This is a Department of the Army permit and associated federal biological opinion document from the U.S. Army Corps of Engineers (USACE) and National Marine Fisheries Service (NMFS) for the Alaska Railroad Corporation's (ARRC) Seward Freight Dock expansion project in Resurrection Bay, Seward, Alaska. The permit (POA-2024-00197) authorizes the placement of fill material below the high tide line and installation of piling below the mean high water mark to expand the existing freight dock and construct a road. The project involves three phases of dock expansion extending the dock face by 375 feet with a 300-foot usable width, installation of approximately 850 sheet pile pairs, 14 anchor piles, 14 fender piles, and 4 mooring dolphin piles, placement of approximately 134,800 cubic yards of fill material across 4.75 acres, rock revetment installation, and construction of approximately 4,500 feet of new gravel roadway. The permit was issued January 5, 2026, and expires January 31, 2031. In-water work is scheduled to commence November 1, 2026, and continue through approximately May 31, 2028, spanning approximately 12 months of active pile driving and construction activities.
The biological opinion concludes that the proposed action is not likely to jeopardize the continued existence of fin whales, Mexico and Western North Pacific DPS humpback whales, or Western DPS Steller sea lions, with authorized incidental take limited to Level B harassment (behavioral disturbance) of two fin whales, 14 humpback whales (13 Mexico DPS, 1 Western North Pacific DPS), and 790 Steller sea lions. The opinion also addresses 250 proposed threatened sunflower sea stars that may be exposed to direct physical contact during construction. The project includes comprehensive mitigation measures requiring protected species observers, shutdown zones for marine mammals, vessel speed restrictions, pre-construction surveys for sunflower sea stars, and strict monitoring and reporting protocols. The state of Alaska Department of Environmental Conservation issued a water quality certification on November 27, 2024, with conditions requiring compliance with construction stormwater permits, erosion control measures, spill prevention procedures, and natural resource delineation. No information regarding federal funding is provided in the permit documents, though the project received partial funding through the U.S. Department of Transportation Maritime Administration's Port Infrastructure Development Program.
Text of this file
DEPARTMENT OF THE ARMY
ALASKA DISTRICT, U.S. ARMY CORPS OF ENGINEERS
REGULATORY DIVISION
P.O. BOX 6898
JBER, AK 99506-0898
January 5, 2026
Regulatory Division
POA-2024-00197
Mr. Brian Lindamood Alaska Railroad Corporation 327 West Ship Creek Avenue Anchorage, Alaska 99506
Dear Mr. Lindamood:
Enclosed is the signed Department of the Army (DA) permit, file number POA-2024- 00197, Resurrection Bay, which authorizes the placement of fill material below the High Tide Line and the installation of piling below the Mean High Water Mark to expand the existing Alaska Railroad Corporation freight dock and construct a road. The project site is located within Section 3, T.1 S, R. 1 W., Seward Meridian; USGS Quad Map Seward A-7; Latitude 60.1194º N., Longitude -149.4246º W.; in Seward, Alaska. Also enclosed is a Notice of Authorization which should be posted in a prominent location near the authorized work.
If changes to the plans or location of the work are necessary for any reason, plans must be submitted to us immediately. Federal law requires approval of any changes before construction begins.
This permit should not be considered as an approval of the design features of any activity authorized or an implication that such construction is considered adequate for any purpose intended. It does not authorize any damages to private property, invasion of private rights, or any infringement of federal, state, or local laws or regulations.
Please contact me via email at Randal.P.Vigil@usace.army.mil, by mail at the address above, or by phone at (907) 201-5022, if you have questions.
Sincerely, Randal P. Vigil Chief, Southeast\North Central Section
Enclosures
United States Army Corps of Engineers Resurrection Bay
A permit to: Place fill material below the High Tide Line and the installation of piling below the Mean High Water Mark to expand an existing dock and construct a road at: Alaska Railroad Corporation freight dock_____________________________ has been issued to: the Alaska Railroad Corporation_____________________ on: January 5, 2026,___________ and expires: January 31, 2031.__________
Address of Permittee: 327 West Ship Creek Avenue, Anchorage, AK 99506.__
Permit Number:
Under “View”, change to Print View FOR: District Commander to see box to insert POA# Randal P. Vigil Chief, Southeast\North Central Section
REGULATORY DIVISION
ENG FORM 4336, Jul 81 (33 CFR 320-330) EDITION OF JUL 70 MAY BE USED (Proponent: CECW-O)
POA-2024-00197
AutoCAD SHX Text
SEWARD
AutoCAD SHX Text
60.1194 LAT.
AutoCAD SHX Text
-149.4246 LONG.
AutoCAD SHX Text
+13.8 FT
AutoCAD SHX Text
MEAN HIGH WATER (MHW)
AutoCAD SHX Text
MEAN LOWER LOW WATER (MLLW)
AutoCAD SHX Text
HIGH TIDE LINE (HTL)
AutoCAD SHX Text
+9.7 FT
AutoCAD SHX Text
0.00 FT
AutoCAD SHX Text
RESURRECTION BAY
AutoCAD SHX Text
CITY OF SEWARD
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 4/12/2024
AutoCAD SHX Text
BY:
AutoCAD SHX Text
IN:
AutoCAD SHX Text of
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVE ANCHORAGE, AK 99501
AutoCAD SHX Text
DATUM: MLLW = O.0'
AutoCAD SHX Text
LAT: 60.119403° NLONG:149.424646° WS: 3 T: 001S R:001W SEWARD MERIDIAN
