HYDRAULIC DATA @ MP 308.38

"N O W

O

E A

"N O W

O

E A

Extg. surface

Extg. 54"culvert

95% = 98.29

5% = 98.35

100 Yr. = 105.33

50 Yr. = 104.04

105 105

110 110

115 115

CULVERT INLET SECTION

H_M22072_clpl_01.dgn :: HB04 3/13/2023 10:28:04 AM hwyr33e 1"=20' Scale: Rotation: 0°

MP 308.38

OF TRANSPORTATION

OREGON DEPARTMENT

Checker:Drafter:

Designer:

SHEET NO.

Reviewer:

AVAILABLE UPON REQUEST

FINAL ELECTRONIC DOCUMENT

CURRY COUNTY

COAST HIGHWAY

MP 307.99 & MP 308.38

US 101: CULVERT REPAIRS

F O

T N

E

MTRAPED

N

O G

E R

O

N

OI

T

ATROPS

N A

R T

HB04

ST

ERE

JU

LD

E R

HOLA

W A

19202

D A

Y

Y

YDER

U S

Extg. surface

54" I.E.=95.81

54" I.E.=96.5

S= 0.58%

Brush Creek WS Elev. = 98.29 (12/7/2022)

Extg. 54" cmp

Extg. sediment elev.

S= .5

S= 7%

B r u s h C r e e k th a lw a g

PROFILE SHEET

Remove extg. sediment

Robert Trevis

Allen Gillette

Wade Holaday

Wade Holaday

95% WS Elev. = 98.29 (post repair)

5% WS Elev. = 98.35 (post repair)

50 Yr. WS Elev. = 104.04 (post repair)

100 Yr. WS Elev. = 105.33 (post repair) extg. channel elev.=96.85

FG = 97.8

H_M22072_clpl_01.dgn :: HD01 3/13/2023 10:28:05 AM hwyr33e 1"=20' Scale: Rotation: 0°

OF TRANSPORTATION

OREGON DEPARTMENT

Checker:Drafter:

Designer:

SHEET NO.

Reviewer:

AVAILABLE UPON REQUEST

FINAL ELECTRONIC DOCUMENT

CURRY COUNTY

COAST HIGHWAY

MP 307.99 & MP 308.38

US 101: CULVERT REPAIRS

F O

T N

E

MTRAPED

N

O G

E R

O

N

OI

T

ATROPS

N A

R T

Elevations shown are based on a TBM of 100.00

NOTE:

PLAN

SCALE: 1"=20'-0"

U S

48" cm p

G o ld B e a c h

P o rt O rf o rd

MP 307.99

3) Average daily discharge expected to be exceeded 16 days each month.

2) Average daily discharge expected to be exceeded 8 days each month.

1) Average daily discharge expected to be exceeded 2 days each month.

FEET PER SECOND (GALLONS PER MINUTE)

AVERAGE DAILY DISCHARGE IN CUBIC

NOTE

JULY

AUGUST

SEPTEMBER

TEMPORARY WATER MANAGEMENT

ESTIMATED DISCHARGES FOR

its height is:

linear feet of barrier that is twice as wide as

The estimated number of bags needed for 100 inches wide by 14 inches long. This is a 30 pound bag of dry sand.

having a placed dimension of about 4 to 5 inches high by 9 to 10 used to construct a sandbag barrier. This is based on each bag of 2 feet). This is the minimum width-to-height ratio that should be wide as its height (e.g., a one foot high wall would have a base width

A common recommendation is to make the sandbag barrier twice as

Height (ft)# bags

2 1700

H e ig h t (f t.

Width (ft.)

SANDBAG FOOTPRINT DETAIL

NO SCALE

and restore site as per plans and specifications.

Remove all Temporary Water Management features sediment-laden water does not leave the site.

storm events and to insure that sediment and periods, this facility shall be upgraded for unexpected anticipated site conditions. During the construction on this plan is the minimum requirements for

The Temporary Water Management Facility shown is completed and approved.

responsibility of the contractor until all construction replacement and upgrading of this facility is the

Management Plan and the construction, maintenance, The implementation of this Temporary Water

GENERAL NOTES:

Sediment control facility

Energy dissipator

Sandbag isolation barrier

Dewatering sump pump

LEGEND

Isolating the work site upstream: Install single

If Needed, install secondary sandbag barrier.

Install sandbag barrier and energy dissipator pad downstream from work area. Location to be set based on topography and easements available.

Size the temporary water management facility based

Water seeping through the primary barrier and contained by the secondary barrier shall be returned to an area up stream of the sandbag barrier to a temporary settling basin or other approved location.

Provide adequate sediment control measures during dewatering of the work area to insure sediment laden water does not leave the site.

