ATT B Bid Cost Form 25_159.pdf
PDF 142 KB Posted
- Solicitation number
- PE-63100-NONST-2026-000000076
- Issued by
- Clayton County, Georgia
About this file
ITB #XX-XX Mt. Zion Road Turn Lane
This is an Invitation to Bid (ITB) for a turn lane construction project on Mt. Zion Road. The project encompasses roadway improvements including grading, drainage infrastructure, asphalt and concrete work, erosion control measures, and traffic control. The scope of work includes 420 distinct line items organized into four categories: roadway items, erosion control items, and signing and marking items. Key roadway components include graded aggregate base courses totaling 4,635 tons, recycled asphalt concrete in various grades totaling approximately 2,705 tons, concrete work for curbs, gutters, sidewalks, and driveways, storm drain pipe installation in multiple sizes (15 to 24 inches), and safety end sections. Erosion control features include temporary silt fencing (5,200 linear feet), inlet sediment traps, check dams, temporary grassing, erosion control mats, and water quality monitoring. Signing and marking work includes thermoplastic traffic striping in white and yellow, raised pavement markers, highway signs, and pavement marking arrows.
All bid line items show estimated unit costs of $0.00, indicating this is a blank bid form awaiting contractor pricing. The total contract bid cost field is provided for the contractor's complete project cost proposal. Bidders must sign and date the form with their printed name. The project includes provisions for quantities "as directed by engineer" beyond the estimated quantities, allowing for construction contingencies and change orders. The document does not specify response deadlines, bid opening dates, site visit requirements, pre-bid conferences, or contract award timelines, as these details are typically included in accompanying solicitation documents. No incumbent contractor, set-asides, or specific funding sources are identified in this bid form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB _25_159 Final.pdf | ||
| Project Plans ITB _25_159.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB #XX-XX
Mt. Zion Road Turn Lane
Line Item No.
DOT Pay Item #
Unit Estimated Quantity
As Directed by Engineer
Total Quantity
Unit Cost Total Cost
005 150-1000 LS 1 0 1 $0.00
010 210-0100 LS 1 0 1 $0.00
015 310-5060 TN 179 11 190 $0.00
020 310-5100 TN 4233 212 4445 $0.00
025 402-1812
RECYCLED ASPH CONC LEVELING,
INCL BITUM MATL & H LIME
TN 806 44 850 $0.00
030 402-3130 TN 1173 62 1235 $0.00
035 402-3121 TN 296 14 310 $0.00
040 402-3190
RECYCLED ASPH CONC 19 MM
SUPERPAVE, GP 1 OR 2, INCL BITUM
MATL & H LIME
TN 296 14 310 $0.00
045 413-0750 GL 716 39 755 $0.00
050 432-5010 SY 4698 232 4930 $0.00
055 441-0104 SY 2545 125 2670 $0.00
060 441-0106 SY 143 7 150 $0.00
065 441-0740 SY 242 13 255 $0.00
070 441-4020 SY 169 11 180 $0.00
075 441-6021 LF 4625 230 4855 $0.00
080 446-1100 LF 1780 90 1870 $0.00
085 500-3800 CY 1.1 0.9 2 $0.00
090 500-3200 CY 2.36 0.14 2.5 $0.00
095 500-9999 CY 94 6 100 $0.00