AutoCAD SHX Text
POA-1965-00034-M23
AutoCAD SHX Text
PURPOSE:
EXPAND AND IMPROVE FREIGHT DOCK AND TRANSPORTATION CORRIDOR
(1) EXISTING MOORING DOLPHIN
AutoCAD SHX Text 571'
AutoCAD SHX Text 571'
AutoCAD SHX Text
RESURRECTION BAY
AutoCAD SHX Text
EBB FLOW
AutoCAD SHX Text
CITY
AutoCAD SHX Text
CITY
AutoCAD SHX Text
CITY
AutoCAD SHX Text
ARRC PARCEL LEASED TO CITY
AutoCAD SHX Text
ALASKA RAILROAD RESERVE LIMITS
AutoCAD SHX Text
MHW
AutoCAD SHX Text
HTL
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
MLLW
AutoCAD SHX Text -40
AutoCAD SHX Text -40
AutoCAD SHX Text -25
AutoCAD SHX Text -35
AutoCAD SHX Text -30
AutoCAD SHX Text -35
AutoCAD SHX Text -30
AutoCAD SHX Text -25
AutoCAD SHX Text -20
AutoCAD SHX Text -5
AutoCAD SHX Text
EXISTING SEWARD LOADING FACILITY
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
MHW
AutoCAD SHX Text
HTL
AutoCAD SHX Text -25
AutoCAD SHX Text
APPROXIMATE LOCATIONS OF EXISTING TIDE STATION BENCHMARKS
AutoCAD SHX Text
+13.8 FT
AutoCAD SHX Text
MEAN HIGH WATER (MHW)
AutoCAD SHX Text
MEAN LOWER LOW WATER (MLLW)
AutoCAD SHX Text
HIGH TIDE LINE (HTL)
AutoCAD SHX Text
+9.7 FT
AutoCAD SHX Text
0.00 FT
AutoCAD SHX Text
CITY = PARCEL BELONGS TO THE CITY OF SEWARD
AutoCAD SHX Text
RESURRECTION BAY
AutoCAD SHX Text
CITY OF SEWARD
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 4/12/2024
AutoCAD SHX Text
BY:
AutoCAD SHX Text
IN:
AutoCAD SHX Text of
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVE ANCHORAGE, AK 99501
AutoCAD SHX Text
DATUM: MLLW = O.0'
AutoCAD SHX Text
LAT: 60.119403° NLONG:149.424646° WS: 3 T: 001S R:001W SEWARD MERIDIAN
AutoCAD SHX Text
POA-1965-00034-M23
AutoCAD SHX Text
PURPOSE:
MLLW
AutoCAD SHX Text
SEWARD HIGHWAY
AutoCAD SHX Text
BULK MATERIAL STORAGE YARD
AutoCAD SHX Text
PORT AVE
AutoCAD SHX Text
AIRPORT ROAD
AutoCAD SHX Text
AIRPORT
AutoCAD SHX Text
+13.8 FT
AutoCAD SHX Text
MEAN HIGH WATER (MHW)
AutoCAD SHX Text
MEAN LOWER LOW WATER (MLLW)
AutoCAD SHX Text
HIGH TIDE LINE (HTL)
AutoCAD SHX Text
+9.7 FT
AutoCAD SHX Text
0.00 FT
AutoCAD SHX Text
RESURRECTION BAY
AutoCAD SHX Text
CITY OF SEWARD
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 4/12/2024
AutoCAD SHX Text
BY:
AutoCAD SHX Text
IN:
AutoCAD SHX Text of
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVE ANCHORAGE, AK 99501
AutoCAD SHX Text
DATUM: MLLW = O.0'
AutoCAD SHX Text
LAT: 60.119403° NLONG:149.424646° WS: 3 T: 001S R:001W SEWARD MERIDIAN
AutoCAD SHX Text
POA-1965-00034-M23
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
EXPAND AND IMPROVE FREIGHT DOCK AND TRANSPORTATION CORRIDOR
AutoCAD SHX Text
PEM
AutoCAD SHX Text
PSS/EM
AutoCAD SHX Text PUB, PUBHx, PABH
AutoCAD SHX Text
PUB/EM
AutoCAD SHX Text
RUBH
EEM
NTS
AutoCAD SHX Text
APPROX EXISTING GRADE
AutoCAD SHX Text
EXISTING SHEET PILE TAIL WALL
AutoCAD SHX Text
EL= 20' TOP OF DOCK
AutoCAD SHX Text
EL= 0' MLLW
AutoCAD SHX Text
EL= -37'±MUDLINE
AutoCAD SHX Text 1%±
AutoCAD SHX Text
EXISTING RR TRACKS
AutoCAD SHX Text
EL= 9.7' MHW
AutoCAD SHX Text
EL= 13.8' HTL
AutoCAD SHX Text
RESURRECTION BAY
AutoCAD SHX Text
CITY OF SEWARD
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 4/12/2024
AutoCAD SHX Text
BY:
AutoCAD SHX Text
IN:
AutoCAD SHX Text of
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVE ANCHORAGE, AK 99501
AutoCAD SHX Text
DATUM: MLLW = O.0'
AutoCAD SHX Text
LAT: 60.119403° NLONG:149.424646° WS: 3 T: 001S R:001W SEWARD MERIDIAN
AutoCAD SHX Text
POA-1965-00034-M23
AutoCAD SHX Text
PURPOSE:
571'
AutoCAD SHX Text 571'
AutoCAD SHX Text -40
AutoCAD SHX Text -40
AutoCAD SHX Text -25
AutoCAD SHX Text -35
AutoCAD SHX Text -30
AutoCAD SHX Text
HTL
AutoCAD SHX Text
MHW
AutoCAD SHX Text -35
AutoCAD SHX Text -30
AutoCAD SHX Text -25
AutoCAD SHX Text -20
AutoCAD SHX Text -5
AutoCAD SHX Text
PHASE I PROPOSED RELOCATED MOORING DOLPHIN & CATWALK
AutoCAD SHX Text 375'±
AutoCAD SHX Text 375'±
AutoCAD SHX Text 375'±
AutoCAD SHX Text 375'±
AutoCAD SHX Text
PHASE I PROPOSED SCOUR PROTECTION
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
PHASE I PROPOSED HIGH MAST LIGHT, TYP
AutoCAD SHX Text
PHASE I PROPOSED ONSHORE BOLLARD, TYP
AutoCAD SHX Text
TO FREIGHT DOCK ROAD
AutoCAD SHX Text -25
AutoCAD SHX Text
+13.8 FT
AutoCAD SHX Text
MEAN HIGH WATER (MHW)
AutoCAD SHX Text
MEAN LOWER LOW WATER (MLLW)
AutoCAD SHX Text
HIGH TIDE LINE (HTL)
AutoCAD SHX Text
+9.7 FT
AutoCAD SHX Text
0.00 FT
AutoCAD SHX Text
RESURRECTION BAY
AutoCAD SHX Text
CITY OF SEWARD
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 4/12/2024
AutoCAD SHX Text
BY:
AutoCAD SHX Text
IN:
AutoCAD SHX Text of
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVE ANCHORAGE, AK 99501
AutoCAD SHX Text
DATUM: MLLW = O.0'
AutoCAD SHX Text
LAT: 60.119403° NLONG:149.424646° WS: 3 T: 001S R:001W SEWARD MERIDIAN
AutoCAD SHX Text
POA-1965-00034-M23
AutoCAD SHX Text
PURPOSE:
-40
AutoCAD SHX Text -40
AutoCAD SHX Text -40
AutoCAD SHX Text -35
AutoCAD SHX Text -30
AutoCAD SHX Text
HTL
AutoCAD SHX Text
MHW
AutoCAD SHX Text -35
AutoCAD SHX Text -30
AutoCAD SHX Text -25
AutoCAD SHX Text -20
AutoCAD SHX Text -5
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
TO FREIGHT DOCK ROAD
AutoCAD SHX Text
+13.8 FT
AutoCAD SHX Text
MEAN HIGH WATER (MHW)
AutoCAD SHX Text
MEAN LOWER LOW WATER (MLLW)
AutoCAD SHX Text
HIGH TIDE LINE (HTL)
AutoCAD SHX Text
+9.7 FT
AutoCAD SHX Text
0.00 FT
AutoCAD SHX Text
RESURRECTION BAY
AutoCAD SHX Text
CITY OF SEWARD
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 4/12/2024
AutoCAD SHX Text
BY:
AutoCAD SHX Text
IN:
AutoCAD SHX Text of
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVE ANCHORAGE, AK 99501
AutoCAD SHX Text
DATUM: MLLW = O.0'
AutoCAD SHX Text
LAT: 60.119403° NLONG:149.424646° WS: 3 T: 001S R:001W SEWARD MERIDIAN
