Att 2 TRSSF BCOES Specs NOT FOR CONSTRUCTION.pdf

PDF 16 MB Posted

Attached to
Construction of Training Support Squadron Facility (TRSS-F) at Langley AFB, Hampton, VA Federal contract opportunity
Solicitation number
W9123623R2002
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This notice provides details for a construction project to build a Training Squadron Support Facility at Langley Air Force Base in Hampton, Virginia. The U.S. Army Corps of Engineers-Norfolk District intends to issue a Request for Proposal for a firm-fixed-price contract to construct an eight-bay facility to support additional F-22A flight crews. The facility will include classrooms, simulators, staff space, restrooms, briefing rooms, and building systems. The project scope also encompasses utilities, site work, security features, and supporting facilities. The contract completion date will be 1064 calendar days after notice to proceed. Prospective offerors should monitor sam.gov where the RFP will be posted on or about February 17, 2023. Offerors must be registered in SAM and remain so through final payment. Preliminary plans and specifications are attached for advance review.

View the file

Other files for this federal contract opportunity

Other files attached to Construction of Training Support Squadron Facility (TRSS-F) at Langley AFB, Hampton, VA, newest first.
File Type Posted
Att 1-2of3 TRSSF BCOES Drawings NOT FOR CONSTRUCTION.pdf PDF
Att 1-3of3 TRSSF BCOES Drawings NOT FOR CONSTRUCTION.pdf PDF
Att 1-1of3 TRSSF BCOES Drawings NOT FOR CONSTRUCTION.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Training Support Squadron

Facility (TRSS-F)

Specifications

BCOES Design Submittal

January 19, 2023

Solicitation Number: F22 Formal Training Unit (FTU)

Construction Contract Number : Joint Base Langley-Eustis (JBLE)

W91236-20-F-0042 3012011031TRSSF

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 02/11 LIST OF DRAWINGS

Appendix: List of Drawings

00 22 13.00 20 02/14 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 03/20 SPECIAL CONDITIONS FOR MILCON

PROJECTS

01 14 00 11/11 WORK RESTRICTIONS

01 30 00 08/15 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 02/15 PROJECT SCHEDULE

01 33 00 08/18 SUBMITTAL PROCEDURES

Appendix: Submittal Register

01 33 29 02/17 SUSTAINABILITY REPORTING

Appendix: Sustainability Scorecard

01 35 26 11/15 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 11/16 QUALITY CONTROL

00.15

10 11/16

02/20

RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

SPECIAL INSPECTIONS

Appendix A: Schedule of Special Inspections Appendix B: Statement of Special Inspections

13.00

05/18

07/06

TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

EROSION AND SEDIMENT CONTROL

01 57 19 11/15 TEMPORARY ENVIRONMENTAL CONTROLS

Appendix: JBLE-Langley Environmental Special Conditions

01 58 00 08/19 PROJECT IDENTIFICATION

02/19

05/19

CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

CLOSEOUT SUBMITTALS

01 78 23 08/15 OPERATION AND MAINTENANCE DATA

01 78 24.00 10 05/18 FACILITY DATA REQUIREMENTS

01 91 00.15 10 05/19 TOTAL BUILDING COMMISSIONING

Appendix: Construction Phase

Commissioning Plan

DIVISION 02 - EXISTING CONDITIONS

02 41 00

05/10

DEMOLITION

DIVISION 03 - CONCRETE

03 30 00

02/19

CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00

11/15

UNIT MASONRY

DIVISION 05 - METALS

20.00

27 02/21

08/18

POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

STRUCTURAL STEEL

PROJECT TABLE OF CONTENTS Page 2

05 21 00 05/15 STEEL JOIST FRAMING

05 30 00 05/15 STEEL DECKS

05 40 00 05/15 COLD-FORMED METAL FRAMING

05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS

05 50 14 08/18 STRUCTURAL METAL FABRICATIONS

05 51 00 02/17 METAL STAIRS

05 51 33 02/16 METAL LADDERS

05 52 00 02/18 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16 ROUGH CARPENTRY

06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS AND WALL CLADDING

06 61 16 08/10 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 21 13 02/16 BOARD AND BLOCK INSULATION

07 21 16 11/11 MINERAL FIBER BLANKET INSULATION

07 22 00 02/16 ROOF AND DECK INSULATION

07 27 10.00 10 08/19 BUILDING AIR BARRIER SYSTEM

07 27 36 05/17 SPRAY FOAM AIR BARRIERS

07 41 13 05/11, CHG 4: 02/21 METAL ROOF PANELS

07 52 00 05/12 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 05/17 FLASHING AND SHEET METAL

07 84 00 05/10 FIRESTOPPING

07 92 00 08/16 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 02/10 STEEL DOORS AND FRAMES

08 14 00 08/16 WOOD DOORS

08 31 00 05/17 ACCESS DOORS AND PANELS

08 34 73 11/19 SOUND CONTROL DOOR ASSEMBLIES

08 36 19 11/11 VERTICAL LIFT DOORS

08 41 13 08/18 ALUMINUM-FRAMED ENTRANCES AND

STOREFRONTS

08 44 00 05/19 CURTAIN WALL AND GLAZED ASSEMBLIES

08 56 19 02/16 PASS WINDOWS

08 71 00 02/16 DOOR HARDWARE

Appendix: Hardware List

08 81 00 05/19 GLAZING

08 91 00 05/11 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16 GYPSUM BOARD

09 30 10 08/17 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 08/17 ACOUSTICAL CEILINGS

09 62 38 08/17 STATIC-CONTROL FLOORING

09 65 00 08/10 RESILIENT FLOORING

09 66 23 08/16 RESINOUS MATRIX TERRAZZO FLOORING

09 67 23.13 11/19 STANDARD RESINOUS FLOORING

09 68 00 11/17 CARPETING

09 69 13 11/15 RIGID GRID ACCESS FLOORING

09 70 00 09/21 PLASTIC LAMINATE CLAD PANEL WALL SYSTEM

09 71 00 09/21 WALL FINISHES

09 72 00 08/17, CHG 1: 08/18 WALLCOVERINGS

PROJECT TABLE OF CONTENTS Page 3

09 84 20 08/16 ACOUSTICAL WALL PANELS

09 90 00 05/11 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 08/17 INTERIOR SIGNAGE

10 21 13 08/17 TOILET COMPARTMENTS

10 22 39 08/17 FOLDING PANEL PARTITIONS

10 26 00 08/17 WALL AND DOOR PROTECTION

10 28 13 08/17 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

10 51 13 05/11 METAL LOCKERS

10 56 13 04/06 STEEL SHELVING

DIVISION 12 - FURNISHINGS

12 24 13 08/17 ROLLER WINDOW SHADES

12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES

12 50 00.13 10 08/17 FURNITURE AND FURNITURE INSTALLATION

12 61 13 08/17 UPHOLSTERED AUDIENCE SEATING

12 93 00 08/17 SITE FURNISHINGS

DIVISION 14 - CONVEYING EQUIPMENT

14 24 23 05/16 HYDRAULIC PASSENGER ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 05/09 WET PIPE SPRINKLER SYSTEM, FIRE

PROTECTION

DIVISION 22 - PLUMBING

22 00 00 11/15 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 15 02/14 COMMON PIPING FOR HVAC

