ATT B Bid Cost Form 25_159.pdf

PDF 142 KB Posted

Attached to
ITB #25-159 Construction on Left Turn on Mt. Zion Rd. at Mt. Zion Primary School
Solicitation number
PE-63100-NONST-2026-000000076
Issued by
Clayton County, Georgia

About this file

ITB #XX-XX Mt. Zion Road Turn Lane

This is an Invitation to Bid (ITB) for a turn lane construction project on Mt. Zion Road. The project encompasses roadway improvements including grading, drainage infrastructure, asphalt and concrete work, erosion control measures, and traffic control. The scope of work includes 420 distinct line items organized into four categories: roadway items, erosion control items, and signing and marking items. Key roadway components include graded aggregate base courses totaling 4,635 tons, recycled asphalt concrete in various grades totaling approximately 2,705 tons, concrete work for curbs, gutters, sidewalks, and driveways, storm drain pipe installation in multiple sizes (15 to 24 inches), and safety end sections. Erosion control features include temporary silt fencing (5,200 linear feet), inlet sediment traps, check dams, temporary grassing, erosion control mats, and water quality monitoring. Signing and marking work includes thermoplastic traffic striping in white and yellow, raised pavement markers, highway signs, and pavement marking arrows.

All bid line items show estimated unit costs of $0.00, indicating this is a blank bid form awaiting contractor pricing. The total contract bid cost field is provided for the contractor's complete project cost proposal. Bidders must sign and date the form with their printed name. The project includes provisions for quantities "as directed by engineer" beyond the estimated quantities, allowing for construction contingencies and change orders. The document does not specify response deadlines, bid opening dates, site visit requirements, pre-bid conferences, or contract award timelines, as these details are typically included in accompanying solicitation documents. No incumbent contractor, set-asides, or specific funding sources are identified in this bid form.

View the file

Other files

File Type Posted
ITB _25_159 Final.pdf PDF
Project Plans ITB _25_159.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB #XX-XX

Mt. Zion Road Turn Lane

Line Item No.