AutoCAD SHX Text
POA-1965-00034-M23
AutoCAD SHX Text
PURPOSE:
-40
AutoCAD SHX Text -40
AutoCAD SHX Text -40
AutoCAD SHX Text -35
AutoCAD SHX Text -30
AutoCAD SHX Text
HTL
AutoCAD SHX Text
MHW
AutoCAD SHX Text -35
AutoCAD SHX Text -30
AutoCAD SHX Text -25
AutoCAD SHX Text -20
AutoCAD SHX Text -5
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
MLLW
AutoCAD SHX Text
TO FREIGHT DOCK ROAD
AutoCAD SHX Text
+13.8 FT
AutoCAD SHX Text
MEAN HIGH WATER (MHW)
AutoCAD SHX Text
MEAN LOWER LOW WATER (MLLW)
AutoCAD SHX Text
HIGH TIDE LINE (HTL)
AutoCAD SHX Text
+9.7 FT
AutoCAD SHX Text
0.00 FT
AutoCAD SHX Text
RESURRECTION BAY
AutoCAD SHX Text
CITY OF SEWARD
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 4/12/2024
AutoCAD SHX Text
BY:
AutoCAD SHX Text
IN:
AutoCAD SHX Text of
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVE ANCHORAGE, AK 99501
AutoCAD SHX Text
DATUM: MLLW = O.0'
AutoCAD SHX Text
LAT: 60.119403° NLONG:149.424646° WS: 3 T: 001S R:001W SEWARD MERIDIAN
AutoCAD SHX Text
POA-1965-00034-M23
AutoCAD SHX Text
PURPOSE:
SEWARD HIGHWAY
AutoCAD SHX Text
AIRPORT ROAD
AutoCAD SHX Text
PROPOSED FREIGHT DOCK ROAD
AutoCAD SHX Text
PROPOSED CULVERT, TYP
AutoCAD SHX Text
TO FREIGHT DOCK
AutoCAD SHX Text
RESURRECTION BAY
AutoCAD SHX Text
CITY OF SEWARD
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 4/12/2024
AutoCAD SHX Text
BY:
AutoCAD SHX Text
IN:
AutoCAD SHX Text of
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVE ANCHORAGE, AK 99501
AutoCAD SHX Text
DATUM: MLLW = O.0'
AutoCAD SHX Text
LAT: 60.119403° NLONG:149.424646° WS: 3 T: 001S R:001W SEWARD MERIDIAN
AutoCAD SHX Text
POA-1965-00034-M23
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
EXPAND AND IMPROVE FREIGHT DOCK AND TRANSPORTATION CORRIDOR
AutoCAD SHX Text
PEM
AutoCAD SHX Text
PSS/EM
AutoCAD SHX Text PUB, PUBHx, PABH
AutoCAD SHX Text
PUB/EM
AutoCAD SHX Text
RUBH
EEM
QUANTITIES
9 14
SEWARD FREIGHT
DOCK IMPROVEMENTS
DOCK AND REVETMENT FOOTPRINT QUANTITIES
DOCK FILL QUANTITIES
REVETMENT FILL QUANTITIES FOR SLOPE PROTECTION
POA-2024-00197
AutoCAD SHX Text
RESURRECTION BAY
AutoCAD SHX Text
CITY OF SEWARD
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 4/12/2024
AutoCAD SHX Text
BY:
AutoCAD SHX Text
IN:
AutoCAD SHX Text of
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVE ANCHORAGE, AK 99501
AutoCAD SHX Text
DATUM: MLLW = O.0'
AutoCAD SHX Text
LAT: 60.119403° NLONG:149.424646° WS: 3 T: 001S R:001W SEWARD MERIDIAN
AutoCAD SHX Text
POA-1965-00034-M23
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
EXPAND AND IMPROVE FREIGHT DOCK AND TRANSPORTATION CORRIDOR
AutoCAD SHX Text
PROJECT TOTAL
AutoCAD SHX Text
BELOW HTL
AutoCAD SHX Text
BELOW MHW
AutoCAD SHX Text
BELOW MLLW
AutoCAD SHX Text
EXISTING FOOTPRINT - PHASE I (ACRES)*
AutoCAD SHX Text 0.27
AutoCAD SHX Text 0.24
AutoCAD SHX Text 0.22
AutoCAD SHX Text 0.00
AutoCAD SHX Text
IN TIDAL WATERS
AutoCAD SHX Text 0.36
AutoCAD SHX Text 0.31
AutoCAD SHX Text 0.00
AutoCAD SHX Text 0.05
AutoCAD SHX Text 0.02
AutoCAD SHX Text 0.00
AutoCAD SHX Text 4.75
AutoCAD SHX Text 4.65
AutoCAD SHX Text 2.18
AutoCAD SHX Text 0.44
AutoCAD SHX Text 0.10
AutoCAD SHX Text 5.01
AutoCAD SHX Text
EXISTING FOOTPRINT - PHASE II (ACRES)*
AutoCAD SHX Text
EXISTING FOOTPRINT - PHASE III (ACRES)*
AutoCAD SHX Text
NEW FOOTPRINT - FULL PROJECT (ACRES)
AutoCAD SHX Text
NEW FOOTPRINT - PHASE I (ACRES)
AutoCAD SHX Text 2.81
AutoCAD SHX Text 2.80
AutoCAD SHX Text 2.80
AutoCAD SHX Text 1.96
AutoCAD SHX Text 1.72
AutoCAD SHX Text 1.63
AutoCAD SHX Text 0.18
AutoCAD SHX Text 1.92
AutoCAD SHX Text
NEW FOOTPRINT - PHASE II (ACRES)
AutoCAD SHX Text 0.23
AutoCAD SHX Text 0.22
AutoCAD SHX Text 0.04
AutoCAD SHX Text 0.28
AutoCAD SHX Text
NEW FOOTPRINT - PHASE III (ACRES)
AutoCAD SHX Text
EXISTING FOOTPRINT - FULL PROJECT (ACRES)*
AutoCAD SHX Text 0.65
AutoCAD SHX Text 0.55
AutoCAD SHX Text 0.00
AutoCAD SHX Text 0.81
AutoCAD SHX Text
*NEW FILL ON EXISTING DOCK AND SEDIMENT GROIN FOOTPRINT
AutoCAD SHX Text
PROJECT TOTAL
AutoCAD SHX Text
BELOW HTL
AutoCAD SHX Text
BELOW MHW
AutoCAD SHX Text
BELOW MLLW
AutoCAD SHX Text
IN TIDAL WATERS
AutoCAD SHX Text 50,800
AutoCAD SHX Text 50,800
AutoCAD SHX Text 28,800
AutoCAD SHX Text 7,100
AutoCAD SHX Text 7,100
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 58,700
AutoCAD SHX Text 58,700
AutoCAD SHX Text 28,800
AutoCAD SHX Text 35,900
AutoCAD SHX Text 19,900
AutoCAD SHX Text
AutoCAD SHX Text 12,900
AutoCAD SHX Text 18,100
AutoCAD SHX Text
AutoCAD SHX Text 50,800
AutoCAD SHX Text 7,100
AutoCAD SHX Text
AutoCAD SHX Text 58,700
AutoCAD SHX Text 43,300
AutoCAD SHX Text 22,800
AutoCAD SHX Text
BULK FILL - PHASE I (CY)
AutoCAD SHX Text
BULK FILL - PHASE II (CY)
AutoCAD SHX Text
BULK FILL - PHASE III (CY)
AutoCAD SHX Text
BULK FILL - PROJECT TOTAL (CY)
AutoCAD SHX Text
LAYER FILL - PHASE I (CY)
AutoCAD SHX Text
LAYER FILL - PHASE II (CY)
AutoCAD SHX Text 1,800
AutoCAD SHX Text 1,000
AutoCAD SHX Text
AutoCAD SHX Text 2,300
AutoCAD SHX Text
LAYER FILL - PHASE III (CY)
AutoCAD SHX Text 55,800
AutoCAD SHX Text 33,800
AutoCAD SHX Text
AutoCAD SHX Text 68,400
AutoCAD SHX Text
LAYER FILL - PROJECT TOTAL (CY)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 13,800
AutoCAD SHX Text
SURFACING FILL - PHASE I (CY)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 7,600
AutoCAD SHX Text
SURFACING FILL - PHASE II (CY)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1,100
AutoCAD SHX Text
SURFACING FILL - PHASE III (CY)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 22,500
AutoCAD SHX Text
SURFACING FILL - PROJECT TOTAL (CY)
AutoCAD SHX Text
FILTER ROCK - PHASE I (CY)
AutoCAD SHX Text 2,100
AutoCAD SHX Text 1,500
