This is a Statement of Work (SOW) for the SOCOM Unique Munitions Requirement (SUMR), a multi-award Indefinite Delivery Indefinite Quantity (IDIQ) contract to support Special Operations Forces' (SOF) unique munitions needs. The contract aims to provide a mechanism for rapidly procuring various small caliber munitions, including Commercial off the Shelf (COTS), modified COTS, and munitions manufactured to a government technical data package.
The initial munitions list includes over 25 different cartridge types, ranging from 5.56mm to .338 caliber, covering various specialized rounds like stunners, breaching rounds, and combat/training ammunition. The contract will run for ten years, with contractors responsible for supplying munitions and providing specific technical data to demonstrate performance, which may include testing such as Electronic Pressure Velocity, Dispersion, Radar, Drop Testing, and Terminal Ballistics. Contractors must meet rigorous quality control standards, including a critical non-conformance escape risk goal of 1 in a million items delivered.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION D. Distribution authorized to Department of Defense and U.S. DoD contractors only. Other requests for this document shall be referred USSOCOM PM-SL.
Statement of Work (SOW) For the
SOCOM Unique Munitions Requirement
(SUMR)
20 February 2025
U.S. SPECIAL OPERATIONS COMMAND
7701 Tampa Point Boulevard MacDill Air Force Base, Florida 33621-5323
Approved by:
Jason W. Dorwart DAPM-Ammunition
SOF-A&L, PEO-SW, PM-SL
1. SCOPE:
HQ SOF PEO SW-Lethality is fielding next generation weapons with significantly increased capabilities than service common weapons. As such, there is a need for SOCOM to be able to provide a constant chain of supply for the ammunition to support these weapons as well as develop future capabilities to ensure our warfighters always have the most lethal capability on the battlefield. The intent of this contract is to establish a multi-award Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide a mechanism to rapidly procure the required munitions.
The initial munitions intended to be supported under the SUMR include, but are not limited to:
5.56MM PSRTA M862E1
CTG .50 Cal, SRTA PIP, Linked, M1183 CTG, 9mm, 147g CTG, 6.5 CM, Special Ball LR, 140GR CTG, 12.7mmx108mm Ball
CTG, .25 CALIBER STUNNER
CTG, .22 CALIBER STUNNER
CTG, 12 GAGE, 2 3/4 INCH NUMBER 6 STEEL
SHOT
CTG, .410 GAGE, 3 INCH, NUMBER 6 STEEL
SHOT
CTG, .25 CALIBER STUNNER BLUE
CTG, .300 Blackout Supersonic CTG, .300 Blackout Subsonic CTG, 6.5MM Creedmoor, 103GR, MP CTG, 6.5mm CM, 137GR
CTG, .375 ESSO, 407 GR
CTG, 6.5MM CM, Linked, 103GR CTG, .338 NM, Linked, 272 GR MP XM1214 CTG, .300 NM Ball, 245GR
CTG, .338NM, LT WT NM
CTG, 6.5mm Creedmoor, SMCC CTG, 5.56MM Optimized 70gr Barnes TSX
CTG, .300 BLACKOUT 201 GR SUBSONIC ME
CTG, .300 BLACKOUT 110 GR TTSX
CTG, .300 BLACKOUT 110 GR RRLP
CTG, .260 REM 135 GR A-TIP
CTG, .260 REM 142 GR ACCUBOND
CTG, .338 CAL, 300 GR SCENAR
CTG, 5.56MM, 62 GR BARNES RRLP LEAD
FREE PRIMERS GRAY TIP
CTG, 9MM BREACHING ROUND-REACTIVE
CTG 7.62MM X 39 Ball Combat Round CTG 7.62mm x 39 Blank Training Round
This statement of work describes the delivery orders that shall be performed under this contract.
2. BACKGROUND:
Due to Special Operations Force’s (SOF) unique mission an overarching IDIQ capable of purchasing various types of small caliber munitions is required to support the continuous evaluation and fielding of munitions not supported by the Single Manager for Conventional Munitions (SMCA). The intent of the SUMR IDIQ is to allow SOF to purchase both small and large quantities of small caliber munitions to be utilized throughout the acquisition cycle. The munitions intended to be purchased under the SUMR will be both Commercial off the Shelf (COTS), modified COTS, and munitions manufactured to a GOV TDP.
Nothing in this statement of work shall relieve the contractor of its responsibility for complying with applicable local, national, and international laws, environmental laws, ordinances, codes, and regulations (including those requiring the obtaining of licenses and permits).
