Att 2 Statement of Work.pdf

PDF 93 KB Posted

Attached to
Replace Tile with LVT, First Floor Hallway, Bldg 380 Federal contract opportunity
Solicitation number
FA282323Q4035
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This statement of work outlines the requirements for a project to replace tile flooring with luxury vinyl tile and install new rubber base in the first floor hallway of Building 380 on Eglin Air Force Base in Florida. The contractor will be responsible for removing the existing tile, cove base, and transition strips; preparing the substrate; installing approximately 1,500 square feet of 36-inch-by-36-inch LVT flooring and 300 linear feet of 6-inch rubber base; and disposing of all waste. The work must follow all applicable National Fire Protection Association standards and Air Force electrical requirements. The solicitation number for this project is FA282323Q4035, issued by the Department of the Air Force Materiel Command Test Center. Curtis Keefer of the 96th Civil Engineer Squadron will serve as the contracting officer's representative.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Tile with LVT, First Floor Hallway, Bldg 380, newest first.
File Type Posted
Questions and Anwsers.pdf PDF
FA282323Q4035_Combo RFQ_Amendment 1.pdf PDF
Att 1 Provisions and Clauses.pdf PDF
FA282323Q4035_Combo RFQ.pdf PDF
Att 4 Tile Pricing Form.xlsx XLSX spreadsheet
Att 3 Tier 1 Contract Inquires POC.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract #:

TRIRIGA ID 12368080

Project Title: Replace Tile with LVT, First Floor Hallway, Bldg 380 Date: 06/06/23

SUMMARY OF WORK

1. PURPOSE OF SECTION: The purpose of this section is to provide the Contractor with a Statement of Work for the above mentioned project. The Contractor shall follow the guidelines provided in the Statement of Work of said contract. The Contractor shall seek clarification from the Contracting Officer (CO) if there is any question on the applicability of a provision. These provisions are for the purpose of general information only and are not intended to completely describe the regulations and restrictions that apply on Eglin AFB.

2. PROJECT SCOPE: The project is located on Eglin AFB, Florida. The Contractor shall be required to furnish all materials, equipment, plant, labor and personnel necessary to design, manage, and accomplish this work in accordance with the contract requirements. The Contractor is expected to maintain safety requirements and demonstrate standard construction methods, at all times.

A. Provide everything necessary to remove tile & vinyl base, then replace with LVT along with new rubber base as indicated on the Task Order. Scope is limited to the First Floor Hallway within building 380 on Eglin AFB.

B. Contractors shall be responsible for the disposal of the old tile, vinyl cove base, transition strips and any waste generated by the installation of flooring products.

3. PRINCIPAL FEATURES: Principal features of work are as follows:

A. Civil:

a. None.

B. Architectural:

a. Remove existing cove base, scrape and prep to receive new. (~ 300 LF)

b. Remove existing transition strips, as required.

c. Remove existing Tile. Do not disturb substrate to ensure a smooth and secure bonding surface. (~1500 SQFT) NOTE: Asbestos Abatement accomplished 26-27Aug2023, so all removed

d. Install new LVT, 36” x 36” Residential Resilient LVT, 20 Mil thickness, color 925 Pebble Color or equivalent (customer approved). GSA Approved Tile Vendor (~ 1500 SQFT)

e. Install 6” cove base (color will coordinate with LVT) ( ~ 300 LF)

f. All work shall be in accordance with the latest NFPA and NEC requirements to ensure maximum protection against loss of life and property by fire.

g. Design and installation must meet all UFC 3-600-01 and applicable NFPA

Standards.

h. All interior finishes, contents and furnishings must meet NFPA 101 Chapter 10.

C. Mechanical (HVAC):

a. None

D. Electrical

a. All electrical work must be completed IAW NFPA 70 and by a certified electrician.

b. Any fire detection or fire alarm devices that are moved or disconnected for any reason will require reacceptance testing IAW NFPA 72.

c. All work must be in compliance with UFC 3-520-01 Interior Electrical Systems, latest edition.

d. Ensure compliance with the Eglin AFB specific electrical requirements.

E. COMMUNICATIONS: (Customer and 96 CS will verify)

a. All work shall be IAW 96 CS Eglin AFB Cable Installation Specifications, 2

March 2012 (96 CS), or latest release. Provides the technical criteria and information for the installation of base cable infrastructure.

F. SPECIAL INSTRUCTIONS:

a. This project must be completed in a timely matter with minimal impact. Notify CO immediately of any impact regarding long lead items, delays or anything that could affect the negotiated schedule and completion date.

b. Customer will provide escorts if needed.

c. The adjacent areas within this facility will be occupied during construction.

d. Ensure adequate ventilation and coordination prior to work generating fumes, dust, debris and vibration, prior to the activity.

e. Provide warranty, certificates of compliance plus maintenance/cleaning instructions, as applicable the COR prior to the invoice being paid.

COR (Contracting Officer Representative) will be: Curtis Keefer/796CES/CEOES Contracting Officer Representative 850-882-5023