AutoCAD SHX Text 1,200
AutoCAD SHX Text
AutoCAD SHX Text 1,500
AutoCAD SHX Text 1,200
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3,400
AutoCAD SHX Text 2,700
AutoCAD SHX Text
AutoCAD SHX Text 2,100
AutoCAD SHX Text
AutoCAD SHX Text 4,800
AutoCAD SHX Text
FILTER ROCK - PHASE II (CY)
AutoCAD SHX Text
FILTER ROCK - PHASE III (CY)
AutoCAD SHX Text
FILTER ROCK - PROJECT TOTAL (CY)
AutoCAD SHX Text
SLOPE PROTECTION - PHASE I (CY)
AutoCAD SHX Text 6,500
AutoCAD SHX Text 3,200
AutoCAD SHX Text 2,100
AutoCAD SHX Text 1,300
AutoCAD SHX Text 2,700
AutoCAD SHX Text 3,000
AutoCAD SHX Text 1,000
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6,600
AutoCAD SHX Text 5,100
AutoCAD SHX Text 2,600
AutoCAD SHX Text 2,300
AutoCAD SHX Text
AutoCAD SHX Text 10,300
AutoCAD SHX Text
SLOPE PROTECTION - PHASE II (CY)
AutoCAD SHX Text
SLOPE PROTECTION - PHASE III (CY)
AutoCAD SHX Text
SLOPE PROTECTION - PROJECT TOTAL (CY)
AutoCAD SHX Text
SLOPE PROTECTION REMOVAL/SALVAGE - PHASE I (CY)
AutoCAD SHX Text 2,900
AutoCAD SHX Text 2,300
AutoCAD SHX Text 2,000
AutoCAD SHX Text 1,000
AutoCAD SHX Text 5,200
AutoCAD SHX Text 3,800
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 8,200
AutoCAD SHX Text 6,300
AutoCAD SHX Text 1,700
AutoCAD SHX Text 7,100
AutoCAD SHX Text 1,000
AutoCAD SHX Text 11,000
AutoCAD SHX Text
SLOPE PROTECTION REMOVAL/SALVAGE - PHASE II (CY)
AutoCAD SHX Text
SLOPE PROTECTION REMOVAL/SALVAGE - PHASE III (CY)
AutoCAD SHX Text
SLOPE PROTECTION REMOVAL/SALVAGE - PROJECT TOTAL (CY)
AutoCAD SHX Text
EXCAVATION - PHASE I (CY)
AutoCAD SHX Text 4,400
AutoCAD SHX Text 4,400
AutoCAD SHX Text 4,400
AutoCAD SHX Text 2,400
AutoCAD SHX Text 3,900
AutoCAD SHX Text 3,900
AutoCAD SHX Text 1,900
AutoCAD SHX Text 1,200
AutoCAD SHX Text 1,200
AutoCAD SHX Text
AutoCAD SHX Text 9,500
AutoCAD SHX Text 9,500
AutoCAD SHX Text 4,600
AutoCAD SHX Text 3,900
AutoCAD SHX Text 1,200
AutoCAD SHX Text 9,500
AutoCAD SHX Text
EXCAVATION - PHASE II (CY)
AutoCAD SHX Text
EXCAVATION - PHASE III (CY)
AutoCAD SHX Text
EXCAVATION - PROJECT TOTAL (CY)
AutoCAD SHX Text
PROJECT TOTAL
AutoCAD SHX Text
BELOW HTL
AutoCAD SHX Text
BELOW MHW
AutoCAD SHX Text
BELOW MLLW
IN TIDAL WATERS
SEWARD FREIGHT
DOCK IMPROVEMENTS
QUANTITIES
PILE QUANTITIES
ROADWAY FILL QUANTITIES
REVETMENT FILL QUANTITIES FOR SCOUR PROTECTION
POA-2024-00197
AutoCAD SHX Text
RESURRECTION BAY
AutoCAD SHX Text
CITY OF SEWARD
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 4/12/2024
AutoCAD SHX Text
BY:
AutoCAD SHX Text
IN:
AutoCAD SHX Text of
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVE ANCHORAGE, AK 99501
AutoCAD SHX Text
DATUM: MLLW = O.0'
AutoCAD SHX Text
LAT: 60.119403° NLONG:149.424646° WS: 3 T: 001S R:001W SEWARD MERIDIAN
AutoCAD SHX Text
POA-1965-00034-M23
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
EXPAND AND IMPROVE FREIGHT DOCK AND TRANSPORTATION CORRIDOR
AutoCAD SHX Text
CONSTRUCTION METHOD
AutoCAD SHX Text
PROJECT TOTAL
AutoCAD SHX Text
BELOW HTL
AutoCAD SHX Text
BELOW MHW
AutoCAD SHX Text
BELOW MLLW
AutoCAD SHX Text
EXISTING DOLPHIN PILES (24" ROUND STEEL)
AutoCAD SHX Text
VIBRATORY REMOVAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING ONSHORE BOLLARD (24" ROUND STEEL)
AutoCAD SHX Text
VIBRATORY REMOVAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET PILES PAIRS (PS31 OR SIMILAR)
AutoCAD SHX Text
VIBRATORY INSTALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ANCHOR PILES (HP14 STEEL H-PILES)
AutoCAD SHX Text
VIBRATORY INSTALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NEW FENDER PILES (30" ROUND STEEL)
AutoCAD SHX Text
VIBRATORY INSTALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BOLLARD PILES (30" ROUND STEEL)
AutoCAD SHX Text
AutoCAD SHX Text
VIBRATORY INSTALL (UPLANDS)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HIGH MAST LIGHT PILES (30" ROUND STEEL)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VIBRATORY INSTALL (UPLANDS)
AutoCAD SHX Text
DOLPHIN PILES (30" ROUND STEEL)
AutoCAD SHX Text
AutoCAD SHX Text
VIBRATORY INSTALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
IMPACT PROOFING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PILE REMOVAL
AutoCAD SHX Text
TEMPORARY PILES
AutoCAD SHX Text
NEW PILE INSTALLATION
AutoCAD SHX Text
TEMPORARY TEMPLATE PILES (24" ROUND STEEL OR HP18 STEEL H-PILES)
AutoCAD SHX Text
VIBRATORY INSTALL & REMOVAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VIBROCOMPACTION PROBES (HP14 STEEL H-PILE PROBE)
AutoCAD SHX Text
VIBRATORY INSTALL (UPLANDS)
AutoCAD SHX Text 2,157
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT TOTAL
AutoCAD SHX Text
PUB/EM1H WETLANDS
AutoCAD SHX Text
PSS1F/EM1B WETLANDS
AutoCAD SHX Text
PUBH WETLANDS
AutoCAD SHX Text
ROAD FOOTPRINT (ACRES)
AutoCAD SHX Text 7.5
AutoCAD SHX Text
ROAD CUT (CY)
AutoCAD SHX Text
ROAD FILL (CY)
AutoCAD SHX Text 0.06
AutoCAD SHX Text 0.20
AutoCAD SHX Text 0.005
AutoCAD SHX Text
BY WETLAND CLASSIFICATIONS
AutoCAD SHX Text 14,500
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 17,500
AutoCAD SHX Text
AutoCAD SHX Text 1,290
AutoCAD SHX Text
AutoCAD SHX Text
SCOUR PROTECTION FOOTPRINT (ACRES)
AutoCAD SHX Text 0.44
AutoCAD SHX Text
AutoCAD SHX Text 0.44
AutoCAD SHX Text 0.44
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1,400
AutoCAD SHX Text 1,400
AutoCAD SHX Text 1,400
AutoCAD SHX Text
AutoCAD SHX Text 1,400
AutoCAD SHX Text
FILTER ROCK (CY)
AutoCAD SHX Text
SCOUR PROTECTION (CY)
AutoCAD SHX Text 2,100
AutoCAD SHX Text 2,100
AutoCAD SHX Text 2,100
AutoCAD SHX Text 2,100
AutoCAD SHX Text
EXCAVATION (CY)
AutoCAD SHX Text
PROJECT TOTAL
AutoCAD SHX Text
BELOW HTL
AutoCAD SHX Text
BELOW MHW
AutoCAD SHX Text
BELOW MLLW
IN TIDAL WATERS
TYPICAL ROAD SECTION - UNDEVELOPED AREA
TYPICAL ROAD SECTION - DEVELOPED AREA
TYPICAL OPEN CELL SHEET PILE DOCK SECTION B-B
SEWARD FREIGHT
DOCK IMPROVEMENTS
TYPICAL SECTIONS
POA-2024-00197
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
COMPACTED GRAVEL
AutoCAD SHX Text
BASE COURSE
AutoCAD SHX Text 2%
AutoCAD SHX Text 2%
AutoCAD SHX Text
COMPACTED GRAVEL
AutoCAD SHX Text
BASE COURSE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ROAD
AutoCAD SHX Text 2%
AutoCAD SHX Text
RAIL
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 60'±
AutoCAD SHX Text 60'±
AutoCAD SHX Text 60'±
AutoCAD SHX Text 60'±
AutoCAD SHX Text
NTS
AutoCAD SHX Text
FILTER ROCK
AutoCAD SHX Text
FINISH GRADE
AutoCAD SHX Text
APPROX EXISTING GRADE
AutoCAD SHX Text 1.5
AutoCAD SHX Text
AutoCAD SHX Text
EL= -40' FUTURE DREDGE LINE
AutoCAD SHX Text
EL= 20' TOP OF DOCK
AutoCAD SHX Text
EL= 0' MLLW
AutoCAD SHX Text
EL= -34' (VARIES) MUDLINE
AutoCAD SHX Text
EL= 6.7' EXISTING GROIN
AutoCAD SHX Text
EL= VARIES TOP OF SLOPE PROTECTION
AutoCAD SHX Text
EL= VARIES TOE OF SLOPE PROTECTION
AutoCAD SHX Text
EL= VARIES BOTTOM OF SLOPE PROTECTION
AutoCAD SHX Text 1%±
AutoCAD SHX Text
NEW SHEET PILE TAIL WALL
AutoCAD SHX Text
REVETMENT ROCK
AutoCAD SHX Text
EL= 9.7' MHW
AutoCAD SHX Text
EL= 13.8' HTL
AutoCAD SHX Text
RESURRECTION BAY
AutoCAD SHX Text
CITY OF SEWARD
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 4/12/2024
AutoCAD SHX Text
BY:
AutoCAD SHX Text
IN:
AutoCAD SHX Text of
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVE ANCHORAGE, AK 99501
AutoCAD SHX Text
DATUM: MLLW = O.0'
AutoCAD SHX Text
LAT: 60.119403° NLONG:149.424646° WS: 3 T: 001S R:001W SEWARD MERIDIAN
AutoCAD SHX Text
POA-1965-00034-M23
AutoCAD SHX Text
PURPOSE:
PANEL FENDER TYPICAL SECTION
NEW FENDERS
12 14
SEWARD FREIGHT
DOCK IMPROVEMENTS
POA-2024-00197
AutoCAD SHX Text
FENDER PILE SLEEVE
AutoCAD SHX Text
30" ROUND PILE
AutoCAD SHX Text
PANEL FENDER
AutoCAD SHX Text
MLLW= 0.0'
AutoCAD SHX Text
NTS
AutoCAD SHX Text
EL = -37' VARIES
AutoCAD SHX Text
FINISHED SURFACE
AutoCAD SHX Text
EL= 20'
AutoCAD SHX Text
HTL= 13.8'
AutoCAD SHX Text
MHW= 9.7'
AutoCAD SHX Text
FACE BEAM
AutoCAD SHX Text
EXISTING MUDLINE (VARIES)
AutoCAD SHX Text
RESURRECTION BAY
AutoCAD SHX Text
CITY OF SEWARD
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 4/12/2024
AutoCAD SHX Text
BY:
AutoCAD SHX Text
IN:
AutoCAD SHX Text of
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVE ANCHORAGE, AK 99501
AutoCAD SHX Text
DATUM: MLLW = O.0'
AutoCAD SHX Text
LAT: 60.119403° NLONG:149.424646° WS: 3 T: 001S R:001W SEWARD MERIDIAN
AutoCAD SHX Text
POA-1965-00034-M23
AutoCAD SHX Text
PURPOSE:
4 PILE DOLPHIN
SECTION
PLAN
13 14
SEWARD FREIGHT
DOCK IMPROVEMENTS
4 PILE DOLHIN DETAILS
POA-2024-00197
AutoCAD SHX Text
30" ROUND BATTER PILE
AutoCAD SHX Text
SPIN FIN
AutoCAD SHX Text 50'
AutoCAD SHX Text 50'
AutoCAD SHX Text
BOLLARD
AutoCAD SHX Text
TOP PLATE
AutoCAD SHX Text
CENTER PIPE STUB
AutoCAD SHX Text
30" ROUND PILE
AutoCAD SHX Text
BATTER PILE
AutoCAD SHX Text
BOLLARD
AutoCAD SHX Text
STIFFENER PLATE, TYP
AutoCAD SHX Text
BULL RAIL
AutoCAD SHX Text 50'
AutoCAD SHX Text 50'
AutoCAD SHX Text
NTS
AutoCAD SHX Text 80'
AutoCAD SHX Text 80'
AutoCAD SHX Text
EL 0.0' MLLW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 11'-5"
AutoCAD SHX Text 11'-5"
AutoCAD SHX Text
EL 20.0'
AutoCAD SHX Text
RESURRECTION BAY
AutoCAD SHX Text
CITY OF SEWARD
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 4/12/2024
AutoCAD SHX Text
BY:
AutoCAD SHX Text
IN:
AutoCAD SHX Text of
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVE ANCHORAGE, AK 99501
AutoCAD SHX Text
DATUM: MLLW = O.0'
AutoCAD SHX Text
LAT: 60.119403° NLONG:149.424646° WS: 3 T: 001S R:001W SEWARD MERIDIAN
AutoCAD SHX Text
POA-1965-00034-M23
AutoCAD SHX Text
PURPOSE:
TYPICAL EAST REVETMENT SECTION C-C
TYPICAL SOUTH REVETMENT SECTION D-D
TYPICAL REVETMENT
SECTIONS
14 14
SEWARD FREIGHT
DOCK IMPROVEMENTS
TYPICAL SCOUR PROTECTION SECTION E-E
POA-2024-00197
AutoCAD SHX Text
REVETMENT ROCK
AutoCAD SHX Text
FILTER ROCK
AutoCAD SHX Text
FINISH GRADE
AutoCAD SHX Text
APPROX EXISTING GRADE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 15.0'±
AutoCAD SHX Text 15.0'±
AutoCAD SHX Text 15.0'±
AutoCAD SHX Text 15.0'±
AutoCAD SHX Text
EL= VARIES TOP OF SLOPE PROTECTION
AutoCAD SHX Text
EL= VARIES TOE OF SLOPE PROTECTION
AutoCAD SHX Text
EL= VARIES BOTTOM OF SLOPE PROTECTION
AutoCAD SHX Text
REVETMENT ROCK
AutoCAD SHX Text
FILTER ROCK
AutoCAD SHX Text
APPROX EXISTING GRADE
AutoCAD SHX Text 1.5
AutoCAD SHX Text
AutoCAD SHX Text 10.0'±
AutoCAD SHX Text 10.0'±
AutoCAD SHX Text 10.0'±
AutoCAD SHX Text 10.0'±
AutoCAD SHX Text
EL= VARIES TOP OF SLOPE PROTECTION
AutoCAD SHX Text
EL= VARIES TOE OF SLOPE PROTECTION
AutoCAD SHX Text
EL= VAIRES BOTTOM OF SLOPE PROTECTION
AutoCAD SHX Text
FINISH GRADE
AutoCAD SHX Text
EL= -40' FUTURE DREDGE LINE
AutoCAD SHX Text
FILTER ROCK
AutoCAD SHX Text
SHEET PILE FACE
AutoCAD SHX Text
APPROX EXISTING GRADE, VARIES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RESURRECTION BAY
AutoCAD SHX Text
CITY OF SEWARD
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 4/12/2024
AutoCAD SHX Text
BY:
AutoCAD SHX Text
IN:
AutoCAD SHX Text of
AutoCAD SHX Text
PURPOSE:
AutoCAD SHX Text
ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVE ANCHORAGE, AK 99501
AutoCAD SHX Text
DATUM: MLLW = O.0'
AutoCAD SHX Text
LAT: 60.119403° NLONG:149.424646° WS: 3 T: 001S R:001W SEWARD MERIDIAN
AutoCAD SHX Text
POA-1965-00034-M23
AutoCAD SHX Text
PURPOSE:
Department of Environmental Conservation
DIVISION OF WATER
Wastewater Discharge Authorization Program
555 Cordova Street Anchorage, Alaska 99501-2617
Main: 907.269.6285 Fax: 907.334.2415 www.dec.alaska.gov/wastewater
Reference EDMS Submission Ref Nbr: HQ5-NFPH-D1NES, Rcv 10/17/2024 12:18:00 PM
November 27, 2024
Alaska Railroad Corporation Attn: Brian Lindamood, Vice President, Chief Engineer PO Box 107500 Anchorage, AK 99510
Re: Alaska Railroad Corporation, ARRC Seward Freight Dock POA-2024-00197 v1.0, Resurrection Bay
Mr. Lindamood, In accordance with Section 401 of the Federal Clean Water Act and provisions of the Alaska Water Quality Standards, the Department of Environmental Conservation (DEC) is issuing the enclosed water quality certification with conditions that the discharge from the proposed project will comply with water quality requirements for dredging and/or fill material in waters of the U.S., authorized by an Army Corps of Engineers (USACE) permit/license POA-2024-00197 (revised per USACE 05/07/24) - ARRC Seward Freight Dock project.
A person authorized under a provision of 18 AAC 15 may request an informal review of a contested decision by the Division Director in accordance with 18 AAC 15.185 and/or an adjudicatory hearing in accordance with 18 AAC 15.195 – 18 AAC 15.340. See DEC’s “Appeal a DEC Decision” web page https://dec.alaska.gov/commish/review-guidance/ for access to the required forms and guidance on the appeal process. Please provide a courtesy copy of the adjudicatory hearing request in an electronic format to the parties required to be served under 18 AAC 15.200. Requests must be submitted no later than the deadline specified in 18 AAC 15.
By copy of this letter, we are advising the U.S. Army Corps of Engineers of our actions and enclosing a copy of the certification for their use.
If you have any questions regarding the attached certification, please contact Willow Weimer at 907- 269-6096, dec-401cert@alaska.gov.
Sincerely, James Rypkema Program Manager, Storm Water and Wetlands
Enclosure: 401 Water Quality Certificate cc: (with encl.)
Brenna Hughes PND Engineers, Inc.
Jenn Mercer, USACE Kris Gilson; DOT
Tony Munter, ADF&G USFWS Field Office Kenai Matthew LaCroix, EPA AK Operations Jeffrey Brittain, EPA AK Operations https://dec.alaska.gov/commish/review-guidance/ mailto:dec-401cert@alaska.gov
STATE OF ALASKA
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Water Quality Certification In accordance with Section 401 of the Federal Clean Water Act (CWA) and the Alaska Water Quality Standards (18 AAC 70), a water quality certification with conditions is issued to the Alaska Railroad Corporation, Attn: Brian Lindamood, PO Box 107500, Anchorage AK 99510 for a permit/license to be issued by Army Corps of Engineers (USACE), reference POA-2024-00197 ARRC Seward Freight Dock.
Based upon the review of the federal application, readily available water quality-related materials, and certification request1 in accordance with the CWA § 121.5(b) and (c), and 121.7 (c), DEC certifies that if the permittee complies with the terms and conditions imposed by the permit and the conditions set forth in this water quality certification, then it is reasonable for DEC to conclude that the activity will comply with water quality requirements, including applicable requirements of the CWA §§ 301, 302, 303, 306, and 307, Alaska’s Water Quality Standards (WQS, 18 AAC 70) and other appropriate water quality requirements of state law.
The scope of certification is limited to the water quality-related impacts of the activity subject to the Federal license or permit (40 CFR 121.3, 18 AAC 15.180). Public notice of the application for this certification was given as required by 18 AAC 15.180 in the DEC Public Notice POA-2024-00197 posted from 10/21/2024 to 11/20/2024.
Project Purpose, Description, and Location
Project Name: ARRC Seward Freight Dock
Dates of the proposed activity are planned to begin and end: 11/01/2026 to 05/31/2028
Location: The proposed activity is located within Section 3, T. 001S, R. 001W, Seward Meridian, in Kenai Peninsula Borough, Alaska. Project Site (Latitude, Longitude): 60.119403, -149.42465.
With potential discharge location(s) as follows: 60.118364174256605, -149.4246481895447 60.131632324662895, -149.42554941177372
Purpose: The Alaska Railroad Corporation (ARRC) proposes to expand and improve the existing Seward Alaska Marine Terminal (Terminal) Freight Dock and associated transportation corridor within the Alaska Railroad Terminal Reserve (Reserve). The project will improve safety and efficiency for the movement of goods by better separating pedestrian traffic from freight and heavy truck traffic, enhance the safety and efficiency of stevedoring activities, preserve the intermodal operations of commercial freight customers, accommodate larger vessels, and enhance the long-term utility of the dock.
The U.S. Department of Transportation (USDOT) Maritime Administration (MARAD) will partially fund the project with a Port Infrastructure Development Program (PIDP) grant. Additional support is provided by a partnership with the City of Seward. As this project is intended to facilitate vessel-related operations, it would not be possible to site it away from the water.
Description: The proposed activity consists of dock expansion and road construction that will be in three phases. The applicant proposes to expand the existing freight dock to allow for additional berthing and cargo unloading space. The dock will be extended by 375 feet in tidal waters by placing 134,800 cubic
1 Reference EDMS Submission Ref Nbr: HQ5-NFPH-D1NES, Rcv 10/17/2024 12:18:00 PM yards of fill material over 4.75 acres below the High Tide Line (approximate elevation +13.8 feet above the 0.0-foot contour) of Resurrection Bay.
The proposed work would include the installation of piles below the Mean High-Water Mark (approximate elevation +9.7 feet above the 0.0-foot contour) the following totals are proposed for the project:
The new dock extension will be an Open Cell Sheet Pile TM (OCSPTM) bulkhead backed by a rock revetment, consistent with the existing dock. This type of bulkhead is a flexible steel sheet pile membrane supported by soil contact with the embedded steel sheet pile tail walls.
The dock face will be extended by 375 feet (ft); the usable width of the new extension will be 300 ft. The existing dock uplands will also be widened to 300 ft, further expanding the fill footprint and revetment to the east. The widening of the uplands, both the existing and new upland portions, will take place in up to three (3) phases. Dock upland facilities will be improved, including the installation and upgrades of dock utilities, rails, etc. The dock extension will include typical components, such as fenders, mooring bollards, sacrificial anodes, and bull rail. South of the new dock extension, a salvaged mooring dolphin and catwalk (new or salvaged) will be installed.
Temporary:
• 60, 24-inch diameter steel piles
• 2,157 steel H-piles (in post-fill uplands)
Permanent:
• 425 sheet piles
• 14 steel H-piles
• 14, 30-inch diameter round fender piles
• 4, 24-inch diameter round dolphin piles (to be removed and re-installed)
The proposed road will replace an existing gravel rail yard access route with a two-lane gravel roadway, approximately 4,500 feet long with a 24-foot-wide driving surface. Up to 1,455 cubic yards of material will be excavated and up to 1,940 cubic yards of fill material will be placed in three wetlands (0.3 acres total) for road construction.
This project will fill 4.75 acres of waters of the U.S. (WOTUS) across three phases. 134,800 cubic yards (CY) of new and salvaged fill will be placed below the high tide line (HTL).
A detailed description of the components of the dock expansion is provided in the following sections.
In addition to the dock expansion, this project entails improvements to the transportation corridor connecting the dock to Alaska’s rail and road networks. The proposed road replaces an existing gravel rail yard access route with a two-lane gravel roadway. The new road will be approximately 4,500 ft long with a 24-ft-wide driving surface and a 4:1 fore slope with a base width spanning up to 60 ft. The road will be constructed of subgrade and base course material with compacted gravel surfacing. Four (4) 24” culverts will also be installed in the North section of the roadway to facilitate cross drainage considering the adjacent wetlands.
A detailed description of the components of the corridor improvements follows the description of the dock expansion.
Mobilization: Project materials will be transported to Seward via barge, rail, and road. The origination of the project vessel(s) will depend on the selected contractor’s means and methods, but it would likely be from Anchorage, Unalaska, or Seattle. Project vessels will comply with all pertinent regulations, including protocols for marine mammal impact avoidance and minimization measures listed in this document.
Dock Expansion: Dock expansion plans are shown in three phases in the project permit drawings. One or more or all the dock construction phases may be constructed during the in-water work year, depending upon project funding and contractor means and methods. Phase I (Sheet 5) extends and armors the existing dock on the west side of the sediment groin. Phases II (Sheet 6) and III (Sheet 7) widen and extend the dock on the east side of the sediment groin within the barge basin. For impact assessment, it was assumed that all the docks would be constructed.
For the activities described below, only a single pile-driving hammer will be operational at any given time.
This assumption was utilized in the assessment of potential effects on protected species.
Template Piles: Before the construction of the OCSPTM dock, a temporary template will be constructed to aid in sheet pile cell installation. Temporary template piles will be either steel pipe piles or H-piles driven using vibratory pile-driving equipment. The template will be removed using similar methods after the sheet pile cells are constructed. Quantities noted in Table 5 are either for pipe piles or for H-piles, not cumulative.
Sheet Piles: The dock extension will be an OCSPTM structure (bulkheads using flat-web sheet piles, fabricated connector wyes, and anchor piles). This type of bulkhead is a flexible wall constructed of steel sheet piles with embedded tail wall diaphragms supported by the soil. Piles will be installed with vibratory pile-driving equipment. Interlocking sheets will be driven in pairs to the required embedment until each cell is complete.
Anchor Piles: Anchor piles fabricated from H-piles with welded connectors will be installed at the end of each sheet pile tail wall using vibratory pile-driving equipment to further support the structure.
Fill Placement & Vibro-compaction: Gravel fill will be sourced by ARRC from a competitive source, existing stockpiles of materials, or a previously existing permitted source and may be stockpiled for the project at a designated bulk materials storage area within the Reserve or placed directly in the fill location.
Fill materials will be transported from the bulk materials storage area to the project site as necessary.
Following completion of each cell, fill materials will be placed behind the sheet pile with traditional earth-moving equipment (loaders, dump trucks, bulldozers, etc.) up to an elevation of +5’ MLLW. Vibro-compaction will take place within the fill and existing soils down to -60 ft MLLW. Vibro-compaction uses an H-pile with “displacement angles” probed with vibratory pile-driving equipment to consolidate and compact fill. Above the Vibro-compaction section, fill will be placed in lifts with dump trucks and bulldozers and compacted with vibratory roller compactors.
To mitigate short-term localized turbidity resulting from fill placement, a full-length silt curtain will be used on the south end of the dock expansion between the sheet pile construction and the west side of the sediment groin. No silt curtain will be used on the east side of the sediment groin where turbidity and sedimentation are naturally increased.
Rock Revetment Scour Protection: Rock revetment will reinforce the face of the existing sheet pile wall to prevent scouring. New sheet pile walls will be driven to depths not expected to require additional rock revetment for scour protection. Materials will be placed with a land- or barge-based excavator or crane.
Rock Revetment Apron Expansion: A rock revetment protects the east and south sides of the existing dock and provides additional upland laydown capacity. Two previous expansions of the revetment were permitted and only partially constructed. An existing sediment groin, constructed following major
Resurrection River flooding in 1995, protects the vessel basin from rapid sedimentation. During this project, areas of the dock that have not yet been expanded will be widened to match the dock extension.
Gravel fill will be placed, followed by a layer of filter rock, and finally rock revetment. The existing sediment groin will be removed in sections using a land- or barge-based excavator or crane. Existing rock revetment will be salvaged for reuse in the expansion, as feasible.
Mooring Dolphin: The existing mooring dolphin and access catwalk at the south end of the Freight Dock will be removed and salvaged before dock extension. The catwalk will be lifted off with the aid of a crane.
The existing mooring dolphin is constructed with SPIN FIN™ piles. Extraction of dolphin piles will be performed with a vibratory hammer. After the dock extension is complete, the salvaged mooring dolphin will be installed. The dolphin will be connected to the dock via a new or salvaged catwalk to facilitate access during mooring operations. All dolphin piles will be installed with vibratory pile driving equipment and capacity-tested with impact pile driving equipment.
Fenders: New heavy-duty fenders with two fender piles each will be installed along the dock face to protect the dock from moored vessels. The installation will use vibratory pile-driving equipment.
Bollards: A steel face beam with bull rails, ladders, and new heavy-duty bollards is planned along the entire face of the new structure. Seven (7) of the new 18” pipe pile bollards will be welded to the face beam. One
(1) existing 24” pipe pile onshore mooring bollard at the south end of the existing dock face will be removed and salvaged. Two (2) new 30” pipe pile onshore mooring bollards will be installed in uplands at the new southern extent of the dock face. The bollard piles will be driven into completed, compacted cell fill using vibratory pile-driving equipment.
Dock Appurtenances: In addition to the main structural components and fill, the expanded dock facility will include necessary appurtenances to meet the current and future needs of the port. The existing rail lines will be extended onto the new dock. Utilities (fuel and water service lines, electrical hookups, and lighting), fenders, mooring bollards, sacrificial dock anodes, and bull rail will also be installed. New high-mast lights with buried electrical lines will be supported by 30” upland pipe pile foundations at three (3) new locations (seven (7) total locations counting existing and new high-mast lights) along the centerline of the existing and new dock sections. The high-mast light foundation piles will be driven into completed, compacted fill using vibratory pile-driving equipment.
Corridor Improvements: The proposed project also facilitates travel from the Freight Dock to Airport Road via a new Freight Dock Road. Most of the road alignment is already an existing gravel route through the Terminal that will be upgraded to an improved gravel road for freight trucks. The new road alignment will minimize impacts to railroad tracks; avoid pedestrian traffic from the Passenger Dock and Port Ave to the west; and provide traffic calming, speed mitigation, and appropriate access to the Seward Highway for freight vehicles.
The selected alignment avoids the significant wetland, and floodplain impacts of other alternatives considered at the south end of the airport as well as addressing feedback regarding the potential impacts to airport operations along that route. A new intersection with Airport Road will be created northwest of the airport’s infrastructure, avoiding additional traffic through airport facilities.
The proposed road replaces an existing gravel rail yard access route with a two-lane gravel roadway. The new road will be approximately 4,500 ft long with a 24-ft-wide driving surface, 4-ft-wide shoulders, and a 4:1 fore slope, with a total base width spanning up to 60 ft. The road will be constructed of subgrade and base course material with compacted gravel surfacing. Four (4) 24” culverts will also be installed in the North section of the roadway to facilitate cross drainage considering the adjacent wetlands.
Demobilization: Refuse and excess materials from the project will be reclaimed, recycled, or disposed of as necessary in accordance with applicable regulations. Project equipment will be demobilized to the port of origin according to the contractor’s needs and means.
Schedule and Duration: The project is scheduled to be constructed between 2026 and 2028. The total project duration is expected to be approximately 18 months. Pile driving and in-water work on the Freight Dock will require approximately 12 months beginning in November 2026. Upland vibro-compaction operations are expected to need three months, overlapping the in-water work period. Initial set-up and completion of upland appurtenances are anticipated to require two to three months. Construction of the road will require one month.
Dock expansion plans are shown in three phases in the project permit drawings. One or more or all the dock construction phases may be constructed during the in-water work year, depending upon the outcome of the project award process and contractor means and methods. Phase I extends and armors the existing dock on the west side of the sediment groin. Phases II and III widen and extend the dock on the east side of the sediment groin within the barge basin. For impact assessment, it was assumed that all the docks would be constructed.
Applicant Proposed Mitigation: The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to waters of the United States from activities involving discharges of dredged or fill material.
a. Avoidance: As this project is intended to facilitate vessel-related operations, it would not be possible to site it away from the water. The route of the road corridor has been selected to avoid more significant impacts on higher-value wetlands to the east of the proposed route.
b. Minimization: Fill quantities are the minimum required to meet the project purpose. The following Best Management Practices (BMPs) will be followed to minimize impacts to water quality and wildlife.
- Wetlands, vegetated areas, and project construction and storage areas will be clearly delineated at the beginning of the project to prevent unnecessary impacts to habitat.
- Impact pile driving equipment will utilize a pile cushion to mitigate underwater sound impacts from impulsive noise.
- In-water work activities will only take place when environmental conditions (daylight, weather, etc.) allow the entirety of permit-specified areas to be observed.
- In-water work will stop if a protected species enters a shutdown zone to avoid unauthorized
“take”.
- One or more qualified and equipped independent (i.e., not construction personnel) protected species observers (PSOs) will be on duty continuously during all in-water or over-water construction activities in accordance with the project’s Marine Mammal Monitoring and Mitigation Plan (4MP).
- Construction equipment will be cleaned of dirt, plants, and foreign materials before entering the Reserve to help prevent the spread of invasive species.
- A full-length silt curtain will be used on the south end of the dock expansion between the sheet pile construction and the west side of the sediment groin.
- A spill control and countermeasures plan will be developed and implemented for the project. The plan will address the potential for encountering contaminated soils in the vicinity of previously remediated underground storage tanks (USTs) so that appropriate procedures and materials are in place prior to beginning excavation.
- Oil booms will be readily available for containment should any releases occur.
- All hazardous materials and debris will be stored above the high tide line and secured to prevent being blown offshore.
- Pile driving will be limited to between the hours of 7 a.m. and 10 p.m. to limit the amount of noise resulting from the project each day.
- No impact pile driving will occur July 15 – September 15 to prevent impacts to sport fisheries.
c. Mitigation: Mitigation: A full list of mitigation measures is included in the Project Description. Specific measures pertaining to wetlands, WOTUS, and water quality are repeated here. Compensatory mitigation may be used to offset impacts to wetlands and waters of the U.S. that cannot be avoided or minimized. Development and final approval of this mitigation plan will be conducted in cooperation with USACE.
- ARRC and its contractors will comply with the USACE and Alaska Department of Environmental
Conservation (ADEC) permits that will be required for impacts to wetlands and waters of the U.S.
under Sections 404 and 401 of the CWA and Section 10 of the RHA.
- Wetland habitat within the vicinity of project activities will be delineated before construction to prevent unplanned impacts.
- Drainage mats will be utilized in wetland areas as appropriate to minimize impacts on vegetation and on natural drainage patterns.
- Culverts will be installed where necessary to maintain hydrologic flow.
- Cathodic protection or other corrosion protection will be utilized to protect steel elements in corrosive environments, as needed.
- A full-length silt curtain will be used on the south end of the dock expansion between the sheet pile construction and the west side of the sediment groin.
- No silt curtain will be used on the east side of the sediment groin where turbidity and sedimentation are naturally increased.
- A project SWPPP will be developed per ADEC’s Construction General Permit for stormwater discharge to prevent and mitigate construction sources of stormwater erosion and standard erosion and sedimentation BMPs will be utilized.
- Natural vegetative barriers will be maintained through the early delineation of work areas to prevent unnecessary clearing to the extent practicable.
- Erosion control measures will be regularly inspected and maintained whenever damage is discovered.
- Disturbed areas will be stabilized per ADEC’s Construction General Permit for stormwater discharge.
- Project vessels will be maintained in a manner to prevent negative impacts on water quality, including proper servicing of mechanical systems and proper stowage of hazardous materials and debris.
Antidegradation Analysis Finding
Pursuant to the Department’s Antidegradation Policy and Implementation Methods at 18 AAC 70.015 and 18 AAC 70.016, DEC finds that the project would comply with the requirements for Tiers 1 and 2 regarding water quality impacts to receiving water immediately surrounding the dredge or fill material pursuant to the Corps evaluation and findings of no significant degradation under 33 U.S.C. 1344 and under 40 CFR 230. The use of appropriate best management practices and erosion and sediment control measures would adequately protect the existing water uses and the level of water quality necessary to protect existing uses. Any potential water quality degradation is expected to be temporary and limited and necessary to accommodate important social and/or economic development in the area.
Conditions Necessary to Ensure Compliance with Water Quality Standards or Other Appropriate Water Quality Requirements of State Law
The Department of Environmental Conservation (DEC) reviewed the application and certifies that there is reasonable assurance that the proposed activity, as well as any discharge which may result, will comply with applicable provisions of Section 401 of the CWA and the Alaska Water Quality Standards (18 AAC
70) provided the permittee complies with the terms and conditions imposed by the permit/license and that the following additional measures are adhered to.
Pursuant to 18 AAC 70.020(a) and the Toxics and Other Deleterious Organic…
This is the start of the file's text. The full file is on GovTribe.
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .