Att 4_QASP N0024124R0003 EW Jets.pdf
PDF 374 KB Posted
- Solicitation number
- N0042124R0003
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for contracted air services providing Electronic Warfare (EW) jet services to the Department of the Navy Naval Air Systems Command Naval Air Warfare Center. The QASP describes performance standards and incentives for on-time mission completion between 95-100% of the time to be considered mission effective. It outlines government resources such as the Contracting Officer, Contracting Officer's Representative, and Program Manager responsible for oversight and documentation of contractor surveillance. Methods for quality assurance include the Contractor Performance Assessment Reporting System (CPARS) used for annual evaluations. Enclosures provide further details on performance standards, data requirements, incentives, and the surveillance activity checklist and contract discrepancy report used to document contractor performance.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment (3)
N0042124R0003
Quality Assurance Surveillance Plan (QASP)
Electronic Warfare (EW) Jet Services
1. Purpose
This Quality Assurance Surveillance Plan (QASP) is a government developed and applied document used to ensure the systematic quality assurance methods are used in the administration of the performance-based service tasks under the planned contract. The intent is to ensure that the contractor performs In Accordance With (IAW) the performance metrics, the government receives the quality of services required under the contract, and that the actual performance results are documented IAW this plan.
This QASP describes how the government will observe, evaluate and document the contractor’s performance in meeting the critical performance standards identified in the contract and task orders. Specifically, the QASP will identify the government resources responsible for monitoring performance and surveillance methods that will be utilized in determining the quality level of services and products delivered under the contract. The intent is to establish and properly execute a QASP that will assist the government in obtaining services from the contractor.
2. Authority
Authority for issuance of this QASP is provided under contract Section E – Inspection and
Acceptance, which provides for inspection and acceptance of the services and documentation called for in the contract to be executed by the Contracting Officer or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the QASP. The contractor, and not the government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract.
The QASP, on the other hand, is put in place to provide government surveillance oversight of the contractor’s efforts to assure that they are timely, effective, and are delivering the results specified in the order.
4. Government Resources
The following definitions for government resources are applicable to this plan:
Contracting Officer – A person duly appointed with the authority to enter into (Procuring
Contracting Officer) (PCO) or administer (Administrative Contracting Officer) (ACO) contracts and make related determination and findings on behalf of the government. The PCO for this contract is A252600. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.
Contracting Officer’s Representative (COR) – An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
Alternative Contracting Officer Representative (ACOR) – An individual appointed in writing by the PCO to act as its authorized representative, in the absence of the COR, to assist in administering the contract. The ACOR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
Government Flight Representative (GFR) – A United States (US) Military Officer or similarly qualified civilian with the responsibility for oversight of public aircraft operations conducted by commercial contractors.
Program Manager (PM) – As part of PMA 226, the PM manages and supports specialized and proven aircraft platforms & systems to include CAS acquisition, PAO Declaration and
Airworthiness.
CAS Integrated Product Team Lead (IPTL) - The IPTL executes the program as the PM’s primary representative.
5. Responsibilities
The following government resources shall have responsibility for the implementation of this
QASP:
Contracting Officer – The Contracting Officer shall monitor performance of all necessary actions for effective contracting, ensure compliance with the terms of the contract, and safeguard the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the contractor receives impartial, fair, and equitable treatment under the contract. The
Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
COR/ACOR – The COR/ACOR is responsible for technical administration of the contract and assures proper government surveillance of the contractor’s performance. In addition to the continuous monitoring of performance, the COR/ACOR will also submit an annual assessment in the Navy’s Contractor Performance Assessment Reporting System (CPARS). In CPARS, the
COR/ACOR assesses general quality of the services, schedule, management, and other important areas. The COR/ACOR is not empowered to make any contractual commitments or to authorize any changes on the government’s behalf. Any changes that the contractor deems may affect contract price and terms or conditions shall be referred to the Contracting Officer for action.
GFR – The GFR is responsible for surveillance of contractor ground operations involving CAS aircraft. GFR duties and responsibilities are described in DCMA INST 8210.1D, Chapter 7
(NAVAIRINST 3710.1G).
PM – The PM provides primary program oversight, nominates the COR, and supports the COR’s performance assessment activities. The PM for this contract is PMA-226.
CAS IPTL - The IPTL executes the program as the PM’s primary representative, which includes designating the Scheduling Officers to execute administrative tasks such as mission scheduling, coordination, prioritization of CAS and invoice inspection.