23 05 48.00 40 08/15 VIBRATION AND SEISMIC CONTROLS FOR

23 05 93

HVAC PIPING AND EQUIPMENT

TESTING, ADJUSTING, AND BALANCING FOR

23 07 00

02/13

HVAC

THERMAL INSULATION FOR MECHANICAL

23 09 00

SYSTEMS

INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13

23 09 23

11/15 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

DIRECT DIGITAL CONTROL FOR HVAC AND

23 11 20

05/20

OTHER BUILDING CONTROL SYSTEMS

FACILITY GAS PIPING

23 21 13.00 20 04/06 LOW TEMPERATURE WATER (LTW) HEATING

23 21 23

08/17

SYSTEM

HYDRONIC PUMPS

23 23 00 10/07 REFRIGERANT PIPING

23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR

23 30 00

05/20

MECHANICAL SYSTEMS

HVAC AIR DISTRIBUTION

23 52 00 04/08 HEATING BOILERS

23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE

10 11 00 08/17 VISUAL DISPLAY UNITS

10 14 00.10 08/17 EXTERIOR SIGNAGE

PROJECT TABLE OF CONTENTS Page 4

23 64 26 08/09 CHILLED WATER PIPING SYSTEMS

23 81 00 05/18 DECENTRALIZED UNITARY HVAC EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 11/17 CYBERSECURITY FOR FACILITY-RELATED

HVAC CONTROL SYSTEMS

25 05 11.02 11/17 CYBERSECURITY FOR FACILITY-RELATED

FIRE ALARM CONTROL SYSTEMS

25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM

TESTING

25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM

(UMCS) FRONT END AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 08 00 08/08 APPARATUS INSPECTION AND TESTING

26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM

26 24 13 05/15 SWITCHBOARDS

Appendix: AMRS Meter Specifications

26 29 23 02/20 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY

(UPS)

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 08/09 CATHODIC PROTECTION SYSTEM

(SACRIFICIAL ANODE)

26 51 00 05/20 INTERIOR LIGHTING

26 56 00 05/20 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

Appendix: JBLE-Langley Telecommunication Building Cabling Systems

27 40 10 10/20 AUDIO-VISUAL GENERAL

27 40 90.01 11/20 AUDIO-VISUAL PERFORMANCE VERIFICATION

27 41 05 11/20 AUDIO-VISUAL EQUIPMENT ENCLOSURES AND

TECHNICAL FURNITURE

27 41 06 11/20 AUDIO-VISUAL POWER DISTRIBUTION AND

MANAGEMENT EQUIPMENT

27 41 10 11/20 MICROPHONES, CONFERENCING SYSTEM, AND

AUDIO SOURCE EQUIPMENT

27 41 11 11/20 AUTOMATED MIXING, PROCESSING AND

AMPLIFICATION EQUIPMENT

27 41 13 11/20 REINFORCEMENT AND PROGRAM AUDIO

LOUDSPEAKERS

27 41 23 11/20 VIDEO DISPLAY EQUIPMENT

27 41 26 11/20 PROJECTION SCREENS

27 41 31 11/20 AUDIO-VISUAL CONTROL SYSTEMS AND

PROGRAMMING

27 41 32 11/20 AUDIO-VISUAL NETWORK EQUIPMENT

27 41 40 11/20 AUDIO-VISUAL CABLING AND CONNECTORS.

27 51 16 05/20 PUBLIC ADDRESS SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 08/11 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM

PROJECT TABLE OF CONTENTS Page 5

DIVISION 31 - EARTHWORK

31 00 00 08/08 EARTHWORK

31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK

31 11 00 11/18 CLEARING AND GRUBBING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT

32 05 33 08/17 LANDSCAPE ESTABLISHMENT

32 11 23 08/17 AGGREGATE BASE COURSES

32 12 13 05/17 BITUMINOUS TACK COAT

32 12 16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR

SITE FACILITIES INCLUDING SIGNAGE

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 31 13.53 02/20 ORNAMENTAL FENCE AND GATES

32 92 23 04/06 SODDING

32 93 00 08/17 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 32 16 11/19 PACKAGED UTILITY WASTEWATER PUMPING

STATIONS

33 40 00 02/10 STORM DRAINAGE UTILITIES

33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

See List of Drawings attached to this specification section.

1.3 SUPPLEMENTARY DATA

These supplementary Data may not be a part of the contract but are included for information.

1.3.1 Boring Logs

The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.

Subsurface data, not specified or indicated, have been obtained by the Government at this station.

1.3.2 Subsurface Data

The soils report is included as part of the solicitation.

00 01 15 LIST DRAWINGS APPENDIX

-- End of Document --

DOCUMENT 00 01 15 Page 1

COORD_SHEET INDEX FOR EXCEL

SHEET NUMBER SHEET NAME

00. GENERAL

G-001 COVER SHEET

G-002 SHEET INDEX

G-003 BUILDING AND LIFE SAFETY CODE EVALUATION

G-004 OCCUPANT LOAD ROOM SCHEDULES

GS101 CODE COMPLIANCE SITE PLAN

G-101 FIRST FLOOR LIFE SAFETY PLAN - OVERALL

G-102 SECOND FLOOR LIFE SAFETY PLAN - OVERALL

00. GENERAL: 7

02. SURVEY AND MAPPING

V-001 LEGENDS AND NOTES

VF100 OVERALL EXISTING CONDITIONS

VF101 EXISTING CONDITIONS

VF102 EXISTING CONDITIONS

02. SURVEY AND MAPPING: 4

04.CIVIL

C-001 LEGEND AND GENERAL NOTES

C-002 CONSTRUCTION ACCESS PLAN

C-003 EROSION AND SEDIMENT CONTROL PLAN INITIAL

C-004 EROSION AND SEDIMENT CONTROL PLAN FINAL

CD001 DEMOLITION LEGEND & NOTES

CD100 EXISTING CONDITIONS - OVERALL

CD101 EXISTING CONDITIONS AND DEMOLITION PLAN

CD102 EXISTING CONDITIONS AND DEMOLITION PLAN

CD103 EXISTING CONDITIONS, EROSION CONTROL AND DEMOLITION PLAN - OFFSITE

CS001 SITE LAYOUT LEGEND & CONTROL POINTS

CS101 SITE LAYOUT PLAN

CS102 SITE LAYOUT PLAN

CS103 SITE LAYOUT PLAN - OFFSITE

CS104 OVERALL JOINTING PLAN

CS401 ENLARGED JOINTING PLANS

CG001 GRADING LEGEND, STORM SCHEDULES & NOTES

CG101 GRADING PLAN

CG102 GRADING PLAN

CG103 GRADING PLAN - OFFSITE

CG201 STORM SEWER PROFILES

CG202 STORM SEWER PROFILES

CG203 STORM SEWER PROFILES

CG204 STORM SEWER PROFILES

CG205 STORM SEWER PROFILES

CG700 POST DEVELOPMENT DRAINAGE AREAS

CG701 STORMWATER MANAGEMENT CALCULATIONS

CG702 STORMWATER MANAGEMENT CALCULATIONS

CU001 UTILITY LEGEND, CONTROL POINTS & SCHEDULES

CU101 UTILITY PLAN

CU102 UTILITY PLAN

CU201 UTILITY PROFILES

CU202 UTILITY PROFILES

CU203 UTILITY PROFILES

C-501 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

RoseborS Text Box Appendix to 00 01 15 - List of Drawings

C-502 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-503 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-504 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-505 EROSION AND SEDIMENT CONTROL DETAILS