3. APPLICABLE DOCUMENTS:
3.1. International Traffic in Arms Regulations (ITAR) (22 CFR Parts 120-130)
3.2. Arms Export Control Act (AECA) (22 USC 2778-2780)
3.3. DoD Directive 2040.3, End Use Certificates (EUCS)
3.4. DoD Instruction 2030.08 Implementation of Trade Security Controls (TSC) for
Transfers of DoD US Munitions List (USML) and Commerce Control List (CCL) Personal Property to Parties Outside DoD Control
3.5. DoD Instruction 2040.02 International Transfers of Technology, Articles, and Services
3.6. Registration and Reporting AR710-3 Inventory Management Asset and Transaction Reporting System
3.7. MIL-PRF-372 Cleaning Compound, Solvent, for Bore of Small Arms and Automatic Aircraft Weapons
3.8. MIL-PRF-680 Degreasing Solvent
3.9. MIL-STD-882 System Safety
3.10. MIL-STD-1168 Ammunition Lot Numbering
3.11. MIL-STD-1916 DOD preferred methods for acceptance of product
3.12. MIL-STD-129, Revision R
4. REQUIREMENTS:
4.1 General Requirements: Vendors participating in the SUMR contract will be responsible for supplying the contracted munitions along with furnishing any specific specification conformance data depending on the unique requirements specifically detailed in each individual deliver order (DO). Each individual DO will detail the specific technical data required to demonstrate performance and/or specification conformance. Depending on the maturity and end use of the item the data required will vary between each DO. The data required will be driven by the intended end use of the munitions procured. Examples of the data that may be required include, but are not limited to Electronic Pressure Velocity, and Action Time (EPVAT), Dispersion, Radar, Drop Testing, Energetic Material Data, Function and Casualty, Packaging, and Terminal Ballistics.
4.2. Energetic material qualification: As required, the contractor shall provide CDRL A024 - Energetic Plan (DI-NDTI-80566A). As required, the contractor shall provide CDRL A025 - Energetic Material Qualification Report (DI- MISC-80508B Tailored).
4.3. Packaging, Inspections, & delivery: As required, the contractor shall procure, inspect, package, and deliver required materiel in accordance with the specifications stated in this Statement of Work (SOW) and those provided with each DO. 2D barcoding is required as per unit packages, intermediate packs, exterior shipping containers, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision R, including bar coding. REPORT OF SHIPMENT shall be completed with each delivery. Billing in WAWF shall occur post-delivery to the address below. The contractor shall not perform any requirement unless specifically assigned in a delivery order. All deliveries shall be sent to:
DODAAC: W91TQM
BLUE GRASS ARMY DEPOT
431 BATTLEFIELD MEMORIAL HIGHWAY
RICHMOND KY 40475-5070
POC: Tim Thompson
(859) 779-6670 RIC: A5R; Project Code: 0EB
PIEE DODAAC info
Administered By: H92403
Ship To:W22PVK
Payment Official: HQ0338
Issued By: H92403
Accept By: H921DP
Ordering Period and Place of Performance: The ordering period for this contract is ten
(10) years from the date of Basic contract award. There will be ten one-year ordering periods. Period of Performance for the Individual Orders awarded on the Basic contract will be determined on an order-by-order basis. The place of performance will also be determined on an order-by-order basis.
4.4. Quality: The Prime contractor (Prime): As required, the contractor shall develop and maintain a Quality Program Plan (QPP) throughout the entire contract performance. When available, Prime shall submit supplier’s QPP. The Prime contractor shall ensure requirements for inspection, testing, and shipping are compliant to the Prime’s and supplier’s published quality requirements. This document shall delineate contractor’s quality system: traceability, inspection and testing, and processes (process control, inspection), non-conforming material control, data retention, and contractor identified critical characteristics list (CICCL) when applicable and/or required by specific order. The plan shall address (as a minimum) inspection and test plans, Measurement System Evaluation (MSE) CDRL A014 (DI-QCIC-81960), CCCP (Critical Characteristics Control Plan) CDRL A012 (DI- MGMT-81986), rework and repair DI-MISC-80508B, initiatives to minimize quality problems, and supplier audits. The plan shall include provisions for quality system and statistical process control audits of suppliers to verify compliance with contract requirements. In accordance with CDRL A009 – Quality Program Plan (DI- QCIC- 81722).
