This Statement of Work (SOW) details semi-annual maintenance requirements for the Aircraft Fire Trainer facilities at Columbus Air Force Base, specifically Buildings 993 and 994. The contractor will be responsible for comprehensive inspection, testing, and maintenance of the fire training pit and burn building, following Technical Order 35E1-2-13-1 and NFPA 1403 standards. The maintenance scope includes semi-annual and annual inspections of various system components such as propane storage, safety controls, valves, gauges, electrical systems, and structural elements.
The contract is structured with a base year and four option years, requiring the contractor to have a registered Fire Protection engineer on staff with experience maintaining complex fire trainers, including propane and pumping systems. Maintenance will be performed between 0800-1700 hours Monday through Friday, excluding federal holidays. The contractor must provide a written report within 30 days of each quarterly maintenance, identifying the system's operational status (Operational, Impaired, Marginal, or Compromised) and detailing any deficiencies or required repairs. The work will be conducted at facility number 993 on the flightline across from the fire department, with strict security and identification requirements for contractor personnel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - FA302225Q0003.pdf | ||
| ATT 2 - Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
AIRCRAFT FIRE TRAINER
Semi-Annual Maintenance for Facility 993 3 Mar 20
Provide all management, labor, material, equipment tools, transportation and other items necessary to inspect and test the fire training pit building 993 and the burn building 994. Bring the system to current qualification standards in accordance with Technical Order 35E1-2-13-1, Table 1 contained below. Services will be performed in accordance with the Technical Order 35E1-2-13-1 Operations and Instruction Manual, Table 1 below, Aircraft Fire Training Facility. Additional items may need to be addressed after the Inspection Testing and Maintenance (ITM). Maintenance personnel will coordinate getting a flight line driving pass from Base Operations for access.
1. GENERAL: This is a non-personnel services contract to provide maintenance of the aircraft fire trainer maintenance facility. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.1 Scope: Unless otherwise identified herein, the contractor shall provide all management, labor, equipment, transportation, tools, materials and other items necessary to perform aircraft fire trainer maintenance as defined in this Statement of Work.
1.2 Specific Tasks:
1.2.1. All work for building 993 shall be accomplished in accordance with table 1 inspection checklist.
1.2.2. Base bid, year 1 the following maintenance will occur.
1.2.2.1. Building 993, Aircraft Fire Training Facility (AFTF) semi-annual inspection and maintenance IAW TO 35E1-2-13-1.
1.2.2.2. Building 994, Burn Building annual inspection IAW NFPA 1403, Standard on Live Fire Training Evolutions. Performed in accordance with Table 2.
1.2.2.3. Building 994, Burn building 5 year inspection IAW NFPA 1403, Standard on Live Fire Training Evolutions.
1.2.3. Year 2-5 the following maintenance will occur.
1.2.3.1. Building 993, Aircraft Fire Training Facility (AFTF) semi-annual inspection and maintenance IAW TO 35E1-2-13-1.
1.2.3.2. Building 994, Burn building annual inspection IAW NFPA 1403, Standard on Live Fire Training Evolutions. Performed in accordance with Table 2.
1.2.4. Fully inspect, functionally test and perform tests per Technical Order 35E1-2-13-1
1.2.5. The contractor will follow Air Force Civil Engineer Support Agency’s (AFCEC) guidelines to perform the following testing of Columbus AFB fire trainer system in accordance with Technical Order 35E1-2-13-1.
Table 1. Semi-Annual System Safety Inspection and Operational Checks
SUBSYSTEM ITEM INSPECTION INSPECT OPS CHECK OPS CHECK REQ’D COMMENTS
INTERVAL OPS CHECK INTERVAL HOW ACTION
PROPANE ASME TANK SEMI-
ANNUAL
CORROSION N/A N/A REPAIR
STORAGE CRACKS REPLACE
LEAKAGE
FOUNDATION,
CRADLE, AND
SADDLE PADS
SEMI-
ANNUAL
CORROSION N/A N/A REPAIR
CRACKS REPLACE
AREA INSIDE FENCE SEMI-
ANNUAL
FREE OF
DEBRIS
N/A N/A REMOVE
AND
VEGETATION
DEBRIS
WELDED, FLANGED,
THREADED
CONNECTIONS
SEMI-
ANNUAL
CORROSION N/A N/A REPAIR
CRACKS REPLACE
LEAKAGE
FLOAT GAUGE SEMI-
ANNUAL
CORROSION COMPARE
TO ROTO
GAUGE
READING
QUARTERLY COMPARE TO
ROTO GAUGE
READING
CRACKS
LEAKAGE
READABLE
ROTO GAUGE SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FUNCTION
IAW TECH
ORDER.