100 550-1150 LF 145 8 153 $0.00
105 550-1180 LF 2481 125 2606 $0.00
110 550-1240 LF 90 5 95 $0.00
115 550-2180 LF 82 8 90 $0.00
120 550-3415 EA 1 1 2 $0.00
125 550-3618 EA 7 1 8 $0.00
130 550-4118 EA 1 1 2 $0.00
135 611-3000 EA 1 1 2 $0.00
140 611-3010 EA 1 0 1 $0.00
Item Description
TACK COAT
TRAFFIC CONTROL -
MT. ZION RD. TURN LANE
STM DRAIN PIPE, 24 IN, H 1-10
GRADING COMPLETE -
MT. ZION RD. TURN LANE
RECYCLED ASPH CONC 12.5 MM
SUPERPAVE, GP 2 ONLY, INCL BITUM
MATL & H LIME
MILL ASPH CONC PVMT,
VARIABLE DEPTH
DRIVEWAY CONC, 6 IN
STM DRAIN PIPE, 15 IN, H 1-10
CONC SIDEWALK, 4 IN
ROADWAY ITEMS
RECONSTR DROP INLET, GP 1
CLASS B CONC, BASE OR PVMT WIDENING
CLASS B CONC
GR AGGR BASE CRS, 6 IN, INCL MATL
GR AGGR BASE CRS, 10 IN, INCL MATL
CLASS A CONC, INCL REINF STEEL
CONC MEDIAN, 4 IN
CONC VALLEY GUTTER, 6 IN
STM DRAIN PIPE, 18 IN, H 1-10
SIDE DRAIN PIPE, 18 IN, H 1-10
SAFETY END SECTION 15 IN, SIDE DRAIN,
4:1 SLOPE
SAFETY END SECTION 18 IN, SIDE DRAIN,
6:1 SLOPE
RECONSTR CATCH BASIN, GP 1
FLARED END SECTION, 18 IN,
SIDE DRAIN
RECYCLED ASPH CONC 25 MM
SUPERPAVE, GP 1 OR 2, INCL BITUM
MATL & H LIME
CONC CURB & GUTTER, 8 IN X 30 IN,
TP 2
PVMT REINF FAB STRIPS, TP 2,
18 INCH WIDTH
Line Item No.
DOT Pay Item #
Unit Estimated Quantity
As Directed by Engineer
Total Quantity
Unit Cost Total CostItem Description
145 611-5029 LF 110 25 135 $0.00
150 611-8000 EA 1 1 2 $0.00
155 611-8040 EA 1 1 2 $0.00
160 611-8050 EA 3 1 4 $0.00
165 634-1200 EA 22 2 24 $0.00
170 641-1200 LF 449 21 470 $0.00
175 641-5001 EA 3 0 3 $0.00
180 641-5012 EA 3 0 3 $0.00
185 668-1100 EA 17 1 18 $0.00
190 668-1110 LF 4.56 0.44 5 $0.00
195 668-2100 EA 3 1 4 $0.00
200 668-4300 EA 2 0 2 $0.00
205 668-5000 EA 2 0 2 $0.00
210 163-0232 AC 1 0.5 1.5 $0.00
215 163-0240 TN 30 2 32 $0.00
220 163-0301 EA 2 1 3 $0.00
225 163-0502 EA 7 0 7 $0.00
230 163-0503 EA 7 0 7 $0.00
235 163-0527 EA 12 1 13 $0.00
240 163-0550 EA 26 1 27 $0.00
245 165-0010
MAINTENANCE OF TEMPORARY SILT
FENCE, TP A
LF 2365 240 2605 $0.00
250 165-0030
MAINTENANCE OF TEMPORARY SILT
FENCE, TP C
LF 325 35 360 $0.00
255 165-0086 EA 7 0 7 $0.00
260 165-0087 EA 7 0 7 $0.00
265 165-0041 EA 120 20 140 $0.00
270 165-0101 EA 2 1 3
275 165-0105 EA 26 1 27 $0.00
280 167-1000
WATER QUALITY MONITORING AND
SAMPLING
EA 2 0 2 $0.00
285 167-1500 MO 5 1 6 $0.00
CONC RIGHT OF WAY MARKERS
TEMPORARY GRASSING
CONSTRUCT AND REMOVE
CONSTRUCTION EXIT
CONSTR AND REM RIP RAP CHK DAMS,
STONE PLAIN RIP RAP/SAND BAGS
CONSTR AND REM SILT CONTROL GATE,
TP 3
EROSION CONTROL ITEMS
CONSTR AND REM SILT CONTROL GATE,
TP 2
STORM SEWER MANHOLE, TP 1
ADJUST CATCH BASIN TO GRADE
GUARDRAIL, TP W
WATER QUALITY INSPECTIONS
CONSTR AND REM INLET SEDIMENT TRAP
MAINTENANCE OF CONSTRUCTION EXIT
MULCH
CATCH BASIN, GP 1
MAINTENANCE OF SILT CONTROL GATE,
TP 2
MAINTENANCE OF SILT CONTROL GATE,
TP 3
MAINTENANCE OF CHECK DAM -
ALL TYPES
RESET CHAIN LINK FENCE,
ALL SIZES & TYPES
GUARDRAIL ANCHORAGE, TP 1
GUARDRAIL ANCHORAGE, TP 12
JUNCTION BOX
CATCH BASIN, GP 1, ADDL DEPTH
MAINTENANCE OF INLET SEDIMENT TRAP
ADJUST DROP INLET TO GRADE
ADJUST MANHOLE TO GRADE
DROP INLET, GP 1
Line Item No.