4.5. Measurement System Evaluation (MSE):
a) Definitions. This paragraph defines specific terms utilized throughout the rest of the addendum and in the accompanying Contract Data Requirements List
(CDRL) and Data Item Description (DID) (DI-QCIC-81960). This aids in clarifying the MSE requirements to Government and contractor personnel.
i. Acceptance Inspection Equipment (AIE). All equipment (includes AAIE defined below), special and standard, including dimensional gages, measuring equipment, test fixtures, electronic and physical test equipment, and other test equipment used for examination and test of a product to determine conformance to the Technical Data Package (TDP) which may include drawings and specifications (e.g., Detail, Performance, Weapon specifications, and QAPs).
ii. Automated Acceptance Inspection Equipment (AAIE). AIE in which the inspection and acceptance determination of the product is performed, in whole or in part, in an automatic manner.
iii. Contractor Inspection Equipment. Government-approved equipment utilized by the contractor to perform examination and tests to assure conformance to contract requirements.
iv. Commercial Inspection Equipment. Industry-developed inspection equipment of universal application, without limitations to a specific part or item, which is advertised or cataloged as available to the trade or to the public on an unrestricted basis at an established price. Examples follow:
v. Standard Test Equipment. Multi-usage equipment that is specific to a function rather than to an item. It includes such items as hardness testers, tensile strength testers, meters, weighing devices, standard gear testers, ohmmeters, voltmeters, and oscilloscopes.
vi. Standard Measuring Equipment (SME). Multipurpose equipment and standards used for performing measurements. It includes such items as micrometers, rulers, tapes, height gages, and protractors, etc. Standards include visual inspection equipment such as scratch and dig standards, surface finish comparator, color standards (FED-STD-595), etc.
b) Scope. This addendum establishes requirements for design, supply, performance, and maintenance of AIE used for product inspection and acceptance. In addition, this addendum establishes requirements for the preparation, submission, and approval of AIE documentation.
c) AIE. The contractor shall provide all AIE necessary to ensure conformance of components and end-items to contract requirements. AIE shall include inspection, measuring, and test equipment whether Government furnished, or contractor furnished (including commercially acquired) along with the necessary specifications and procedures for their use (see ISO 10012, paragraph 6.2.1).
The AIE shall not create or conceal defects on the product being inspected. All AIE documentation shall contain sufficient information to permit evaluation of the AIE’s ability to test, verify, and/or measure the applicable characteristics or parameters (see DI-QCIC-81960).
d) AIE Designs & Government Furnished Gages. AIE designs are of two types –
Government designs (see d.1) and contractor designs (see d.2). When applicable, Government designs or Government furnished gages are designated in the TDP/contract; responsibility for all other AIE is assigned to the contractor.
The designs, associated inspection procedures, and theory of operation shall have the level of detail to demonstrate capability of the proposed AIE to perform the required inspection.
i. Government AIE Designs. Government AIE designs may consist of detailed drawings necessary for the fabrication and use of the AIE. Unless otherwise specified, the contractor may submit alternate or modified contractor designs of Government AIE designs.
ii. Contractor AIE Designs. Contractor AIE design drawings shall meet the requirements of ASME Y14.100, ASME Y14.5 and ASME Y14.43 and may include commercial inspection equipment. [“Commercial inspection equipment” is defined as shown in paragraph a.4 above. It shall be fully described by catalog listings or other means which provide sufficient information to permit identification and evaluation by the Government and may include illustrations and engineering data.] Designs shall be submitted for any special fixture(s) to be used. Unless otherwise specified, Gage Tolerancing Policy shall be in accordance with ASME Y14.43, “Absolute Tolerancing (Pessimistic Tolerancing).”
iii. Visual Inspection. Visual inspection standards used for the acceptance/rejection of product shall be submitted for approval.
e) AIE Package Submittals. The contractor shall prepare the AIE package submittal in accordance with (DI-QCIC-81960) in the applicable Contract Data Requirements List (CDRL – DD Form 1423). In addition, the contractor shall adhere to the following requirements:
i. Designs for Approval. Contractor designs and/or the submission for the use of Government designs shall be approved by the Government. Partial submission of AIE designs is permissible in order to expedite the approval process; however, the response date for design review will be based on the date of the final complete submission of designs.
ii. Correspondence in English. The contractor shall ensure all AIE correspondence and documentation are submitted in English.
iii. Units of Measurement. The units of measurement within the AIE package submittal shall be consistent with the requirements of the Technical Data Package (TDP).
iv. AIE Flow Down. The contractor shall flow down AIE requirements to sub-contractors at any tier who are performing acceptance inspections.
f) Characteristics for Inspection. AIE documentation for Critical, Special, and Major characteristic inspections shall be submitted to the Government for approval in accordance with (IAW) the CDRL (DI-QCIC-81960). AIE for Minor characteristic inspections shall be submitted to the Government for approval IAW
CDRL (DI-QCIC-81960) and as required below:
i. Listed Minor (characteristics displayed on specifications and/or drawing
ii. Government selected list (as attached or as provided herein)
iii. Not submitted
g) Automated Acceptance Inspection Equipment. The AAIE shall accept only conforming material. All characteristics requiring AAIE per the TDP shall utilize inspection equipment with a minimum demonstrated reliability of 99.8% at a 90% confidence level to detect non-conforming material.
