Att 1-1of3 TRSSF BCOES Drawings NOT FOR CONSTRUCTION.pdf
PDF 38 MB Posted
- Attached to
- Construction of Training Support Squadron Facility (TRSS-F) at Langley AFB, Hampton, VA Federal contract opportunity
- Solicitation number
- W9123623R2002
About this file
This notice provides details for a planned construction project for a Training Squadron Support Facility at Langley Air Force Base in Hampton, Virginia. The U.S. Army Corps of Engineers-Norfolk District intends to issue a Request for Proposal for the construction of an eight-bay facility to support additional F-22A flight crews. The estimated price range for construction is between $25 million and $100 million. The solicitation will require bid bonds with proposals and payment and performance bonds from the awardee. Evaluation factors will include past performance, project approach, small business participation, and price. The solicitation is anticipated to be issued on or about February 17, 2023 on sam.gov. Prospective offerors should monitor the site for the RFP and any amendments. Preliminary plans and specifications are attached for advance review.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Att 1-2of3 TRSSF BCOES Drawings NOT FOR CONSTRUCTION.pdf | ||
| Att 2 TRSSF BCOES Specs NOT FOR CONSTRUCTION.pdf | ||
| Att 1-3of3 TRSSF BCOES Drawings NOT FOR CONSTRUCTION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL
THIS WORK WAS PREPARED BY ME OR UNDER
MY SUPERVISION
SURVEY
THIS WORK WAS PREPARED BY ME OR UNDER
MY SUPERVISION
JOHN THOUSAND
(NAME AND LICENSE)
LANDSCAPE
THIS WORK WAS PREPARED BY ME OR UNDER
MY SUPERVISION
STRUCTURAL
THIS WORK WAS PREPARED BY ME OR UNDER
MY SUPERVISION
ARCHITECTURAL
THIS WORK WAS PREPARED BY ME OR UNDER
MY SUPERVISION
INTERIORS
THIS WORK WAS PREPARED BY ME OR UNDER
MY SUPERVISION
FIRE PROTECTION
THIS WORK WAS PREPARED BY ME OR UNDER
MY SUPERVISION
PLUMBING
THIS WORK WAS PREPARED BY ME OR UNDER
MY SUPERVISION
MECHANICAL
THIS WORK WAS PREPARED BY ME OR UNDER
MY SUPERVISION
ELECTRICAL
THIS WORK WAS PREPARED BY ME OR UNDER
MY SUPERVISION
TELECOMMUNICATIONS
THIS WORK WAS PREPARED BY ME OR UNDER
MY SUPERVISION
AUDIO VISUAL
THIS WORK WAS PREPARED BY ME OR UNDER
MY SUPERVISION
DESIGN MANAGER
THIS WORK WAS PREPARED BY ME OR UNDER
MY SUPERVISION
ANDREA LANDFAIR
(NAME AND LICENSE)
BEN YAR
(NAME AND LICENSE)
CHRIS RHOADES
(NAME AND LICENSE)
LINDA DELEO
(NAME AND LICENSE)
KERRY FELTON
(NAME AND LICENSE)
SCOTT LEOPOLD
(NAME AND LICENSE)
KELLEN MILLER
(NAME AND LICENSE)
KURT CLEMENTE
(NAME AND LICENSE)
KELLEN MILLER
(NAME AND LICENSE)
KURT CLEMENTE
(NAME AND LICENSE)
KRISTEN R. KUIPERS
(NAME AND LICENSE)
TOM WOMELDURF
(NAME AND LICENSE)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
VOLUME:
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
C
N O
R F
O L
K D
IS
T
R
IC
T F
R O
N T
S T
R E
E T
N O
R F
O L
K V
A
W R
BIM 360://3012011031_F22 Formal Training Unit TRSS-F/3012011031_TRSS-F_G_R19.rvt
1/19/2023 3:07:45 PM
G-001
C O
V E
R S
H E
E T
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
D
S
T A
P L E
S
D S
T A
P L E
S
T W
O M
E L D
U R
F
J A
N U
A R
Y
PRELIMINARY NOT FOR CONSTRUCTION
T R
A
IN
IN
G
S U
P P
O R
T S
Q U
A D
R O
N F
A C
IL
IT
Y (T
R S
S -F
JANUARY 2023
FY19 F-22 FORMAL TRAINING UNIT (FTU)
TRAINING SUPPORT SQUADRON FACILITY
(TRSS-F)
PROJECT LOCATION
N
PROJECT LOCATION MAP PROJECT VICINITY MAP
HAMPTONNEWPORT NEWS
JOINT BASE, LANGLEY - EUSTIS (JBLE)
BCOES DESIGN SUBMITTAL
CIVIL
LANDSCAPE
STRUCTURAL
ARCHITECTURAL
FIRE PROTECTION
PLUMBING
MECHANICAL
ELECTRICAL
TELECOM
BAMFORTH ENGINEERS + SURVEYORS
2207 HAMPTON BLVD
NORFOLK, VIRGINIA, VA 23517
PHONE (757)627-7079
THE RESOLUTION STUDIO
MADISON, WISCONSIN, USA
PHONE (608)206-2685
RS&H
10748 DEERWOOD PARK BOULEVARD SOUTH
JACKSONVILLE, FL 32256
(904) 256-2500
RS&H
10748 DEERWOOD PARK BOULEVARD SOUTH
JACKSONVILLE, FL 32256
(904) 256-2500
RS&H
10748 DEERWOOD PARK BOULEVARD SOUTH
JACKSONVILLE, FL 32256
(904) 256-2500
RS&H
248 W BUTE ST, SUITE 101,
NORFOLK, VA 23510
(757) 985-4513
RS&H
248 W BUTE ST, SUITE 101,
NORFOLK, VA 23510
(757) 985-4513
RS&H
13750 SAN PEDRO AVE, SUITE 300
SAN ANTONIO, TX 78232
(210) 301-4882
RS&H
248 W BUTE ST, SUITE 101,
NORFOLK, VA 23510
(757) 985-4513
N
AUDIO VISUAL
NEWCOMB & BOYD
303 PEACHTREE CENTER AVE NE SUITE 525
ATLANTA, GA 30303
((404)730-8400
INTERIORS
RS&H
10748 DEERWOOD PARK BOULEVARD SOUTH
JACKSONVILLE, FL 32256
(904) 256-2500
SURVEY
OES (ONEIDA ENGINEERING SOLUTIONS)
5100 EASTPARK BLVD, SUITE 300
MADISON, WI 53718
PHONE (608) 241-6473
DESIGN MANAGER
RS&H
13750 SAN PEDRO AVE, SUITE 300
SAN ANTONIO, TX 78232
(210) 301-4882
W9123623R2002
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
C
N O
R F
O L
K D
IS
T
R
IC
T F
R O
N T
S T
R E
E T
N O
R F
O L
K V
A
W R
BIM 360://3012011031_F22 Formal Training Unit TRSS-F/3012011031_TRSS-F_G_R19.rvt
1/19/2023 3:07:45 PM
G-002
S H
E E
T I
N D
E X
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
D
S
T A
P L E
S
D S
T A
P L E
S
T W
O M
E L D
U R
F
J A
N U
A R
Y
PRELIMINARY NOT FOR CONSTRUCTION
T R
A
IN
IN
G
S U
P P
O R
T S
Q U
A D
R O
N F
A C
IL
IT
Y (T
R S
S -F
SHEET INDEX
SHEET NUMBER SHEET NAME
17. SECURITY
X-001 SECURITY LEGEND AND ABBREVIATIONS
X-002 SECURITY GENERAL NOTES AND SCHEDULES
X-101 FIRST FLOOR SECURITY PLAN - OVERALL
X-101A FIRST FLOOR SECURITY PLAN - AREA A
X-101B FIRST FLOOR SECURITY PLAN - AREA B
X-101C FIRST FLOOR SECURITY PLAN - AREA C
X-101D FIRST FLOOR SECURITY PLAN - AREA D
X-102 SECOND FLOOR SECURITY PLAN - OVERALL
X-102A SECOND FLOOR SECURITY PLAN - AREA A
X-102B SECOND FLOOR SECURITY PLAN - AREA B
X-102C SECOND FLOOR SECURITY PLAN - AREA C
X-501 SECURITY DETAILS
X-502 CCTV DETAILS
X-503 CONDUIT MOUNTING ON PARTITION DETAILS
X-504 CONDUIT MOUNTING ON PARTITION DETAILS
X-505 CONDUIT MOUNTING ON PARTITION DETAILS
X-506 CONDUIT MOUNTING ON PARTITION DETAILS
X-507 CONDUIT MOUNTING ON PARTITION DETAILS
X-701 SECURITY RISER DIAGRAMS
18.AUDIO VISUAL
TA001 AUDIO VISUAL LEGEND, GENERAL NOTES AND ABBREVIATIONS
TA101A FIRST FLOOR AUDIO VISUAL PLAN - AREA A
TA101B FIRST FLOOR AUDIO VISUAL PLAN - AREA B
TA101C FIRST FLOOR AUDIO VISUAL PLAN - AREA C
TA101D FIRST FLOOR AUDIO VISUAL PLAN - AREA D
TA102A SECOND FLOOR AUDIO VISUAL PLAN - AREA A
TA102B SECOND FLOOR AUDIO VISUAL PLAN - AREA B
TA102C SECOND FLOOR AUDIO VISUAL PLAN - AREA C
TA201A FIRST FLOOR AUDIO VISUAL RCP - AREA A
TA201D FIRST FLOOR AUDIO VISUAL RCP - AREA D
TA202B SECOND FLOOR AUDIO VISUAL RCP - AREA B
TA202C SECOND FLOOR AUDIO VISUAL RCP - AREA C
TA400 AUDIO VISUAL ELEVATIONS
TA401 AUDIO VISUAL ELEVATIONS
TA501 AUDIO VISUAL DETAILS
TA601 AUDIO VISUAL FUNCTIONAL DIAGRAMS
TA602 AUDIO VISUAL FUNCTIONAL DIAGRAMS
TA603 AUDIO VISUAL FUNCTIONAL DIAGRAMS
TA604 AUDIO VISUAL FUNCTIONAL DIAGRAMS
TA605 AUDIO VISUAL FUNCTIONAL DIAGRAMS
Grand total: 460
SHEET INDEX
SHEET NUMBER SHEET NAME
MP102A SECOND FLOOR HVAC PIPING PLAN - AREA A
MP102B SECOND FLOOR HVAC PIPING PLAN - AREA B