C-506 DETAILS

C-507 DETAILS

C-508 DETAILS

C-509 DETAILS

C-510 DETAILS

C-511 DETAILS

C-512 DETAILS

C-513 DETAILS

C-514 DETAILS

C-515 DETAILS

C-516 DETAILS

C-517 DETAILS

C-518 DETAILS

C-519 DETAILS

C-520 DETAILS

C-521 DETAILS

04.CIVIL: 54

05. LANDSCAPE

L-101 LANDSCAPE PLAN

L-102 LANDSCAPE PLAN

L-103 LANDSCAPE PLAN

L-104 LANDSCAPE PLAN

L-105 LANDSCAPE PLAN

L-501 LANDSCAPE DETAILS

05. LANDSCAPE: 6

06. STRUCTURAL

S-001 GENERAL STRUCTURAL NOTES - 1

S-002 GENERAL STRUCTURAL NOTES - 2

S-003 GENERAL STRUCTURAL NOTES - 3

S-004 GENERAL STRUCTURAL NOTES - 4

S-005 GENERAL STRUCTURAL NOTES - 5

S-101 FOUNDATION PLAN - OVERALL

S101A FOUNDATION PLAN - AREA A

S101B FOUNDATION PLAN - AREA B

S101C FOUNDATION PLAN - AREA C

S101D FOUNDATION PLAN - AREA D

S-102 SECOND FLOOR FRAMING PLAN - OVERALL

S102A SECOND FLOOR FRAMING PLAN - AREA A

S102B SECOND FLOOR FRAMING PLAN - AREA B

S102C SECOND FLOOR FRAMING PLAN - AREA C

S-103 ROOF FRAMING PLAN - OVERALL

S103A ROOF FRAMING PLAN - AREA A

S103B ROOF FRAMING PLAN - AREA B

S103C ROOF FRAMING PLAN - AREA C

S103D ROOF FRAMING PLAN - AREA D

S-201 LATERAL RESISTING SYSTEM ELEVATIONS - 1

S-202 LATERAL RESISTING SYSTEM ELEVATIONS - 2

S-203 LATERAL RESISTING SYSTEM ELEVATIONS - 3

S-204 LATERAL RESISTING SYSTEM ELEVATIONS - 4

S-301 FOUNDATION SECTIONS - 1

S-302 FOUNDATION SECTIONS - 2

S-303 FOUNDATION SECTIONS - 3

S-321 SECOND FLOOR FRAMING SECTIONS - 1

S-322 SECOND FLOOR FRAMING SECTIONS - 2

S-323 SECOND FLOOR FRAMING SECTIONS - 3

S-331 ROOF FRAMING SECTIONS - 1

S-332 ROOF FRAMING SECTIONS - 2

S-333 ROOF FRAMING SECTIONS - 3

S-334 ROOF FRAMING SECTIONS - 4

S-401 ENLARGED FRAMING PLANS

S-402 ENLARGED STAIR PLAN AND SECTIONS

S-403 ENLARGED CANOPY PLANS AND SECTIONS

S-404 ENLARGED MECH UNIT PLAN AND SECTIONS

S-405 ENLARGED CMU STAIR TOWER PLANS

S-406 ENLARGED BREAK AREA CANOPY PLAN AND SECTIONS

S-407 ENLARGED SITE SLAB PLANS AND SECTIONS

S-501 FOUNDATION DETAILS

S-502 MASONRY DETAILS

S-511 STEEL DETAILS - 1

S-512 STEEL DETAILS - 2

S-513 STEEL DETAILS - 3

S-601 SCHEDULES - 1

S-602 SCHEDULES - 2

S-603 SCHEDULES - 3

S-901 3D ISOMETRICS

06. STRUCTURAL: 49

07. ARCHITECTURAL

A-001 GENERAL NOTES

A-002 PARTITION TYPES

A-003 ACOUSTIC PENETRATION DETAILS

AS101 ARCHITECTURAL SITE PLAN

AS401 ENLARGED SITE PLANS

AS402 SITE DETAILS

A-101 FIRST FLOOR PLAN - OVERALL

A101A FIRST FLOOR PLAN - AREA A

A101B FIRST FLOOR PLAN - AREA B

A101C FIRST FLOOR PLAN - AREA C

A101D FIRST FLOOR PLAN - AREA D

A-102 SECOND FLOOR PLAN - OVERALL

A102A SECOND FLOOR PLAN - AREA A

A102B SECOND FLOOR PLAN - AREA B

A102C SECOND FLOOR PLAN - AREA C

A-103 ROOF PLAN - OVERALL

A103A ROOF PLAN - AREA A

A-104 FIRST FLOOR REFLECTED CEILING PLAN - OVERALL

A104A FIRST FLOOR REFLECTED CEILING PLAN - AREA A

A104B FIRST FLOOR REFLECTED CEILING PLAN - AREA B

A104C FIRST FLOOR REFLECTED CEILING PLAN - AREA C

A104D FIRST FLOOR REFLECTED CEILING PLAN - AREA D

A-105 SECOND FLOOR REFLECTED CEILING PLAN - OVERALL

A105A SECOND FLOOR REFLECTED CEILING PLAN - AREA A

A105B SECOND FLOOR REFLECTED CEILING PLAN - AREA B

A105C SECOND FLOOR REFLECTED CEILING PLAN - AREA C

A-141 FIRST FLOOR AIR BARRIER PLAN

A-142 SECOND FLOOR AIR BARRIER PLAN

A-143 AIR BARRIER SECTIONS

A-201 EXTERIOR BUILDING ELEVATIONS

A-202 EXTERIOR BUILDING ELEVATIONS

A-203 EXTERIOR BUILDING ELEVATIONS

A-204 EXTERIOR BUILDING ELEVATIONS

A-205 EXTERIOR BUILDING ELEVATIONS

A-301 BUILDING SECTIONS

A-302 BUILDING SECTIONS

A-303 BUILDING SECTIONS

A-304 BUILDING SECTIONS

A-305 BUILDING SECTIONS

A-306 BUILDING SECTIONS

A-307 BUILDING SECTIONS

A-308 BUILDING SECTIONS

A-311 WALL SECTIONS

A-312 WALL SECTIONS

A-313 WALL SECTIONS

A-314 WALL SECTIONS

A-315 WALL SECTIONS

A-316 WALL SECTIONS

A-317 WALL SECTIONS

A-318 WALL SECTIONS

A-319 WALL SECTIONS

A-401 ENLARGED PLANS AND INTERIOR ELEVATIONS

A-402 ENLARGED PLANS AND INTERIOR ELEVATIONS

A-403 ENLARGED PLANS AND INTERIOR ELEVATIONS

A-404 ENLARGED PLANS AND INTERIOR ELEVATIONS

A-405 ENLARGED PLAN ROOM 221

A-406 ENLARGED RCP ROOM 221

A-407 INTERIOR ELEVATIONS AND SECTION ROOM 221

A-408 MISCELLANEOUS CASEWORK ELEVATIONS AND SECTIONS

A-409 ENLARGED LOBBY PLAN AND INTERIOR ELEVATIONS

A-410 ENLARGED CANOPY PLANS, SECTIONS AND DETAILS

A-411 EXTERIOR WALL DETAILS

A-421 ABA MOUNTING HEIGHTS

A-451 STAIR 163 PLANS AND SECTION

A-452 STAIR 138 AND 152 PLANS AND SECTION

A-453 STAIR 163 AND 138 DETAILS

A-454 MEZZANINE STAIR PLAN, SECTION AND DETAILS

A-455 STAIR 107 DETAILS

A-456 STAIR 107 DETAILS

A-461 VERTICAL CIRCULATION - ELEVATOR PLANS, SECTIONS & DETAILS

A-501 CEILING AND RAISED ACCESS FLOORING DETAILS

A-521 LIGHT WEIGHT CAST STONE ROOF DETAILS

A-522 ROOF DETAILS

A-523 WALL SECTION DETAILS

A-524 WALL SECTION DETAILS

A-525 MISCELANEOUS DETAILS

A-531 VERTICAL RETRACTABLE PARTITION DETAILS

A-601 DOOR SCHEDULE

A-602 DOOR HEAD, JAMB AND SILL DETAILS

A-603 INTERIOR WINDOW AND STOREFRONT TYPES

07. ARCHITECTURAL: 80

08. INTERIORS

I101A FIRST FLOOR INTERIOR FINISH PLAN - AREA A

I101B FIRST FLOOR INTERIOR FINISH PLAN - AREA B

I101C FIRST FLOOR INTERIOR FINISH PLAN - AREA C

I101D FIRST FLOOR INTERIOR FINISH PLAN - AREA D

I102A SECOND FLOOR INTERIOR FINISH PLAN - AREA A

I102B SECOND FLOOR INTERIOR FINISH PLAN - AREA B

I102C SECOND FLOOR INTERIOR FINISH PLAN - AREA C

I-131 WALL PATTERN PLANS AND DETAILS

I-132 INTERIOR DETAILS

I-133 INTERIOR DETAILS

I-601 INTERIOR FINISH LEGEND AND DETAILS

I-602 INTERIOR ROOM FINISH SCHEDULE

IG101A FIRST FLOOR SIGNAGE PLAN - AREA A

IG101B FIRST FLOOR SIGNAGE PLAN - AREA B

IG101C FIRST FLOOR SIGNAGE PLAN - AREA C

IG101D FIRST FLOOR SIGNAGE PLAN - AREA D

IG102A SECOND FLOOR SIGNAGE PLAN - AREA A

IG102B SECOND FLOOR SIGNAGE PLAN - AREA B

IG102C SECOND FLOOR SIGNAGE PLAN - AREA C

IG401 SIGNAGE ELEVATIONS AND DETAILS

IG601 SIGNAGE SCHEDULE

IF100 GFGI FURNITURE SCHEDULE AND NOTES

IF101 FIRST FLOOR INTERIOR FURNITURE PLAN - OVERALL

IF101A FIRST FLOOR INTERIOR FURNITURE PLAN - AREA A

IF101B FIRST FLOOR INTERIOR FURNITURE PLAN - AREA B

IF101C FIRST FLOOR INTERIOR FURNITURE PLAN - AREA C

IF101D FIRST FLOOR INTERIOR FURNITURE PLAN - AREA D

IF102 SECOND FLOOR INTERIOR FURNITURE PLAN - OVERALL

IF102A SECOND FLOOR INTERIOR FURNITURE PLAN - AREA A

IF102B SECOND FLOOR INTERIOR FURNITURE PLAN - AREA B

IF102C SECOND FLOOR INTERIOR FURNITURE PLAN - AREA C

IF501 VISUAL DISPLAY DETAILS

IF601 FURNITURE SCHEDULE AND NOTES

IF602 FURNITURE SCHEDULE AND NOTES

08. INTERIORS: 34

10. FIRE PROTECTION

FA001 FIRE ALARM NOTES, LEGENDS, DETAILS & OPERATIONS MATRIX

FA002 FIRE ALARM OPERATIONS MATRIX (RFMCP)