i. For inspection of major and minor characteristics where contractor utilizes AAIE when it is not required by the TDP, the AAIE package shall be submitted to the Government for approval. If the Minor characteristic is not listed in paragraph f.2 or not required for submittal in paragraph f.3, then the AAIE requirements (e.g., verification, calibration, prove-out, etc.) of the inspection shall still be performed.
ii. All AAIE packages submitted to the Government for approval shall be in accordance with MIL-A-70625 (Automated Acceptance Inspection Equipment Design, Testing and Approval of). Furthermore, the contractor shall be responsible for producing the acceptance and rejection verification standards/masters representative of the characteristics the AAIE is designed to inspect. The verification standards and frequency of use require Government approval prior to use. When verification standards are used for the VL-VII “sampling plan” per MIL-STD-1916 paragraph 4.4, verification standards and frequency of use shall require Government approval prior to use.
iii. If the AAIE accepts a critical characteristic “reject” standard the contractor shall notify the Government and act in accordance with paragraph f of the Critical Characteristic Control Addendum. In addition, if the AAIE accepts a major and/or minor characteristic “reject” standard the contractor shall act in accordance with paragraph 8.3 of ISO 10012 or paragraph 5.2.3 of
ANSI/NCSL Z540.3.
iv. All AAIE shall be required to pass a Government-approved Acceptance (Prove-Out) Test. The contractor shall conduct this test per the approved test plan and shall submit a test analysis report for approval. See applicable CDRL (DI-QCIC-81960). This test shall be performed at the contractor’s facilities who’s manufacturing system has had the AAIE fully integrated and calibrated as per paragraph (j) of this addendum. The contractor shall allow Government personnel access to this facility and unobstructed monitoring of this test.
v. The contractor shall notify the Government prior to a modification and/or relocation of the Government-approved AAIE. The modified AAIE designs shall be submitted for approval. The modified and/or relocated AAIE shall require submission of the acceptance test plan (prove-out) and results for review and approval prior to use. The modified and/or relocated AAIE shall be in accordance with paragraphs (g)(i) – (g)(iv).
h) Robust AIE System. The contractor shall ensure the AIE and its use is not negatively affected by any manufacturing/inspection environmental stimuli including, but not limited to production rate, noise, temperature, humidity, and vibration.
i) AIE Calibration and Verification. The calibration system shall be in accordance with ISO 10012 or ANSI/NCSL Z540.3. All AIE shall be subjected to scheduled calibration intervals to ensure that the equipment will accept only conforming product and reject all non-conforming product for the duration of the approved calibration period. AIE shall be subjected to periodic verification to ensure that the equipment will continue to accept and reject product with the same consistency as it did at the time of its previous calibration.
j) Contractor Alternate Inspection Method(s), Modifications and/or Relocation of AIE (Non-Automated) After Government Approval. If the contractor proposes an alternate inspection method and/or modifies the AIE design(s) affecting hardware, software, or procedures after Government approval the intended change(s) shall be submitted to and approved by the Government prior to implementation. If an AIE is relocated and the relocation risks the integrity of the inspection system, notify the Government to determine information needed to assess impact to AIE. See CDRL (DI-QCIC-81960).
k) Responsibility for AIE Package Submittal. The contractor shall submit the AIE design documentation package within contractual timeframes per CDRL (DI- QCIC-81960). The Government will provide approval or disapproval within the timeframe specified in the CDRL. Disapproval of the AIE package will require re-submittal and subsequent Government review in accordance with the CDRL requirements. The AIE package and any required prove-outs must be approved prior to First Article (FA) (if required) or production start-up if FA is not required.
l) Government’s Right to Disapprove AIE. The Government reserves the right to revoke approval of any AIE that is not satisfying the required acceptance criteria at any time during the performance of this contract. See CDRL (DI-QCIC-81960).