MP102C SECOND FLOOR HVAC PIPING PLAN - AREA C
M-103 ROOF HVAC & PIPING PLAN
M-401 HVAC ENLARGED PLANS
M-402 MECHANICAL SECTIONS
M-403 MECHANICAL SECTIONS
M-404 MECHANICAL SECTIONS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-603 MECHANICAL SCHEDULES
M-801 MECHANICAL CONTROLS SCHEMATICS
M-802 MECHANICAL CONTROLS SCHEMATICS
M-803 MECHANICAL CONTROLS SCHEMATICS
M-804 MECHANICAL CONTROLS SCHEMATICS
M-805 MECHANICAL CONTROLS SCHEMATICS
14. ELECTRICAL
E-001 ELECTRICAL LEGEND, GENERAL NOTES AND ABBREVIATIONS
ES100 ELECTRICAL SITE KEY PLAN
ED101 ELECTRICAL SITE DEMOLITION PLAN
ED102 ELECTRICAL SITE DEMOLITION PLAN
ED103 ELECTRICAL SITE DEMOLITION PLAN
ES101 ELECTRICAL SITE PLAN
ES102 ELECTRICAL SITE PLAN
ES103 ELECTRICAL SITE PLAN
ES104 ELECTRICAL SITE PLAN
ES105 ELECTRICAL SITE PLAN
ES106 CATHODIC PROTECTION SITE PLAN
ES401 ELECTRICAL SITE ENLARGED PLANS
ES501 ELECTRICAL SITE DETAILS
ES502 ELECTRICAL SITE DETAILS
ES503 ELECTRICAL SITE DETAILS
ES504 ELECTRICAL SITE DETAILS
ES701 ELECTRICAL SITE DEMOLITION SINGLE LINE DIAGRAM
ES702 ELECTRICAL SITE SINGLE LINE DIAGRAM
EG101 LIGHTNING PROTECTION SYSTEM PLAN
EG501 LIGHTNING PROTECTION SYSTEM DETAILS
EL101A FIRST FLOOR LIGHTING PLAN - AREA A
EL101B FIRST FLOOR LIGHTING PLAN - AREA B
EL101C FIRST FLOOR LIGHTING PLAN - AREA C
EL101D FIRST FLOOR LIGHTING PLAN - AREA D
EL102A SECOND FLOOR LIGHTING PLAN - AREA A
EL102B SECOND FLOOR LIGHTING PLAN - AREA B
EL102C SECOND FLOOR LIGHTING PLAN - AREA C
EL501 LIGHTING DETAILS
EL502 LIGHTING DETAILS
EL503 LIGHTING DETAILS - PLATES
EL504 LIGHTING DETAILS - PLATES
EL601 LUMINAIRE SCHEDULE AND ENLARGED MEZZANINE PLANS
EP101A FIRST FLOOR POWER PLAN - AREA A
EP101B FIRST FLOOR POWER PLAN - AREA B
EP101C FIRST FLOOR POWER PLAN - AREA C
EP101D FIRST FLOOR POWER PLAN - AREA D
EP102A SECOND FLOOR POWER PLAN - AREA A
EP102B SECOND FLOOR POWER PLAN - AREA B
EP102C SECOND FLOOR POWER PLAN - AREA C
EP103 ROOF POWER PLAN - OVERALL
EP401 ENLARGED PLANS - ELECTRICAL ROOMS AND ELEVATED MEZZANINE
EP402 ENLARGED PLANS - UPS ROOMS
EP403 ENLARGED PLANS - TELECOMMUNICATIONS ROOMS
EP501 ELECTRICAL DETAILS
EP502 ELECTRICAL DETAILS
EP601 MECHANICAL EQUIPMENT SCHEDULE
EP602 PANELBOARD SCHEDULES
EP603 PANELBOARD SCHEDULES
EP604 PANELBOARD SCHEDULES
EP605 PANELBOARD SCHEDULES
EP606 PANELBOARD SCHEDULES
EP607 PANELBOARD SCHEDULES
EP608 PANELBOARD SCHEDULES
EP701 ELECTRICAL SINGLE-LINE DIAGRAM
EP702 ELECTRICAL UPS SUBSYSTEM DIAGRAM
16. TELECOMMUNICATIONS
T-001 TELECOMMUNICATIONS LEGEND, GENERAL NOTES AND ABBREVIATIONS
TS100 TELECOMMUNICATIONS SITE KEY PLAN
TD101 TELECOMMUNICATIONS SITE DEMOLITION PLAN
TS101 TELECOMMUNICATIONS SITE PLAN
TS102 TELECOMMUNICATIONS SITE PLAN
TS103 TELECOMMUNICATIONS SITE PLAN
TS104 TELECOMMUNICATIONS SITE PLAN
TS105 TELECOMMUNICATIONS SITE PLAN
TS501 TELECOMMUNICATIONS SITE DETAILS
TS502 TELECOMMUNICATIONS SITE DETAILS
T-101Z FIRST FLOOR TELECOMMUNICATIONS SERVING ZONES
T-101A FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA A
T-101B FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA B
T-101C FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA C
T-101D FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA D
T-102Z SECOND FLOOR TELECOMMUNICATIONS SERVING ZONES
T-102A SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA A
T-102B SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA B
T-102C SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA C
T-201 TELECOMMUNICATIONS ELEVATIONS - COMM 104
T-202 TELECOMMUNICATIONS ELEVATIONS - COMM 129
T-203 TELECOMMUNICATIONS ELEVATIONS - IIQC 260
T-401 ENLARGED TELECOMMUNICATIONS PLANS - COMM ROOMS
T-402 ENLARGED TELECOMMUNICATIONS PLANS - SERVER ROOMS
T-403 ENLARGED PLAN - CABLE TRAY IN TRENCH AND UNDER RAF
T-404 ENLARGED PLAN - IIQC SECURE AREA LAN/SERVER ROOMS
T-501 TELECOMMUNICATIONS DETAILS
T-502 TELECOMMUNICATIONS DETAILS
T-503 TELECOM GROUNDING DETAILS
T-701 TELECOMMUNICATIONS RISER DIAGRAMS
T-702 TELECOMMUNICATIONS RISER DIAGRAMS
SHEET INDEX
SHEET NUMBER SHEET NAME
I-602 INTERIOR ROOM FINISH SCHEDULE
IG101A FIRST FLOOR SIGNAGE PLAN - AREA A
IG101B FIRST FLOOR SIGNAGE PLAN - AREA B
IG101C FIRST FLOOR SIGNAGE PLAN - AREA C
IG101D FIRST FLOOR SIGNAGE PLAN - AREA D
IG102A SECOND FLOOR SIGNAGE PLAN - AREA A
IG102B SECOND FLOOR SIGNAGE PLAN - AREA B
IG102C SECOND FLOOR SIGNAGE PLAN - AREA C
IG401 SIGNAGE ELEVATIONS AND DETAILS
IG601 SIGNAGE SCHEDULE
IF100 GFGI FURNITURE SCHEDULE AND NOTES
IF101 FIRST FLOOR INTERIOR FURNITURE PLAN - OVERALL
IF101A FIRST FLOOR INTERIOR FURNITURE PLAN - AREA A
IF101B FIRST FLOOR INTERIOR FURNITURE PLAN - AREA B
IF101C FIRST FLOOR INTERIOR FURNITURE PLAN - AREA C
IF101D FIRST FLOOR INTERIOR FURNITURE PLAN - AREA D
IF102 SECOND FLOOR INTERIOR FURNITURE PLAN - OVERALL
IF102A SECOND FLOOR INTERIOR FURNITURE PLAN - AREA A
IF102B SECOND FLOOR INTERIOR FURNITURE PLAN - AREA B
IF102C SECOND FLOOR INTERIOR FURNITURE PLAN - AREA C
IF501 VISUAL DISPLAY DETAILS
IF601 FURNITURE SCHEDULE AND NOTES
IF602 FURNITURE SCHEDULE AND NOTES
10. FIRE PROTECTION
FA001 FIRE ALARM NOTES, LEGENDS, DETAILS & OPERATIONS MATRIX
FA002 FIRE ALARM OPERATIONS MATRIX (RFMCP)
FA003 FIRE ALARM / MASS NOTIFICATION SYSTEM RISER DIAGRAM
FA101 FIRST FLOOR FIRE ALARM PLAN - OVERALL
FA101A FIRST FLOOR FIRE ALARM PLAN - AREA A
FA101B FIRST FLOOR FIRE ALARM PLAN - AREA B
FA101C FIRST FLOOR FIRE ALARM PLAN - AREA C
FA101D FIRST FLOOR FIRE ALARM PLAN - AREA D
FA102 SECOND FLOOR FIRE ALARM PLAN - OVERALL
FA102A SECOND FLOOR FIRE ALARM PLAN - AREA A
FA102B SECOND FLOOR FIRE ALARM PLAN - AREA B
FA102C SECOND FLOOR FIRE ALARM PLAN - AREA C
FX001 FIRE SPRINKLER NOTES, LEGEND AND DETAILS
FX101 FIRST FLOOR FIRE SPRINKLER PLAN - OVERALL
FX101A FIRST FLOOR FIRE SPRINKLER PLAN - AREA A
FX101B FIRST FLOOR FIRE SPRINKLER PLAN - AREA B
FX101C FIRST FLOOR FIRE SPRINKLER PLAN - AREA C
FX101D FIRST FLOOR FIRE SPRINKLER PLAN - AREA D
FX102 SECOND FLOOR FIRE SPRINKLER PLAN - OVERALL
FX102A SECOND FLOOR FIRE SPRINKLER PLAN - AREA A
FX102B SECOND FLOOR FIRE SPRINKLER PLAN - AREA B
FX102C SECOND FLOOR FIRE SPRINKLER PLAN - AREA C
11. PLUMBING
P-001 PLUMBING GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
P-101 FIRST FLOOR PRESSURE PIPING PLAN - OVERALL
P101A FIRST FLOOR PRESSURE PIPING PLAN - AREA A
P101B FIRST FLOOR PRESSURE PIPING PLAN - AREA B
P101C FIRST FLOOR PRESSURE PIPING PLAN - AREA C
P101D FIRST FLOOR PRESSURE PIPING PLAN - AREA D
P-102 SECOND FLOOR PRESSURE PIPING PLAN - OVERALL
P102B SECOND FLOOR PRESSURE PIPING PLAN - AREA B
P102C SECOND FLOOR PRESSURE PIPING PLAN - AREA C
P-111 FIRST FLOOR DRAIN WASTE VENT PIPING PLAN - OVERALL
P111A FIRST FLOOR DRAIN WASTE VENT PIPING PLAN - AREA A
P111B FIRST FLOOR DRAIN WASTE VENT PIPING PLAN - AREA B
P111C FIRST FLOOR DRAIN WASTE VENT PIPING PLAN - AREA C
P111D FIRST FLOOR DRAIN WASTE VENT PIPING PLAN - AREA D
P-112 SECOND FLOOR DRAIN WASTE VENT PIPING PLAN - OVERALL