FA003 FIRE ALARM / MASS NOTIFICATION SYSTEM RISER DIAGRAM

FA101 FIRST FLOOR FIRE ALARM PLAN - OVERALL

FA101A FIRST FLOOR FIRE ALARM PLAN - AREA A

FA101B FIRST FLOOR FIRE ALARM PLAN - AREA B

FA101C FIRST FLOOR FIRE ALARM PLAN - AREA C

FA101D FIRST FLOOR FIRE ALARM PLAN - AREA D

FA102 SECOND FLOOR FIRE ALARM PLAN - OVERALL

FA102A SECOND FLOOR FIRE ALARM PLAN - AREA A

FA102B SECOND FLOOR FIRE ALARM PLAN - AREA B

FA102C SECOND FLOOR FIRE ALARM PLAN - AREA C

FX001 FIRE SPRINKLER NOTES, LEGEND AND DETAILS

FX101 FIRST FLOOR FIRE SPRINKLER PLAN - OVERALL

FX101A FIRST FLOOR FIRE SPRINKLER PLAN - AREA A

FX101B FIRST FLOOR FIRE SPRINKLER PLAN - AREA B

FX101C FIRST FLOOR FIRE SPRINKLER PLAN - AREA C

FX101D FIRST FLOOR FIRE SPRINKLER PLAN - AREA D

FX102 SECOND FLOOR FIRE SPRINKLER PLAN - OVERALL

FX102A SECOND FLOOR FIRE SPRINKLER PLAN - AREA A

FX102B SECOND FLOOR FIRE SPRINKLER PLAN - AREA B

FX102C SECOND FLOOR FIRE SPRINKLER PLAN - AREA C

10. FIRE PROTECTION: 22

11. PLUMBING

P-001 PLUMBING GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

P-101 FIRST FLOOR PRESSURE PIPING PLAN - OVERALL

P101A FIRST FLOOR PRESSURE PIPING PLAN - AREA A

P101B FIRST FLOOR PRESSURE PIPING PLAN - AREA B

P101C FIRST FLOOR PRESSURE PIPING PLAN - AREA C

P101D FIRST FLOOR PRESSURE PIPING PLAN - AREA D

P-102 SECOND FLOOR PRESSURE PIPING PLAN - OVERALL

P102B SECOND FLOOR PRESSURE PIPING PLAN - AREA B

P102C SECOND FLOOR PRESSURE PIPING PLAN - AREA C

P-111 FIRST FLOOR DRAIN WASTE VENT PIPING PLAN - OVERALL

P111A FIRST FLOOR DRAIN WASTE VENT PIPING PLAN - AREA A

P111B FIRST FLOOR DRAIN WASTE VENT PIPING PLAN - AREA B

P111C FIRST FLOOR DRAIN WASTE VENT PIPING PLAN - AREA C

P111D FIRST FLOOR DRAIN WASTE VENT PIPING PLAN - AREA D

P-112 SECOND FLOOR DRAIN WASTE VENT PIPING PLAN - OVERALL

P112A SECOND FLOOR DRAIN WASTE VENT PIPING PLAN - AREA A

P112B SECOND FLOOR DRAIN WASTE VENT PIPING PLAN - AREA B

P112C SECOND FLOOR DRAIN WASTE VENT PIPING PLAN - AREA C

P-121 ROOF DRAIN WASTE VENT PIPING PLAN - OVERALL

P121A ROOF DRAIN WASTE VENT PIPING PLAN - AREA A

P121B ROOF DRAIN WASTE VENT PIPING PLAN - AREA B

P121C ROOF DRAIN WASTE VENT PIPING PLAN - AREA C

P121D ROOF DRAIN WASTE VENT PIPING PLAN - AREA D

P-401 PLUMBING ENLARGED PLANS

P-402 PLUMBING ENLARGED PLANS

P-403 PLUMBING ENLARGED PLANS

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-701 PLUMBING SCHEDULES

P-901 PRESSURE PIPING RISER DIAGRAM - AREA A AND B

P-902 PRESSURE PIPING RISER DIAGRAM - AREA C AND D

P-903 ENLARGED PRESSURE PIPING RISER DIAGRAMS

P-904 DWV RISER DIAGRAM- AREA A, B, AND C

P-905 ENLARGED DWV RISER DIAGRAMS

11. PLUMBING: 34

13. MECHANICAL

M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

MD101 HVAC DEMOLITION PLAN GEO WELLS

MS100 MECHANICAL SITE PLAN

MS101 MECHANICAL YARD PLAN

M-101 FIRST FLOOR HVAC PLAN - OVERALL

M101A FIRST FLOOR HVAC PLAN - AREA A

M101B FIRST FLOOR HVAC PLAN - AREA B

M101C FIRST FLOOR HVAC PLAN - AREA C

M101D FIRST FLOOR HVAC PLAN - AREA D

M111A FIRST FLOOR AIRFLOW PLAN - AREA A

M111B FIRST FLOOR AIRFLOW PLAN - AREA B

M111C FIRST FLOOR AIRFLOW PLAN - AREA C

M111D FIRST FLOOR AIRFLOW PLAN - AREA D

M-102 SECOND FLOOR HVAC PLAN - OVERALL

M102A SECOND FLOOR HVAC PLAN - AREA A

M102B SECOND FLOOR HVAC PLAN - AREA B

M102C SECOND FLOOR HVAC PLAN - AREA C

M112A SECOND FLOOR AIRFLOW PLAN - AREA A

M112B SECOND FLOOR AIRFLOW PLAN - AREA B

M112C SECOND FLOOR AIRFLOW PLAN - AREA C

MP101 FIRST FLOOR HVAC PIPING PLAN - OVERALL

MP101A FIRST FLOOR HVAC PIPING PLAN - AREA A

MP101B FIRST FLOOR HVAC PIPING PLAN - AREA B

MP101C FIRST FLOOR HVAC PIPING PLAN - AREA C

MP101D FIRST FLOOR HVAC PIPING PLAN - AREA D

MP102 SECOND FLOOR HVAC PIPING PLAN - OVERALL

MP102A SECOND FLOOR HVAC PIPING PLAN - AREA A

MP102B SECOND FLOOR HVAC PIPING PLAN - AREA B

MP102C SECOND FLOOR HVAC PIPING PLAN - AREA C

M-103 ROOF HVAC & PIPING PLAN

M-401 HVAC ENLARGED PLANS

M-402 MECHANICAL SECTIONS

M-403 MECHANICAL SECTIONS

M-404 MECHANICAL SECTIONS

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-603 MECHANICAL SCHEDULES

M-801 MECHANICAL CONTROLS SCHEMATICS

M-802 MECHANICAL CONTROLS SCHEMATICS

M-803 MECHANICAL CONTROLS SCHEMATICS

M-804 MECHANICAL CONTROLS SCHEMATICS

M-805 MECHANICAL CONTROLS SCHEMATICS

13. MECHANICAL: 45

14. ELECTRICAL

E-001 ELECTRICAL LEGEND, GENERAL NOTES AND ABBREVIATIONS

ES100 ELECTRICAL SITE KEY PLAN

ED101 ELECTRICAL SITE DEMOLITION PLAN

ED102 ELECTRICAL SITE DEMOLITION PLAN

ED103 ELECTRICAL SITE DEMOLITION PLAN

ES101 ELECTRICAL SITE PLAN

ES102 ELECTRICAL SITE PLAN

ES103 ELECTRICAL SITE PLAN

ES104 ELECTRICAL SITE PLAN

ES105 ELECTRICAL SITE PLAN