COMPARE
REPAIR OR
REPLACE
CRACKS TO FLOAT
GAUGE.
LEAKAGE
READABLE
PRESSURE GAUGE SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
COMPARE
WITH YOUR
PRESSURE
DATA
REPLACE
(250 PSIG SERVICE) CRACKS
LEAKAGE
READABLE
TEMPERATURE
GAUGE
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
COMPARE
WITH YOUR
PRESSURE
DATA
REPLACE
CRACKS
LEAKAGE
READABLE
RELIEF VALVES IN
TANK
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
CRACKS
CLEAN AND
CLEAR
MANUAL VALVES IN
LPG LINES
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FREELY
OPENS
CLOSES
AND SEALS
REPAIR
(250 PSIG SERVICE) CRACKS REPLACE
LEAKAGE
EXCESS FLOW
VALVES LPG LINES
SEMI-
ANNUAL
CORROSION REPLACE
CRACKS
LEAKAGE
3” PROPANE FILL
LINE FROM TRUCK
SEMI-
ANNUAL
CORROSION N/A N/A REPAIR
CRACKS REPLACE
STATION
(BOLLARDS)
LEAKAGE
LABELED
2” VAPOR RETURN
LINE TO TRUCK
STATION
(BOLLARDS)
SEMI-
ANNUAL
CORROSION N/A N/A REPAIR
CRACKS REPLACE
LEAKAGE
LABELED
EMERGENCY
SHUTOFF
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FREELY
OPENS
CLOSES
AND SEALS
REPLACE
VALVES CRACKS
(250 PSIG SERVICE) LEAKAGE
PNEUMATIC
SHUTOFF VALVES
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FREELY
OPENS
CLOSES
AND SEALS
REPAIR
(250 PSIG SERVICE) CRACKS REPLACE
LEAKAGE
HYDROSTATIC
RELIEF VALVES IN
LINES
SEMI-
ANNUAL
CORROSION N/A N/A REPLACE
CRACKS
LEAKAGE
CLEAN AND
CLEAR
PROPANE LINE TO
STAND
SEMI-
ANNUAL
CORROSION N/A N/A REPAIR
CRACKS REPLACE
LEAKAGE
LABELED
FENCE SEMI-
ANNUAL
CORROSION N/A N/A REPAIR
CONDITION CLEAR
FREE OF
DEBRIS
DEBRIS
PAINT SEMI-
ANNUAL
CRACKS N/A N/A REPAIR
PEELING
FLAKING
STENCILING,
LABELING AND
MARKING
SEMI-
ANNUAL
CLEAN N/A N/A REPAIR
(PLATE DATA) READABLE
WATER
CONSERVATION
POND
INFLOW TO POND
FROM BURN AREA
SEMI-
ANNUAL
CRACKS SEMI-
ANNUAL
FREE
FLOWING
REPAIR
LEAKAGE
FREE OF
DEBRIS
OUTFLOW FROM
POND TO BURN
AREA
SEMI-
ANNUAL
CRACKS SEMI-
ANNUAL
FREE
FLOWING
REPAIR
LEAKAGE
FREE OF
DEBRIS
OUTFLOW PUMP SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FREE
FLOWING
SMOOTH
AND QUIET
RUNNING
REPAIR
CRACKS REPLACE
LEAKAGE
80 MIL LINERS SEMI-
CRACKS N/A N/A REPAIR IN
ACCORDANCE
WITH TECH
ORDER
<80 MIL LINERS TEARS
LINER NOTICE SIGN SEMI-
ANNUAL
CLEAN N/A N/A REPLACE
READABLE
FENCE SEMI-
ANNUAL
CORROSION N/A N/A REPAIR
CONDITION CLEAR
FREE OF
DEBRIS
DEBRIS
SAFETY/CONTROL
STAND
LPG MANIFOLD
SHUTOFF VALVE
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FREELY
OPENS
CLOSES
AND SEALS
REPAIR
CRACKS REPLACE
LEAKAGE
LPG MANIFOLD SEMI-
ANNUAL
CORROSION N/A N/A REPAIR
CRACKS REPLACE
LEAKAGE
LP LINES TO BURN
AREA
SEMI-
ANNUAL
CORROSION N/A N/A REPAIR
CRACKS REPLACE
LEAKAGE
BURNER CONTROL
BALL VALVES
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FEELY
OPENS
CLOSES
AND SEALS
REPAIR
CRACKS REPLACE
LEAKAGE
SOLENOID VALVES
IN LPG LINES
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
OPENS
CLOSES
SEALS
REPAIR
CRACKS NO
CHATTER
REPLACE
LEAKAGE
MOMENTARY
IGNITOR SWITCHES