6. Methods of Quality Assurance Surveillance
a. Contractor Performance Assessment Report System (CPARS) – The market place for
Contracted Air Services is becoming very competitive. As such, the successful offeror has a vested interest in the government generated CPARS rating under this contract.
Additionally, an evaluation using the CPARS format will be performed annually inclusive of all task orders awarded during the applicable annual rating period. This evaluation will be one determinant in the continuation of issuing task orders under this contract. The government will address the quality of the services, schedule, management, and other important areas for this procurement. As this information may affect future source selections throughout DoD, and the continuation of the contract, the CPARS evaluation will be used appropriately as an additional performance oversight and communication tool with the QASP.
b. QASP - The below listed methods of surveillance shall be used by the COR in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity
Checklist (SAC) provided as Enclosure (4) herein.
7. Surveillance
Enclosures (1), (2), and (3) set forth the CAS performance standards, data performance standards, and incentives for the contractor and the COR. Enclosure (4) provides the checklist and means for the COR to document on a monthly basis the results of the surveillance and shall be provided to the Contracting Officer on a quarterly basis.
8. Documentation
In addition to providing monthly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file within the Surveillance and Performance Module (SPM). The file will contain copies of all reports, evaluations, recommendations, and any actions related to the government’s performance of the quality assurance function, including the originals of the
Quality Assurance Checklists. All such records will be maintained for the life of the contract.
The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a
Contract Discrepancy Report (CDR), and present it to the contractor's task manager or on-site representative. A CDR template is attached to this QASP enclosure (5).
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The government will review the contractor's corrective action plan to determine acceptability.
The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action;
and, whenever an unfavorable trend is detected in contractor performance.
9. Enclosures
Enclosure (1) – Contracted Air Service Performance Standards
Enclosure (2) - Data Performance Standards
Enclosure (3) - Incentives
Enclosure (4) - Surveillance Activity Checklist
Enclosure (5) – Contract Discrepancy Report
Enclosure (1)
CONTRACTED AIR SERVICES PERFORMANCE STANDARDS
Performance Based
Work Statement
(PBWS) Task
Description
Performance
Standards Required and Tied to CPAR
Ratings
Surveillance Method/Measure Incentives
Provide EW Jet
Services (flight minutes) which meet requirements within the PBWS
Metric 1
Execute complete missions
(weight off wheels to weight on wheels) 95.0% of the time to be mission effective.
98.0 – 100.0% = Exceptional
97.0 – 97.99% = Very Good
95.0 – 96.99% = Satisfactory
90.0 – 94.99% = Marginal
<90.0% = Unsatisfactory
100.0% Inspection by COR and customer feedback.
Example:
Mission Effectiveness is the total sorties flown in which the aircraft functions as required by the PBWS and IAW scheduled flights prescribed by Scheduling Officer (SO) divided into the total sorties scheduled to achieve percentage (e.g. 49 flown/50 scheduled = 98.0%). Excludes canceled sorties by customer or due to weather related occurrences.
See enclosure
3.
Contractor to maintain
Government
Furnished Property
(GFP) accountability
IAW DI- MGMT-
81947B
Metric 2
Contractor shall account for all GFP with a goal of
100.0% accuracy and a
Satisfactory metric of 95.0%.
Reports shall be submitted
IAW CDRL A00D.
95.0 – 96.99% = Satisfactory
90.0 – 94.99% = Marginal
<90.0% = Unsatisfactory
Government performed random on-site physical audits combined with
100.0% inspection by COR of GFP reports submitted per CDRL A00D of contractor assigned GFP against the contract master list of assigned GFR.
Take total number of GFP items issued from the government to the contractor compared to the 1149 list and complete reports submitted. And/or Take total
GFP items accounted for during physical audit and divide by total GFP issued by government to derive percentage (299/300 = 99.7%)
See enclosure
3.
Safety program compliance
Metric 3
Contractor shall maintain compliance with Ground
Operating Procedures (GOPs) and Flight Operating
Procedures (FOPs).
Contractor goal is 100.0% compliance with a
Satisfactory metric of 94.0%
96.0 – 97.99% = Very Good
94.0 – 95.99% = Satisfactory
90.0 – 94.99% = Marginal
<90.0% = Unsatisfactory
100.0% Inspection by GFR.
DCMAINST 8210.1D Change 1 compliance inspection will be conducted by the GFR on a semiannual basis. A score will be derived based on the total number of compliant responses versus the total number of questions in the applicable audit checklist.
See enclosure 3.