4.6. Critical Characteristics (SIX SIGMA)
a) The contractor’s processes shall be designed with the objective of preventing the creation or occurrence of nonconforming critical characteristics (see paragraphs d & e). The contractor shall establish, document and maintain a product specific, Critical Characteristics Control (CCC) plan that shall be submitted to and approved by the Procuring Contracting Officer (PCO) IAW DD Form 1423 and CDRL A012 (DI-MGMT-81986). The CCC plan shall include or reference all procedures, work and handling instructions and process controls relating to any critical characteristics. Mistake Proofing techniques of the material handling and inspection systems shall be a part of the CCC Plan. Guidance for developing this plan and submitting Critical Plans of Action (CPOA) (paragraph g) can be found at:
http://www.pica.army.mil/PicatinnyPublic/organizations/ardec/orgchart/quality.htm l.
b) The contractor shall assure its critical processes are robust in design, capable and under control, with the objective of not generating any critical non-conformances. The contractor shall calculate, document, clearly identify, and have a schedule that routinely assess the reliability and effectiveness of its critical processes to prevent generating critical non-conformances as identified in the CCC Plan.
c) An inspection and verification system shall be employed that will verify the robustness of all critical processes. The contractor shall calculate, document, clearly identify, and have a schedule that routinely assess the reliability and effectiveness of its inspection and verification system to detect and prevent critical non-conformance escapes as identified in the CCC Plan. The Government expects that a contractor will allow zero critical escapes. To demonstrate its critical escape risk the contractor will utilize the non-conformance escape risk goal provided below.
i. Unless otherwise specified immediately below, the calculated critical non-conformance escape risk is 1 in a million (.000001) items delivered.
Unless otherwise approved by the PCO, the non-conformance escape risk is the sum of the individual characteristic escape rates. The probability of escape for a single characteristic shall be calculated by multiplying the non-conformance rate(s) entering the inspection system(s) by the error rate of the inspection system(s). These escape rates are then summed and shall not exceed the tolerable critical non-conformance escape risk.
ii. Within 45 days after award, the contractor can elect to submit a phased-in approach on how the nonconformance escape risk will be achieved over a period of time not to exceed 180 days from the date of first article approval, or from initiation of production when first article is not required.
Submission will require approval by the Government and is subject to a technical review and analysis. Allowance for a phased-in approach will then become a part of the contract. Disapproval of the contractor’s submission does not relieve the contractor of its obligation to comply with the terms of this addendum.
iii. Based on the maximum error rate defined for the inspection system, the contractor shall develop a test procedure to demonstrate the error rate. As part of the test plan the contractor shall include sufficient test quantities to assure 90% statistical confidence in the resultant rates unless otherwise approved by the PCO. Once established, the contractor shall have a documented schedule to routinely monitor the non-conformance and inspection system error rates to assure they do not exceed the maximum rates allotted.
d) As a result of previous practices, the government’s technical data may refer to “Critical I”, “Critical II”, and “Special” characteristics. The use of the term "critical characteristics" within this addendum includes Critical I, Critical II and Special characteristics and the use of the term "critical nonconformances" includes those nonconformances pertaining to Critical I, Critical II and Special characteristics.
Unless otherwise stated in Section C, these characteristics shall be subject to all requirements of this addendum.
e) In addition to critical characteristics defined in the government’s technical data (drawings, specifications, etc.), the contractor shall also identify and document in their contractor developed technical data all known material, component, subassembly and assembly characteristics whose non-conformances would likely result in hazardous or unsafe conditions for individuals using, maintaining or depending upon the product. All additional critical characteristics identified by the contractor shall comply with the critical characteristic requirements of the technical data package, supplemented herein. The Critical Item Characteristic List (CICL) review process shall be included in the CCC Plan. The contractor's additional critical characteristics shall be classified in accordance with guidance located at http://www.pica.army.mil/PicatinnyPublic/organizations/ardec/orgchart/quality.htm l and shall be submitted to and approved by the PCO prior to production (DI-
SAFT-80970A).
f) In the event that a critical non-conformance is found anywhere in the production process, the contractor, as part of its CCC Plan, shall have procedures in place to ensure:
i. The non-conformance is positively identified and segregated to ensure that nonconforming product does not inadvertently remain in or reenter the production process. This control shall be accomplished without affecting or impairing subsequent non-conformance analysis. Final disposition of non-conforming product shall be documented and audited for traceability.
ii. The operation that produced the non-conforming component or assembly and any other operations incorporating suspect components or assemblies are immediately stopped. (See para h. for exceptions)
iii. The government (PCO) is immediately notified of the critical non-conformance (electronic mail)(DISAFT-80970A)
iv. Any suspect material is identified, segregated and suspended from any further processing and shipment.
v. An investigation is conducted to determine the root cause of the non-conformance and the required corrective actions. An evaluation shall also be conducted with regard to suspect material to ensure that no additional critical non-conformances are present. A report of this investigation shall be submitted to the government CDRL A016 (DISAFT-80970A). The use of the DID report shall not delay notification to the government as required in f(3) above.