P112A SECOND FLOOR DRAIN WASTE VENT PIPING PLAN - AREA A
P112B SECOND FLOOR DRAIN WASTE VENT PIPING PLAN - AREA B
P112C SECOND FLOOR DRAIN WASTE VENT PIPING PLAN - AREA C
P-121 ROOF DRAIN WASTE VENT PIPING PLAN - OVERALL
P121A ROOF DRAIN WASTE VENT PIPING PLAN - AREA A
P121B ROOF DRAIN WASTE VENT PIPING PLAN - AREA B
P121C ROOF DRAIN WASTE VENT PIPING PLAN - AREA C
P121D ROOF DRAIN WASTE VENT PIPING PLAN - AREA D
P-401 PLUMBING ENLARGED PLANS
P-402 PLUMBING ENLARGED PLANS
P-403 PLUMBING ENLARGED PLANS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-701 PLUMBING SCHEDULES
P-901 PRESSURE PIPING RISER DIAGRAM - AREA A AND B
P-902 PRESSURE PIPING RISER DIAGRAM - AREA C AND D
P-903 ENLARGED PRESSURE PIPING RISER DIAGRAMS
P-904 DWV RISER DIAGRAM- AREA A, B, AND C
P-905 ENLARGED DWV RISER DIAGRAMS
13. MECHANICAL
M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
MD101 HVAC DEMOLITION PLAN GEO WELLS
MS100 MECHANICAL SITE PLAN
MS101 MECHANICAL YARD PLAN
M-101 FIRST FLOOR HVAC PLAN - OVERALL
M101A FIRST FLOOR HVAC PLAN - AREA A
M101B FIRST FLOOR HVAC PLAN - AREA B
M101C FIRST FLOOR HVAC PLAN - AREA C
M101D FIRST FLOOR HVAC PLAN - AREA D
M111A FIRST FLOOR AIRFLOW PLAN - AREA A
M111B FIRST FLOOR AIRFLOW PLAN - AREA B
M111C FIRST FLOOR AIRFLOW PLAN - AREA C
M111D FIRST FLOOR AIRFLOW PLAN - AREA D
M-102 SECOND FLOOR HVAC PLAN - OVERALL
M102A SECOND FLOOR HVAC PLAN - AREA A
M102B SECOND FLOOR HVAC PLAN - AREA B
M102C SECOND FLOOR HVAC PLAN - AREA C
M112A SECOND FLOOR AIRFLOW PLAN - AREA A
M112B SECOND FLOOR AIRFLOW PLAN - AREA B
M112C SECOND FLOOR AIRFLOW PLAN - AREA C
MP101 FIRST FLOOR HVAC PIPING PLAN - OVERALL
MP101A FIRST FLOOR HVAC PIPING PLAN - AREA A
MP101B FIRST FLOOR HVAC PIPING PLAN - AREA B
MP101C FIRST FLOOR HVAC PIPING PLAN - AREA C
MP101D FIRST FLOOR HVAC PIPING PLAN - AREA D
MP102 SECOND FLOOR HVAC PIPING PLAN - OVERALL
SHEET INDEX
SHEET NUMBER SHEET NAME
S-401 ENLARGED FRAMING PLANS
S-402 ENLARGED STAIR PLAN AND SECTIONS
S-403 ENLARGED CANOPY PLANS AND SECTIONS
S-404 ENLARGED MECH UNIT PLAN AND SECTIONS
S-405 ENLARGED CMU STAIR TOWER PLANS
S-406 ENLARGED BREAK AREA CANOPY PLAN AND SECTIONS
S-407 ENLARGED SITE SLAB PLANS AND SECTIONS
S-501 FOUNDATION DETAILS
S-502 MASONRY DETAILS
S-511 STEEL DETAILS - 1
S-512 STEEL DETAILS - 2
S-513 STEEL DETAILS - 3
S-601 SCHEDULES - 1
S-602 SCHEDULES - 2
S-603 SCHEDULES - 3
S-901 3D ISOMETRICS
07. ARCHITECTURAL
A-001 GENERAL NOTES
A-002 PARTITION TYPES
A-003 ACOUSTIC PENETRATION DETAILS
AS101 ARCHITECTURAL SITE PLAN
AS401 ENLARGED SITE PLANS
AS402 SITE DETAILS
A-101 FIRST FLOOR PLAN - OVERALL
A101A FIRST FLOOR PLAN - AREA A
A101B FIRST FLOOR PLAN - AREA B
A101C FIRST FLOOR PLAN - AREA C
A101D FIRST FLOOR PLAN - AREA D
A-102 SECOND FLOOR PLAN - OVERALL
A102A SECOND FLOOR PLAN - AREA A
A102B SECOND FLOOR PLAN - AREA B
A102C SECOND FLOOR PLAN - AREA C
A-103 ROOF PLAN - OVERALL
A103A ROOF PLAN - AREA A
A-104 FIRST FLOOR REFLECTED CEILING PLAN - OVERALL
A104A FIRST FLOOR REFLECTED CEILING PLAN - AREA A
A104B FIRST FLOOR REFLECTED CEILING PLAN - AREA B
A104C FIRST FLOOR REFLECTED CEILING PLAN - AREA C
A104D FIRST FLOOR REFLECTED CEILING PLAN - AREA D
A-105 SECOND FLOOR REFLECTED CEILING PLAN - OVERALL
A105A SECOND FLOOR REFLECTED CEILING PLAN - AREA A
A105B SECOND FLOOR REFLECTED CEILING PLAN - AREA B
A105C SECOND FLOOR REFLECTED CEILING PLAN - AREA C
A-141 FIRST FLOOR AIR BARRIER PLAN
A-142 SECOND FLOOR AIR BARRIER PLAN
A-143 AIR BARRIER SECTIONS
A-201 EXTERIOR BUILDING ELEVATIONS
A-202 EXTERIOR BUILDING ELEVATIONS
A-203 EXTERIOR BUILDING ELEVATIONS
A-204 EXTERIOR BUILDING ELEVATIONS
A-205 EXTERIOR BUILDING ELEVATIONS
A-301 BUILDING SECTIONS
A-302 BUILDING SECTIONS
A-303 BUILDING SECTIONS
A-304 BUILDING SECTIONS
A-305 BUILDING SECTIONS
A-306 BUILDING SECTIONS
A-307 BUILDING SECTIONS
A-308 BUILDING SECTIONS
A-311 WALL SECTIONS
A-312 WALL SECTIONS
A-313 WALL SECTIONS
A-314 WALL SECTIONS
A-315 WALL SECTIONS
A-316 WALL SECTIONS
A-317 WALL SECTIONS
A-318 WALL SECTIONS
A-319 WALL SECTIONS
A-401 ENLARGED PLANS AND INTERIOR ELEVATIONS
A-402 ENLARGED PLANS AND INTERIOR ELEVATIONS
A-403 ENLARGED PLANS AND INTERIOR ELEVATIONS
A-404 ENLARGED PLANS AND INTERIOR ELEVATIONS
A-405 ENLARGED PLAN ROOM 221
A-406 ENLARGED RCP ROOM 221
A-407 INTERIOR ELEVATIONS AND SECTION ROOM 221
A-408 MISCELLANEOUS CASEWORK ELEVATIONS AND SECTIONS
A-409 ENLARGED LOBBY PLAN AND INTERIOR ELEVATIONS
A-410 ENLARGED CANOPY PLANS, SECTIONS AND DETAILS
A-411 EXTERIOR WALL DETAILS
A-421 ABA MOUNTING HEIGHTS
A-451 STAIR 163 PLANS AND SECTION
A-452 STAIR 138 AND 152 PLANS AND SECTION
A-453 STAIR 163 AND 138 DETAILS
A-454 MEZZANINE STAIR PLAN, SECTION AND DETAILS
A-455 STAIR 107 DETAILS
A-456 STAIR 107 DETAILS
A-461 VERTICAL CIRCULATION - ELEVATOR PLANS, SECTIONS & DETAILS
A-501 CEILING AND RAISED ACCESS FLOORING DETAILS
A-521 LIGHT WEIGHT CAST STONE ROOF DETAILS
A-522 ROOF DETAILS
A-523 WALL SECTION DETAILS
A-524 WALL SECTION DETAILS
A-525 MISCELANEOUS DETAILS
A-531 VERTICAL RETRACTABLE PARTITION DETAILS
A-601 DOOR SCHEDULE
A-602 DOOR HEAD, JAMB AND SILL DETAILS
A-603 INTERIOR WINDOW AND STOREFRONT TYPES
08. INTERIORS
I101A FIRST FLOOR INTERIOR FINISH PLAN - AREA A
I101B FIRST FLOOR INTERIOR FINISH PLAN - AREA B
I101C FIRST FLOOR INTERIOR FINISH PLAN - AREA C
I101D FIRST FLOOR INTERIOR FINISH PLAN - AREA D
I102A SECOND FLOOR INTERIOR FINISH PLAN - AREA A
I102B SECOND FLOOR INTERIOR FINISH PLAN - AREA B
I102C SECOND FLOOR INTERIOR FINISH PLAN - AREA C
I-131 WALL PATTERN PLANS AND DETAILS
I-132 INTERIOR DETAILS
I-133 INTERIOR DETAILS
I-601 INTERIOR FINISH LEGEND AND DETAILS
SHEET INDEX
SHEET NUMBER SHEET NAME
00. GENERAL
G-001 COVER SHEET
G-002 SHEET INDEX
G-003 BUILDING AND LIFE SAFETY CODE EVALUATION
G-004 OCCUPANT LOAD ROOM SCHEDULES
GS101 CODE COMPLIANCE SITE PLAN
G-101 FIRST FLOOR LIFE SAFETY PLAN - OVERALL
G-102 SECOND FLOOR LIFE SAFETY PLAN - OVERALL
02. SURVEY AND MAPPING
V-001 LEGENDS AND NOTES
VF100 OVERALL EXISTING CONDITIONS
VF101 EXISTING CONDITIONS
VF102 EXISTING CONDITIONS
04.CIVIL
C-001 LEGEND AND GENERAL NOTES
C-002 CONSTRUCTION ACCESS PLAN
C-003 EROSION AND SEDIMENT CONTROL PLAN INITIAL
C-004 EROSION AND SEDIMENT CONTROL PLAN FINAL
CD001 DEMOLITION LEGEND & NOTES
CD100 EXISTING CONDITIONS - OVERALL
CD101 EXISTING CONDITIONS AND DEMOLITION PLAN
CD102 EXISTING CONDITIONS AND DEMOLITION PLAN
CD103 EXISTING CONDITIONS, EROSION CONTROL AND DEMOLITION PLAN - OFFSITE
CS001 SITE LAYOUT LEGEND & CONTROL POINTS
CS101 SITE LAYOUT PLAN
CS102 SITE LAYOUT PLAN
CS103 SITE LAYOUT PLAN - OFFSITE
CS104 OVERALL JOINTING PLAN
CS401 ENLARGED JOINTING PLANS
CG001 GRADING LEGEND, STORM SCHEDULES & NOTES
CG101 GRADING PLAN
CG102 GRADING PLAN
CG103 GRADING PLAN - OFFSITE
CG201 STORM SEWER PROFILES
CG202 STORM SEWER PROFILES
CG203 STORM SEWER PROFILES
CG204 STORM SEWER PROFILES
CG205 STORM SEWER PROFILES
CG700 POST DEVELOPMENT DRAINAGE AREAS
CG701 STORMWATER MANAGEMENT CALCULATIONS
