This file contains Best Management Practices (BMPs) documentation for piling and structure removal projects in aquatic environments, applicable to state and local contract opportunities including the removal and disposal of burned in-water debris and pilings on the Columbia River in Goble, Oregon. The document provides detailed technical specifications for removing untreated and chemically treated wood pilings, piers, vessels, boat docks, derelict fishing gear, and similar structures composed of plastic, concrete, and other materials found in estuaries, lakes, floodplains, and rivers. For intact pile removal, the BMPs require installation of floating surface booms to capture debris, keeping equipment out of the water whenever possible, using vibratory hammers for dislodging pilings, and slowly lifting piles through the water column during low water and current conditions. Chemically-treated piles must be placed in containment basins without sediment removal, and all holes must be filled with clean, native sediments from the project area, with all removed materials disposed of at permitted upland sites.

The document also addresses procedures for broken pile removal, specifying that piles broken above uncontaminated sediment or less than two feet below the surface must be removed entirely when feasible, with GPS documentation of unretrievable broken piles for future debris characterization if dredging operations are anticipated. Additionally, the BMPs outline requirements for shellfish bed and nearshore habitat restoration projects, including provisions for procuring clean shell substrate from sustainable sources, steam cleaning shells, and maintaining shells on dry land for a minimum of one month before placement in aquatic environments, with preference given to sourcing materials from local areas to support environmental restoration objectives.

View the file

Other files

File Type Posted
DJI Photo of Goble Site 1.JPG JPG image
DJI Photo of Goble Site 2.JPG JPG image
RFQ - Debris and Piling Removal.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

42. Piling and Other Structure Removal includes the removal of untreated and chemically treated wood pilings, piers, vessels, boat docks, derelict fishing gear, as well as similar structures comprised of plastic, concrete, and other material. Pilings and other structures occur in estuaries, lakes, floodplains, and rivers, and are typically used in association with boat docks, structures, and other facilities.

a. When removing an intact pile

1. Install a floating surface boom to capture floating surface debris.

ii. To the extent possible, keep all equipment (e.g., bucket, steel cable, vibratory hammer) out of the water, grip piles above the waterline, and complete all work during low water and low current conditions.

111. Dislodge the piling with a vibratory hammer, whenever feasible. Never intentionally break a pile by twisting or bending.

iv. Slowly lift piles from the sediment and through the water column.

v. Place chemically-treated piles in a containment basin on a barge deck, pier, or shoreline without attempting to clean or remove any adhering sediment. A containment basin for the removed piles and any adhering sediment may be constructed of durable plastic sheeting with sidewalls supported by hay bales or another support structure to contain all sediment and return flow which may otherwise be directed back to the waterway.

vi. After piling removal, fill the holes left with clean, native sediments from the project area.

vii. Dispose of all removed piles, floating surface debris, any sediment spilled on work surfaces, and all containment supplies at a permitted upland disposal site.

b. When removing a broken pile

i. If a pile breaks above the surf ace of uncontaminated sediment, or less than

2 feet below the surface, make every attempt short of excavation to remove it entirely. If the pile cannot be removed without excavation, drive the pile deeper if possible.

11. If dredging is likely in the area of piling removal, use a GPS (global positioning device) to note the location of all broken piles for future use in site debris characterization.

43. Shellfish Bed/Nearshore Habitat Restoration may involve shellfish bed restoration, replacing shore line armoring, and providing beach nourishment. An example of a sustainable restoration action might include restoration of sediment input to a nearshore by removing bulkheads at historical feeder bluff sites, thereby allowing gradual and ongoing erosion/mass wasting of bluffs and L W recruitment, instead of one-time beach nourishment. This opinion does not cover projects where the sole objective is to protect upland property or to cap contaminants.

a. Shellfish bed restoration

i. Shell or other substance used for substrate enhancement will be procured from clean sources that do not deplete the existing supply of shell bottom.

Shells should be steam cleaned, left on dry land for a minimum of one month, or both, before placement in the aquatic environment. Shells from the local area should be used whenever possible.

-42-