DOT Pay Item #
Unit Estimated Quantity
As Directed by Engineer
Total Quantity
Unit Cost Total CostItem Description
290 171-0010 TEMPORARY SILT FENCE, TP A LF 4730 470 5200 $0.00
295 171-0030 TEMPORARY SILT FENCE, TP C LF 740 75 815 $0.00
300 603-2180 SY 48 7 55 $0.00
305 603-7000 SY 60 10 70 $0.00
310 700-6910 AC 2.3 0.5 2.8 $0.00
315 700-7000 AGRICULTURAL LIME TN 0.1 0 0.1 $0.00
320 700-8000 FERTILIZER MIXED GRADE TN 0.5 0.1 0.6 $0.00
325 700-8100 FERTILIZER NITROGEN CONTENT LB 115 5 120 $0.00
330 711-0200 SY 729 36 765 $0.00
335 716-2000 SY 2552 258 2810 $0.00
340 610-9001 EA 1 0 1 $0.00
345 611-5551 EA 1 0 1 $0.00
350 632-0003 EA 2 0 2 $0.00
355 636-1036 SF 75.68 0.32 76 $0.00
360 636-2070 LF 224 6 230 $0.00
365 653-0120 EA 37 1 38 $0.00
370 653-0130 EA 1 0 1 $0.00
375 653-1906 LF 6978 347 7325 $0.00
380 653-2604 LF 4449 221 4670 $0.00
385 653-1704
THERMOPLASTIC SOLID TRAF
STRIPE, 24 IN, WHITE
LF 340 35 375 $0.00
390 653-1804 LF 920 90 1010 $0.00
395 653-2611 GLF 676 34 710 $0.00
400 653-3602 GLF 1534 76 1610 $0.00
405 653-6004 SY 508 27 535 $0.00
410 653-6006 SY 341 19 360 $0.00
415 654-1001 EA 193 7 200 $0.00
420 654-1003 EA 102 13 115 $0.00
This _______ day of ______________________, 2025.
THERMOPLASTIC SOLID TRAF STRIPE,
6 IN, WHITE
CHANGEABLE MESSAGE SIGN,
PORTABLE, TP 3
PLASTIC FILTER FABRIC
GALV STEEL POSTS, TP 7
(Signature)
PERMANENT GRASSING
(Printed Name)
EROSION CONTROL MATS, SLOPES
THERMOPLASTIC PVMT MARKING,
ARROW, TP 2
RAISED PVMT MARKERS, TP 1
$0.00
RAISED PVMT MARKERS, TP 3
THERMOPLASTIC SKIP TRAF STRIPE,
6 IN WHITE
TOTAL CONTRACT BID COST:
SIGNING AND MARKING ITEMS
THERMOPLASTIC TRAF STRIPING, YELLOW
THERMOPLASTIC TRAF STRIPING, WHITE
TURF REINFORCING MAT, TP 2
REMOVE SIGN
HIGHWAY SIGNS, TP 1 MATL,
REFL SHEETING, TP 11
THERMOPLASTIC PVMT MARKING,
ARROW, TP 3
THERMOPLASTIC SKIP TRAF STRIPE,
6 IN YELLOW
RESET SIGN
THERMOPLASTIC SOLID TRAF STRIPE,
6 IN, YELLOW
THERMOPLASTIC SOLID TRAF STRIPE,
8 IN, WHITE
STN DUMPED DRIP RAP, TP 3, 12 IN
Line Item No.
DOT Pay Item #
Unit Estimated Quantity
As Directed by Engineer
Total Quantity
Unit Cost Total CostItem Description