This is a Cost and Software Data Reporting Plan (DD Form 2794) for the F/A-18E/F Super Hornet Naval Strike Fighter program, specifically for the F-18 Advanced Cockpit System (ACS) Light Training Configuration (LTC). The plan establishes requirements for The Boeing Company's Defense, Space and Security Division (St. Louis, MO) to report comprehensive cost and technical data to the government under contract number TBD (N-13-F-C41). The program is in the C-FRP (Full Rate Production) phase and classified as ACAT I (Major Defense Acquisition Program). Data reporting will utilize the FlexFile format with at-completion costs for standard functional categories and recurring/nonrecurring categories. The contractor must submit three submissions: an initial report with an as-of date of July 15, 2027 (due September 15, 2027); an interim report as of July 15, 2029 (due September 15, 2029); and a final report as of January 15, 2032 (due March 15, 2032). The reporting organization is required to obtain a CBDR (Contractor Business Data Report) for this contract.
The plan requires detailed cost tracking across an extensive work breakdown structure including unit-level manpower, operations, maintenance (consumables, repair parts, depot-level reparables), sustaining support (training, sustaining engineering, program management), and continuing system improvements. Specific technical data requirements include quantity data and maintenance/repair parts information, with particular focus on two identified National Item Identification Numbers (NIINs): LLR4BA030 (Large Area Display) and 016879444 (Display Unit). The contractor must conduct a CSDR Readiness Review with the government's Cost Working Group Integrated Product Team within 60 days of contract award. All submissions must be made electronically through the Cost Assessment Data Enterprise (CADE) website. Prime contractors are required to flow down CSDR requirements to all subcontractors with anticipated contract value exceeding $20 million and ensure separate subcontract CSDR plans are submitted for CAPE approval. The government point of contact is Chris Letts at NAVSUP WSS, Philadelphia, PA.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 2794, MAY 2024 PREVIOUS EDITION IS OBSOLETE Page 1 of 7
COST AND SOFTWARE DATA REPORTING PLAN OMB No. 0704-0671
The public reporting burden for this collection of information is estimated to average 57 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0671). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1a. PROGRAM NAME F/A-18E/F - SUPER HORNET Naval Strike Fighter 1b. PHASE/MILESTONE (check all that apply)
Pre-A A B
C-LRIP
X C-FRP
O&S
1c. PRIME MISSION PRODUCT F-18 Advanced Cockpit System (ACS) LTC 1d. ACQUISITION CATEGORY (ACAT)
Pre-ACAT
X ACAT I (MDAP)
ACAT IA (MAIS)
ACAT II
ACAT III
Other
2. COMMODITY TYPE
Aircraft System
3. PLAN ITERATION TYPE
X INITIAL
REVISION
4. CURRENT SUBMISSION DATE (YYYYMMDD)
20250421
5. LAST APPROVED PLAN DATE (YYYYMMDD)
6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.)
Letts, Chris 6b. ADDRESS (Include ZIP Code) 700 Robbins St Philadelphia, PA 19111 6c. TELEPHONE NUMBER (Include Area Code) 215-697-1249 6d. E-MAIL ADDRESS Christopher.j.letts2.civ@us.navy.mil
7. PLAN TYPE
GOVERNMENT
X CONTRACT (PRIME)
CONTRACT (SUB)
8. PLAN GOVERNMENT PREPARING ORGANIZATION
NAVSUP WSS
9a. CONTRACTOR NAME/ADDRESS
i. REPORTING ORGANIZATION NAME The Boeing Company
ii. DIVISION NAME Defense, Space and Security Division
iii. LOCATION St Louis, MO
iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT:
CBDR REQUIRED FOR THIS ORGANIZATION
9b. CONTRACT NUMBER (List all that apply, separated by commas)
TBD - (N-13-F-C41)
9c. APPROPRIATION (check all that apply)
RDT&E
PROCUREMENT
O&M
FMS
X WCF
OTHER
10a. APPROVED PLAN NUMBER N-13-F-C41 10b. APPROVED PLAN REVISION NUMBER 10c. APPROVED PLAN REQUIREMENTS X AT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy) X AT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only)
TECHNICAL DATA REQUIRED
10d. COST REPORT TYPE
X FLEXFILE
LEGACY DD 1921 SERIES
Attachment 04
DD FORM 2794, MAY 2024 PREVIOUS EDITION IS OBSOLETE Page 2 of 7
COST AND SOFTWARE DATA REPORTING PLAN
11. WORK BREAKDOWN STRUCTURE (WBS) 12. COST 13. TECHNICAL DATA
a. WBS
CODE
b. WBS LEVEL c. WBS ELEMENT NAME a. ACTUALS TO
DATE (ATD)
b. LEGACY
1921-1
c. LEGACY
1921-2
d. LEGACY
1921-5
e. EAC/FAC
(See item 10d)
a. QUANTITY
b. SRDR
FORMATS
c.