CG702 STORMWATER MANAGEMENT CALCULATIONS
CU001 UTILITY LEGEND, CONTROL POINTS & SCHEDULES
CU101 UTILITY PLAN
CU102 UTILITY PLAN
CU201 UTILITY PROFILES
CU202 UTILITY PROFILES
CU203 UTILITY PROFILES
C-501 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-502 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-503 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-504 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-505 EROSION AND SEDIMENT CONTROL DETAILS
C-506 DETAILS
C-507 DETAILS
C-508 DETAILS
C-509 DETAILS
C-510 DETAILS
C-511 DETAILS
C-512 DETAILS
C-513 DETAILS
C-514 DETAILS
C-515 DETAILS
C-516 DETAILS
C-517 DETAILS
C-518 DETAILS
C-519 DETAILS
C-520 DETAILS
C-521 DETAILS
05. LANDSCAPE
L-101 LANDSCAPE PLAN
L-102 LANDSCAPE PLAN
L-103 LANDSCAPE PLAN
L-104 LANDSCAPE PLAN
L-105 LANDSCAPE PLAN
L-501 LANDSCAPE DETAILS
06. STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES - 1
S-002 GENERAL STRUCTURAL NOTES - 2
S-003 GENERAL STRUCTURAL NOTES - 3
S-004 GENERAL STRUCTURAL NOTES - 4
S-005 GENERAL STRUCTURAL NOTES - 5
S-101 FOUNDATION PLAN - OVERALL
S101A FOUNDATION PLAN - AREA A
S101B FOUNDATION PLAN - AREA B
S101C FOUNDATION PLAN - AREA C
S101D FOUNDATION PLAN - AREA D
S-102 SECOND FLOOR FRAMING PLAN - OVERALL
S102A SECOND FLOOR FRAMING PLAN - AREA A
S102B SECOND FLOOR FRAMING PLAN - AREA B
S102C SECOND FLOOR FRAMING PLAN - AREA C
S-103 ROOF FRAMING PLAN - OVERALL
S103A ROOF FRAMING PLAN - AREA A
S103B ROOF FRAMING PLAN - AREA B
S103C ROOF FRAMING PLAN - AREA C
S103D ROOF FRAMING PLAN - AREA D
S-201 LATERAL RESISTING SYSTEM ELEVATIONS - 1
S-202 LATERAL RESISTING SYSTEM ELEVATIONS - 2
S-203 LATERAL RESISTING SYSTEM ELEVATIONS - 3
S-204 LATERAL RESISTING SYSTEM ELEVATIONS - 4
S-301 FOUNDATION SECTIONS - 1
S-302 FOUNDATION SECTIONS - 2
S-303 FOUNDATION SECTIONS - 3
S-321 SECOND FLOOR FRAMING SECTIONS - 1
S-322 SECOND FLOOR FRAMING SECTIONS - 2
S-323 SECOND FLOOR FRAMING SECTIONS - 3
S-331 ROOF FRAMING SECTIONS - 1
S-332 ROOF FRAMING SECTIONS - 2
S-333 ROOF FRAMING SECTIONS - 3
S-334 ROOF FRAMING SECTIONS - 4
BUILDING CODE EVALUATION
1. APPLICABLE CODES AND STANDARDS
• UFC 1-200-01 DOD BUILDING CODE, 8 OCTOBER 2019
• UFC 3-301-01 STRUCTURAL ENGINEERING, 1 OCTOBER 2019
• UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES, 7 FEBRUARY 2020 W/CHANGE 4
• UFC 4-010-01 DOD MINIMUM ANTITERRORISM STANDARD FOR BUILDINGS, 12 DECEMBER 2018
• UFC 4-021-01 DESIGN AND O&M: MASS NOTIFICATION SYSTEMS, 1 JANUARY 2010 W/CHANGE 1
• USACE ENGINEERING AND TECHNICAL BULLETIN #2018-17, 25 OCTOBER 2018
• AFCESA ENGINEERING TECHNICAL LETTER (ETL) 01-18 FIRE PROTECTION ENGINEERING CRITERIA - ELECTRONIC
EQUIPMENT INSTALLATIONS, 24 OCTOBER 2001
• INTERNATIONAL BUILDING CODE (IBC), 2018, AS REFERENCED BY UFC 1-200-01 AND 3-600-01
• NFPA 1 FIRE CODE, 2018, AS REFERENCED BY UFC 1-200-01 AND 3-600-01
• NFPA 3 STANDARD FOR COMMISSIONING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS, 2018
• NFPA 4 STANDARD FOR INTEGRATED FIRE PROTECTION AND LIFE SAFETY SYSTEM TESTING, 2018
• NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018
• NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019
• NFPA 24 STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES, 2019
• NFPA 70 NATIONAL ELECTRICAL CODE (NEC), 2020
• NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE, 2019
• NFPA 80 STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, 2019
• NFPA 90A STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS, 2018
• NFPA 101 LIFE SAFETY CODE, 2018, AS REFERENCED BY UFC 3-600-01
• NFPA 291 RECOMMENDED PRACTICE FOR FIRE FLOW TESTING AND MARKING OF HYDRANTS, 2019
• ASME A17.1 SAFETY CODE FOR ELEVATORS AND ESCALATORS, 2019
• ARCHITECTURAL BARRIERS ACT (ABA) ACCESSIBILITY STANDARDS FOR DOD FACILITIES, 2015
2. OCCUPANCY CLASSIFICATION
BUSINESS (B) IBC, 304
ASSEMBLY (A-3) IBC, 303.4 (ACCESSORY TO MAIN BUSINESS OCCUPANCY, <10% AGGREGATE FLOOR AREA)
ROOMS OR SPACES USED FOR ASSEMBLY PURPOSES HAVING AN OCCUPANT LOAD OF LESS THAN 50 PERSONS AND ACCESSORY TO ANOTHER OCCUPANCY ARE CLASSIFIED AS GROUP B (IBC, 303.1.2.1) OR BUSINESS OCCUPANCY (NFPA 101, 6.1.2.1).
3. CONSTRUCTION TYPE
TYPE II-B, NON-COMBUSTIBLE, UNPROTECTED IBC CHAPTER 6
4. MIXED USE AND OCCUPANCY SEPARATIONS
ASSEMBLY OCCUPANCY AREAS (> 50 OCCUPANTS) TOTAL < 10% OF THE AGGREGATE FLOOR AREA OF THE STORY IN WHICH THEY OCCUR AND ARE LESS THAN THE IBC TABULAR ALLOWABLE AREA FOR NON-SPRINKLERED BUILDINGS OF ASSEMBLY OCCUPANCY. THESE ASSEMBLY OCCUPANCY AREAS ARE THEREFORE ACCESSORY TO THE MAIN (BUSINESS) OCCUPANCY PER IBC, 508.2.3. NO SEPARATION IS REQUIRED BETWEEN ACCESSORY OCCUPANCIES AND THE MAIN
OCCUPANCY PER IBC 508.2.4.
FIRST FLOOR TOTAL AREA = 44,252 SF SECOND FLOOR TOTAL AREA = 25,182 SF
FIRST FLOOR ASSEMBLY AREA = 1,972 SF (5%) SECOND FLOOR ASSEMBLY AREA = 1,828 SF (7%)
5. GENERAL BUILDING HEIGHT AND AREA LIMITATIONS (SPRINKLERED BUILDING)
ALLOWABLE BUILDING AREA (PER FLOOR) 69,000 SQ. FT (IBC TABLE 506.2)
ACTUAL BUILDING AREA (EXCLUDING MEZZANINES, IBC 505.2) 44,252 SQ. FT. (1ST FLOOR, APPROX.)
25,182. FT. (2ND FLOOR, APPROX.)
ALLOWABLE BUILDING HEIGHT / NUMBER OF STORIES 75 FT. / 4 STORIES (IBC TABLES 504.3 & 504.4)
ACTUAL BUILDING HEIGHT / NUMBER OF STORIES 50 FT. / 2 STORIES
6. BUILDING SEPARATION AND EXPOSURE PROTECTION
AN IMAGINARY LOT LINE IS DRAWN AT 10 FT. FROM THE BUILDING EXTERIOR WALLS FOR THE EVALUATION OF FIRE SEPARATION DISTANCE AND EXTERIOR WALL FIRE RESISTANCE RATING REQUIREMENTS. AT THAT DISTANCE THERE ARE NO FIRE RESISTANCE RATING REQUIREMENTS FOR GROUP B OCCUPANCIES OF TYPE II-B CONSTRUCTION (IBC, TABLE
602) AND EXTERIOR WALLS ARE PERMITTED TO HAVE UNLIMITED UNPROTECTED OPENINGS (IBC, 705.8.1 EXCEPTION 2).
THERE ARE NO OTHER BUILDINGS WITHIN 30 FEET OF THIS LOT LINE.
7. FIRE RESISTIVE REQUIREMENTS FOR BUILDING ELEMENTS
THERE ARE NO FIRE RESISTIVE REQUIREMENTS FOR BUILDING ELEMENTS OF TYPE II-B CONSTRUCTION PER IBC, TABLE 601, EXCEPT SUPPORTING CONSTRUCTION REQUIRED FOR RATED FIRE BARRIERS (STAIRS, ELEVATOR HOISTWAY, ELEVATOR MACHINE ROOM) ARE REQUIRED TO BE 1-HOUR RATED (IBC, 707.5.1).
8. FIRE PROTECTION SYSTEMS (UFC 3-600-01, NFPA 13)
THE BUILDING WILL BE PROTECTED THROUGHOUT WITH AUTOMATIC WET-PIPE SPRINKLER SYSTEMS. QUICK RESPONSE SPRINKLERS WILL BE PROVIDED THROUGHOUT ALL BUILDING AREAS. REFER TO FIRE PROTECTION DRAWINGS FOR
ADDITIONAL INFORMATION.
9. WATER SUPPLY TESTING
HYDRANT TEST DATE: 15 JUNE 2022
WITNESSED BY: SCOTT LEOPOLD, FIRE PROTECTION ENGINEER
TEST HYDRANT LOCATION: SOUTH SIDE OF SITE
FLOW HYDRANT LOCATION: SOUTHWEST CORNER OF SITE
STATIC PRESSURE: 60 PSI
RESIDUAL PRESSURE: 52 PSI
MEASURED FLOW: 1,035 GPM
CALCULATED FLOW: 2,470 GPM @ 20 PSI
THE WATER SUPPLY CONSISTS OF SEVERAL REDUNDANT PUMPS AND A SERIES OF GRIDDED/LOOPED MAINS. THE WATER SUPPLY IS ASSUMED TO BE UNINTERUPTED AND CONTINUOUSLY AVAILABLE IN ORDER TO MEET THE WATER
DEMAND REQUIREMENTS THROUGHOUT THE BASE.