FULL ISOLATION NOTES

CONCEPT PLAN

TEMPORARY WATER MANAGEMENT

HD01

the subject watershed may differ by year.

estimated discharges are based on regression equations. Discharges in

Listed discharges are surface water from the upstream watershed. The

In-water work period extends from 15 July through 30 September.

1 (5) 2 (25) 3 (50)

0.02 (10) 0.001 (0.5) 0.001 (0.5)

0.03 (15) 0.01 (5) 0.004 (2)

0.04 (20) 0.002 (1) 0

CROSSING AT US 101, MP 307.99

3 4

ST

ERE

JU

LD

E R

HOLA

W A

19202

D A

Y

Y

YDER

B ru s h C re e k

Robert Trevis

Allen Gillette

Wade Holaday

Wade Holaday primary barrier across the culvert inlet.

"N O W

O

E A

"N O W

O R K A

R

EA

Sheet pile barrier on site conditions.

No work limits

U S

P o r t

O r fo r d

Elevations shown are based on a TBM of 100.00

NOTE:

PLAN

SCALE: 1"=20'-0"

54"I.E.=98.39

G o ld B e a c h

MP 308.38

B r u s h C r e e k

OF TRANSPORTATION

OREGON DEPARTMENT

Checker:Drafter:

Designer:

SHEET NO.

Reviewer:

AVAILABLE UPON REQUEST

FINAL ELECTRONIC DOCUMENT

CURRY COUNTY

COAST HIGHWAY

MP 307.99 & MP 308.38

US 101: CULVERT REPAIRS

F O

T N

E

MTRAPED

N

O G

E R

O

N

OI

T

ATROPS

N A

R T

H_M22072_clpl_01.dgn :: HD02 3/13/2023 10:28:05 AM hwyr33e 1"=20' Scale: Rotation: 0°

HD02

" c m p

ST

ERE

JU

LD

E R

HOLA

W A

19202

D A

Y

Y

YDER

3) Average daily discharge expected to be exceeded 16 days each month.

2) Average daily discharge expected to be exceeded 8 days each month.

1) Average daily discharge expected to be exceeded 2 days each month.

FEET PER SECOND (GALLONS PER MINUTE)

AVERAGE DAILY DISCHARGE IN CUBIC

NOTE

JULY

AUGUST

SEPTEMBER

TEMPORARY WATER MANAGEMENT

ESTIMATED DISCHARGES FOR

the subject watershed may differ by year.

estimated discharges are based on regression equations. Discharges in

Listed discharges are surface water from the upstream watershed. The

In-water work period extends from 15 July through 30 September.

1 (5) 2 (25) 3 (50)

0.03 (15)

0.3 (135) 0.02 (10)

CROSSING AT US 101, MP 308.38

its height is:

linear feet of barrier that is twice as wide as

The estimated number of bags needed for 100 inches wide by 14 inches long. This is a 30 pound bag of dry sand.

having a placed dimension of about 4 to 5 inches high by 9 to 10 used to construct a sandbag barrier. This is based on each bag of 2 feet). This is the minimum width-to-height ratio that should be wide as its height (e.g., a one foot high wall would have a base width

A common recommendation is to make the sandbag barrier twice as

Height (ft)# bags

2 1700

Width (ft.)

SANDBAG FOOTPRINT DETAIL

NO SCALE

H e ig h t (f t.

and restore site as per plans and specifications.

Remove all Temporary Water Management features sediment-laden water does not leave the site.

storm events and to insure that sediment and periods, this facility shall be upgraded for unexpected anticipated site conditions. During the construction on this plan is the minimum requirements for

The Temporary Water Management Facility shown is completed and approved.

responsibility of the contractor until all construction replacement and upgrading of this facility is the

Management Plan and the construction, maintenance, The implementation of this Temporary Water

GENERAL NOTES:

Sandbag isolation barrier

LEGEND

Isolating the work site upstream: Install single primary sandbag barrier across the stream channel.

If Needed, install secondary sandbag barrier.

Downstream: Install sandbag barrier.

Install sandbag barrier and energy dissipator pad downstream from work area. Location to be set based on topography and easements available.

Size the temporary water management facility based

Water seeping through the primary barrier and contained by the secondary barrier shall be returned to an area up stream of the sandbag barrier to a temporary settling basin or other approved location.

Provide adequate sediment control measures during dewatering of the work area to insure sediment laden water does not leave the site.

FULL ISOLATION NOTES

CONCEPT PLAN

TEMPORARY WATER MANAGEMENT

0.1 (45) 0.06 (30) 0.03 (15)

0.3 (135) 0.06 (30)

0.01 (5)

3 4

54" I.E.=95.81

Robert Trevis

Allen Gillette

Wade Holaday

Wade Holaday on site conditions.

(as needed)

Dewatering sump pump

(as needed)

Sediment control facility

(as needed)

Energy dissipator

"N O W

O

E A

"N O W

O

E A

No work limits