MAINT. &
REPAIR
PARTS
i. QUANTITY
DATA
ii. GFE
QUANTITY
1.0 1 F-18 Advanced Cockpit System (ACS) LTC X
1.1 2 Unit-Level Manpower (System Level Cost Only) X X
1.2 2 Unit Operations (System Level Cost Only) X X
1.3 2 Maintenance X
1.3.1 3 Consumables and Repair Parts X X
1.3.2 3 Depot Level Reparables (DLRs) / Repair of Reparables (RoRs) X
1.3.2.1 4 Airframe/Hull/Vehicle DLRs X
1.3.2.1.1 5 NIIN LLR4BA030, LARGE AREA DISPLAY, and any future configuration X X X
1.3.2.1.2 5 NIIN 016879444, DISPLAY UNIT, and any future configuration X X X
1.3.2.2 4 Propulsion DLRs X X
1.3.3 3 Intermediate Maintenance X X
1.3.4 3 Depot Maintenance X X
1.3.5 3 Other Mainenance X X
1.3.6 3 Packing, Handling, Shipping and Transportation X X
1.4 2 Sustaining Support X
1.4.1 3 System Specific Training X X
1.4.2 3 Support Equipment Replacement and Repair X X
1.4.3 3 Sustaining/Systems Engineering X
1.4.3.1 4 Reliability and Maintainability Engineering X X
1.4.3.2 4 Logistics Engineering (LSA Updates, Logistics Analysis) X X
1.4.3.3 4 Supply Analysis Efforts X X
1.4.3.4 4 Safety/Human Systems Integration Engineering X X
1.4.3.5 4 Affordability Engineering X X
1.4.3.6 4 Obsolescence Engineering X X
1.4.3.7 4 Availability Management X X
1.4.3.8 4 Product Engineering Support X X
1.4.3.9 4 Certification and Accreditation X X
1.4.3.10 4 Configuration Management X X
1.4.3.11 4 System Performance Analysis X X
1.4.3.12 4 Supply X X
1.4.3.13 4 Data Analysis X X
1.4.3.14 4 Physical Security X X
1.4.4 3 Program Management X
1.4.4.1 4 Program Management X X
1.4.4.2 4 CLS Supply Management X X
1.4.4.3 4 Finance X X
1.4.4.4 4 Transition to Lead Service X X
1.4.4.5 4 Quality Assurance X X
1.4.4.6 4 Administrative Security X X
1.4.4.7 4 Transition to Performance Based Logistics (PBL) X X
1.4.4.8 4 Risk Mitigation X X
1.4.4.9 4 Contracts X X
1.4.4.10 4 Commercial Asset Visiblity (CAV) Reporting X X
1.4.4.11 4 Contract Data Requirements List (CDRL) Reporting X X
1.4.4.12 4 Travel X X
1.4.4.13 4 Proposal Preparation X X
1.4.5 3 Information Systems X X
1.4.6 3 Data and Technical Publications X X
1.4.7 3 Simulator/Training Device Operations and Repair X X
1.5 2 Continuing System Improvements X X
1.6 2 Installation and Personnel Support X X
Subtotal Cost X X
DD FORM 2794, MAY 2024 PREVIOUS EDITION IS OBSOLETE Page 3 of 7
11. WORK BREAKDOWN STRUCTURE (WBS) 12. COST 13. TECHNICAL DATA
a. WBS
CODE
b. WBS LEVEL c. WBS ELEMENT NAME a. ACTUALS TO
DATE (ATD)
b. LEGACY
1921-1
c. LEGACY
1921-2
d. LEGACY
1921-5
e. EAC/FAC
(See item 10d)
a. QUANTITY
b. SRDR
FORMATS
c.
MAINT. &
REPAIR
PARTS
i. QUANTITY
DATA
ii. GFE
QUANTITY
Reporting Contractor G&A X X Reporting Contractor Undistributed Budget X X Reporting Contractor Management Reserve X X Reporting Contractor FCCM X X Total Cost X X
Reporting Contractor Profit/Loss or Fee X X
Total Price X X
DD FORM 2794, MAY 2024 PREVIOUS EDITION IS OBSOLETE Page 4 of 7
14. CSDR SUBMISSION EVENTS
a.