vi. A request to restart manufacturing or to use any suspect material associated with the critical nonconformance is submitted to the government CDRL A016 (DI-SAFT-80970A). Restart of production shall not occur until authorized by the PCO, unless previously addressed in the approved CCC Plan. The Government will respond to a restart request within 3 working days. All objective evidence of the investigations to date shall be available for review at the time of restart. Suspect material shall not be used without PCO approval.
vii. The procuring activity reserves the right to refuse acceptance of any suspect material until the root cause or reasonably likely cause of the critical non-conformance has been identified, corrective action has been fully implemented and sufficient evidence has been provided to exclude non-conforming material from the conforming population.
g) The contractor may develop alternative plans and provisions, collectively referred to as a Critical Plan of Action (CPOA), relative to government or contractor identified critical characteristics. All CPOAs are independent and shall be evaluated by the government for this contract. The CPOA and any subsequent revisions submitted IAW DD Form 1423 and CDRL A012 (DI-MGMT-81986) require PCO approval prior to implementation. Unless otherwise specified at time of approval, contractor shall review and evaluate CPOAs for currency and process improvements at least on an annual basis and submit results to the PCO.
Unless otherwise approved by the PCO, each critical characteristic shall require a separate CPOA. If the CPOA includes other documents by reference they shall be submitted upon request. Guidance for the development of a CPOA can be found in the referenced guidance located at paragraph (a) of this addendum.
h) The contractor may continue production with an approved CPOA provided that the critical non-conformance is consistent with the failure mode(s) and rates established in the CPOA. Failure to meet all CPOA requirements will require the contractor to revert back to paragraph (f) requirements.
i) If a critical non-conformance is discovered beyond its designated inspection point and prior to Government acceptance the contractor shall take actions specified in paragraph (f) above. If a critical non-conformance is discovered after Government acceptance the Government has the right to invoke the requirements of paragraph (f) with respect to the contractor’s remaining production under this contract.
4.7. Rework and Repair of Nonconforming Material:
a) Rework and Repair are defined as follows:
i. Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
ii. Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
c) Repair procedures shall be documented by the Contractor and submitted on a Request for Variance, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.
d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances, and a description of the action taken or to be taken to prevent recurrence.
e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
4.8. Contract and Delivery Status Reports: As required, the contractor shall submit a report in accordance with CDRL A008 –Contractor's Status and Progress Report (DI-MGMT-81928).
4.9. Quality Post Award: As required, the contractor shall host a post award conference/meeting to include contractor and government contracting, management, quality assurance and technical personnel. The contractor shall correspond with the government to arrange a schedule and agenda CDRL DI-ADMN-81249C for the post award conference prior to the meeting. The contractor shall provide the government with minutes of the post award meeting in accordance with CDRL A010 – Contract Post Award Conference/Meeting (CPAC/M) (DI-ADMN-81250B)
4.10. First Article Acceptance Test (FAAT):
a) The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production.
All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
i. Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
ii. Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
iii. Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.
iv. Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.
v. Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to the contracting officer and the program management team.
f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the Government shall be borne by the Contractor.
g) The Prime contractor shall notify the Government sixty (60) days prior to the conducting of FAAT. The contractor shall submit a FAAT Plan for Procuring Contracting Officer (PCO) approval IAW CDRL A001 – First Article Acceptance Testing (FAAT) (DI-NDTI- 81307A). The contractor shall successfully perform a FAAT within one-hundred-twenty (120) days ACA. The contractor shall submit a FAAT report IAW CDRL A002- First Article Acceptance Test (FAAT) Report
(DI-NDTI-80809B)
4.11. Lot Acceptance/ Test and Report: As required, a Lot Acceptance Test (LAT) for all cartridge lots to verify conformance in accordance with the detailed specification, performance specification or applicable contractor specification. The Contractor shall furnish cartridges and perform the LAT at Contractor’s facility in the quantities cited in the delivery schedule. Unless authorized by the PCO or the designated representative, the lot from which the LAT sample is drawn shall not be shipped until the Government has provided official notification that the tested units have satisfactorily met the established requirements. Final acceptance of the lot shall not proceed until such notifications have been provided. The Contractor shall submit lot acceptance test to the PCO for approval in accordance with CDRL A006 – Lot Acceptance Test (LAT) Report (DI-NDTI-80809B).
4.12. Destructive Testing: All costs for destructive testing by the Contractor and items destroyed by the Government are considered as being included in the contract unit price. Where destructive testing of items or components thereof is required by contract or specification, the number of items or components required to be destructively tested, whether destructively tested or not, shall be in addition to the quantity to be delivered to the Government as set forth in the Contract Schedule. All pieces of the complete First Article shall be considered as destructively tested items unless specifically exempted by other provisions of this contract. The Contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance or in process testing, unless specifically authorized by the Contracting Officer. The Government reserves the right to take title to all or any items or components described above. The Government may take title to all or any items or components upon notice to the Contractor. The items or components of items to which the Government takes title shall be shipped in accordance with the Contracting Officer's instructions. Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor.