10. WATER STORAGE REQUIREMENTS
NO WATER STORAGE IS REQUIRED FOR THIS PROJECT, THE EXISTING BASE COMBINED FIRE/DOMESTIC WATER DISTRIBUTION SYSTEM IS ADEQUATE TO SUPPLY THE FACILITY FIREFIGHTING WATER REQUIREMENTS.
11. FIRE PUMP REQUIREMENTS
A FIRE PUMP IS NOT REQUIRED FOR THIS PROJECT, THE EXISTING BASE COMBINED FIRE/DOMESTIC WATER DISTRIBUTION SYSTEM IS ADEQUATE TO SUPPLY THE FACILITY FIREFIGHTING WATER REQUIREMENTS.
12. BACKFLOW PREVENTION REQUIREMENTS (UFC 3-600-01 AND NFPA 13)
THE FIRE SPRINKLER SYSTEM WILL BE PROVIDED WITH A DOUBLE CHECK BACKFLOW PREVENTION ASSEMBLY AT THE
WATER SERVICE ENTRANCE IN THE MECHANICAL ROOM.
1. OCCUPANCY CLASSIFICATION
BUSINESS NFPA 101, 6.1.11 AND CHAPTER 38
ASSEMBLY NFPA 101, 6.1.2 AND CHAPTER 12
ROOMS OR SPACES USED FOR ASSEMBLY PURPOSES HAVING AN OCCUPANT LOAD OF LESS THAN 50 PERSONS AND ACCESSORY TO ANOTHER OCCUPANCY ARE CLASSIFIED AS GROUP B (IBC, 303.1.2.1) OR BUSINESS OCCUPANCY (NFPA 101, 6.1.2.1).
2. OCCUPANT LOAD (NFPA 101, 7.3.1.2 AND UFC 3-600-01)
BUILDING USES, FUNCTIONS AND OCCUPANT LOADS ARE SUMMARIZED BELOW. REFER TO ROOM OCCUPANT LOAD SCHEDULES ON SHEET G-004 AND LIFE SAFETY PLANS ON SHEETS G-101 AND G-102 FOR ADDITIONAL INFORMATION AND
DETAILS.
USE / FUNCTION OF SPACE OCCUPANT LOAD FACTOR (PER PERSON)
GENERAL BUSINESS 150 SQ. FT. GROSS
STAGES / ASSEMBLY W/TABLES & CHAIRS 15 SQ. FT. NET
ASSEMBLY W/FIXED SEATING # OF FIXED SEATS
ASSEMBLY W/CHAIRS ONLY 7 SQ. FT. NET
STORAGE / EQUIPMENT ROOMS 500 SQ. FT. GROSS
IT / TELECOM ROOMS 300 SQ. FT. GROSS
CLASSROOMS 20 SQ. FT. NET
OCCUPANT LOAD, 1ST FLOOR 682 TOTAL OCCUPANTS (316 NON-SECURE / 366 SECURE)
OCCUPANT LOAD, 2ND FLOOR 583 TOTAL OCCUPANTS (96 NON-SECURE / 487 SECURE)
3. CAPACITY OF MEANS OF EGRESS (NFPA 101, 7.3.3, CH. 12 & 38)
MINIMUM EGRESS WIDTH FOR LEVEL COMPONENTS AND RAMPS = 0.2 IN. / PERSON
*MINIMUM EGRESS WIDTH FOR STAIRS = 0.3 IN. / PERSON
*FOR STAIRS GREATER THAN 44 IN. WIDE, CAPACITY IS CALCULATED PER NFPA 101, 7.3.3.2 AS FOLLOWS:
C=146.7 + (W-44)/0.218, WHERE C = STAIR CAPACITY AND W = STAIR WIDTH.
3 EXIT STAIRS HAVE A CLEAR WIDTH OF 54 IN., C = 146.7 + (54-44)/0.218 = 192 PERSONS 1 EXIT ACCESS STAIR HAS A CLEAR WIDTH OF 60 IN., C = 146.7 + (60-44)/0.218 = 220 PERSONS
REFER TO LIFE SAFETY PLANS ON SHEETS G101 AND G102 FOR ADDITIONAL INFORMATION AND DETAILS.
4. NUMBER OF EXITS (NFPA 101, 7.4, CH. 12 & 38)
MINIMUM NUMBER OF EXITS REQUIRED 3 FROM 2ND FLOOR, 3 FROM GROUND FLOOR
ACTUAL NUMBER OF EXITS PROVIDED 3 FROM 2ND FLOOR, 5 FROM GROUND FLOOR
ADDITIONAL EXITS PROVIDED FROM INDIVIDUAL ROOMS AT GROUND FLOOR (EQUIPMENT ROOMS, SIMULATOR ROOMS, ETC.)
5. MEZZANINES
THE BOEING MAINTENANCE MEZZANINE IS NOT MORE THAN ONE-HALF THE AREA OF THE ROOM IN WHICH IT IS LOCATED (IBC 505.2.1, EXCEPTION 2), AND IS PROVIDED WITH A SINGLE EXIT WITH A COMMON PATH OF TRAVEL NOT EXCEEDING 100 FEET
(NFPA 101, 38.2.4.5).
MECHANICAL MEZZANINES MTC2 AND MTC4 ARE EACH LESS THAN ONE-HALF THE AREA OF THE ROOM IN WHICH THEY ARE LOCATED (IBC 505.2.1, EXCEPTION 2), AND ARE PROVIDED WITH A SINGLE EXIT WITH A COMMON PATH OF TRAVEL NOT EXCEEDING 100 FEET (NFPA 101, 38.2.4.5). THESE MEZZANINES EACH HAVE AN OCCUPANT LOAD NOT GREATER THAN 10 PERSONS AND ARE ENCLOSED AND NOT OPEN TO THE ROOM IN WHICH THEY ARE LOCATED (IBC 505.2.3.1).
6. ARRANGEMENT OF MEANS OF EGRESS (NFPA 101, 7.5, CH. 12 AND 38)
EXITS ARE PROVIDED ON ALL SIDES OF THE BUILDING
IN BUILDINGS PROTECTED BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM, EXITS ARE REQUIRED TO BE SEPARATED BY
NOT LESS THAN ONE-THIRD THE LARGEST OVERALL BUILDING DIAGONAL DIMENSION.
FIRST FLOOR SECOND FLOOR
BUILDING DIAGONAL DIMENSION 412 FT. 289 FT.
MINIMUM SEPARATION REQUIRED 135 FT. 95 FT.
EXIT SEPARATION 360 FT. 183 FT.
7. TRAVEL DISTANCE TO EXITS (NFPA 101, 7.6, CH. 12 & 38)
TRAVEL DISTANCES ARE PROVIDED IN ACCORDANCE WITH PERMITTED LIMITATIONS FOR THE APPLICABLE OCCUPANCY AND USE OF EACH SPACE AS NOTED BELOW. REFER TO LIFE SAFETY PLANS FOR ACTUAL EGRESS PATHS AND TRAVEL
DISTANCES PROVIDED.
OCCUPANCY TRAVEL DISTANCE (FT.) DEAD END (FT.) COMMON PATH (FT.)
BUSINESS 300 50 100
ASSEMBLY 250 20 20 (>50 PERSONS)
75 (<50 PERSONS)
8. DISCHARGE FROM EXITS (NFPA 101, 7.7, CH. 12 AND 38)
ALL EXITS TERMINATE DIRECTLY AT A PUBLIC WAY OR TO A FINISHED WALKING PATH TO THE PUBLIC WAY.
9. ILLUMINATION OF MEANS OF EGRESS (NFPA 101, 7.8, CH. 12 & 38)
MEANS OF EGRESS WILL BE CONTINUOUSLY ILLUMINATED DURING BUILDING OCCUPIED HOURS. REFER TO ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
10. EMERGENCY LIGHTING (NFPA 101, 7.9, CH. 12 & 38)
EMERGENCY LIGHTING IS REQUIRED AND WILL BE PROVIDED FOR A MINIMUM OF 1-1/2 HOURS IN THE EVENT OF FAILURE OF
NORMAL LIGHTING. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
11. MARKING OF MEANS OF EGRESS (UFC 3-600-01 PARA. 10-2, NFPA 101, 7.10, CH. 12 & 38) EXITS WILL BE PROVIDED WITH APPROVED SIGNAGE READILY VISIBLE FROM ANY DIRECTION OF EXIT ACCESS. REFER TO
ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
12. INTERIOR FINISH CLASSIFICATION REQUIREMENTS (NFPA 101, 10.2, CH. 12 & 38)
INTERIOR WALL AND CEILING FINISHES SHALL BE CLASS A IN EXIT ENCLOSURES, CLASS A OR B IN LOBBIES AND
CORRIDORS, AND CLASS A, B OR C IN ALL OTHER AREAS.
INTERIOR FLOOR FINISHES SHALL BE NOT LESS THAN CLASS II IN EXIT ENCLOSURES AND EXIT ACCESS CORRIDORS.
CARPET AND CARPET-LIKE INTERIOR FLOOR FINISHES SHALL COMPLY WITH ASTM D2859 STANDARD TEST METHOD FOR
IGNITION CHARACTERISTICS OF FINISHED TEXTILE FLOOR COVERING MATERIALS.
FLOOR COVERINGS OTHER THAN CARPET SHALL HAVE A MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/SQ. CM.
LIFE SAFETY CODE EVALUATION
13. ENCLOSURE PROTECTION, THRU-PENETRATIONS AND OPENING PROTECTIVES
ITEM REQUIRED RATING OPENING PROTECTIVE
*VERTICAL SHAFT (STAIR/ELEVATOR) 1-HR BARRIER 1-HR (IBC, 713.4 & NFPA 101, 8.6.5)
*ELEVATOR EQUIPMENT ROOM 1-HR BARRIER 1-HR (UFC 3-600-01, 4-12.2.1)
*2-STORY OPENING W/PARTIAL ENCLOSURE 1-HR BARRIER 1-HR (NFPA 101, 8.6.8)
*UPS ROOMS 1-HR BARRIER 45-MIN (NFPA 70, 450.42)
MECH / ELEC EQUIPMENT ROOMS, SMOKE PARTITION SEALED PENETRATIONS AND
TELECOM ROOMS SELF-CLOSING DOORS (NFPA 101,
8.7.1.2)
*SUPPORTING CONSTRUCTION FOR 1-HR RATED FIRE BARRIERS SHALL BE PROTECTED TO AFFORD THE REQUIRED FIRE RESISTANCE RATING OF THE BARRIER BEING SUPPORTED. HOLLOW VERTICAL SPACES
WITHIN A FIRE BARRIER SHALL BE FIREBLOCKED AT EVERY FLOOR LEVEL.