DOT Pay Item #

Unit Estimated Quantity

As Directed by Engineer

Total Quantity

Unit Cost Total Cost

005 150-1000 LS 1 0 1 $0.00

010 210-0100 LS 1 0 1 $0.00

015 310-5060 TN 179 11 190 $0.00

020 310-5100 TN 4233 212 4445 $0.00

025 402-1812

RECYCLED ASPH CONC LEVELING,

INCL BITUM MATL & H LIME

TN 806 44 850 $0.00

030 402-3130 TN 1173 62 1235 $0.00

035 402-3121 TN 296 14 310 $0.00

040 402-3190

RECYCLED ASPH CONC 19 MM

SUPERPAVE, GP 1 OR 2, INCL BITUM

MATL & H LIME

TN 296 14 310 $0.00

045 413-0750 GL 716 39 755 $0.00

050 432-5010 SY 4698 232 4930 $0.00

055 441-0104 SY 2545 125 2670 $0.00

060 441-0106 SY 143 7 150 $0.00

065 441-0740 SY 242 13 255 $0.00

070 441-4020 SY 169 11 180 $0.00

075 441-6021 LF 4625 230 4855 $0.00

080 446-1100 LF 1780 90 1870 $0.00

085 500-3800 CY 1.1 0.9 2 $0.00

090 500-3200 CY 2.36 0.14 2.5 $0.00

095 500-9999 CY 94 6 100 $0.00

100 550-1150 LF 145 8 153 $0.00

105 550-1180 LF 2481 125 2606 $0.00

110 550-1240 LF 90 5 95 $0.00

115 550-2180 LF 82 8 90 $0.00

120 550-3415 EA 1 1 2 $0.00

125 550-3618 EA 7 1 8 $0.00

130 550-4118 EA 1 1 2 $0.00

135 611-3000 EA 1 1 2 $0.00

140 611-3010 EA 1 0 1 $0.00

Item Description

TACK COAT

TRAFFIC CONTROL -

MT. ZION RD. TURN LANE

STM DRAIN PIPE, 24 IN, H 1-10

GRADING COMPLETE -

MT. ZION RD. TURN LANE

RECYCLED ASPH CONC 12.5 MM

SUPERPAVE, GP 2 ONLY, INCL BITUM

MATL & H LIME

MILL ASPH CONC PVMT,

VARIABLE DEPTH

DRIVEWAY CONC, 6 IN

STM DRAIN PIPE, 15 IN, H 1-10

CONC SIDEWALK, 4 IN

ROADWAY ITEMS

RECONSTR DROP INLET, GP 1

CLASS B CONC, BASE OR PVMT WIDENING

CLASS B CONC

GR AGGR BASE CRS, 6 IN, INCL MATL

GR AGGR BASE CRS, 10 IN, INCL MATL

CLASS A CONC, INCL REINF STEEL

CONC MEDIAN, 4 IN

CONC VALLEY GUTTER, 6 IN

STM DRAIN PIPE, 18 IN, H 1-10

SIDE DRAIN PIPE, 18 IN, H 1-10

SAFETY END SECTION 15 IN, SIDE DRAIN,

4:1 SLOPE

SAFETY END SECTION 18 IN, SIDE DRAIN,

6:1 SLOPE

RECONSTR CATCH BASIN, GP 1

FLARED END SECTION, 18 IN,

SIDE DRAIN

RECYCLED ASPH CONC 25 MM

SUPERPAVE, GP 1 OR 2, INCL BITUM

MATL & H LIME

CONC CURB & GUTTER, 8 IN X 30 IN,

TP 2

PVMT REINF FAB STRIPS, TP 2,

18 INCH WIDTH

Line Item No.