4.13. Cartridge Markings: As required, the cartridge case shall permanently and legibly mark the Identification Code of the Manufacturer and the last two digits of the year of manufacture.
4.14. Government Furnished Ammunition: Requests for all ammunition shall be submitted electronically to the contract specialist on DD Form 1348 no later than 90 days prior to desired delivery dates. The completed request may be submitted via electronic mail to the Contracting Officer. The contractor shall be responsible for reporting on the status of ammunition expenditures throughout the life of the contract as follows:
i. Every 90 days after the initial receipt of government furnished ammunition, the contractor shall provide an ammunition consumption report in accordance with (IAW) (DID OT-16-10003) attached in Section J, attachment title “Government Furnished Ammunition Request” to the Contracting Officer.
ii. No later than 30 days after completion of the contract, the contractor shall report to the Contracting Officer on the remaining ammunition IAW (DID OT-16-10003). The contractor shall request disposition instructions for the remaining ammunition. The contractor shall execute the disposition instructions and provide confirmation to the Contracting Officer.
The contractor shall furnish a copy of the above ammunition reports and disposition requests to the cognizant Defense Contract Management Agency (DCMA) Quality Assurance Representative (QAR).
4.15. Cartridge Lot Numbering: As required, all delivered hardware shall be assigned Ammunition Lot Numbers in accordance with MIL-STD-1168. Ammunition Data Cards shall be prepared in accordance with MIL-STD-1168 and shall follow the format required by the worldwide web application identified as WARP or Worldwide Ammunition-data Repository Program at https://mhp.redstone.army.mil. Additional details on WARP are provided on the WARP website. Prior to gaining access to WARP, developer/facility personnel involved in the preparation of ammunition data cards shall obtain a username and password for the Army Electronic Product Support (AEPS) network. The contractor shall submit CDRL A007 – Ammunition Data Cards (ADC) (DI-MISC-80043B) during LAT& FAAT & during all production deliveries.
4.16. Ammunition Data Cards (ADC):
a) Detailed requirements and guidance for the preparation of Ammunition Data
Cards (ADCs) and Ammunition Lot Numbers are contained in MIL-STD-1168, (DI-MISC-80043B) and the Worldwide Ammunition-data Repository Program (WARP) online user's manual. Detailed requirements for obtaining and using a manufacturer's identification symbol, which is an integral component of the ammunition lot number, can be found in MIL-STD-1168 and the WARP user’s manual. Information provided in paragraphs 6.7 through 6.16 of MIL-STD-1168 shall be considered mandatory requirements where all instances of the term "should" are considered to be replaced with the word "shall."
b) The contractor shall develop and submit ADCs in accordance with the requirements of this addendum, MIL-STD-1168, and the user's manual located on the WARP database. The WARP application is accessed through the Munitions History Program (MHP) website. The ADC requirement is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
c) The contractor shall prepare an ADC for each lot of item(s) being produced under this contract, regardless of whether or not those lots are accepted or rejected by the Government. The ADC shall comply with MIL-STD-1168 and WARP requirements.
d) Unless otherwise authorized by the Procuring Contracting Officer, the contractor shall include, in the components sections on the ADC representing the deliverable item, as a minimum; all assemblies, sub-assemblies, components, explosives, and propellants listed below for the item being procured.
i. End Item Component Listing Drawing Number Nomenclature See TDP see TDP
ii. The component items identified below are from paragraph (c) above and will require their own component ADC in addition to being listed on the end item ADC. The component ADCs shall also comply with MIL-STD-1168 and WARP requirements.
Drawing Number from paragraph (c) above see TDP:
e) Lot numbers shall be in accordance with MIL-STD-1168 lot number convention and the technical data package requirements. Lot numbers shall be used for all ammunition end items and their major components, including inert, dummy, or non-energetic items and components. When not required by technical data package and not considered an end item or major component, the component lot number may be constructed through contractor lot number convention.
f) The flow down of the requirement for component ADCs generated via WARP is highly encouraged for other items not identified in paragraph (d) above when the prime contractor is purchasing components, assemblies, and subassemblies from subcontractors or vendors.
g) All component RFD/ECPs shall be listed on the ADC for the deliverable item, as well as on the component ADC, when that component is identified in paragraph
(d) above. The WARP user's manual provides information on the level of detail required.
h) A sample ADC shall be developed and submitted to the WARP system 30 days prior to First Article Testing or 30 days prior to production in the event a first article is not required. The WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system.