EVENT ID
b.
DATA REPORT(S)
c.
SUBMISSION EVENT NAME
d.
REPORT CYCLE
e. AS OF DATE f. DUE DATE
(YYYYMMDD) (YYYYMMDD)
1 Cost and Hour Report (FlexFile), Quantity Data Report F-18 ACS LTC - Initial Report Initial 20270715 20270915 2 Cost and Hour Report (FlexFile), Quantity Data Report F-18 ACS LTC - Interim Report Interim 20290715 20290915 3 Cost and Hour Report (FlexFile), Quantity Data Report F-18 ACS LTC - Final Report Final 20320115 20320315
DD FORM 2794, MAY 2024 PREVIOUS EDITION IS OBSOLETE Page 5 of 7
15. REMARKS
A. In addition to the direction provided in the associated CSDR Data Item Descriptions (DIDs) and the CSDR Manual (DoDM 5000.04), the following instructions, requirements, and considerations found on this page/worksheet shall be utilized when collecting data and preparing CSDR submissions. This CSDR Contract plan is intended to capture costs associated with the contract number(s) listed in block 9.b, irrespective of contract type (e.g., firm-fixed price, cost-plus fixed fee) or CLIN structure, including Over and Above, Advance Procurement, Long Lead Materials, Multiyear Procurement, Inter-Division or Inter-Company Work Orders (IWOs), Foreign Military Sales (FMS), Warranty, etc.
B. CSDR PLAN REMARKS & PREPARATION INSTRUCTIONS 1. Costs reported against this CSDR plan shall be cumulative in nature (i.e., each submission shall report any and all costs incurred on and prior to the submission's "AS OF DATE" (block 14.e)). i. Any changes to WBS, Order/Lot, End Item, and/or Period of Performance must be reported to the government prior to submission or immediately, with revised CSDR Plan, must be approved by the CSDR Plan approval authority.
C. SUBMISSION EVENTS & DATES 1. Deliverable Preparation Instructions by AS OF and DUE Dates: All CSDR deliverable "AS OF DATE[S]" and "DUE DATE[S]" listed in blocks 14.e and 14.f are identified for planning purposes only. Submission dates are subject to change and are determined in accordance with the event drivers as identified below: i.
All "DUE DATE" requirements are equal to the "AS OF DATE" plus 60 calendar days. If the calculated "DUE DATE" does not fall on a regular business day, the "DUE DATE" will be the next regular business day on the contractor's accounting calendar. ii. "Final" Submission Events must meet both of the following two conditions: Condition 1: The final end item(s) has been delivered and accepted by the government (e.g., as evidenced by a completed DD-250) or higher tier contractor in the case of a subcontractor, and Condition 2: 95% or more of all ATD costs associated with the Subtotal, G&A and FCCOM have been incurred relative to all costs the reporting entity expects to incur for each and every Order/Lot (defined in Item 4 of Data Group B) associated with the contract Subtotal, G&A, FCCOM and UB. iii. If the Contract period of performance is extended by more than six months, or if the scope of work is modified to include work not otherwise covered by the CSDR Plan, the government may modify the CSDR Plan to require additional submission events and add additional WBS elements in order to ensure the accurate and complete collection of cost data associated with the modified contract.
D. COST & HOUR REPORT (FLEXFILE) 1. The checkmarks for EAC/FAC in column 12e at the WBS level shall be reported as "Forecast at Completion" (FAC). The Forecast At Completion (FAC) required here is not subject to the standards established in ANSI/EIA-748 guideline #27 (Estimate at Complete); therefore, the FAC does not need to be, but may be, derived from Industry Earned Value Management (EVM) processes. 2. WBS Definitions & Remarks (Data Group C) must match the technical content, cost content, and work content of each end item (see Block 17) for all WBS elements for each Cost and Hour (FlexFile) submission. The WBS Definitions & Remarks shall contain a disclosure statement detailing any differences between the CSDR reporting methodology and the reporting entity's Cost Accounting Standards. WBS Definitions & Remarks shall include a section detailing how parts are procured under this contract and any limitations of the parts procurement cost data or allocation of cost data for the WBS element. 3. The reporting entity must maintain and update WBS Definitions & Remarks throughout the life of the contract, IAW DI-FNCL-82162, if changes to the WBS occur, the reporting entity shall annotate and track changes by adding the "As of Date" of the submitted FlexFile report and indicate the changes to the WBS Definitions.
E. RESOURCE DISTRIBUTION TABLE (RDT) 1. Submissions of the Resource Distribution Table (RDT) are required under the following conditions: i. An RDT shall be delivered no later than seven calendar days before the "CSDR Readiness Review". Prepare this submission of the RDT in accordance with the RDT Instructions on the CADE website at FAC/EAC value.This copy of the RDT will be used during the "CSDR Readiness Review" in order to identify which subcontractors will be required to provide CSDR reporting via electronic submission of deliverables directly to CADE and which subcontractors may qualify for a CSDR direct reporting subcontractor waiver. ii. The contractor must notify the government program office immediately of the contractor identifying that a subcontractor who, at the time of initial subcontractor award, was not anticipated to qualify for direct subcontractor CSDR reporting via electronic submission of deliverables directly to CADE but is subsequently anticipated to meet the CSDR direct reporting subcontractor threshold value due to changes to scopes of work, end-item design, subcontractor/supplier, or subcontract price changes since initial contract award (unless the newly identified subcontractor has already been issued a subcontractor reporting waiver associated with this contract).
F. CSDR READINESS REVIEW 1. The contractor shall host a CSDR-RR with the Government's Cost Working Group Integrated Product Team (CWIPT) IAW DFARS 242.503-2(b) and DoD Manual 5000.04 (CSDR Manual). The purpose of the CSDR-RR is to review the contract's CSDR requirements and assess how the Contractor's accounting system satisfies the CSDR requirements found in DODM 5000.04 and this CSDR Plan. Reference the CADE website for instructions and additional information:
https://cade.osd.mil/csdrreportingguidance/dd2794.html 2. The contractor and CWIPT will also review the initial submission of the "Resource Distribution Table (RDT)", in order to finalize which subcontractors will be required to provide CSDR reporting and electronic submission of deliverables directly to Cost Assessment Data Enterprise (CADE), and which subcontractors may qualify for a CSDR direct reporting subcontractor waiver. 3. The CSDR-RR shall be held within 60 days of contract award or the start of work meeting on a date mutually agreed to by the CWIPT and the contractor.
DD FORM 2794, MAY 2024 PREVIOUS EDITION IS OBSOLETE Page 6 of 7
G. CONTRACT-SPECIFIC REMARKS 1. The Reporting Entity shall report the number of repairs planned and number of repairs performed per WBS element (marked in the Quantity Data column (Block 13 a. i.)) in the Quantities At Complete tab within the Quantity Data Report (QDR). 2. The date of submission #6, which is 6 months after the contract end date, can be adjusted to reflect when the contractor is able to submit a Final Report, with at least 95% of costs captured. In the event the contractor can submit a Final Report at the end of the contract end date, DCARC will OBE submission #5 in the CADE system and the contractor shall submit against the Final Report (submission #6). 3. The contractor shall identify the CLIN and Delivery Orders in the CLIN field by coding Delivery Order # underscore CLIN # on each Account to assist Delivery Order level visibility. For Example, N6AB1234_0001 where N6AB1234 is the Delivery Order Number and 0001 is the CLIN number. It is the Reporting Entity's responsibility to submit the dollars and hours in the FlexFile tagged to the appropriate Delivery Orders.
DD FORM 2794, MAY 2024 PREVIOUS EDITION IS OBSOLETE Page 7 of 7
INTRA-CONTRACT SCOPE REPORTING DEFINITION
16. ORDERS/LOTS
a. ID b. NAME c. PHASE/MILESTONE F-18 F-18 Advanced Cockpit System (ACS) LTC C-FRP
17. END ITEMS
a. ID b. NAME F-18 F-18 Advanced Cockpit System (ACS) LTC
18. UNIT/SUBLOT REPORTING AND UNIT SEQUENCING REQUIREMENTS
a. ORDER/LOT ID b. END ITEM ID c. UNIT/SUBLOT REPORTING (X if applicable)
d. UNIT SEQUENCING (X if applicable)
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
Blocks 10 - 13: Prepare the Cost and Hour Report (FlexFile) in accordance with DI-FNCL-82162 and the OSD CAPE Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-FNCL-82162, is available from the Cost Assessment Data Enterprise (CADE) website at https://cade.osd.mil/ csdrreportingguidance/dids.html. The CSDR Plan is included as a contract attachment.
The following tailoring of the DID is acceptable:
1. Data Group B - Item 4 - Additional Data Fields #1-#12 Not required.
Contractors shall be required to submit the Cost and Hour Report (FlexFile) at frequencies specified in the CAPE-approved CSDR plan. The contract CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CADE website for CAPE approval before relief is given for the date reflected in the CAPE-approved CSDR Plan.
The FlexFile shall be delivered in either a) MS Excel (.xlsx) or comma separated values (.csv) in accordance with the FlexFile & Quantity cPet-compatible templates and the DD FORM 2794, or b) JavaScript Object Notation (JSON) as described in the FlexFile File Format Specification (FFS) and Data Exchange Instructions (DEI) referenced in the FlexFile DID Requirements Section 2 and available on the CADE website at https://cade.osd.mil.
All files shall be submitted electronically using the CADE website. Data submitters must register through the CADE website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a CADE Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the CADE Portal and requesting a CSDR submitter user role. After the registration information has been verified, CAPE shall authorize the user account and requested roles. All CADE
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
Page of Pages
Subcontractor Reporting: Prime contractors shall ensure CSDR requirements contained in their prime contracts are flowed down to all subcontractors with an anticipated eventual contract value greater than $20M unless given relief by the Government. This flow down includes requiring subcontractors to electronically report directly to CAPE using the CSDR Submit-Review System.
The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to the CAPE for DDCA approval.
The Office of the Secretary of Defense (OSD) Cost Assessment & Program Evaluation (CAPE) may use a CADE management support contractor to review the data submitted under this CDRL to ensure contractual requirements are met and to facilitate distribution of the data to authorized Government users (hereinafter referred to as "the support contractor"). This data may include information that is considered a trade secret, proprietary, business sensitive, or otherwise protected pursuant to law or regulation (hereinafter referred to as “protected information”). Execution of this contract by the contractor is considered consent to CAPE's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its CADE management support contractor for the limited purpose of executing its CADE management support contract responsibilities.
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
Blocks 10 - 13: Prepare the Quantity Data Report in accordance with DI- MGMT-82164 and the OSD CAPE Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-MGMT-82164, is available from the Cost Assessment Data Enterprise (CADE) website at https://cade.osd.mil/ csdrreportingguidance/dids.html. The CSDR Plan is included as a contract attachment.
The following tailoring of the DID is acceptable:
N/A
Contractors shall be required to submit the Quantity Data Report at frequencies specified in the CAPE-approved CSDR plan. The contract CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CADE website for CAPE approval before relief is given for the date reflected in the CAPE-approved CSDR Plan.
The Quantity Date Report shall be delivered in either a) MS Excel (.xlsx) or comma separated values (.csv) in accordance with the Quantity cPet-compatible template and the DD FORM 2794 or b) JavaScript Object Notation (JSON) as described in the Quantity Data Report Format Specification (FFS) and Data Exchange Instructions (DEI) referenced in the Quantity Data Report DID Requirements Section 2 and available on the CADE website at https:// cade.osd.mil.
All files shall be submitted electronically using the CADE website. Data submitters must register through the CADE website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a CADE Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the CADE Portal and requesting a CSDR submitter user role. After the registration information has been verified, CAPE shall authorize the user account and requested roles. All CADE
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
Page of Pages
Subcontractor Reporting: Prime contractors shall ensure CSDR requirements contained in their prime contracts are flowed down to all subcontractors with an anticipated eventual contract value greater than $20M unless given relief by the Government. This flow down includes requiring subcontractors to electronically report directly to CAPE using the CSDR Submit-Review System.
The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to the CAPE for DDCA approval.
The Office of the Secretary of Defense (OSD) Cost Assessment & Program Evaluation (CAPE) may use a CADE management support contractor to review the data submitted under this CDRL to ensure contractual requirements are met and to facilitate distribution of the data to authorized Government users (hereinafter referred to as "the support contractor"). This data may include information that is considered a trade secret, proprietary, business sensitive, or otherwise protected pursuant to law or regulation (hereinafter referred to as “protected information”). Execution of this contract by the contractor is considered consent to CAPE's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its CADE management support contractor for the limited purpose of executing its CADE management support contract responsibilities.
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
| CSDR Plan and CDRLs |
| Boeing ACS LTC CSDR Plan RFP version |
| CDRL Cost and Hour Flexfile for RFP |
| CDRL_Quantity Data Report RFP |
File details come from the government source that posted it. Updated .