DOT Pay Item #

Unit Estimated Quantity

As Directed by Engineer

Total Quantity

Unit Cost Total CostItem Description

145 611-5029 LF 110 25 135 $0.00

150 611-8000 EA 1 1 2 $0.00

155 611-8040 EA 1 1 2 $0.00

160 611-8050 EA 3 1 4 $0.00

165 634-1200 EA 22 2 24 $0.00

170 641-1200 LF 449 21 470 $0.00

175 641-5001 EA 3 0 3 $0.00

180 641-5012 EA 3 0 3 $0.00

185 668-1100 EA 17 1 18 $0.00

190 668-1110 LF 4.56 0.44 5 $0.00

195 668-2100 EA 3 1 4 $0.00

200 668-4300 EA 2 0 2 $0.00

205 668-5000 EA 2 0 2 $0.00

210 163-0232 AC 1 0.5 1.5 $0.00

215 163-0240 TN 30 2 32 $0.00

220 163-0301 EA 2 1 3 $0.00

225 163-0502 EA 7 0 7 $0.00

230 163-0503 EA 7 0 7 $0.00

235 163-0527 EA 12 1 13 $0.00

240 163-0550 EA 26 1 27 $0.00

245 165-0010

MAINTENANCE OF TEMPORARY SILT

FENCE, TP A

LF 2365 240 2605 $0.00

250 165-0030

MAINTENANCE OF TEMPORARY SILT

FENCE, TP C

LF 325 35 360 $0.00

255 165-0086 EA 7 0 7 $0.00

260 165-0087 EA 7 0 7 $0.00

265 165-0041 EA 120 20 140 $0.00

270 165-0101 EA 2 1 3

275 165-0105 EA 26 1 27 $0.00

280 167-1000

WATER QUALITY MONITORING AND

SAMPLING

EA 2 0 2 $0.00

285 167-1500 MO 5 1 6 $0.00

CONC RIGHT OF WAY MARKERS

TEMPORARY GRASSING

CONSTRUCT AND REMOVE

CONSTRUCTION EXIT

CONSTR AND REM RIP RAP CHK DAMS,

STONE PLAIN RIP RAP/SAND BAGS

CONSTR AND REM SILT CONTROL GATE,

TP 3

EROSION CONTROL ITEMS

CONSTR AND REM SILT CONTROL GATE,

TP 2

STORM SEWER MANHOLE, TP 1

ADJUST CATCH BASIN TO GRADE

GUARDRAIL, TP W

WATER QUALITY INSPECTIONS

CONSTR AND REM INLET SEDIMENT TRAP

MAINTENANCE OF CONSTRUCTION EXIT

MULCH

CATCH BASIN, GP 1

MAINTENANCE OF SILT CONTROL GATE,

TP 2

MAINTENANCE OF SILT CONTROL GATE,

TP 3

MAINTENANCE OF CHECK DAM -

ALL TYPES

RESET CHAIN LINK FENCE,

ALL SIZES & TYPES

GUARDRAIL ANCHORAGE, TP 1

GUARDRAIL ANCHORAGE, TP 12

JUNCTION BOX

CATCH BASIN, GP 1, ADDL DEPTH

MAINTENANCE OF INLET SEDIMENT TRAP

ADJUST DROP INLET TO GRADE

ADJUST MANHOLE TO GRADE

DROP INLET, GP 1

Line Item No.

DOT Pay Item #

Unit Estimated Quantity

As Directed by Engineer

Total Quantity

Unit Cost Total CostItem Description

290 171-0010 TEMPORARY SILT FENCE, TP A LF 4730 470 5200 $0.00

295 171-0030 TEMPORARY SILT FENCE, TP C LF 740 75 815 $0.00

300 603-2180 SY 48 7 55 $0.00

305 603-7000 SY 60 10 70 $0.00

310 700-6910 AC 2.3 0.5 2.8 $0.00

315 700-7000 AGRICULTURAL LIME TN 0.1 0 0.1 $0.00

320 700-8000 FERTILIZER MIXED GRADE TN 0.5 0.1 0.6 $0.00

325 700-8100 FERTILIZER NITROGEN CONTENT LB 115 5 120 $0.00

330 711-0200 SY 729 36 765 $0.00

335 716-2000 SY 2552 258 2810 $0.00

340 610-9001 EA 1 0 1 $0.00

345 611-5551 EA 1 0 1 $0.00

350 632-0003 EA 2 0 2 $0.00

355 636-1036 SF 75.68 0.32 76 $0.00

360 636-2070 LF 224 6 230 $0.00

365 653-0120 EA 37 1 38 $0.00

370 653-0130 EA 1 0 1 $0.00

375 653-1906 LF 6978 347 7325 $0.00

380 653-2604 LF 4449 221 4670 $0.00

385 653-1704

THERMOPLASTIC SOLID TRAF

STRIPE, 24 IN, WHITE

LF 340 35 375 $0.00

390 653-1804 LF 920 90 1010 $0.00

395 653-2611 GLF 676 34 710 $0.00

400 653-3602 GLF 1534 76 1610 $0.00

405 653-6004 SY 508 27 535 $0.00

410 653-6006 SY 341 19 360 $0.00

415 654-1001 EA 193 7 200 $0.00

420 654-1003 EA 102 13 115 $0.00

This _______ day of ______________________, 2025.

THERMOPLASTIC SOLID TRAF STRIPE,

6 IN, WHITE

CHANGEABLE MESSAGE SIGN,

PORTABLE, TP 3

PLASTIC FILTER FABRIC

GALV STEEL POSTS, TP 7

(Signature)

PERMANENT GRASSING

(Printed Name)

EROSION CONTROL MATS, SLOPES

THERMOPLASTIC PVMT MARKING,

ARROW, TP 2

RAISED PVMT MARKERS, TP 1

$0.00

RAISED PVMT MARKERS, TP 3

THERMOPLASTIC SKIP TRAF STRIPE,

6 IN WHITE

TOTAL CONTRACT BID COST:

SIGNING AND MARKING ITEMS

THERMOPLASTIC TRAF STRIPING, YELLOW

THERMOPLASTIC TRAF STRIPING, WHITE

TURF REINFORCING MAT, TP 2

REMOVE SIGN

HIGHWAY SIGNS, TP 1 MATL,

REFL SHEETING, TP 11

THERMOPLASTIC PVMT MARKING,

ARROW, TP 3

THERMOPLASTIC SKIP TRAF STRIPE,

6 IN YELLOW

RESET SIGN

THERMOPLASTIC SOLID TRAF STRIPE,

6 IN, YELLOW

THERMOPLASTIC SOLID TRAF STRIPE,

8 IN, WHITE

STN DUMPED DRIP RAP, TP 3, 12 IN

Line Item No.

DOT Pay Item #

Unit Estimated Quantity

As Directed by Engineer

Total Quantity

Unit Cost Total CostItem Description