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FREELY
MOVES TO
THREE
POSITIONS
REPLACE
CLEARLY
LABELED
READABLE
CONTINUOUS
IGNITOR SWITCHES
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FREELY
MOVES TO
BOTH
POSITIONS
REPLACE
CLEARLY
LABELED
READABLE
EMERGENCY
SHUTDOWN
SWITCH
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FREELY
MOVES TO
BOTH
POSITIONS
REPLACE
CLEARLY
LABELED
READABLE
HYDROSTATIC
RELIEF VALVES
SEMI-
ANNUAL
CORROSION N/A N/A REPLACE
CRACKS
LEAKAGE
CLEAN AND
CLEAR
TEMPLATE SEMI-
ANNUAL
CLEAN N/A N/A REPLACE
READABLE
VALVE LABELING SEMI-
ANNUAL
CLEAN N/A N/A REPLACE
READABLE
SWITCH LABELING SEMI-
ANNUAL
CLEAN N/A N/A REPLACE
READABLE
LPG LINE
REGULATOR
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FREELY
OPENS
CLOSES
REPLACE
CRACKS
LEAKAGE
SPRINKLER
CONTROL VALVE
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FREELY
OPENS
CLOSES
REPAIR
CRACKS REPLACE
LEAKAGE
WASHDOWN
CONTROL
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FREELY
OPENS
CLOSES
AND SEALS
REPAIR
CRACKS REPLACE
COOLING WATER
CONTROL
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FREELY
OPENS
CLOSES
AND SEALS
REPAIR
CRACKS REPLACE
LEAKAGE
244 SCF N2
BOTTLES
SEMI-
ANNUAL
SECURE IN
PLACE
SEMI-
ANNUAL
PRESSURE
AVAILABLE
500-2200
PSI
REPAIR
REPLACE
NITROGEN PILOT
VALVES
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
OPENS
CLOSES
SEALS
REPAIR
CRACKS REPLACE
N2 ACCUMULATOR SEMI-
ANNUAL BY
USER
CORROSION N/A N/A REPAIR
CRACKS REPLACE
LEAKAGE
PNEUMATIC RELIEF
VALVE
SEMI-
ANNUAL
CORROSION N/A N/A REPLACE
CRACKS
LEAKAGE
CLEAN AND
CLEAR
WARNING SIGN SEMI-
ANNUAL
CLEAR N/A N/A REPLACE
READABLE
BURN AREA WASHDOWN
HEADER
SEMI-
ANNUAL
CORROSION N/A N/A REPAIR
CRACKS REPLACE
LEAKAGE
WEIR SEMI-
CORROSION N/A N/A REPAIR
CRACKS REPLACE
LEAKAGE
AGGREGATE SEMI-
LEVEL N/A N/A LEVEL
80 MIL LINER CRACKS N/A N/A REPAIR IN
ACCORDANCE
WITH TECH
ORDER
<80 MIL LINER TEARS
LINER SIGNS SEMI-
ANNUAL
CLEAN N/A N/A REPLACE
READABLE
6” WEIR DRAIN
VALVE
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FREELY
OPENS
CLOSES
AND SEALS
REPAIR
CRACKS REPLACE
LEAKAGE
2” BURN AREA
DRAIN VALVE
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FREELY
OPENS
CLOSES
AND SEALS
REPAIR
CRACKS REPLACE
LEAKAGE
GROUND BURNERS
AND GRATES
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FULL
FLAME
REPAIR
CRACKS REPLACE
WARPED
HOLES OPEN
COAX VALVES IN
PROPANE LINES
N/A N/A SEMI-
ANNUAL
FREELY
OPENS
CLOSES
REPAIR
REPLACE
AND SEALS
DRIVE AROUND SEMI-
ANNUAL
LEVEL N/A N/A LEVEL
RUT-FREE REPAIR
DEBRIS FREE REMOVE
DEBRIS
LEAK DETECTION SEMI-
ANNUAL
CRACKS SEMI-
ANNUAL
DRY REFER TO
TECH ORDER
DUAL LINER LEAKAGE
CLEAR
AIRCRAFT MOCK-
UP
ENGINE BURNERS SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FULL
FLAME
REPAIR
CRACKS REPLACE
WARPED
HOLES OPEN
WING ENGINE
RUNNING FUEL
PLUMBING
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
N/A REPAIR
CRACKS
LEAKAGE
CLEAN AND
CLEAR