4.17. Hazard Classification: As required, the Contractor has the option of utilizing the capability of DEVCOM AC to obtain Interim Hazard Classification (IHC) for shipment of their Research and Development (R&D) quantities of energetic materials or energetic item in support of this contract. For all Government mandated testing items Developmental Testing and Evaluation (DT&E hardware), the Contractor shall utilize the capabilities of DEVCOM AC to obtain IHCs for these items. Obtaining IHCs through DEVCOM AC, the Contractor shall provide technical data (DI-SAFT-81299C) to DEVCOM AC two (2) months prior to shipment of energetic materials or energetic items. The necessary data is explained in Army TB 700-2 and DI-SAFT-81299C. DOT and UN serial number information and packaging method are available in Title 49, CFR. The explosive weight for quantity distance determination is obtained using the guidance of Paragraph 15.4 of AMC-R 385-100.
CDRL A011– Technical Data for IHCs (DI-SAFT-81299C) (due two (2) months before LAT, FAAT& any production delivery).
SECURITY: The security level of this effort is UNCLASSIFIED
5.1 AT Level I Training: All contractor employees, including subcontractor employees, requiring access to Department of Defense installations, facilities, or controlled access areas shall complete AT Level I awareness training within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies and within 12 months prior to travel outside of the US, then annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 14 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at http://jkodirect.jten.mil/.
5.2 AT Awareness Training for Contractor Personnel Traveling Overseas: This standard language requires U.S.-based contractor employees and associated subcontractor employees to make available and to receive Government-provided area of responsibility (AOR)–specific AT awareness training within 3 months prior to OCONUS travel as directed by AR 525-13. Government provided awareness training specific to an AOR traveled is provided to contract personnel upon request by contacting the CCDC Armaments Center AT Officer at usarmy.pica.ccdc-ac.mbx.pica-ardec-at-training@mail.mil or 973-724-3005.”
5.3 Access and General Protection/Security Policy and Procedures: All contractor employees, including subcontractor employees, shall comply with all installation and facility access and local security policies and procedures (provided by the Government representative), and security/emergency management exercises.
The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements (CFR clause 52.204-9, Personal Identity Verification of Contract Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. During FPCONs Charlie and Delta, services/installation access may be discontinued/ postponed due to higher threat.
Services will resume when FPCON level and or threat is reduced to an acceptable level as determined by the Installation Commander. Contractor personnel working on an installation are required to participate in the Installation Random Antiterrorism Measures Program as directed. Contractors may be subject to and must comply with vehicle searches, wearing of ID badges, etc. Failure to comply with policies and procedures could result in barred access onto the installation.
5.4 iWATCH: All contractor employees, including subcontractor employees, shall receive training and participate in the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, and then annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 14 calendar days after completion of training by all employees and subcontractor personnel.
5.5 For contractors that do not require CAC, but require access to a DoD facility or installation: Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database
(Army Directive 2014-05/AR 190-13); applicable installation, facility and area commander installation and facility access and local security policies and procedures (provided by Government representative); or, at OCONUS locations, in accordance with status-of-forces agreements and other theater regulations.
5.6 For Contract Requiring Performance in a Foreign Country: DFARS Clause 252.225-7043, AT/Force Protection (FP) Policy for defense contractors outside of the US applies to this contract. The key AT requirement is for the contractor personnel to comply with theater clearance requirements and SOCOM policies and directives.
5.7 Hazardous Material: FAR Clause 52.223-3, Hazardous Material Identification and Material Safety Data applies to this contract.
5.8 SRC I-IV or CAT-U AA or E: DFARS Clause 252.223-7007, Safeguarding Sensitive Conventional Arms, Ammunition, and Explosives applies to this effort.
5.9 Export Control Laws/International Traffic in Arms Regulation: DFARS Clause 252.225-7048, Export- Controlled Items applies to this effort. All documents determined to contain export controlled technical data will be marked with the following notice: WARNING: - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., App. 2401 et seq.
Isolations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
5.10 Contractor must ensure compliance with the Domestic Violence Amendment to the Gun Control Act of 1968: Nothing in this clause shall relieve the Contractor of its responsibility for complying with other applicable Federal, state, and local laws, ordinances, codes, and regulations (including requirements for obtaining licenses and permits) in connection with the performance of this contract.”
5.11 OPSEC Training: Per AR 530-1 (or DoDM 5205.02-M), new contractor employees, including subcontractor employees, must complete initial (Level I) OPSEC training within 30 calendar days of reporting for duty and must also complete annual OPSEC awareness training as provided by the appropriately designated OPSEC level II trained OPSEC Officer/Coordinator.