14. DETECTION, ALARM & MASS COMMUNICATION (UFC 3-600-01 & 4-021-01, NFPA 72)
THE BUILDING WILL BE PROVIDED WITH AN ADDRESSABLE, COMBINED FIRE ALARM AND MASS
NOTIFICATION SYSTEM THROUGHOUT. THIS SYSTEM WILL INCLUDE SMOKE DETECTION WHERE REQUIRED, MANUAL ALARM STATIONS AT ALL BUILDING EXITS, AND WILL MONITOR FIRE SPRINKLER SYSTEMS THROUGH VALVE TAMPER SWITCHES AND WATERFLOW SWITCHES. NOTIFICATION WILL BE PROVIDED WITH CLEAR VISUAL STROBES MARKED "ALERT", EMERGENCY VOICE MESSAGING, AND SCROLLING LED TEXT SIGNS AT THE PRIMARY BUILDING EXITS. THE SYSTEM WILL BE MONITORED BY AND WILL REPORT TO THE
EXISTING BASEWIDE REPORTING SYSTEM. SEE FIRE PROTECTION DRAWINGS FOR ADDITIONAL
INFORMATION.
15. PORTABLE FIRE EXTINGUISHERS (UFC 3-600-01 AND NFPA 101)
GENERAL PURPOSE PORTABLE FIRE EXTINGUISHERS ARE REQUIRED AND WILL PROVIDED IN ACCORDANCE WITH NFPA 101 AND NFPA 10. IN ADDITION TO GENERAL PURPOSE TYPE ABC EXTINGUISHERS, CLEAN AGENT FIRE EXTINGUISHERS WILL BE PROVIDED IN FLIGHT SIMULATOR ROOMS, SIMULATOR IOS ROOMS, WEAPONS AND TACTICS TRAINING ROOMS, AND SERVER ROOMS. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION. ALL FIRE EXTINGUISHERS SHALL BE GOVERNMENT FURNISHED / GOVERNMENT INSTALLED; ALL FIRE EXTINGUISHER CABINETS AND WALL HOOKS SHALL BE CONTRACTOR
FURNISHED / CONTRACTOR INSTALLED.
16. CORRIDORS (NFPA 101, CH. 12 & 38)
CORRIDORS AND LOBBIES ARE NOT REQUIRED TO BE PROVIDED WITH FIRE RATED SEPARATION FROM USE AREAS BECAUSE THE FACILITY IS PROVIDED WITH AN AUTOMATIC FIRE SPRINKLER SYSTEM (NFPA 101,
12.3.6 AND 38.3.6.1(3)). MINIMUM WIDTH OF ANY CORRIDOR OR PASSAGEWAY SHALL BE 36 IN., EXCEPT CORRIDORS AND PASSAGEWAYS SERVING 50 OR MORE OCCUPANTS SHALL NOT BE LESS THAN 44 IN.
17. FIRE DAMPERS (NFPA 90A)
FIRE DAMPERS WILL BE PROVIDED AT PENETRATIONS OF FIRE RATED FLOOR AND WALL ASSEMBLIES WHERE REQUIRED IN ACCORDANCE WITH NFPA 90A. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
18. SMOKE DAMPERS (IBC, 716 AND NFPA 90A)
THERE ARE NO SMOKE BARRIERS PROVIDED OR REQUIRED IN THIS FACILITY, AND THERE IS NO HVAC AIR HANDLING EQUIPMENT HAVING A CAPACITY GREATER THAN 15,000 CFM; SMOKE DAMPERS ARE NOT
REQUIRED.
19. DUCT SMOKE DETECTORS (NFPA 90A)
DUCT SMOKE DETECTORS WILL BE PROVIDED IN ALL HVAC SUPPLY AND RETURN AIR SYSTEMS WHERE REQUIRED IN ACCORDANCE WITH NFPA 90A. REFER TO FIRE PROTECTION AND MECHANICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
20. ELEVATORS (UFC 3-600-01, IBC CH. 30, ASME A17.1)
ELEVATORS AND ELEVATOR CONTROLS WILL BE PROVIDED IN ACCORDANCE WITH UFC 3-600-01 AND NFPA 101.
21. ROOF ACCESS (IBC, 1011.12 AND UFC 3-600-01)
ROOF ACCESS IS PROVIDED IN ACCORDANCE WITH IBC 1011.12.
22. FIRE DEPARTMENT VEHICLE ACCESS (UFC 3-600-01, NFPA 1)
ALL WEATHER GROUND ACCESS IS PROVIDED WITHIN 33 FT. OF ALL SIDES OF THE BUILDING.
23. FIRE HYDRANTS (UFC 3-600-01)
FOUR EXISTING FIRE HYDRANTS ARE PROVIDED AROUND THE PERIMETER OF THE BUILDING AND ARE EXISTING TO REMAIN. ALL PORTIONS OF THE FACILITY EXTERIOR ARE WITHIN 350 FEET OF AT LEAST ONE FIRE HYDRANT, AND THE FACILITY FIRE DEPARTMENT CONNECTION WILL BE PROVIDED WITHIN 150 FEET OF
AT LEAST ONE HYDRANT, IN ACCORDANCE WITH UFC 3-600-01.
24. COMMERCIAL COOKING EXHAUST EQUIPMENT
NOT APPLICABLE, NO COMMERCIAL COOKING EQUIPMENT OR RESIDENTIAL STYLE RANGES ARE PROVIDED.
25. ACCESSIBILITY REQUIREMENTS (ABA CH. 1-10)
ACCESSIBLE RESTROOMS AND EGRESS ARE PROVIDED, AND SCROLLING LED TEXT SIGNS WILL BE PROVIDED AT THE PRIMARY BUILDING EXITS FOR OCCUPANT FIRE ALARM / MASS NOTIFICATION.
LIFE SAFETY CODE EVALUATION (CONT.)
FOR REFERENCE ONLY
NOT FOR CONSTRUCTION
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
C
N O
R F
O L
K D
IS
T
R
IC
T F
R O
N T
S T
R E
E T
N O
R F
O L
K V
A
W R
BIM 360://3012011031_F22 Formal Training Unit TRSS-F/3012011031_TRSS-F_FP_R19.rvt
1/17/2023 10:05:27 AM
G-003
B U
IL
D
IN
G
A N
D L
IF
E
S A
F E
T Y
C O
D E
E V
A L
U A
T
IO
N
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
S
L E
O P
O L D
S L E
O P
O L D
S D
U B
IN
J A
N U
A R
Y
PRELIMINARY NOT FOR CONSTRUCTION
T R
A
IN
IN
G
S U
P P
O R
T S
Q U
A D
R O
N F
A C
IL
IT
Y
(T R
S S
-F
FOR REFERENCE ONLY
NOT FOR CONSTRUCTION
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
C
N O
R F
O L
K D
IS
T
R
IC
T F
R O
N T
S T
R E
E T
N O
R F
O L
K V
A
W R
BIM 360://3012011031_F22 Formal Training Unit TRSS-F/3012011031_TRSS-F_FP_R19.rvt
1/17/2023 10:05:28 AM
G-004
O C
C U
P A
N T
L O
A D
R O
O M
S C
H E
D U
L E
S
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
S
L E
O P
O L D
S L E
O P
O L D
S D
U B
IN
J A
N U
A R
Y
PRELIMINARY NOT FOR CONSTRUCTION
T R
A
IN
IN
G
S U
P P
O R
T S
Q U
A D
R O
N F
A C
IL
IT
Y
(T R
S S
-F
178 ELEC 12 EQUIPMENT 500 1
177 FIRE ALARM 63 EQUIPMENT 500 1
176 IL WTT 2348 BUSINESS 150 16
175 FMT 44 1762 BUSINESS 150 12
174 CONSOLIDATED SERVER 781 IT 300 3
173 COURSEWARE MANAGER 91 BUSINESS 150 1
172 COURSEWARE DEVELOPMENT 766 BUSINESS 150 6
171 BLDG. SECURE AREA MECH. 520 EQUIPMENT 500 2
170 FMT 43 1760 BUSINESS 150 12
169 MTC 4 UPS 511 EQUIPMENT 500 2
168 MTC 4 MECH 230 EQUIPMENT 500 1
167 MTC 4 SERVER/DTOC 326 IT 300 2
166 MTC 4 IOS 423 BUSINESS 150 3
165 COMM. 92 IT 300 1
164 BLDG. SECURE AREA ELEC 442 EQUIPMENT 500 1 262 TELECOM 104 IT 300 1
163 STAIR 287 BUSINESS 150 2 261 STORAGE 107 STORAGE 500 1
162 IOS 379 BUSINESS 150 3 260 IIQC LAN/SERVER 193 IT 300 1
161 JC 60 STORAGE 500 1 259 CORRIDOR 1622 BUSINESS 150 11
160 FMT 42 1760 BUSINESS 150 12 258 IIQC 327 BUSINESS 150 3
159 FMT 41 1758 BUSINESS 150 12 257 MECH 56 EQUIPMENT 500 1
158 CORRIDOR 2220 BUSINESS 150 15 256 COMM 141 IT 300 1
157 UNISEX 117 BUSINESS 150 1 255 SCHEDULING 206 BUSINESS 150 2
156 MEN 222 BUSINESS 150 2 254 INSTRUCTOR MANAGER 131 BUSINESS 150 1
155 BDS SERVER 300 IT 300 1 253 INSTRUCTOR OFFICE 1282 BUSINESS 150 9
154 BRIEFING 7/MTC 4 BDS 2 309 ASSEMBLY 15 21 252 ELECTRICAL 73 EQUIPMENT 500 1
153 MOC MTC4 438 ASSEMBLY 15 30 251 UNISEX 111 BUSINESS 150 1
152 STAIR 286 BUSINESS 150 2 250 SECURE AREA BREAK ROOM 273 ASSEMBLY 15 19
151 BRIEFING 6/MTC4 BDS1 455 ASSEMBLY 15 31 249 STUDENT LOUNGE 483 ASSEMBLY 15 33
150 FMT 24 1760 BUSINESS 150 12 248 MEN 171 BUSINESS 150 2
149 FMT 23 1759 BUSINESS 150 12 247 WOMEN 132 BUSINESS 150 1
148 MTC2 BDS1 445 ASSEMBLY 15 30 246 JC 65 STORAGE 500 1
147 BRIEFING 4 261 ASSEMBLY 15 18 245 BOEING SYSTEM ADMIN. 287 BUSINESS 15 20
146 BRIEFING 3 246 ASSEMBLY 15 17 244 CLASSROOM 6 / JMPS 437 CLASSROOM 20 22