IGNITOR COOLING
JACKETS
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
CHECK
WATER
FLOW
REPAIR
CRACKS
LEAKAGE
CLEAN AND
CLEAR
WHEEL WELL
BURNER
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FULL
FLAME
REPAIR
CRACKS REPLACE
WARPED
HOLES OPEN
INTERIOR (BOTTOM
UNDER DECKING)
SEMI-
ANNUAL
VISUALLY
VERIFY
N/A N/A CLEAN IF
BLOCKED
ALL DRAIN REPLACE
HOLES OPEN
APU BURNER SEMI-
CORROSION SEMI-
ANNUAL
FULL
FLAME
REPAIR
CRACKS REPLACE
WARPED
HOLES OPEN
FLIGHT DECK
BURNER
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FULL
FLAME
REPAIR
CRACKS REPLACE
WARPED
HOLES OPEN
BATTERY BURNER SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FULL
FLAME
REPAIR
CRACKS REPLACE
WARPED
HOLES OPEN
PASSENGER
BURNER
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FULL
FLAME
REPAIR
CRACKS REPLACE
WARPED
HOLES OPEN
CARGO BURNER SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
FULL
FLAME
REPAIR
CRACKS REPLACE
WARPED
HEADS
SPRINKLER SYSTEM SEMI-
CORROSION SEMI-
ANNUAL
ALL HEADS REPAIR
CRACKS FULL FLOW REPLACE
WARPED
HEADS
EXPANSION JOINT
BOLTS
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
MAKE SURE
FINGER
TIGHT
REPAIR
REPLACE
MOCK-UP WELDS &
SURFACES
SEMI-
ANNUAL
CORROSION N/A N/A REPAIR
CRACKS REPLACE
WARPED
IGNITION CH31723/CH31615/ SEMI-
ANNUAL
CRACKS SEMI-
ANNUAL
CRISP
SPARK
REPLACE
CH31917 IGNITORS CLEAN AIR
GAP
CH20485 PIGTAILS N/A N/A SEMI-
ANNUAL
CRISP
SPARK
REPLACE
CHAMPION SPLICES N/A N/A SEMI-
ANNUAL
CRISP
SPARK
REPLACE
M3702-
U5MC/U7MC
IGNITION CABLES
N/A NA SEMI-
ANNUAL
CRISP
SPARK
REPLACE
110V PRIMARY;10kV, 23
MA SECONDARY
TRANSFORMER
SEMI-
ANNUAL
CORROSION SEMI-
ANNUAL
CRISP
SPARK
REPAIR
CABLE REPLACE
CONNECTION
INSPECTED BY DATE
LP GAS STORAGE INSPECTION CHECKLIST FOR STORAGE CONTAINERS
CONSTRUCTION-CODE COMPLIANCE YES NO COMMENTS
CHECK FOR MANUFACTURER'S DATA
PLATE. IS IT SECURELY ATTATCHED AND
LEGIBLE?
CONDITION OF CONTAINER AND PAINT
ARE ABOVE-GROUND CONTAINERS
PROPERLY PAINTED?
ARE CONTAINER FREE OF CORROSION
DAMAGE, DENTS, GOUGES, OR OTHER
DAMAGE?
FOUNDATIONS
ARE FOUNDATIONS IN GOOD CONDITION?
ARE FOOTINGS FREE OF SETTLING WHICH
MIGHT CAUSE MISALIGNMENT?
ARE CONTAINERS FREE OF CORROSION AT
MASONARY CONTACT AREAS?
ARE SADDLE PADS IN GOOD CONDITION?
CONTAINER CONNECTIONS
HAVE EXCESS FLOW AND BACK FLOW
CHECK VALVES BEEN RECENTLY CHECKED
FOR PROPER OPERATION?
TANK FITTINGS
ARE ALL ACME (OR OTHER TYPE)
CONNECTORS IN GOOD CONDITION WITH
GOOD GASKETS AND ARE THEY PLUGGED
OR CAPPED? (SEE NPGA BULLETIN #134
"CARE AND INSPECTION OF ACME
THREADED HOSE COUPLINGS."
ARE ALL UNUSED OPENING PLUGGED OR
CAPPED?
ARE ALL FITTINGS LEAK FREE?
GAUGES
ARE PRESSURE GAUGES IN GOOD
CONDITION AND ARE THEY SUITABLE FOR
250 PSIG SERVICE (SUCH AS 0-400 PSIG)?
ARE THERMOMETERS IN GOOD CONDITION
AND CHECKED FOR ACCURACY?
ARE LIQUID LEVEL GAUGING DEVICES
APPROVED FOR THE SERVICE INVOLVED IN
GOOD CONDITION?
PRESSURE RELIEF VALVES
IS RELIEF VALVE DATA LEGIBLE?