ES106 CATHODIC PROTECTION SITE PLAN

ES401 ELECTRICAL SITE ENLARGED PLANS

ES501 ELECTRICAL SITE DETAILS

ES502 ELECTRICAL SITE DETAILS

ES503 ELECTRICAL SITE DETAILS

ES504 ELECTRICAL SITE DETAILS

ES701 ELECTRICAL SITE DEMOLITION SINGLE LINE DIAGRAM

ES702 ELECTRICAL SITE SINGLE LINE DIAGRAM

EG101 LIGHTNING PROTECTION SYSTEM PLAN

EG501 LIGHTNING PROTECTION SYSTEM DETAILS

EL101A FIRST FLOOR LIGHTING PLAN - AREA A

EL101B FIRST FLOOR LIGHTING PLAN - AREA B

EL101C FIRST FLOOR LIGHTING PLAN - AREA C

EL101D FIRST FLOOR LIGHTING PLAN - AREA D

EL102A SECOND FLOOR LIGHTING PLAN - AREA A

EL102B SECOND FLOOR LIGHTING PLAN - AREA B

EL102C SECOND FLOOR LIGHTING PLAN - AREA C

EL501 LIGHTING DETAILS

EL502 LIGHTING DETAILS

EL503 LIGHTING DETAILS - PLATES

EL504 LIGHTING DETAILS - PLATES

EL601 LUMINAIRE SCHEDULE AND ENLARGED MEZZANINE PLANS

EP101A FIRST FLOOR POWER PLAN - AREA A

EP101B FIRST FLOOR POWER PLAN - AREA B

EP101C FIRST FLOOR POWER PLAN - AREA C

EP101D FIRST FLOOR POWER PLAN - AREA D

EP102A SECOND FLOOR POWER PLAN - AREA A

EP102B SECOND FLOOR POWER PLAN - AREA B

EP102C SECOND FLOOR POWER PLAN - AREA C

EP103 ROOF POWER PLAN - OVERALL

EP401 ENLARGED PLANS - ELECTRICAL ROOMS AND ELEVATED MEZZANINE

EP402 ENLARGED PLANS - UPS ROOMS

EP403 ENLARGED PLANS - TELECOMMUNICATIONS ROOMS

EP501 ELECTRICAL DETAILS

EP502 ELECTRICAL DETAILS

EP601 MECHANICAL EQUIPMENT SCHEDULE

EP602 PANELBOARD SCHEDULES

EP603 PANELBOARD SCHEDULES

EP604 PANELBOARD SCHEDULES

EP605 PANELBOARD SCHEDULES

EP606 PANELBOARD SCHEDULES

EP607 PANELBOARD SCHEDULES

EP608 PANELBOARD SCHEDULES

EP701 ELECTRICAL SINGLE-LINE DIAGRAM

EP702 ELECTRICAL UPS SUBSYSTEM DIAGRAM

14. ELECTRICAL: 55

16. TELECOMMUNICATIONS

T-001 TELECOMMUNICATIONS LEGEND, GENERAL NOTES AND ABBREVIATIONS

TS100 TELECOMMUNICATIONS SITE KEY PLAN

TD101 TELECOMMUNICATIONS SITE DEMOLITION PLAN

TS101 TELECOMMUNICATIONS SITE PLAN

TS102 TELECOMMUNICATIONS SITE PLAN

TS103 TELECOMMUNICATIONS SITE PLAN

TS104 TELECOMMUNICATIONS SITE PLAN

TS105 TELECOMMUNICATIONS SITE PLAN

TS501 TELECOMMUNICATIONS SITE DETAILS

TS502 TELECOMMUNICATIONS SITE DETAILS

T-101Z FIRST FLOOR TELECOMMUNICATIONS SERVING ZONES

T-101A FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA A

T-101B FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA B

T-101C FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA C

T-101D FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA D

T-102Z SECOND FLOOR TELECOMMUNICATIONS SERVING ZONES

T-102A SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA A

T-102B SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA B

T-102C SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA C

T-201 TELECOMMUNICATIONS ELEVATIONS - COMM 104

T-202 TELECOMMUNICATIONS ELEVATIONS - COMM 129

T-203 TELECOMMUNICATIONS ELEVATIONS - IIQC 260

T-401 ENLARGED TELECOMMUNICATIONS PLANS - COMM ROOMS

T-402 ENLARGED TELECOMMUNICATIONS PLANS - SERVER ROOMS

T-403 ENLARGED PLAN - CABLE TRAY IN TRENCH AND UNDER RAF

T-404 ENLARGED PLAN - IIQC SECURE AREA LAN/SERVER ROOMS

T-501 TELECOMMUNICATIONS DETAILS

T-502 TELECOMMUNICATIONS DETAILS

T-503 TELECOM GROUNDING DETAILS

T-701 TELECOMMUNICATIONS RISER DIAGRAMS

T-702 TELECOMMUNICATIONS RISER DIAGRAMS

16. TELECOMMUNICATIONS: 31

17. SECURITY

X-001 SECURITY LEGEND AND ABBREVIATIONS

X-002 SECURITY GENERAL NOTES AND SCHEDULES

X-101 FIRST FLOOR SECURITY PLAN - OVERALL

X-101A FIRST FLOOR SECURITY PLAN - AREA A

X-101B FIRST FLOOR SECURITY PLAN - AREA B

X-101C FIRST FLOOR SECURITY PLAN - AREA C

X-101D FIRST FLOOR SECURITY PLAN - AREA D

X-102 SECOND FLOOR SECURITY PLAN - OVERALL

X-102A SECOND FLOOR SECURITY PLAN - AREA A

X-102B SECOND FLOOR SECURITY PLAN - AREA B

X-102C SECOND FLOOR SECURITY PLAN - AREA C

X-501 SECURITY DETAILS

X-502 CCTV DETAILS

X-503 CONDUIT MOUNTING ON PARTITION DETAILS

X-504 CONDUIT MOUNTING ON PARTITION DETAILS

X-505 CONDUIT MOUNTING ON PARTITION DETAILS

X-506 CONDUIT MOUNTING ON PARTITION DETAILS

X-507 CONDUIT MOUNTING ON PARTITION DETAILS

X-701 SECURITY RISER DIAGRAMS

17. SECURITY: 19

18.AUDIO VISUAL

TA001 AUDIO VISUAL LEGEND, GENERAL NOTES AND ABBREVIATIONS

TA101A FIRST FLOOR AUDIO VISUAL PLAN - AREA A

TA101B FIRST FLOOR AUDIO VISUAL PLAN - AREA B

TA101C FIRST FLOOR AUDIO VISUAL PLAN - AREA C

TA101D FIRST FLOOR AUDIO VISUAL PLAN - AREA D

TA102A SECOND FLOOR AUDIO VISUAL PLAN - AREA A

TA102B SECOND FLOOR AUDIO VISUAL PLAN - AREA B

TA102C SECOND FLOOR AUDIO VISUAL PLAN - AREA C

TA201A FIRST FLOOR AUDIO VISUAL RCP - AREA A

TA201D FIRST FLOOR AUDIO VISUAL RCP - AREA D

TA202B SECOND FLOOR AUDIO VISUAL RCP - AREA B

TA202C SECOND FLOOR AUDIO VISUAL RCP - AREA C

TA400 AUDIO VISUAL ELEVATIONS

TA401 AUDIO VISUAL ELEVATIONS

TA501 AUDIO VISUAL DETAILS

TA601 AUDIO VISUAL FUNCTIONAL DIAGRAMS

TA602 AUDIO VISUAL FUNCTIONAL DIAGRAMS

TA603 AUDIO VISUAL FUNCTIONAL DIAGRAMS

TA604 AUDIO VISUAL FUNCTIONAL DIAGRAMS

TA605 AUDIO VISUAL FUNCTIONAL DIAGRAMS

18.AUDIO VISUAL: 20

Grand total: 460

F22 FTU, Training Support Squadron Facility

Joint Base Langley-Eustis (JBLE)

00 22 13.00 20

SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

OFFEROR’S NAME:

CONTRACT LINE ITEM SCHEDULE

CLIN Description Unit Unit

Amount

Base Proposal

0001 All work, labor, materials, and equipment required to construct the Training Support Squadron Facility (TRSS-

F), including all building related construction within the 5’ line, complete as prescribed in the construction documents excluding work described in all other CLINs.

Source of funding is MILCON.

LS

0002 All work, labor, materials, and equipment required to construct the TRSS-F site improvements, including all construction outside of the 5’ line, complete as prescribed in the construction documents excluding work described in all other CLINs.

0003 All work, labor, materials, and equipment by Dominion Energy required to construct electrical service to the new TRSS-F facility, including the 35kV pad-mounted switch, building pad-mounted transformer, 35kV conductors and terminations, and the connection to the existing JBLE 34.5kV electrical distribution system, complete as prescribed in the in the construction documents excluding work described in all other

CLINs.

0004 All work, labor, materials, and equipment required to construct natural gas service to the new TRSS-F facility by

Virginia Natural Gas, including the distribution system to the new facility, the meter, the regulator, and all connection fees, complete as prescribed in the in the construction documents excluding work described in all other CLINs.

0005 Provide unit price for all work, labor, materials, and equipment required to dispose and replace any unsatisfactory soils, complete as prescribed in the construction documents, excluding work described in all other CLINs. Option to be exercised within 365 days of contract Notice To Proceed in accordance with FAR 52.217-7.

For bidding purposes Offeror shall assume 1 lot equals 250CY and a total quantity of 1 Lot.

lot

CLIN Description Unit Unit

Amount

Total Base

0006 Bid Option 1

All work, labor, materials, and equipment required to furnish and install Audio-Visual (AV) Equipment complete as prescribed in the construction documents excluding work described in all other CLINs. Option to be exercised within 365 days of contract Notice To Proceed in accordance with FAR 52.217-7.

Source of funding is NON-MILCON.

0007 BID OPTION 2

All work, labor, materials, and equipment required to furnish and install Fixtures, Furniture and Equipment (FF&E) complete as prescribed in the construction documents excluding work described in all other CLINs. Option to be exercised within

365 days of contract Notice To Proceed in accordance with FAR

52.217-7.

Source of funding is NON-MILCON.

0008 BID OPTION 3

All work, labor, materials, and equipment required to construct Offsite Communications improvements from connection point at HH179E (including structure HH179E) to Building 330, with exception of 24 Strand Single Mode Fiber Option cable from TRSS-F to telcon room inside Bldg 330 (24 Strand FO Cable is base bid) complete as prescribed in the construction documents excluding work described in all other CLINs. Option to be exercised within 365 days of contract Notice To Proceed in accordance with FAR 52.217-7.

0009 BID OPTION 4

Provide unit price for all work, labor, materials, and equipment required to dispose any other-than-clean soil complete as prescribed in the construction documents, including but not limited to specification section 01 57 19

Temporary Environmental Controls 01 57 19 ATTACHMENT JBLE-

Langley Environmental Special Conditions para 1.1.2.2, excluding work described in all other CLINs. Option to be exercised within 365 days of contract Notice To Proceed in accordance with FAR 52.217-7.

For bidding purposes Offeror shall assume 1 lot equals 250CY and a total quantity of 1 Lot.

Unit Price for each Lot

Lot

TOTAL BASE AMOUNT (CLINS 0001, 0002, 0003,

0004, 0005)

TOTAL NON-MILCON OPTIONS (CLINS 0006, 0007)

CLIN Description Unit Unit

Amount

TOTAL MILCON OPTIONS (CLINS 0008, 0009)

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item

(CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items including unit prices and options of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.