145 BRIEFING 2 250 ASSEMBLY 15 17 243 BRIEFING 8 229 ASSEMBLY 15 16
144 MTC 2 UPS 511 EQUIPMENT 500 2 242 29 TSS 348 BUSINESS 150 3
143 MTC 2 MECH 229 EQUIPMENT 500 1 241A VEST. 46 BUSINESS 150 1
142 MTC 2 SERVER/DMON 325 IT 300 2 241 SOUND BOOTH 76 BUSINESS 150 1
141 MTC 2 IOS 423 BUSINESS 150 3 240 LEARNING RESOURCE CENTER 274 BUSINESS 150 2
140 FMT 22 1759 BUSINESS 150 12 239 CLASSROOM 5 469 CLASSROOM 20 24
139 FMT 21 1768 BUSINESS 150 12 238 EWB 376 BUSINESS 150 3
138 STAIR 287 BUSINESS 150 2 237 MOC MTC2 SERVER 103 IT 300 1
137 BRIEFING 1 259 ASSEMBLY 15 18 236 CLASSROOM 1 471 CLASSROOM 20 24
136 STORAGE 83 STORAGE 500 1 235 CLASSROOM 2 470 CLASSROOM 20 24
135 PRINT COPY 146 BUSINESS 150 1 234 CLASSROOM 4 464 CLASSROOM 20 24
134 F22 CHIEF 119 BUSINESS 150 1 233 CLASSROOM 3 467 CLASSROOM 20 24
133 SECURITY / AIR FORCE SUITE 830 BUSINESS 150 6 232 CORRIDOR 1524 BUSINESS 150 11
132 SECURITY AIRFORCE OFFICER 179 BUSINESS 150 2 231 BOEING INSTRUCTOR LIAISON 119 BUSINESS 150 1
131 UNISEX 94 BUSINESS 150 1 230 WEAPONS MANAGER 152 BUSINESS 150 2
130 KITCHENETTE 83 BUSINESS 150 1 229 WEAPONS SECTION OFFICE 1172 BUSINESS 150 8
129 COMM/ENTRANCE 167 IT 300 1 228 SECURITY OFFICE 120 BUSINESS 150 1
128A MEZZANINE 330 BUSINESS 150 3 227 IT MAINT. 137 BUSINESS 150 1
128 BOEING MAINT. 1230 BUSINESS 150 9 226 BOEING SITE MANAGER 125 BUSINESS 150 1
127 MAN TRAP 74 BUSINESS 150 1 225 BOEING OFFICES 1503 BUSINESS 150 11
126 JANITOR 28 STORAGE 500 1 224 UNSECURE PRINT/COPY 131 BUSINESS 150 1
125 UNISEX 110 BUSINESS 150 1 223 E.F.B 192 BUSINESS 150 2
124 WEAPONS FAMILIARITY 248 ASSEMBLY 15 17 222 ELECTRICAL 26 EQUIPMENT 500 1
123 SUPPLY 636 STORAGE 500 2 MASS BRIEFING MOC MTC 2... 512 BUSINESS 150 4
122 D.O. 136 BUSINESS 150 1 MASS BRIEFING MOC MTC 2 (STAGE) 205 ASSEMBLY 15 14
121 CORRIDOR 183 BUSINESS 150 2 221 MASS BRIEFING MOC MTC 2 (SEATING) 1622 ASSEMBLY 160 SEATS 160
120 SMALL CONFERENCE 224 ASSEMBLY 15 15 220 NURSING MOTHER ROOM 95 BUSINESS 150 1
119 COMMANDER 131 BUSINESS 150 1 219 JANITOR 69 STORAGE 500 1
118 CSS SUPPORT 928 STORAGE 150 7 218 UNISEX 147 BUSINESS 150 1
117 PRINT COPY 39 BUSINESS 150 1 217 MEN 144 BUSINESS 150 1
116 WOMEN 186 BUSINESS 150 2 216 WOMEN 107 BUSINESS 150 1
115 MEN 141 BUSINESS 150 1 215 UNSECURE BREAK 415 ASSEMBLY 15 28
114 BREAK/HERITAGE 1228 ASSEMBLY 15 82 214 DOF OFFICE 117 BUSINESS 150 1
113 JC 51 STORAGE 500 1 213 ADD SECURITY MANAGER 122 BUSINESS 150 1
112 LARGE CONF. 744 ASSEMBLY 7 107 212 COR OFFICE 161 BUSINESS 150 2
111 CHAIR STORAGE 88 STORAGE 500 1 211 WEAPONS SECTION CONFERENCE 389 ASSEMBLY 15 26
110 ELECTRICAL UNSECURE 132 EQUIPMENT 500 1 210 GTIMS 687 BUSINESS 150 5
109 BLDG. MECH. UNSECURE 639 EQUIPMENT 500 2 209 GTIMS LEAD 126 BUSINESS 150 1
108 CORRIDOR 827 BUSINESS 150 6 208 VR CLASSROOM 309 CLASSROOM 20 16
107 STAIR 431 BUSINESS 150 3 207 MAN TRAP 80 BUSINESS 150 1
106 ELEVATOR 97 N/A 0 206 COURSE CHIEF 125 BUSINESS 150 1
105 ELEVATOR MECH 95 EQUIPMENT 500 1 205 IIQC CADRE 323 BUSINESS 150 3
104 COMM 91 IT 300 1 204 IIQC CLASSROOM 484 CLASSROOM 20 25
103 VESTIBULE 186 BUSINESS 150 2 203 ROOF ACCESS 100 BUSINESS 150 1
102 LOBBY 714 BUSINESS 150 5 202 COMM 92 IT 300 1
101 VESTIBULE 178 BUSINESS 150 2 201 CORRIDOR 446 BUSINESS 150 3
ROOM NO ROOM NAME
NET AREA
(SQ. FT.)
USE
LOAD FACTOR
(SQ. FT./PERSON)
OCCUPANTS ROOM NO ROOM NAME
NET AREA
(SQ. FT.)
USE
LOAD FACTOR
(SQ. FT./PERSON)
OCCUPANTS
1ST FLOOR OCCUPANT LOAD SCHEDULE 2ND FLOOR OCCUPANT LOAD SCHEDULE
ROOM OCCUPANT LOADS ARE PROVIDED FOR REFERENCE ONLY. ALL SPACES ARE CLASSIFIED AS BUSINESS OCCUPANCY PER IBC AND NFPA 101, EXCEPT ROOMS 112, 114 AND 221 ARE CLASSIFIED AS ASSEMBLY (A-3) PER IBC AND ASSEMBLY PER NFPA 101. ALL OCCUPANT LOADS ARE BASED ON USE OF THE SPACE, NOT OCCUPANCY, PER NFPA 101. SIMILAR OCCUPANCIES/USES ARE GROUPED TOGETHER AS SHOWN ON LIFE SAFETY PLANS, SHEETS G-101 AND G-102, PER UFC 3-600-01, 1-7.2.3.D, IN ORDER TO
DETERMINE BUILDING OCCUPANT LOADS.
8"
X X
X X
X X
X X
X X
X X
X
26'
30'
142'
10'
33'
24'
GS101
S.
L
EO
PO
LD
S.
L
EO
PO
LD
S.
D
U
BI
N
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
PRELIMINARY NOT FOR CONSTRUCTION
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C:\Users\LeopoldS\ACCDocs\RS&H\3012011031_F22 Formal Training Unit TRSS-F\Project Files\01.Drawings and Design Data\04.DWG CADD\DWG FILES\F\TRSS-F-F-GS101.dwg
PLOT DATE: 1/17/2023 10:14 AM
US Army Corps of Engineers ®
FY
F -2
FO
R M
A L
TR
A
IN
IN
G U
N
IT
(F
TU
TR
A
IN
IN
G
S U
PP
O
R T
SQ
U
A D
R O
N F
A C
IL
IT
Y (T
R
SS
-F
R . H
AM
M
ET
T
N
AO
F
IL
E N
O
8C
N O
R
FO
LK
D
IS
TR
IC
T
F R
O N
T
ST
R
EE
T N
O R
FO
LK
, V A.
JA
N
U
AR
Y
AN
SI
-D
W
3R
C O
D E
C O
M
PL
IA
N
C E
SI
TE
P
LA
N
A. AN IMAGINARY LOT LINE IS DRAWN AT 10 FEET FROM THE BUILDING; NO
OTHER BUILDING IS WITHIN 30 FEET OF THAT LOT LINE. AT THAT
DISTANCE THERE ARE NO FIRE RESISTANCE RATING REQUIREMENTS
FOR EXTERIOR WALLS, AND EXTERIOR WALLS ARE PERMITTED TO
HAVE UNLIMITED UNPROTECTED OPENINGS. THE BUILDING IS
SURROUNDED BY UNOBSTRUCTED CLEAR SPACE NOT LESS THAN 33
FEET IN WIDTH.
B. FRONTAGE AREA INCREASE IS NOT REQUIRED.
C. FIRE DEPARTMENT ACCESS IS VIA EXISTING ROADS AND FIRE LANES
AND NEW PARKING AREAS. SEE CIVIL SITE DRAWINGS FOR ADDITIONAL
INFORMATION.
D. FIRE LANES AND ACCESSWAYS ARE MINIMUM 20 FT. CLEAR WIDTH AND
HAVE MINIMUM 13'-6" UNOBSTRUCTED VERTICAL CLEARANCE. SEE
CIVIL SITE DRAWINGS FOR ADDITIONAL INFORMATION.
E. THE FACILITY IS WITHIN A SECURE PERIMETER, ANTITERRORISM
SECURE ACCESS REQUIREMENTS ARE NOT APPLICABLE.
F. THE FIRE DEPARTMENT MAIN ACCESS TO THE FACILITY IS LOCATED ON
THE WEST SIDE OF THE BUILDING. DIRECT ACCESS TO THE FIRE
SPRINKLER RISER ROOM AND FIRE ALARM CONTROL ROOM ARE
PROVIDED ON THE WEST AND SOUTH WALLS RESPECTIVELY, NEAR THE
SOUTHWEST CORNER OF THE BUILDING.
G. THE FIRE DEPARTMENT CONNECTION IS LOCATED AT THE SOUTHWEST
CORNER OF THE BUILDING.
H. FIRE HYDRANTS ARE EXISTING TO REMAIN AND ARE SPACED IN
ACCORDANCE WITH UFC 3-600-01. THE EXISTING HYDRANT LOCATED
NEAR THE SOUTHWEST CORNER OF THE SITE IS WITHIN 150 FT. OF THE
BUILDING FIRE DEPARTMENT CONNECTION. THE EXISTING
UNDERGROUND DOMESTIC/FIRE WATER DISTRIBUTION IS A GRIDDED
MAIN SYSTEM. BUILDING FIRE PROTECTION SYSTEMS WILL BE
SUPPLIED BY A NEW 8" CONNECTION TO THE EXISTING 10" WATER MAIN
ALONG SWEENEY BLVD. A POST INDICATOR CONTROL VALVE (PIV) WILL
BE PROVIDED IN THE BUILDING FIRE SERVICE LATERAL AT THE POINT
OF CONNECTION.