DO RELIEF VALVES OR VENT STACKS HAVE
PROTECTIVE CAPS OR CLOSURES TO
PREVENT ENTRY OF FOREIGN MATTER?
ARE WEEP HOLES FOR MOISTURE DRAIN
OPEN AND IS GAS IMPINGEMENT ON THE
CONTAINER PREVENTED?
ARE RELIEF VALVES LESS THAN 10 YEARS
OLD?
DOES EXTERNAL VISUAL INSPECTION LOOK
FREE OF CORROSION OR OBSTRUCTION?
SHUT OFF VALVES
ARE VALVES IN GOOD CONDITION AND DO
THEY SHUTOFF TIGHT?
PRESENCE OF COMBUSTIBLES
IS THE AREA WITHIN 10 FT OF THE
CONTAINERS FREE OF WEEDS, LONG GRASS,
RAGS, PAPER, WOOD OR OTHER
COMBUSTIBLE DEBRIS?
CHECKED BY: DATE:
LP GAS BULK STORAGE INSPECTION CHECKLIST FOR PLAN AND
TRANSFER PIPING
PIPE YES NO COMMENTS
ARE ALL CONNECTIONS LEAK TIGHT?
VALVES
ARE VALVES IN GOOD WORKING ORDER?
DO SEATS SHUT OFF TIGHT?
IS PACKING FREE OF LEAKS?
ARE NECESSARY VALVE HANDLERS
AVAILIABLE AT THE VALVE LOCATION?
HYDROSTATIC RELIEF VALVES
ARE THEY FITTED WITH PROTECTIVE CAPS?
TRANSFER AREAS
ARE ANY NECESSARY TRANSFER
INSTRUCTIONS AVAILIABLE?
PUMPS AND COMPRESSORS
IS THE BY-PASS PROPERLY SET AND
FUNCTIONAL?
ARE DRIVE BELTS OR COUPLINGS
PROTECTED BY SUITABLE GUARDS?
IS COMPRESSOR CRANK CASE OIL AT
PROPER LEVEL?
ELECTRICAL EQUIPMENT
DO ALL SWITCHES, ETC. FUNCTION
PROPERLY?
ARE ALL HOUSINGS PROPERLY ASSEMBLED
TO MAINTAIN SEAL?
CHECKED BY: DATE:
Table 2
1.2.6. This contract does not include replacement of major components not included in the parts kit. A report, scope of work, and price will be developed for any deficiencies and necessary repairs noted during the ITM process.
1.2.7. A written report shall be furnished to the Base Civil Engineer indicating the maintenance actions accomplished, any deficiencies identified, any item requiring repairs outside the ITM process, and an assessment of the operational condition of the system. Copies of the report shall be forwarded to the MAJCOM representative and to HQ AFCESA/CESM. Additional reports will be provided to additional contacts upon request.
1.2.7.1. System shall be identified as either:
Operational – Fully functional.
Impaired – May not function as intended.
Marginal – Will not operate without some manual action not normally required.
Compromised/out of service – Will not function.
1.2.7.2. Reports may be on unique contractor developed standard forms or standard fire protection industry provided they cover all the required tasks in Technical Order 35E1-2-13-1. All the forms used for a specified system must be the same.
1.2.8. Any company providing these services shall have on staff or under contract a registered Fire Protection engineer for the entire award period. Personnel providing these services must have experience maintaining complex fire trainers including propane systems and pumping systems. If requested by the Government, the contractor must provide requested certifications and/or demonstrated history/experience for personnel performing services on this contract.
3.0 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0800-1700 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Government technical representative will notify the contractor personnel when the base will be closed. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
3.1 Recognized Holidays: The contractor is not to perform services on the below holidays unless pre-cordination with the government QAE is obtained.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
4.0 Place of Performance: The work to be performed under this contract will be performed at the aircraft fire training pit located at facility number 993 on the flightline across from the fire department.
5.0 Security Requirements: Contractor must comply with the security requirements identified in AFFARS 5352.242-9000, Contractor Access to Air Force Installations and the Local Base Entry Procedures identified in the contract clauses.
6.0 Special Qualifications: Certification maintaining complex fire trainers including propane and pumping systems. Provide demonstrated history and experience performing these services.
7.0 Periodic Meetings: As appropriate, the Contractor may be required to attend periodic meetings in performance of this contract. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
8.0 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
9.0 DELIVERABLES
Deliverable Frequency Medium/Format Submit To ITM report in the SOW paragraph 1.2.7.
Within 30 days of the quarterly maintenance performed.
Word Document or Excel
Fire Emergency Service, Building 998, fire department, 14CES/CEF, (662)
434-2270