Fuel accountability compliance (fuel consumption report)
Metric 4
Contractor shall maintain
95.0% accurate fuel consumption tracking between fuel cards/fuel receipts, flight logs and fuel receipts, with a goal of
100.0% accurate tracking.
95.0 – 96.99% = Satisfactory
90.0 – 94.99% = Marginal
<90.0% = Unsatisfactory
100.0% Inspection by CAS Fuel
Analyst, COR and customer feedback.
Provide evidence that the fuel card charge receipts match with flight log and fuel receipts. Take total fuel transactions (receipt amounts and gallons dispensed) and compare/match aggregate cost & gallons & fuel log & flight log. Perform sample audit each month of transaction IAW MIL-STD-
105E. Divide the total number of errant fuel transactions by the total number of fuel transactions in the
CPAR cycle to derive a percentage.
Capability Stand Up Metric 5
The contractor shall complete a Capability Stand Up period, which consists of all the applicable elements identified in PBWS Section 3.6.
Contractor goal is to complete Capability Stand Up no later than the number of months identified in the awarded contract PBWS
Section 3.6.
Award PBWS 3.6 required
# of months or earlier from contract award =
Satisfactory
Greater than award PBWS
3.2 required # of months =
Unsatisfactory
100.0% Inspection by COR.
Compliance checks with PBWS 3.6 will be conducted by the COR on a continual basis during the Capability
Stand Up period. A rating will be derived based on the total number of months the contractor utilizes to complete the applicable elements of
PBWS Section 3.6, Capability Stand
Up. A score of Satisfactory will be assigned for completion of Capability
Stand Up that occurs on or before the timeline specified in the PBWS. A score of Unsatisfactory will be assigned for completion of Capability
Stand Up greater than the time specified in the PBWS.
Enclosure (2)
DATA PERFORMANCE STANDARDS
PBWS/CDRL Task
Description Standard AQL
Surveillance
Method/
Measure
Incentives
Test / Inspection
Report
(A001)
Submission is
IAW the DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on
2nd submission to government
100.0%
Inspection by
COR and/or
ACOR.
See Enclosure
Airworthiness and
Related
Substantiation Data
(A002)
Submission is
IAW the DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on
2nd submission to government
100.0%
Inspection by
Integrated Master
Schedule (IMS)
(A003)
Submission is
IAW the DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on
2nd submission to government
100.0%
Inspection by
Management Plan
(A004)
Submission is
IAW the DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on
2nd submission to government
100.0%
Inspection by
Airworthiness and
Related
Substantiation Data /
Submission is
IAW the DID cited in the CDRL.
95.0% acceptable on first
100.0%
Inspection by
Contractor’s PAO
Flight Schedule
(A005) submission to government;
100.0% acceptable on
2nd submission to government
Briefing Material /
Post-Award
Conference Brief
(A006)
Submission is
IAW the DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on
2nd submission to government
100.0%
Inspection by
Briefing Material /
Program
Management
Review Brief (A007)
Submission is
IAW the DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on
2nd submission to government
100.0%
Inspection by
Government
Furnished Material
(GFM) Consumption
Report / Fuel
Tracking Report and
Receipts (A008)
Submission is
IAW the DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on
2nd submission to government
100.0%
Inspection by
Course Conduct
Information Package
/ Fuel / AIR Card
SOU and Training
Certificates (A009)
Submission is
IAW the DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on
2nd submission to government
100.0%
Inspection by
Mishap Risk
Assessment Report
(A00A)
Submission is
IAW the DID cited in the CDRL.
95.0% acceptable on first
100.0%
Inspection by submission to government;
100.0% acceptable on
2nd submission to government
Contractor’s
Progress, Status and
Management Report
/ Monthly Status
Report (A00B)
Submission is
IAW the DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on
2nd submission to government
100.0%
Inspection by
Contractor Roster
(A00C)
Submission is
IAW the DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on
2nd submission to government
100.0%
Inspection by
Government Furnished
Property Inventory and
Forecasting Report
(A00D)
Submission is
IAW the DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on
2nd submission to government
100.0%
Inspection by
Enclosure (3)
INCENTIVES
Assessment Period
Acceptable
Performance
Definition
How Measured
Incentives
Year 1 All measurement areas rated**
"Satisfactory" or above.
Annual assessment period (12 months into contract period) evaluation using the
CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for receiving additional task orders*
(+) Receives a positive assessment
(CPAR), appropriate for the quality of service provided.
(-) Does not meet the performance definition as a condition for receiving additional task orders.*
(-)Receives a negative assessment
(CPAR), appropriate for the quality of service provided.
Year 2 All measurement areas rated**
"Satisfactory" or above.
Annual assessment period (24 months into contract period) evaluation using the
CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for receiving additional task orders*
(+) Receives a positive assessment
(CPAR), appropriate performance definition as a condition for receiving additional task orders.*
(-)Receives a negative assessment
(CPAR), appropriate for the quality of service provided.
Year 3 All measurement areas rated**
"Satisfactory" or above.
Annual assessment period (36 months into contract period) evaluation using the
CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for receiving additional task orders*
(+) Receives a positive assessment
(CPAR), appropriate performance definition as a condition for receiving additional task orders.*
(-)Receives a negative assessment
(CPAR), appropriate
Year 4 All measurement areas rated**
"Satisfactory" or above.
Annual assessment period (48 months into contract period) evaluation using the
CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for receiving additional task orders*
(+) Receives a positive assessment
(CPAR), appropriate performance definition as a condition for receiving additional task orders.*
(-)Receives a negative assessment
(CPAR), appropriate for the quality of service provided.
Year 5 All measurement areas rated**
"Satisfactory" or above.
Assessment period
(96 months into contract period) evaluation using the CPARS format covering the previous 12 months.
(+) Receives a positive assessment
(CPAR), appropriate
(-)Receives a negative assessment
(CPAR), appropriate
* The government may not issue additional task orders unless all regulatory requirements are met and the contractor meets at least the “satisfactory” rating levels for the performance metrics identified in this QASP.
**Evaluation Ratings will be IAW FAR 42.1503.
All PBWS/CDRL tasks, including PBWS/CDRL sub-tasks, will be assessed focusing on the following:
Quality of the Services – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.
Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or affect the schedule variance.
Also address significance of scheduled events discuss causes, and assess the effectiveness of contractor corrective actions.
Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantaged and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract;
identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.
Other areas – Assess additional evaluation areas unique to the contract, or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional – Performance meets contractual requirements and exceeds many to the government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good - Performance meets contractual requirements and exceeds some to the government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal - Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.
Enclosure (4)
SURVEILLANCE ACTIVITY CHECKLIST
Monthly Surveillance Format Used:
The COR will perform an annual assessment of Quality, Schedule, Management Responsiveness, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in
Enclosure (3).
Surveillance
Method/Meas ure
Date
Plann ed
Date
Comple ted
Quality
Metric
Schedule
Metric =
Mgmt
Metri c
CPAR
Utilizati on of
Small
Business
(yes/no)
Other
Areas
As described above in
Enclosure
1& 2
100%
Inspection by COR and customer feedback
TBD
100%
Inspection by
COR and customer feedback
TBD
100%
Inspection by
COR and customer feedback
TBD
100%
Inspection by
COR and customer feedback
TBD
100%
Inspection by
COR and customer feedback
TBD
100%
Inspection by
COR and customer feedback
TBD
Monthly Summary of Ratings:
Quality of Service Schedule
Number of Exceptional ____ Number of Exceptional ____
Number of Very Good ____ Number of Very Good ____
Number of Satisfactory ____ Number of Satisfactory ____
Number of Marginal ____ Number of Marginal ____
Number of Unsatisfactory ____ Number of Unsatisfactory ____
Management Other Areas
Number of Exceptional ____ Number of Exceptional ____
Number of Very Good ____ Number of Very Good ____
Number of Satisfactory ____ Number of Satisfactory ____
Number of Marginal ____ Number of Marginal ____
Number of Unsatisfactory ____ Number of Unsatisfactory ____
Surveillance:
The COR will perform an annual assessment of overall contract performance utilizing the
CPARS evaluation rating definitions listed in Enclosure (3) and the monthly summary of ratings.
Surveillance
Method/Measure
Date
Planned Date Completed
Summary
Rating/Results
Quality of the
Services
Review of Monthly
Ratings.
Schedule Review of Monthly
Ratings.
Management
Ratings
Other Areas
Ratings
Enclosure (5)
Contract Discrepancy Report (CDR)
1. Contract Number:
2. TO: (Contractor Task Manager or on-site representative)
3. FROM: (Name of COR)
4. Date and time observed discrepancy:
5. DISCREPANCY OR PROBLEM:
6. Corrective action plan:
A written corrective action plan (is/is not) required.
The written Corrective Action Plan will be provided to the undersigned not later than 7 days after receipt of this CDR.
Prepared by: COR
Signature – Contracting Officer’s Representative Date
Received by:
Signature - Contractor Representative Date
File details come from the government source that posted it. Updated .