I. A FIRE PUMP IS NOT REQUIRED FOR THIS PROJECT.
J. A WATER STORAGE TANK IS NOT REQUIRED FOR THIS PROJECT.
K. THERE ARE NO HAZARDOUS MATERIAL SPILL CONTAINMENT
REQUIREMENTS FOR THIS PROJECT.
L. THE FIRE PROTECTION BACKFLOW PREVENTION ASSEMBLY IS
LOCATED INSIDE THE RISER ROOM AT THE SOUTHWEST CORNER OF
THE BUILDING.
CODE COMPLIANCE SITE NOTES:
EXISTING ACCESS
ROAD TO REMAIN
SWEENEY BLVD, EXISTING
ACCESS ROAD TO REMAIN
JU
N
IP
ER
S
TR
EE
T, E
XI
ST
IN
G
AC
C
ES
S R
O
AD
T O
R
EM
AI
N
EXISTING FIRE HYDRANT
(TYP)
EMERGENCY VEHICLE
ACCESS
WALL MOUNTED FIRE
DEPARTMENT CONNECTION
OPEN / UNCOVERED
LOADING RAMP
TRSS-F BUILDING OUTLINE
EXISTING WATER
TOWER
BUILDING 351
EXISTING
SUBSTATION
EXISTING PUMP
BUILDING 348
SPRINKLER RISER ROOM
FIRE PROTECTION POINT OF SERVICE
CONNECTION TO EXISTING 10" WATER
MAIN WITH PIV (SEE CIVIL FOR
ADDITIONAL INFORMATION)
FIRE PROTECTION SERVICE LATERAL
FIRE DEPARTMENT
PRIMARY BUILDING ACCESS
FIRE ALARM CONTROL ROOM
10 FT. FIRE SEPARATION
TO IMAGINARY LOT LINE
1. REFER TO SHEET G-003 FOR BUILDING AND LIFE SAFETY CODE
EVALUATION.
2. REFER TO SHEETS G-101 AND G-102 FOR BUILDING INTERIOR LIFE
SAFETY PLANS.
GENERAL SHEET NOTES
33 FT. UNOBSTRUCTED SPACE
A1 CODE COMPLIANCE SITE PLAN
1" = 30'-0"
N
FOR REFERENCE ONLY
NOT FOR CONSTRUCTION
AutoCAD SHX Text
SCALE: 1''=30'-0"
AutoCAD SHX Text 20'
AutoCAD SHX Text 30'
AutoCAD SHX Text 10'
AutoCAD SHX Text
AutoCAD SHX Text 30'
AutoCAD SHX Text
SCALE:
98 FT COMMON PATH,
100 FT PERMITTED
66" CLEAR WIDTH
EXIT CAPACITY=330 OCCUPANTS
ACTUAL USAGE=81 OCCUPANTS
66" CLEAR WIDTH
EXIT CAPACITY=330 OCCUPANTS
ACTUAL USAGE 87 OCCUPANTS
66" CLEAR WIDTH
EXIT CAPACITY=330 OCCUPANTS
ACTUAL USAGE=16 OCCUPANTS
41" CLEAR WIDTH
EXIT CAPACITY=205 OCCUPANTS
ACTUAL USAGE=80 OCCUPANTS
33" CLEAR WIDTH
EXIT CAPACITY=165 OCCUPANTS
ACTUAL USAGE=12 OCCUPANTS
(TYPICAL OF 8 SIM ROOMS)
20 FT DEAD END,
20 FT PERMITTED
60 FT COMMON PATH,
100 FT PERMITTED
70 FT COMMON PATH FROM
MEZZANINE, 100 FT PERMITTED
90" CLEAR WIDTH
EXIT CAPACITY=450 OCCUPANTS
ACTUAL USAGE=11 OCCUPANTS
2 4 8 129 10 11
H
K
G
G.5
F
D
E
41" CLEAR WIDTH
EXIT CAPACITY=205 OCCUPANTS
210 FT TRAVEL DISTANCE,
300 FT PERMITTED
44 FT COMMON PATH,
100 FT PERMITTED
117 FT TRAVEL DISTANCE,
300 FT PERMITTED
IL WTT
CONSOLIDATED
SERVER
SECURITY / AIR
FORCE SUITE
BOEING MAINT.
CHAIR
STORAGE
COMMANDER
BLDG. MECH.
UNSECURE
BREAK/HERITAGE
LARGE CONF.
STAIR
FMT 21
FMT 22
MTC 2
SERVER/DMON
FMT 23
149 FMT 24
FMT 41
FMT 42
MTC 4
SERVER/DTOC
FMT 43
FMT 44
MOC MTC4
BRIEFING
6/MTC4 BDS1
MTC2 BDS1
BRIEFING 2
STAIR
MTC 4 IOS
BDS SERVER
BLDG. SECURE
AREA ELEC
COMM.
BLDG. SECURE
AREA MECH.
MEN
BRIEFING 3
BRIEFING 4
BRIEFING
7/MTC 4 BDS 2
BRIEFING 1
JC
MTC 2 IOS
IOS
LOBBY
COURSEWARE
DEVELOPMENT
UNISEX
F22 CHIEF
SECURITY
AIRFORCE
OFFICER
PRINT COPY
COMM
ELEVATOR
ELEVATOR
MECH
CSS SUPPORT
COURSEWARE
MANAGER
MTC 2 UPS
MTC 4 UPS
VESTIBULE
VESTIBULE
CORRIDOR
WOMEN
MEN
KITCHENETTE
STORAGE
JC
D.O.
SMALL
CONFERENCE
STAIR
UNISEX
MAN TRAP
CORRIDOR
ELEC
UNISEX
2-STORY OPENING WITH PARTIAL ENCLOSURE
(2ND FLOOR) PER NFPA 101 SECTION 8.6.8.
SUPPLY
WEAPONS
FAMILIARITY
ELECTRICAL
UNSECURE
FIRE ALARM
19 FT DEAD END,
50 FT PERMITTED
135 FT TRAVEL DISTANCE,
300 FT PERMITTED
50 FT COMMON PATH,
100 FT PERMITTED
ASSEMBLY OCCUPANCY
1,209 SQ. FT. / 81 OCCUPANTS
2 EXITS REQUIRED & PROVIDED
COMM
JANITOR
STAIR
RETRACTABLE PARTITION
ASSEMBLY OCCUPANCY
745 SQ. FT. / 106 OCCUPANTS
2 EXITS REQUIRED & PROVIDED
33" CLEAR WIDTH
EXIT CAPACITY=165 OCCUPANTS
ACTUAL USAGE=9 OCCUPANTS
66" CLEAR WIDTH
EXIT CAPACITY=330 OCCUPANTS
ACTUAL USAGE=80 OCCUPANTS
3 75 61.8
B
C
66" CLEAR WIDTH
EXIT CAPACITY=330 OCCUPANTS
ACTUAL USAGE=2 OCCUPANTS
66" CLEAR WIDTH
EXIT CAPACITY=330 OCCUPANTS
ACTUAL USAGE=1 OCCUPANT
41" CLEAR WIDTH
EXIT CAPACITY=205 OCCUPANTS
66" CLEAR WIDTH
EXIT CAPACITY=330 OCCUPANTS
ACTUAL USAGE=3 OCCUPANTS
66" CLEAR WIDTH
EXIT CAPACITY=330 OCCUPANTS
ACTUAL USAGE=2 OCCUPANTS
33" CLEAR WIDTH
EXIT CAPACITY=165 OCCUPANTS
ACTUAL USAGE=106 OCCUPANTS
66" CLEAR WIDTH
EXIT CAPACITY=330 OCCUPANTS
ACTUAL USAGE=17 OCCUPANTS
33" CLEAR WIDTH
EXIT CAPACITY=165 OCCUPANTS
ACTUAL USAGE=1 OCCUPANT
66" CLEAR WIDTH
EXIT CAPACITY=330 OCCUPANTS
ACTUAL USAGE=1 OCCUPANT
MEZZANINE ABOVE
MEZZANINE ABOVE MEZZANINE ABOVE
66" CLEAR WIDTH
EXIT CAPACITY=330 OCCUPANTS
ACTUAL USAGE=0 OCCUPANTS
IL WTT
LIFE SAFETY LEGEND
DESCRIPTIONSYMBOL
BUILDING EXIT
GENERAL BUSINESS USE
1 PERSON / 150 SQ. FT. GROSS
STAGE / ASSEMBLY USE W/ TABLES & CHAIRS
1 PERSON / 15 SQ. FT. NET
ASSEMBLY USE W/FIXED SEATING
1 PERSON / FIXED SEAT
ASSEMBLY USE W/O FIXED SEATING
1 PERSON / 7 SQ. FT. NET
STORAGE / EQUIPMENT ROOMS
1 PERSON / 500 SQ. FT. GROSS
IT / TELECOM ROOMS
1 PERSON / 300 SQ. FT. GROSS
CLASSROOM USE
1 PERSON / 20 SQ. FT. NET
EGRESS TRAVEL START POINT
FIRE EXTINGUISHER, TYPE ABC
NO HATCH
FIRE EXTINGUISHER, CLEAN AGENT
COMMON PATH OF TRAVEL SEPARATION
TRAVEL DISTANCE
MEZZANINE
OCCUPANT LOAD FACTORS AS NOTED IN
SUMMARY TABLE ON THIS SHEET
CAPACITY OF MEANS OF EGRESS (NFPA 101, 7.3.3, CH. 12 & 38)
MINIMUM EGRESS WIDTH FOR LEVEL COMPONENTS AND RAMPS = 0.2 IN. / PERSON
THE FIRST FLOOR OCCUPANT LOAD IS 682 (316 NON-SECURE, 366 SECURE). A MINIMUM OF THREE EXITS ARE REQUIRED, WITH 5 EXITS AVAILABLE FROM GENERAL BUILDING USE AREAS, PLUS ADDITIONAL EXITS FROM
INDIVIDUAL ROOMS (E.G. BREAK/HERITAGE, EQUIPMENT ROOMS, SIMULATOR ROOMS).
THERE ARE 3 DOUBLE DOOR EXITS HAVING A CLEAR WIDTH OF 66 INCHES EACH, AND TWO SINGLE DOOR EXITS HAVING CLEAR WIDTH OF 33 INCHES, FOR A TOTAL EXIT WIDTH OF 264 INCHES. UTILIZING CAPACITY FACTOR 0.2 INCH PER PERSON FOR THE EXIT DOORS, THE TOTAL EXIT CAPACITY OF THE FIRST FLOOR IS 1,320 PERSONS.
EGRESS CAPACITY IS IN COMPLIANCE.
CAPACITY OF MEANS OF EGRESS -…