NOTE NO. 3. The Offeror’s Base Bid and all Options will be evaluated. In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

End of Section

SECTION 01 11 00

SPECIAL CONDITIONS

FOR MILCON PROJECTS

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

"G, AE" code is applied where Architect/Engineer review and approval is required. "G, RO" code is applied where government Resident Office review and approval is required. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to this section. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Material Safety Data Sheets (MSDS)

Recycling Report

Trip tickets

Affirmative Procurement Report

Exemption Form, Annex B to LAFB Affirmative Procurement Plan 32-7080

All Employee Names and Social Security Numbers

Work Clearance Request (Air Force Form 103)

Quality Control (QC) Report

SD-11 Closeout Submittals

Survey Report

Metadata

Deliverables and Final As-Builts

Three copies of Computer-Aided Drafting and Design (CADD) digital final as-built drawings on CD's

"Redline" As-Built Drawings

Warranty of Construction

Equipment Warranty Certificate

SECTION 01 11 00 Page 1

Equipment Warranty/Guarantee Records

DD Form 1354 Acceptance and Transfer of Real Property Facilities

1.1.1 Submittal Procedures

1.1.1.1 Schedule of Material Submittals (Air Force Form 66)

Information, shop drawings, certificates, test data, etc., listed on the attached AF Form 66, Schedule of Material Submittals, shall be submitted for approval by the Contracting Officer, or his/her designated representative in accordance with the General Provisions. Whenever in this contract materials or drawings are required to be submitted by the Contractor to the Contracting Officer for approval and the material or drawings submitted are at variance with the specifications or Government drawings, but are, nevertheless, approved by the Contracting Officer, inadvertently and without consciousness of the variance, and regardless that a closer review could have revealed the variance, then such approval shall not be final unless the Contractor expressly noted in a memorandum to the Contracting Officer, on the material submittal or drawing that "this material or drawing varies from specifications in the following aspects" or uses other works of similar clear meaning. In the event of such an inadvertent, erroneous approval, the Contracting Officer, upon discovering the variance at any stage, have the right to require the Contractor to do such rework and/or material replacement as is necessary to obtain compliance with the specifications, and the expense of such rework and material replacement shall be borne solely by the Contractor.

a. Submittals for technical compliance of finishes may be made individually for each material. SUBMITTALS FOR PATTERN, COLOR, TEXTURE, ETC., SHALL BE MADE SIMULTANEOUSLY FOR EACH ROOM OR AREA.

Finishes shall be scheduled for each room/area to include surface, type material, manufacturer, brand name or product number, and space for the Government selection of pattern/color.

EXAMPLE:

Room 100 Floor: Vinyl Tarkett Reliant (62107 Adobe) Floor: Carpet Milliken Magistrate (21 Clan Henna) Wall: Paint Pittsburgh Spread-Flow (white #21) Wall: Vinyl Flex-Wall Pls. In a Roll (Rajah Blue) Wainscot: Paneling Masonic Fireguard (walnut) Ceiling: Acoustic Gold Bond Acoustinet (fissure #21) Trim: Paint Glidden Easy-Enamel (0021 blue)

1.2 SCOPE OF WORK

The work under this project consists of demolition of pavements, utilities and miscellaneous site features. Construction of the multi-story Training Support Squadron Facility (TRSS-F), pavements, utilities and incidental related work.

1.2.1 Work Hours

Normal duty hours for Langley AFB, JBLE are 0730 through 1630, Monday through Friday. Work on weekends, recognized Federal holidays, or other than normal duty hours must be coordinated with the Contracting Officer (CO) or his/her designated representative.

SECTION 01 11 00 Page 2

1.2.2 General Working Conditions

a. Work shall be performed in such a manner as to cause minimum disruption to the users in the area.

b. The Contractor shall notify the Contracting Officer or his/her designated representative when he intends to work so Government inspection can be provided while work is in progress.

c. Assume existing elevators are unavailable for contractor use.

1.3 ORDER OF WORK

The Contractor shall coordinate all work with the Contracting Officer, or his/her designated representative. Before starting work at the job site, provide five days' notice to the Contracting Officer or his/her designated representative.

1.4 APPLICABLE CODES AND REGULATIONS

The latest edition of the following Building Codes shall be used for all construction under this contract:

o Air Force Engineering Technical Letter ETL 01-1, Reliability and Maintainability (R&M) Design Checklist o American National Standards Institute (ANSI) o American Standards for Testing Materials (ASTM) o Americans with Disabilities Act (ADA) o ANSI C-2, National Electrical Safety Code (QIESC) o Applicable Unified Facilities Guide Specifications o Institute of Electrical and Electronics Engineers (IEEE) o International Building Code o International Code Council (ICC) International Plumbing Code o International Fire Code o International Mechanical Code o International Society of Automation (ISA) o Langley Air Force Base Design Compatibility Guidelines, March 2006 or most current verison.

o Langley AFB, JBLE Electrical, Fire, and Communications Design

Standards - latest edition o Unified Facilities Criteria (UFC) 1-200-02, High Performance and

Sustainment Building (HPSB) Requirements o Life Safety Code, NFPA 101 o MIL Handbook 1190 o National Electrical Code (NEC) o National Electrical Manufacturers Association (NEMA) o National Fire Protection Association (NFPA) o National Fire Protection Association Codes (NFPA) - latest edition o Supervisory Control and Data Acquisition (SCADA) o Underwriters Laboratories, Inc. (UL) o Unified Facilities Criteria (UFC) 3-600-01, Fire Protection

Engineering for Facilities o Unified Facilities Criteria (UFC) 4-020-01, DoD Security Engineering -

Facilities Planning Manual o 25AF/A4C Mission Critical Facility Engineering Standard (MCFES) 15-01:

Facility Electrical and Mechanical Infrastructure Redundancy Requirements, dated 27 Oct 2015 or most current version.

SECTION 01 11 00 Page 3

NOTE: If there is a conflict between these codes or regulations and these contract specifications, the most stringent requirements shall apply at all times.

1.5 CONSTRUCTION STANDARDS

1.5.1 General

The Contractor is reminded that the construction site must be operated and maintained according to these specifications and is subject to inspection and enforcement according to all federal, state and local codes/regulations.

1.5.2 Office Trailers and Storage Units

1.5.2.1 Office Trailers

If a trailer is required for work and at the discretion of the Government, an office trailer may be located at the project site. The Contractor shall request Contracting Officer approval for the trailer location. The Contractor shall make the request in writing at least fourteen calendar days prior to placement of trailer at site. All office trailers shall be located in areas as directed by the Contracting Officer or his/her designated representative. Any office trailer shall be provided with a skirt on all sides, in like new condition, and painted either Langley Brown (Federal Standard 595a, 20100), Langley Beige, or white. Office trailers in need of painting and / or repairs or that are in an unsightly condition will not be allowed at the project site. Displayed on the exterior of all trailers shall be a nameplate which has the name of the Contractor's company, name for Contractor's point(s) of contact (POC) and telephone number where he or she can be reached, contract number, project number, title and date trailer was placed on site where located.

1.5.2.2 Storage Units

The Contractor shall request Contracting Officer approval for the siting, size and color of Storage Units, CONNEX boxes and dumpsters. The Contractor shall not bring any such items to the job site without the Contracting Officer's approval. All storage units shall be painted Langley Brown (Federal Standard 595a, 20100), Langley Beige or white.

Displayed on the exterior of all storage units shall be a nameplate which has the name of the Contractor's company, name for Contractor's point(s) of contact (POC) and telephone number where he or she can be reached, contract number, project number, title and date unit was placed on site where located.

1.5.3 On-Site Storage Units

Availability and size of material lay down area shall be restricted as noted on the contract documents or as discussed during the preconstruction conference. The Contractor shall consolidate all bulk or large quantities of materials at the construction site in area(s) approved by the CO. All such items shall be stored neatly grouped together. Bulky or unsightly construction materials, heavy or light equipment or tanks shall not be delivered to or stored on the construction site for any period longer than seven calendar days prior to use, installation in the project or start of construction. The Contractor shall store all supplies and equipment on project site to preclude theft or damage. Protection and security for materials and equipment on site is the sole responsibility of the

SECTION 01 11 00 Page 4

Contractor. The Contractor shall not use any area(s) for material or equipment storage that has not been approved by the CO or his/her designated representative.

1.5.4 Fencing and Screening

Fencing and Screening, replace the paragraph to read "Contractor shall enclose the construction and material storage / lay down areas with a temporary chain link fence to a minimum height of six (6) feet or the area shall be secured with required physical barriers as otherwise required.

Temporary fencing shall be completely secured at the top and bottom to prevent access. These areas shall also be screened from view in accordance with base standards or as otherwise specified. Screening shall be fabricated of 100 percent Polypropylene, woven, 92 percent blockage fabric that has been mechanically attached to the fence for the full height of the fence. The edges of each section of screening fabric shall be finished with a reinforced hem. Attachment points shall be reinforced fabric built into the hem or metal grommets built into the hem. All fabric used for screening of the construction and material storage / lay down areas shall be UV rated and dark brown or dark bronze in color unless otherwise approved by the Base Civil Engineer (BCE). Fence screening fabric shall be inspected weekly to insure all sections remain properly in-stalled and taut at all times."

1.5.5 Locksets

If locksets are installed as a result of this project, the Contractor shall provide cylinders and cores for new locks. Cylinders and cores that the Contractor provides shall have seven-pin tumblers using the A2 system and WB keyway - except for dormitories, which use the A4 system and WC keyway. All cylinders will be from a single manufacturer. All cores will be stamped with a key control symbol in a concealed place on the core.

(For information only - the Best Premium WB Keyway, 7-pin core is part number 1CP7WB2.) The cylinders will be fully compatible with products of the Best Lock Corporation, which have interchangeable cores that are removable by special control keys.

Provide and submit a grand master keying system and a sub-master keying system for the building that is an extension of the existing Langley AFB, JBLE keying system. Best Lock Corporation can key cores and provide keys in accordance with the Langley AFB, JBLE grand master keying system; the base grand master keying system will not be made available to outside contractors. Key the equipment spaces and mechanical rooms separately from the building systems. Key them alike to the existing Langley AFB, JBLE systems for equipment and mechanical space doors. Prior to installing any lock cylinder or cores, the contractor shall coordinate with the Langley AFB, JBLE locksmith to ensure compliance with the grand master keying system and master keying sequence, and that the proposed lock hardware will meet requirements of this specification.

1.5.6 Communications

The Contractor shall design and install new communications in accordance with the most current version of 633d COMMUNICATIONS SQUADRON LANGLEY AIR FORCE BASE TELECOMMUNICATIONS BUILDING CABLING SYSTEMS STANDARDS (Langley AFB, JBLE), Attachment to Specification 27 10 00 BUILDING

TELECOMMUNICATIONS CABLING SYSTEM.

SECTION 01 11 00 Page 5

1.5.7 Electrical Identification

1.5.7.1 Panels

Distribution Panels are to be labeled in accordance with LANGLEY ELECTRICAL STANDARD - MEDIUM VOLTAGE LABELING DETAILS, sheets E-203 and E-204 dtd 12/13/2019 or newer. Consult the Base Civil Engineers Project Manager for newest revision.This labeling scheme is generally described in construction documents, drawing Sheet EP501.

1.5.7.2 Transformers, Switches, Cabling

Transformers, Switches, and Cabling are to be labeled in accordance with LANGLEY ELECTRICAL STANDARD- MEDIUM VOLTAGE LABELING DETAILS, sheets E-203 and E-204 dtd 12/13/2019 or newer. Consult the Base Civil Engineers Project Manager for newest revision. This labeling scheme for switches is generally described in construction documents, drawing sheet EP501. This labeling scheme for cabling is generally described in construction documents, in written specifications.

1.6 CONTRACTOR OPERATIONS

1.6.1 Grassy Areas

Grass and weed growth in excavated materials that are stockpiled on site shall be controlled or cut weekly. Weeds and grass within the construction site shall also be controlled or cut weekly and any bushes or shrubs shall be trimmed monthly. Areas disturbed by construction or those areas required by the plans to be "re-seeded" shall be re-established by hydroseeding only. Straw shall not be used as a cover for freshly seeded areas.

1.6.2 Privately Owned Vehicles (POVs)

POVs used by Contractor personnel to commute to work are required to park in existing parking lots. Contractor or Contractor's employees, including subcontractors, shall not park any personally owned vehicle (POV) or company or delivery vehicle on grassy areas near or in the construction site without prior approval from the Contracting Officer, or his/her designated representative. When allowed, parking on grassy areas will only be for short-term delivery purposes (to include heavy tools, equipment, construction materials, etc.). Use designated hard surfaces or existing parking lots near or within the project site for 1 of POVs or company or delivery vehicles. Tire and track impressions (ruts) created on wet or soft soil by vehicles or equipment used in the Contractor's operations shall not be left for more than one day after removal of such vehicle or equipment that caused the rutting. The Contractor shall restore the affected area(s) of the site to its original condition within that one-day period.

1.6.3 Site Cleanup

During construction, the Contractor shall maintain all areas in a neat and orderly manner. Contractor shall keep the construction site cleaned daily of all construction trash, trash generated by employees, debris or demolished building materials. If the work areas are not kept neat and orderly, the Contractor must return to the area to correct the

SECTION 01 11 00 Page 6 unacceptable condition. During the laying of asphalt roads, streets or parking surfaces, areas soiled by residual asphalt shall be cleaned daily. The Contractor shall treat with lime entrances and exits to asphalt work site at his/her own expense.

1.6.4 Access Routes

Access routes to this project shall be limited through the Base as shown on the plans. The Contractor shall not use the gates at King Street Bridge or LaSalle Gate (Nealy Avenue) for haul route entry or exit. When entering and exiting the base, the haul route shall be through the West Gate only.

1.6.5 Removal of Formwork

The Contractor shall remove all concrete formwork and boards within fourteen calendar days after concrete pour.

1.6.6 Noise Control

The Contractor shall comply with all applicable state, local and installation laws, ordinances and regulations relative to noise control, to include applicable quiet hours exclusive to Langley AFB, JBLE. Work site is in a residential area of Langley AFB, JBLE. There shall be absolutely no construction activities in or around the construction site prior to or after the hours designated in "Work Hours" paragraph above without an approval from the Contracting Officer, or his/her designated representative. This restriction also applies to holidays.

1.6.7 Excavations

All trenches/excavations shall be back filled and compacted to 95 percent of maximum Proctor density. Trenches will be top dressed with no less than three inches of shifted topsoil and then compacted. The finished area will be free of all debris, rocks and then graded to conform to the surrounding area.

1.6.8 In-Ground Obstructions

Any type of raised obstructions shall have the surrounding soil backfilled, compacted to 95 percent of maximum Proctor density, and graded. The area will be top dressed as above to within three inches of the top of obstruction.

1.6.9 Architectural Compatibility

Due to Langley AFB, JBLE's distinct historic architecture and the high visitor traffic it receives, several special actions are required during construction:

a. The Contractor is solely responsible for spillage from his/her vehicles and such spillage shall be cleaned up immediately. For the duration of this contract and on a daily basis, the Contractor shall remove from all base roads and streets asphalt, mud, soil, rocks, trash and debris that result from his/her construction operation on base. All roads or streets affected shall be cleaned before close of business on the particular day affected. In the case of asphalt, roads will be cleaned and/or treated with lime immediately upon detection.

SECTION 01 11 00 Page 7

b. Newly placed concrete curbing and sidewalks shall match existing, adjacent concrete in color and texture.

c. Unprimed or factory-finished equipment installed on the exterior of facilities shall be painted with two coats of brown paint to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .