Att 1 TRD 6 Jul 26.pdf
PDF 80 KB Posted
- Attached to
- Drone Targets
- Solicitation number
- FA282326Q0062
About this file
This is a Technical Requirements Document for the procurement of Unmanned Aerial System (UAS) Targets to be used by the 413 FLTS/SOTF at Eglin Air Force Base, Florida, dated 6 July 2026. The contractor must deliver 10 aircraft, 2 ground control stations, 2 paired hand controllers, 1 launch interface, and provide 2 days of flight training. All Commercial-Off-The-Shelf (COTS) information assurance (IA) and IA-enabled products must comply with AFI 17-130, Air Force Cybersecurity Program Management.
The aircraft shall feature gasoline propulsion with an optional electrical alternative, a Shahed-type flying wing airframe (or conventional airframe if suitable), an Orange Cube Autopilot, RFD-900 radio, flight batteries supporting 2 hours of flight time with 10 batteries per aircraft (1 per tail), a charging system, and flight testing prior to delivery. Flight training must be conducted at the contractor's facility. Ground control stations must include Mission Planner© software, RFD-900 radio, and antennas/mast capable of supporting greater than 15 kilometers range. All items shall be delivered to 15312 Blake Street, Eglin AFB Auxiliary Field 3/Duke Field, Florida 32542, Attention: Anthony Hix, within 45 days after receipt of order (ARO).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFIs 10 Aug 26.pdf | ||
| RFIs 7 Aug 26.pdf | ||
| FA282326Q0062 Amend 0001.pdf | ||
| RFIs 4 Aug 26.pdf | ||
| RFIs 28 Jul 26.pdf | ||
| Combo.pdf | ||
| Att 2 Brand Name Justification R.pdf | ||
| FA282326Q0062.pdf | ||
| Att 3 Reps and Certs.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Requirements Document UAS Targets 6 July 2026
1. Introduction. This technical requirements document is for the purchase of UAS Targets to be used by the 413 FLTS/SOTF, Eglin AFB, FL.
2. Technical Requirements:
a. The Contractor shall ensure that all applicable Commercial-Off-The-Shelf (COTS) IA and IA-enabled products comply with AFI 17-130, Air Force Cybersecurity Program Management.
Item Quantity
Aircraft 10 Ea
Ground Control Stations 2 Ea
Hand Controllers – Paired 2 Ea
Launch Interface 1 Ea
Flight Training 2 Days
b. Aircraft Requirements:
i. Gasoline Propulsion, with option for electrical
ii. Shahed-type flying wing airframe preferred, although a conventional airframe may be suitable
iii. Orange Cube Autopilot
iv. RFD-900 radio
v. Flight batteries [supports 2 hours of flight time, 10x batteries (1/tail)]
vi. Charging system
vii. Flight testing prior to delivery
viii. Flight training at the Contractor’s facility
c. Ground Control Station Requirements:
i. Mission Planner© installed
ii. RFD-900
iii. Antennas/mast for >15 km range
d. Delivery: All items will be delivered to 15312 Blake Street, Eglin AFB Aux Field 3/Duke Field, FL 32542, ATTN: Anthony Hix. Delivery to be made 45 Days After Receipt of Order (ARO).
File details come from the government source that posted it. Updated .