Att 3 Hull Info.pdf

PDF 416 KB Posted

Attached to
NAWCAD WOLF Aegis
Solicitation number
N0042125R0004
Issued by

About this file

This is a DRAFT contract structure diagram showing the 9-year AEGIS Follow-On Contract CLIN Structure. The image displays a timeline from 06-2026 through 06-2034, divided into 9 contract years, with overlapping production schedules for multiple hull systems. The diagram illustrates the execution timeline for 15 total hulls, grouped in sets of 3 (Hulls 1-3, 4-6, 7-9, 10-12, and 13-15).

Each hull group has three associated system production completion CLINs that run concurrently but staggered, with approximate 5-year performance periods for each hull. The contract includes both Level of Effort (LOE) labor CLINs and Production Completion CLINs. According to the contract statistics box, each labor CLIN has an associated ODC CLIN. The visualization demonstrates how the production schedules overlap across different hull groups throughout the 9-year contract duration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

DRAFT

File details come from the government source that posted it. Updated .